CN108130973A - Big panel Integral ceiling - Google Patents

Big panel Integral ceiling Download PDF

Info

Publication number
CN108130973A
CN108130973A CN201711371822.0A CN201711371822A CN108130973A CN 108130973 A CN108130973 A CN 108130973A CN 201711371822 A CN201711371822 A CN 201711371822A CN 108130973 A CN108130973 A CN 108130973A
Authority
CN
China
Prior art keywords
integral ceiling
longeron
crossbeam
big panel
ceiling according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711371822.0A
Other languages
Chinese (zh)
Inventor
沈明
肖鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aupu Home Style Corp Ltd
Original Assignee
Aupu Home Style Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aupu Home Style Corp Ltd filed Critical Aupu Home Style Corp Ltd
Priority to CN201711371822.0A priority Critical patent/CN108130973A/en
Publication of CN108130973A publication Critical patent/CN108130973A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/225Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like hanging at a distance below the supporting construction

Abstract

The invention discloses a kind of big panel Integral ceilings, belong to fitting-up technology, existing aluminum-pinch, plaster tablet suspended ceiling are difficult to take into account that appearance is clean and tidy, electrical maintenance is convenient simultaneously, installation period is shorter, crossbeam and longeron are perpendicularly formed mounting bracket by the present invention with the main connector assembling, decoration top surface is mounted stent and is divided into several panel installation regions, and panel is mounted on panel installation region, and electric mounting position is set on crossbeam or/and longeron for installing electric appliance;Relative to the aluminum-pinch or plasterboard of the prior art, which has the area of bigger, and the structure of mounting bracket is more simple so that entire Integral ceiling simple installation, quick, the period is short;The appearance of entire Integral ceiling is clean and tidy, air;Electrical maintenance is convenient.

