CN207601845U - A kind of supervising service major tasks information management system - Google Patents
A kind of supervising service major tasks information management system Download PDFInfo
- Publication number
- CN207601845U CN207601845U CN201721243042.3U CN201721243042U CN207601845U CN 207601845 U CN207601845 U CN 207601845U CN 201721243042 U CN201721243042 U CN 201721243042U CN 207601845 U CN207601845 U CN 207601845U
- Authority
- CN
- China
- Prior art keywords
- module
- information
- unit
- project
- storage unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses a kind of supervising service major tasks information management systems,Including sequentially connected information acquisition module,Processing module and output module,Information acquisition module includes scanner,Audio frequency and video collector,Scanner,Audio frequency and video collector is connect by Digital Transmission device with processing module,Processing module includes Data Analysis Services unit and screening unit and storage unit,Data Analysis Services unit classifies the information that information acquisition module acquires by the single engineering project of project supervision,Memory cell contains the supervising service major tasks classification of construction project different phase and work in every guides,The database of standard,Data Analysis Services unit is transmitted the information come and is compared with the database in storage unit by screening unit,Extraction meets the related data for transmitting information,Storage unit is also connect with output module,The utility model solve management in the prior art be difficult to it is scientific,The problem of standardization and standardization.
Description
Technical field
The utility model belongs to engineering inspection & management service platform technology field, and in particular to a kind of supervising service major tasks letter
Cease management system.
Background technology
At present, China's project management enterprises have more than 7,000 families, and Supervision Enterprise quantity is more, and practitioner's quality is irregular,
In addition management has specification without standard, causes that management is scientific, standardization degree is poor, based on this, rely on it is information-based, it is real
The scientific of existing management, standardization and standardization are trends of the times.
On the one hand management has the legal liabilities that laws and regulations assign management, on the other hand, as construction market
Responsible party wants the burden of contractr and obligation, the diversity of management role and the complexity of work, often results in management
Specific aim is not strong, and deeply degree is inadequate, especially in construction quality safety accident, for management not fulfilling, not as sound not
Disconnected, the criminal responsibility that accident will seriously investigate Supervision Enterprise and personnel causes great risk to the personnel of enterprise therefrom.
In conventional management, supervisor is checked and is checked and accepted according to codes and standards, but due to reference according to
According to lengthy and tedious complexity, supervisor is needed to consult repeatedly, contained much information, checked or the course of receiving is often not comprehensive enough, existed certain
Careless omission.
It is big by supervisor's interference caused by subjective factors that opinion is checked and accepted in management, scientific, adequacy is insufficient, so as to influencing to check and
The accuracy of check and acceptance result.
Utility model content
The purpose of this utility model is to provide a kind of supervising service major tasks information management system, solves the prior art
Present in management be difficult to it is scientific, standardization and standardization the problem of.
The utility model the technical scheme adopted is that a kind of supervising service major tasks information management system, including according to
Information acquisition module, processing module and the output module of secondary connection.
The utility model is also characterized by
Information acquisition module includes scanner, audio frequency and video collector, and scanner, audio frequency and video collector are passed by number
Defeated device is connect with processing module.
Processing module includes Data Analysis Services unit and screening unit and storage unit, and Data Analysis Services unit will
The information of information acquisition module acquisition is classified by the single engineering project of project supervision, and memory cell contains construction project
The supervising service major tasks classification of project different phase and work in every guide, the database of standard, and screening unit divides data
Analysis processing unit transmits the information come and is compared with the database in storage unit, and extraction meets the dependency number for transmitting information
According to storage unit is also connect with output module.
The database of storage unit includes as follows:Professional memory module, work submodule, part-to-item project module, work
Sequence submodule, form module, professional memory module, work submodule, part-to-item project module, process submodule, list mould
The relationship of block is level inclusion relation, that is, the submodule that works is the next stage sort module of professional memory module, branch's subitem work
Journey module is the next stage sort module of work submodule, and process submodule is the next stage classification mould of part-to-item project module
Block, the next stage sort module of form module process submodule.