Description

Big panel Integral ceiling
Technical field
The invention belongs to fitting-up technologies, and in particular to a kind of big panel Integral ceiling.
Background technology
Two kinds of installation sides of the aluminum-pinch of Integral ceiling generally use size module or the plasterboard of overall performance at present Method.The first aluminum-pinch installation method:Triangular keel is installed at top, then aluminum-pinch is tipped upside down on triangular keel, aluminum-pinch Generally there are 30cm × 30cm, 45cm × 45cm, 60cm × 60cm equal-specifications, appliance panel is also these specifications accordingly, and one A complete furred ceiling face needs many pieces of aluminum-pinch or appliance panel to form, therefore furred ceiling face overall appearance is scrappy;Second Gypsum method of plate installation:Several block gypsum plates successively install, and then stitching portion carries out U.S. seam processing, and reflected is monoblock Furred ceiling, since furred ceiling is an entirety, the electric appliance inside furred ceiling during repair to just occur difficulty.Above two knot The furred ceiling of configuration formula generally will install keel during installation according to the dimensions of buckle, when the aluminum-pinch of the first is such as installed, It needs to keep the spacing corresponding to aluminum-pinch dimensions between triangular keel, so that aluminum-pinch can be buckled to mounted on delta queue On bone, if there are errors for spacing, then being squeezed deformation after being installed in the presence of installation buckle difficulty or buckle makes entire furred ceiling face It is not smooth enough, and when installing plasterboard, it needs that wooden keel are installed for fixed plasterboard to be consolidated plasterboard with fastener It is scheduled on wooden keel, in other words, the furred ceiling of existing structure is to install keel according to the dimensions of buckle, for shape Irregular decoration top surface, there are bigger difficulties for installation.Therefore, can show furred ceiling entirety cleaning can facilitate electrical maintenance again Installation of ceiling method is our problem to be solved.
Invention content
The technical problem to be solved in the present invention and the technical assignment proposed are that existing aluminum-pinch, plaster tablet suspended ceiling is overcome to be difficult to It takes into account that appearance is clean and tidy, electrical maintenance is convenient, while ensures the defects of installation period is shorter simultaneously, a kind of big panel is provided integrates and hang Top.
In order to achieve the above objectives, big panel Integral ceiling of the invention, it is characterized in that including:
Crossbeam sets the first carrying side thereon;
Longeron sets the second carrying side thereon;
Main connector, the crossbeam perpendicularly assemble with the main connector with longeron and form mounting bracket, and described first Carrying while, second carrying while be generally aligned in the same plane, decoration top surface several panel installation regions are divided by the mounting bracket;
Sunpender connect the main connector for lifting described with the main connector;
Auxiliary connector is assemblied in the crossbeam, the end of longeron is used to fixing the end of the crossbeam, the end of longeron;
Linea angulata is used to be mounted on the edge of decoration top surface;
Panel, is mounted on the panel installation region, and edge is by described first carrying in, the second carrying, linea angulata In at least two carryings;
Electric mounting position is set on the crossbeam or/and longeron.
As optimization technique means:The crossbeam or/and longeron is made of two parallel beam bodies, and described two parallel Beam body by the main connector, auxiliary connector keep spacing form the first electric mounting position.
As optimization technique means:The electric appliance of the first electric mounting position installation includes tuyere assembly, LED lamp panel group At least one of part, grid.
As optimization technique means:The electric appliance of described first electric mounting position installation passes through the electric appliance card that is set on electric appliance Edge fit is connected in the beam body.
As optimization technique means:The beam body is made of triangular keel and the assembling of the first section bar, first type Set the first carrying side on material, triangular keel tool there are one top surface and bends out from the edge of the top surface Two symmetrical gripper edges, electric appliance clamping checkpost are connected between described two symmetrical gripper edges.
As optimization technique means:The first link slot is set on first section bar, first link slot is built-in with spiral shell Bolt, the bolt are fastenedly connected with the main connector, auxiliary connector.
As optimization technique means:The first section bar clamping side is set on first section bar and helps slot, described first Section bar clamping checkpost is connected between two symmetrical gripper edges of the triangular keel, and the top surface of the triangular keel is positioned at described Support slot in.
As optimization technique means:The crossbeam or/and longeron is made of the second section bar, and is set on second section bar Two electric mounting positions.
As optimization technique means:The electric appliance of the second electric mounting position installation is for light bar or lamp string and for being provide with The translucent cover of the light bar or lamp string.
As optimization technique means:The translucent cover is clamped checkpost by cover body and is connected on second electric mounting Position.
As optimization technique means:The second electric mounting position is card slot.
As optimization technique means:The second link slot is set on second section bar, second link slot is built-in with spiral shell Bolt, the bolt are fastenedly connected with the main connector, auxiliary connector.
As optimization technique means:The crossbeam is made of two parallel beam bodies, two parallel beam bodies by The main connector, auxiliary connector keep spacing to form the first electric mounting position;The longeron is made of the second section bar, institute It states and the second electric mounting position is set on the second section bar.
As optimization technique means:The main connector is made of connecting plate and lifting portion, is set on the connecting plate There is bolt penetration hole, the upside of the connecting plate is fixed in the lifting portion.
As optimization technique means:The auxiliary connector is angle connector.
As optimization technique means:The crossbeam, longeron be " T " shape or "+" shape arrangement.
Crossbeam and longeron are perpendicularly formed mounting bracket by the present invention with the main connector assembling, and decoration top surface is mounted Stent is divided into several panel installation regions, and panel is mounted on panel installation region, electric mounting position is set on crossbeam or/and longeron For installing electric appliance;Relative to the aluminum-pinch or plasterboard of the prior art, which has the area of bigger, mounting bracket Structure is more simple so that entire Integral ceiling simple installation, quick, the period is short;The appearance of entire Integral ceiling is clean and tidy, big Gas;Electrical maintenance is convenient.
Moreover, the big panel Integral ceiling of the present invention, first by assembling mounting bracket during installation, after mounting bracket is installed Panel is installed again, therefore is the size that panel is determined by mounting bracket, and each panel installation region is independent, it is only necessary to Cut one piece of panel of installation respectively in each independent panel installation region, shape, the specification of panel are easily tailored and easily Be not in the situation of extrusion after installation in amendment.Description of the drawings
Fig. 1 is a kind of structure diagram of the big panel Integral ceiling of the present invention;
Fig. 2 is the schematic diagram of mounting bracket shown in installation diagram 1;
Fig. 3 is the installation condition schematic diagram of the big panel Integral ceiling of the present invention;
Fig. 4 is the structure diagram of the crossbeam of the present invention;
Fig. 5 is the structure diagram of the longeron of the present invention;
Fig. 6 is the structure diagram of the main connector of the present invention;
Fig. 7 is a kind of structure diagram of the auxiliary connector of the present invention;
Fig. 8 is another structure diagram of the auxiliary connector of the present invention;
Fig. 9 is the structure diagram of the tuyere assembly of the present invention;
Figure 10 is the structure diagram of the LED lamp panel component of the present invention;
Figure 11 is the structure diagram of the grid of the present invention;
Figure 12 is the auxiliary connector of the present invention and the schematic diagram of longeron assembling;
Figure 13 is the sectional schematic diagram of the crossbeam of the present invention;
Figure 14 is the main connector of the present invention by the vertically-mounted schematic diagram of crossbeam, longeron;
Figure 15 is the schematic diagram of auxiliary connector, grid and the crossbeam assembling of the present invention;
The schematic diagram of second of mounting bracket that Figure 16 is assembled into for crossbeam, the longeron of the present invention;
Figure 17 is the schematic diagram that the third big panel Integral ceiling that panel is formed is installed in the mounting bracket shown in Figure 16;
Figure 18 is the schematic diagram of the 4th kind big panel Integral ceiling of the present invention;
Figure 19 is the schematic diagram of the 5th kind big panel Integral ceiling of the present invention;
Figure 20 is the schematic diagram of the 6th kind big panel Integral ceiling of the present invention;
Figure 21 is the schematic diagram of the 7th kind big panel Integral ceiling of the present invention;
Figure label explanation:
100- crossbeams, 101- first carry side, 102- beam bodies, the first electric mountings of 103- position, 104- triangular keels, 105- tops Face, 106- gripper edges, the first section bars of 107-, the first link slots of 108-, the first section bars of 109- clamping side, 110- help slot;
200- longerons, 201- second carry side, the second electric mountings of 202- position, the second link slots of 203-;
The main connectors of 300-, 301- connecting plates, 302- liftings portion, 303- bolt penetration holes;