Output module includes the individual client end and the enterprise client that are integrated on electronic equipment or mobile terminal APP,
In, output unit is also associated between individual client end and processing module, the processing knot of processing module is realized by output unit
Fruit information is fed back and display, is directly connected between enterprise client and processing module, realizes database update and place in processing module
Reason process trace is inquired.
The beneficial effects of the utility model are that a kind of supervising service major tasks information management system, storage unit is by more
The memory module composition of a different majors type, monomer engineering project of the memory module for a many types, Mei Gecun
Storage module is divided into work submodule, part-to-item project catalogue, process subdirectory and related list according to structural level, no
Data are stored in key data in the corresponding working stamndard of monomer engineering project of many types in the form of list content to deposit
Data information library under storage unit carries out information retrieval, and provide according to guide for management convenient for employee;At the beginning of project construction
Phase, the handling result fed back by the acquisition of master data and information allow employee to be capable of involved by combing this item purpose of system
And part-to-item project, professional process, fulfilling content and check item, understand and grasp this item purpose supervising service emphasis work
Make, be familiar with project situation in advance, employee is effectively guided to carry out supervising service work;It, can be right by system in the project implementation process
The data of field real-time acquisition carry out compliance judgement, provide theoretical foundation for site supervision services, improve management
Efficiency;The initial data acquired in the project implementation process will be automatically saved in system server, and retain comparing
Procedural information and comparison result retain fulfilling trace for project supervision, realize the trackability of project process data.
Description of the drawings
Fig. 1 is a kind of structure diagram of supervising service major tasks information management system of the utility model.
In figure, 1. scanners, 2. Digital Transmission devices, 3. Data Analysis Services units, 4. screening units, 5. storage units,
6. enterprise client, 7. output units, 8. individual client ends, 9. audio frequency and video collectors, 10. information acquisition modules, 11. processing
Module, 12. output modules.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
A kind of supervising service major tasks information management system of the utility model, structure is as shown in Figure 1, including being sequentially connected
Information acquisition module 10, processing module 11 and output module 12.
Wherein, information acquisition module 10 includes scanner 1, audio frequency and video collector 9, scanner 1, audio frequency and video collector
9 are connect by Digital Transmission device 2 with processing module 11.
Processing module 11 includes Data Analysis Services unit 3 and screening unit 4 and storage unit 5, Data Analysis Services
Unit 3 classifies the information that information acquisition module 10 acquires by the single engineering project of project supervision, 5 memory storage of storage unit
There are the supervising service major tasks classification of construction project different phase and work in every guide, the database of standard, screening list
Data Analysis Services unit 3 is transmitted the information come and is compared with the database in storage unit 5 by member 4, and extraction meets transmission
The related data of information, storage unit 5 are also connect with output module 12.
The database of storage unit 5 includes as follows:Professional memory module, work submodule, part-to-item project module, work
Sequence submodule, form module, professional memory module, work submodule, part-to-item project module, process submodule, list mould
The relationship of block is level inclusion relation, that is, the submodule that works is the next stage sort module of professional memory module, branch's subitem work
Journey module is the next stage sort module of work submodule, and process submodule is the next stage classification mould of part-to-item project module
Block, the next stage sort module of form module process submodule.Such as:Professional memory module includes building engineering and stores mould
Multiple modules of this level such as block, municipal works memory module;Wherein, work submodule includes building engineering storage mould
Qualification management module in the block, project checking module, quality control module, safe fulfilling management module, further include municipal works
A series of submodules under memory module;Quality control module includes survey engineering module, witness in part-to-item project module
Sample material module, authentication material module, other materials module, pile foundation engineering module, basement process module, reinforced concrete clay model
Block, waterproofing work module, masonry project module, heat insulating work module, water supply and sewage work module, heating and ventilation project module, electrician
Journey module, part-to-item project mould safe fulfilling management module in the block include safety signs management module, security protection
Articles for use management module, base pit engineering management module, form bracing system management module, scaffold management module, derrick crane
Management module, aerial work basket management module, construction site temporary electricity management module, is applied building hoist management module
Work scene management of fire safety module;Next level of each process submodule for each part-to-item project module, such as steel
Reinforced concrete module includes preliminary preparation process module, mark supports room management process module, winter construction management module, basis
Engineering management process module, major project management process module, each form module is next layer of pole of each process submodule,
Such as wherein foundation engineering management process module includes test process control table, bar connecting control table, beam reinforced steel bar safety
Control table, the control table of wall column reinforcement installation, module installation control table, concreting control table.