400- sunpenders;
501st, the auxiliary connectors of 502-;
600- linea angulatas;
700- panels;
801- tuyere assemblies, 802-LED lamp plate components, 803- grids, 804- electric appliances clamping side, 805- light bar, 806- translucent covers, 807- cover bodies are clamped side;
900- bolts;
WL- walls.
Specific embodiment
Below in conjunction with Figure of description, the present invention will be further described.
As shown in Fig. 1-3, Figure 16-17, Figure 18-21, big panel Integral ceiling of the invention, it is characterized in that including:
Crossbeam 100 sets the first carrying side 101 thereon(Referring to Fig. 4, Figure 13);
Longeron 200 sets the second carrying side 201 thereon(Referring to Fig. 5, Figure 12);
Main connector 300(Referring to Fig. 6), crossbeam 100 and longeron 200 perpendicularly form installation with the main assembling of connector 300 Stent(Referring to Figure 14), the first carrying 201 is generally aligned in the same plane when 101, second carries, and decoration top surface is mounted stent segmentation For several panel installation regions;Specific crossbeam, longeron are " T " shape or "+" shape is assembled with main connector, it is possible thereby to structure Into the mounting bracket of multiple structural forms, the " # " shape shown in "+" shape as shown in Figs. 1-3, Figure 16-17, " T " shown in Figure 18 It is double "T"-shaped, symmetrical double "T"-shaped etc. shown in Figure 21 shown in double "+" shapes, Figure 20 shown in shape, Figure 19;Such as Fig. 6 institutes Show, main connector is made of connecting plate and lifting portion, and connecting plate is equipped with bolt penetration hole for wearing bolts assemblies crossbeam, indulging The upside of connecting plate is fixed on for connecting sunpender in beam, lifting portion, connecting plate therein as the benchmark for assembling crossbeam, longeron, So that the assembling of crossbeam and longeron is more convenient accurate so that entire furred ceiling face is neatly smooth;
Sunpender 400(Referring to Fig. 6), it is connect with main connector 300 for lifting main connector, sunpender is generally fixed to top On roof;Sunpender can be connected through a screw thread with main connector, to adjust;
Auxiliary connector 501,502 is assemblied in the end of crossbeam 100, longeron 200 for the end of fixed cross beam, the end of longeron Portion, auxiliary connector are generally fixed on wall WL;Auxiliary connector is angle connector, specific there are two types of structure type, one is Fig. 7 institutes Show the larger structure of width, this to be suitable for the larger crossbeam of installation cross-sectional width, another kind is the smaller knot of width shown in Fig. 8 Structure, it is this to be suitable for the installation smaller longeron of cross-sectional width;
Linea angulata 600 is used to be mounted on the edge of decoration top surface, for support panel, blocks gap, therefore its section can be Various shapes;
Panel 700, is mounted on panel installation region, and edge is by the first carrying in, the second carrying, at least two in linea angulata Kind carrying;It, can be convenient according to demand since panel installation region is to be split to form by mounting bracket by top surface is decorated Ratio between the size of setting each region and each region, and relative to the prior art, panel installation region is more than existing Aluminum-pinch, the plasterboard of technology, "+" shape mounting bracket as shown in Figs. 1-3 are divided into four panel installing zones by top surface is decorated " # " shape mounting bracket shown in domain, Figure 16-17 will decorate top surface and be divided into nine panel installation regions, "T"-shaped shown in Figure 18 Mounting bracket will decorate top surface and be divided into three panel installation regions, double "+" shape mounting brackets shown in Figure 19 that will decorate top surface It is divided into six panel installation regions, double "T"-shaped mounting brackets shown in Figure 20 that will decorate top surface and is divided into four panels installations Symmetrical double "T"-shaped mounting brackets shown in region, Figure 21 are divided into five panel installation regions by top surface is decorated;The face Plate, however it is not limited to which pure decorative panel, when specific implementation may be other shapes or the plate-like component with certain function (Such as LED lamp panel);When selecting decorative panel, can preferred aluminum cellular board of lightweight etc., for beauty, can also increase in panel surface If decorative coveringn etc.;
Electric mounting position is set on crossbeam or/and longeron for installing electric appliance.
Crossbeam, the longeron of the present invention, is only opposite definition, when the beam for determining a direction is crossbeam, then perpendicular to horizontal stroke The beam of beam is longeron.
The big panel Integral ceiling, the parts formed after to decompose in the form of packing and selling, implement assembling at the scene Installation.
Specifically, referring to Fig. 4, Figure 15, it is illustrated that crossbeam 100 be made of two parallel beam bodies 102, two parallel beams Body keeps spacing to form the first electric mounting position 103 by main connector 300, auxiliary connector 501.
The electric appliance of first electric mounting position 103 installation includes tuyere assembly 801(Referring to Fig. 9), LED lamp panel component 802(Ginseng See Figure 10), grid 803(Referring to Figure 11, Figure 15)At least one of, it, can be by tuyere assembly, LED lamp panel for neat appearance Component, grid, which have combined, fills up electric mounting position.
The electric appliance of first electric mounting position 103 installation is clamped side 804 by the electric appliance being set on electric appliance and is connected in beam body. Referring to Figure 13, in order to realize clamping, beam body 102 is made of triangular keel 104 and the assembling of the first section bar 107, on the first section bar 107 If the first carrying side 101, the tool of triangular keel 104 bend out there are one top surface 105 and from the edge of top surface two are symmetrical Gripper edge 106, electric appliance clamping checkpost are connected between two symmetrical gripper edges.
It is installed for the ease of assembling, sets the first link slot 108 on the first section bar 107, the first link slot 108 is built-in with bolt 900, bolt 900 is fastenedly connected with main connector 300, auxiliary connector 501.During Assembling, by the head of bolt 900(Such as six Angle head)It is placed in the first link slot 108, it is convenient and efficient by the bar portion of bolt with being fastenedly connected with main connector, auxiliary connector.
Referring to Figure 13, in order to which 104 and first section bar 107 of triangular keel is enabled to assemble reliable assembling, the is set on the first section bar 107 One section bar is clamped side 109 and helps slot 110, and the first section bar clamping side 109 is connected to two symmetrical gripper edges of triangular keel Between 106, the top surface 105 of triangular keel, which is located at, to be helped in slot 110, so that triangular keel and the first section bar formation one are whole Body.
Referring to Fig. 5, Figure 12, it is illustrated that longeron 200 be made of the second section bar, the second electric mounting position is set on the second section bar 201.The electric appliance of second electric mounting position 201 installation is light bar 805 or lamp string and the translucent cover for being provide with light bar or lamp string 806.Translucent cover 806 is clamped side 807 by cover body and is connected to the second electric mounting position.For the ease of installation light bar or lamp string and Translucent cover, the second electric mounting position are card slot.
Referring to Fig. 5, Figure 12, for the ease of being linked and packed with main connector, auxiliary connector, the second connection is set on the second section bar Slot 203, the second link slot are built-in with bolt 900, and bolt is fastenedly connected with main connector, auxiliary connector.During Assembling, by spiral shell The head of bolt(Such as turret head)It is placed in the second link slot, by the bar portion of bolt with being fastenedly connected with main connector, auxiliary connector, It is convenient and efficient.
Crossbeam is explained above, longeron uses the situation of different structure form, when it is implemented, crossbeam and longeron can be by Two parallel beam body compositions, two parallel beam bodies keep spacing to form the first electric mounting by main connector, auxiliary connector Position or crossbeam, longeron are made of the second section bar, and the second electric mounting position is set on the second section bar.
Moreover, according to demand, also can electric appliance only be installed on crossbeam or longeron.
When the big panel Integral ceiling is installed:Crossbeam, longeron are vertically first assembled into mounting bracket with main connector;It connects It, the electric appliance such as components such as tuyere assembly, LED lamp panel component and grid is buckled in the triangular keel of crossbeam successively according to design requirement On;Auxiliary connector is separately fixed to the end of crossbeam, longeron by bolt again;Then main connector is lifted on by sunpender Roof fixes auxiliary connector on the wall, that is, completes the installation to mounting bracket;It, can be successively after mounting bracket installation fixes Panel is installed;Then light bar or lamp string and translucent cover are packed into longeron;Finally install linea angulata successively again;Entire big surface plate collection It is completed into installation of ceiling.Therebetween, to the installation of electric appliance such as tuyere assembly, LED lamp panel component and grid etc., installation branch can be completed After the assembling of frame, install in real time;Further, since crossbeam, longeron intersect vertically at main connector, therefore one of needs are cut It is disconnected, crossbeam or longeron specifically can be blocked according to demand during installation, if longeron is not truncated, then whole can be installed in longeron Light bar if longeron is truncated, can install a light bar respectively in the longeron blocked, the crossbeam or longeron not being truncated, The rigidity and intensity of mounting bracket can be increased.The installation process is only a kind of installation side of big panel Integral ceiling of the invention Formula is not construed as limiting the scope of the invention.