Output module 12 includes the individual client end 8 and the enterprise client that are integrated on electronic equipment or mobile terminal APP
6, wherein, output unit 7 is also associated between individual client end 8 and processing module 11, processing module is realized by output unit 7
11 processing result information feedback and display, are directly connected between enterprise client 6 and processing module, realize number in processing module 11
It is inquired according to library update with processing procedure trace.
A kind of supervising service major tasks information management system of the utility model, operation principle are as follows:
As shown in Figure 1, the system mainly by enterprise client 6, individual client end 8, processing module 11, network base station and
Field data acquisition module 10 forms.Output unit 7 wherein is also associated between individual client end 8 and processing module 11, is passed through
Output unit 7 realizes processing result information feedback and the display of processing module 11, and the collecting device of information acquisition module 10 is by sweeping
It retouches instrument 1, audio frequency and video collector 9 and Digital Transmission device 2 to form, supervision trade term built in scanner 1 and engineering fontlib,
The data and feedback information of acquisition are exported by individual client end 8, and processing module 11 includes Data Analysis Services unit 3 and sieve
Menu member 4 and storage unit 5, network base station use telecommunications broadband network.
As shown in Figure 1, data information by enterprise by 6 typing of enterprise client, i.e. enterprise administrator is by different majors
After the key data that the corresponding working stamndard of monomer engineering project of type covers arranges, list is scanned by enterprise client 6,
All data are stored in the form of electronic spreadsheet content in storage unit 5, and specific structural level is as follows:Storage unit 5 by
The database storage module composition of multiple and different many types, monomer engineering item of the memory module for a many types
Mesh, wherein each memory module is decomposed into different work submodules (such as quality control module) according to service content, each
Module divides into part-to-item project catalogue (such as waterproofing work under quality control module) according to part-to-item project classification, should
Again according to process type setting process subdirectory (such as underground waterproof engineering under waterproofing work), each process specific item under catalogue
Cover related list (such as the basement roof waterproof under underground waterproof engineering for all fulfilling processes that the process is related under record
Quality control fulfilling list), list main contents include each process fulfilling content, the check item involved by each many types project
And corresponding data standard, finally it is aggregated to form the data information library under data storage cell.Data information library is according to specification
The update of atlas version, is regularly updated by enterprise administrator.
In the engineering preparation stage, the project data of acquisition is passed through Data Analysis Services list by employee by individual client end 8
Member 3 is compared with data in storage unit 5, each profession process, each process fulfilling content involved by this project of automatic identification,
Coherence check item, employee can export electronic report according to individual client end 8, this item purpose supervising service grasped before the project implementation
The fulfilling content and corresponding check item, guiding employee that major tasks and each process needs are paid close attention to effectively carry out supervising service
Work.
In the project implementation process, employee utilizes information acquisition module 10 (scanner 1, audio frequency and video collector 9 and number
Transmitter 2) data acquisition (mainly keyword and data) is carried out, processing module 11, processing module 11 are uploaded to by network
In Data Analysis Services unit 3 compared comprehensively by data screening function and the related data in storage unit 5, export
Comparison result, and feed back to individual client end 8, employee obtain inspection or examination by checking the comparison result at individual client end 8
Conclusion, so as to which targetedly processing there are problem and tracks rectification as a result, realizing the standardization of supervising service work, specification
Change, information system management.
For screening unit 4 when carrying out project major tasks screening, individual client end 8 can be by adopting in information acquisition module 10
The keyword and data of collection are itemized catalogue and process specific item by data screening program in storage unit 5 with preset branch
Record is compared, and filters out branch's subitem catalogue relevant with gathered data and process subdirectory, exports to system information and feed back
It in unit, is referred to for individual client end 8, understands the work of Project Surveillance focal points of service.In the project implementation process, information collection
The data and information that module 10 is acquired, it is satisfactory to enter at data analysis comprising acquisition two contents in position and data
After managing unit 3, screening unit 4 filters out relevant check item standard according to acquisition position and data content, passes through gathered data
With the standard comparison filtered out in system, Data Analysis Services unit 3 is compared in the form of qualitative or quantitative and provides comparison
As a result, output is checked for the employee at individual client end 8 to individual client end 8, further judges information collection position, obtain inspection
It looks into or check and acceptance result, improves management efficiency.
System server automatically generates personal data files library according to the data information that individual client end acquires for the first time, subsequently
The data that the individual client end is acquired, the file of the project each process subdirectory that preservation to system server is identified
In, it is permanently deposited in the data storage cell of system server, after project completion, enterprise can pass through enterprise according to actual demand
Industry client exports project process data acquisition and processing information so that the later stage uses from system server.
Claims (1)
1. a kind of supervising service major tasks information management system, which is characterized in that including sequentially connected information acquisition module
(10), processing module (11) and output module (12), described information acquisition module (10) are adopted including scanner (1), audio frequency and video
Storage (9), scanner (1), audio frequency and video collector (9) are connect by Digital Transmission device (2) with the processing module (11), institute
It states processing module (11) and includes Data Analysis Services unit (3) and screening unit (4) and storage unit (5), at data analysis
Reason unit (3) classifies the information that information acquisition module (10) acquires by the single engineering project of project supervision, storage unit
(5) memory contains the supervising service major tasks classification of construction project different phase and work in every guide, the data of standard
Data Analysis Services unit (3) is transmitted the information come and compared with the database in storage unit (5) by library, screening unit (4)
Right, extraction meets the related data for transmitting information, and storage unit (5) is also connect with the output module (12), the output mould
Block (12) includes the individual client end (8) being integrated on electronic equipment or mobile terminal APP and enterprise client (6), wherein, it is a
Output unit (7) is also associated between people's client (8) and the processing module (11), is handled by output unit (7) realization
The processing result information feedback and display, enterprise client (6) of module (11) are directly connected between processing module, realize processing mould
Database update is inquired with processing procedure trace in block (11);
The database of the storage unit (5) includes as follows:Professional memory module, work submodule, part-to-item project module,
Process submodule, form module, it is described profession memory module, work submodule, part-to-item project module, process submodule,
The relationship of form module is level inclusion relation, that is, the submodule that works is the next stage sort module of professional memory module, branch
Subdivisional work module is the next stage sort module of work submodule, and process submodule is the next stage of part-to-item project module
Sort module, the next stage sort module of form module process submodule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721243042.3U CN207601845U (en) | 2017-09-26 | 2017-09-26 | A kind of supervising service major tasks information management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721243042.3U CN207601845U (en) | 2017-09-26 | 2017-09-26 | A kind of supervising service major tasks information management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207601845U true CN207601845U (en) | 2018-07-10 |
Family
ID=62756044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721243042.3U Active CN207601845U (en) | 2017-09-26 | 2017-09-26 | A kind of supervising service major tasks information management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207601845U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110378674A (en) * | 2019-07-20 | 2019-10-25 | 深圳市实瑞建筑技术有限公司 | A kind of project delivery method information management system |
CN112269728A (en) * | 2020-11-03 | 2021-01-26 | 北京百度网讯科技有限公司 | System performance evaluation method, device, equipment and storage medium |
CN114140078A (en) * | 2021-11-30 | 2022-03-04 | 鼎信项目管理咨询有限公司 | Digital engineering management system |
CN115409489A (en) * | 2022-09-16 | 2022-11-29 | 盐城工学院 | Project supervision method and system based on big data analysis |
-
2017
- 2017-09-26 CN CN201721243042.3U patent/CN207601845U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110378674A (en) * | 2019-07-20 | 2019-10-25 | 深圳市实瑞建筑技术有限公司 | A kind of project delivery method information management system |
CN112269728A (en) * | 2020-11-03 | 2021-01-26 | 北京百度网讯科技有限公司 | System performance evaluation method, device, equipment and storage medium |
CN112269728B (en) * | 2020-11-03 | 2023-08-04 | 北京百度网讯科技有限公司 | System performance evaluation method, device, equipment and storage medium |
CN114140078A (en) * | 2021-11-30 | 2022-03-04 | 鼎信项目管理咨询有限公司 | Digital engineering management system |
CN115409489A (en) * | 2022-09-16 | 2022-11-29 | 盐城工学院 | Project supervision method and system based on big data analysis |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207601845U (en) | A kind of supervising service major tasks information management system | |
CN106815681B (en) | Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof | |
CN106447156A (en) | Attendance management method and system | |
CN104361419A (en) | Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration | |
CN106940839A (en) | A kind of project of transmitting and converting electricity qualitative data managing and control system and method | |
CN103067512A (en) | Intelligent meter reading system | |
CN108154340A (en) | Prefabricated component informationization management system based on BIM cloud platforms | |
CN113852350B (en) | Photovoltaic power plant control fortune is held system | |
CN111062504A (en) | AR technology-based intelligent power distribution station operation and maintenance system and method | |
CN111598411A (en) | Intelligent safety control system for operation site of transformer substation | |
CN107423826A (en) | A kind of method for inspecting of multi-reservoir, device and system | |
CN112000037A (en) | Environment pollution control facility information monitoring platform and method | |
CN201364484Y (en) | Remote bridge monitoring system based on B/S mode | |
CN110751454A (en) | Cable accessory installation process control system and method | |
CN115392628A (en) | Emergency command and dispatch system for emergency | |
CN115526523A (en) | Evaluation method for intelligent construction site | |
CN114157687A (en) | Power transformation information centralized display system and method based on cloud platform deployment | |
CN113393342A (en) | Building decoration project overall process management method and system | |
CN112288257A (en) | Operation monitoring and collecting system for intelligent manufacturing of ship industry | |
CN105718602B (en) | Standard cloud system for safe production of rural hydropower station | |
CN204883348U (en) | Cement produced with dry method production line safety monitoring system | |
CN109165753B (en) | Transformer substation defect management method based on mobile platform | |
CN109360291A (en) | A kind of construction machinery equipment inspection service system | |
CN111223201A (en) | WeChat small program-based substation equipment maintenance patrol method | |
CN116432995A (en) | Survey whole process production management informatization system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 710000 Floor 15, Building A, Gaoke Shangdu ONE Shangcheng, No. 43, Zhangba Fifth Road, Hi tech Zone, Xi'an, Shaanxi Patentee after: Xi'an High tech Juyi Construction Management Co.,Ltd. Address before: 710075 Floor 15, Block A, Building 5, Gaoke Shangdu ONE Shangcheng, 100m north of the intersection of Jinye Road and Zhangba Fifth Road, Yanta District, Xi'an, Shaanxi Patentee before: XI'AN HIGH-TECH CONSTRUCTION SUPERVISION CO.,LTD. |
|
CP03 | Change of name, title or address |