Claims (16)

1. big panel Integral ceiling, it is characterized in that including:
Crossbeam(100), the first carrying side is set thereon(101);
Longeron(200), the second carrying side is set thereon(201);
Main connector(300), the crossbeam perpendicularly forms mounting bracket with longeron with the main connector assembling, described First carrying is generally aligned in the same plane in, the second carrying, and decoration top surface is divided into several panels by the mounting bracket and installs Region;
Sunpender(400), the main connector for lifting described is connect with the main connector;
Auxiliary connector(501、502), it is assemblied in the crossbeam, the end of longeron is used to fix end, the longeron of the crossbeam End;
Linea angulata(600), it is used to be mounted on the edge for decorating top surface;
Panel(700), be mounted on the panel installation region, edge by described first carrying in, the second carrying, At least two carryings in linea angulata;
Electric mounting position is set on the crossbeam or/and longeron.
2. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam or/and longeron is flat by two Capable beam body(102)Composition, two parallel beam bodies keep spacing to form first by the main connector, auxiliary connector Electric mounting position(103).
3. big panel Integral ceiling according to claim 2, it is characterized in that:The first electric mounting position(103)Peace The electric appliance of dress includes tuyere assembly(801), LED lamp panel component(802), grid(803)At least one of.
4. big panel Integral ceiling according to claim 3, it is characterized in that:The first electric mounting position(103)Peace The electric appliance of dress is clamped side by the electric appliance being set on electric appliance(804)It is connected in the beam body.
5. big panel Integral ceiling according to claim 4, it is characterized in that:The beam body(102)By triangular keel (104)With the first section bar(105)Assembling is formed, first section bar(107)On set the first carrying side(101), institute The triangular keel stated(104)There are one top surfaces for tool(105)And two symmetrical clampings for bending out from the edge of the top surface Side(106), described electric appliance clamping side(804)It is connected to described two symmetrical gripper edges(106)Between.
6. big panel Integral ceiling according to claim 5, it is characterized in that:The first link slot is set on first section bar (108), first link slot(108)Bolt is built-in with, the bolt connects with the main connector, the fastening of auxiliary connector It connects.
7. big panel Integral ceiling according to claim 5, it is characterized in that:The first section bar card is set on first section bar Edge fit(109)And help slot(110), described first section bar clamping side(109)Be connected to the triangular keel two are symmetrical Gripper edge(106)Between, the top surface of the triangular keel(105)Positioned at the support slot(110)It is interior.
8. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam or/and longeron are by Second-Type Material is formed, and the second electric mounting position is set on second section bar(202).
9. big panel Integral ceiling according to claim 8, it is characterized in that:The second electric mounting position(202)Peace The electric appliance of dress is light bar(805)Or lamp string and the translucent cover for being provide with the light bar or lamp string(806).
10. big panel Integral ceiling according to claim 9, it is characterized in that:The translucent cover(806)Pass through cover body card Edge fit(807)It is connected to the second electric mounting position(202).
11. big panel Integral ceiling according to claim 8, it is characterized in that:The second electric mounting position(202)For Card slot.
12. big panel Integral ceiling according to claim 8, it is characterized in that:The second connection is set on second section bar Slot(203), second link slot is built-in with bolt, and the bolt is fastenedly connected with the main connector, auxiliary connector.
13. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam is by two parallel beam bodies Composition, two parallel beam bodies keep spacing to form the first electric mounting position by the main connector, auxiliary connector;Institute The longeron stated is made of the second section bar, and the second electric mounting position is set on second section bar.
14. big panel Integral ceiling according to claim 1, it is characterized in that:The main connector(300)By connecting plate (301)And lifting portion(302)It forms, the connecting plate is equipped with bolt penetration hole(303), the lifting portion is fixed on described The upside of connecting plate.
15. big panel Integral ceiling according to claim 1, it is characterized in that:The auxiliary connector is angle connector.
16. big panel Integral ceiling according to claim 1, it is characterized in that:The crossbeam, longeron it is " T " shape or "+" shape is arranged.
CN201711371822.0A 2017-12-19 2017-12-19 Big panel Integral ceiling Pending CN108130973A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711371822.0A CN108130973A (en) 2017-12-19 2017-12-19 Big panel Integral ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711371822.0A CN108130973A (en) 2017-12-19 2017-12-19 Big panel Integral ceiling

Publications (1)

Publication Number Publication Date
CN108130973A true CN108130973A (en) 2018-06-08

Family

ID=62390534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711371822.0A Pending CN108130973A (en) 2017-12-19 2017-12-19 Big panel Integral ceiling

Country Status (1)

Country Link
CN (1) CN108130973A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040159064A1 (en) * 2003-02-13 2004-08-19 Kabushiki Kaisha Okumura Seisakusho Connecting mechanism for ceiling panel supporting stringers
CN200985577Y (en) * 2006-12-07 2007-12-05 时沈祥 Horizontal inserted type panel installation beam
CN102518245A (en) * 2011-12-20 2012-06-27 杭州奥普卫厨科技有限公司 Freely combinable decoration beam
CN102900193A (en) * 2011-07-25 2013-01-30 佛山市利铭蜂窝复合材料有限公司 Cellular board ceiling system
CN103806586A (en) * 2014-01-22 2014-05-21 昆山协多利金属有限公司 Keel for lamp

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040159064A1 (en) * 2003-02-13 2004-08-19 Kabushiki Kaisha Okumura Seisakusho Connecting mechanism for ceiling panel supporting stringers
CN200985577Y (en) * 2006-12-07 2007-12-05 时沈祥 Horizontal inserted type panel installation beam
CN102900193A (en) * 2011-07-25 2013-01-30 佛山市利铭蜂窝复合材料有限公司 Cellular board ceiling system
CN102518245A (en) * 2011-12-20 2012-06-27 杭州奥普卫厨科技有限公司 Freely combinable decoration beam
CN103806586A (en) * 2014-01-22 2014-05-21 昆山协多利金属有限公司 Keel for lamp

Similar Documents

Publication Publication Date Title
WO2015073907A2 (en) Light art seam effects and hardware background
CN110000524A (en) A kind of universal Sheet-metal machine box and its processing technology
CN207609078U (en) Big panel Integral ceiling
CN107630534B (en) A kind of modularization decoration panel and its installation method
CN108130973A (en) Big panel Integral ceiling
CN112554470A (en) Modular-assembly decorative surface decorative plate structure and mounting method thereof
CN201474134U (en) keel and suspended ceiling
CN210717168U (en) Section bar lamp
CN103759173B (en) Starlight lamp and starlight lamp module
CN102776999A (en) Large-area luminous ceiling
CN107116950B (en) A kind of the socket connection structure and its installation method of three-dimensional art ornament
CN206971640U (en) A kind of decoration board mounting structure
CN207406225U (en) A kind of hollow glass interior decoration structure
CN202542643U (en) Decoration suspended ceiling of elevator car
CN203734027U (en) Panel structure
CN216952730U (en) Curtain wall lamp
CN201411849Y (en) Metallic roof ceiling system
CN108253329B (en) Light-emitting lamp strip for transparent screen
CN209990005U (en) Joint formula keel structure
CN214696566U (en) Modular assembly's veneer decorative board structure
CN104481098B (en) The structural member of assembly type furred ceiling
CN210291485U (en) Flexible lamp strip convenient to clamp
CN218911938U (en) Assembled smallpox structure
KR200408096Y1 (en) Illumination Ornamentals
CN218060954U (en) Light trough keel for assembled ceiling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination