CN207601845U - A kind of supervising service major tasks information management system - Google Patents

A kind of supervising service major tasks information management system Download PDF

Info

Publication number
CN207601845U
CN207601845U CN201721243042.3U CN201721243042U CN207601845U CN 207601845 U CN207601845 U CN 207601845U CN 201721243042 U CN201721243042 U CN 201721243042U CN 207601845 U CN207601845 U CN 207601845U
Authority
CN
China
Prior art keywords
module
information
unit
project
storage unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721243042.3U
Other languages
Chinese (zh)
Inventor
邱佳
史文斌
李宝明
王翠萍
范中东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an High tech Juyi Construction Management Co.,Ltd.
Original Assignee
Xi'an Hi Tech Construction Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Hi Tech Construction Supervision Co Ltd filed Critical Xi'an Hi Tech Construction Supervision Co Ltd
Priority to CN201721243042.3U priority Critical patent/CN207601845U/en
Application granted granted Critical
Publication of CN207601845U publication Critical patent/CN207601845U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a kind of supervising service major tasks information management systems,Including sequentially connected information acquisition module,Processing module and output module,Information acquisition module includes scanner,Audio frequency and video collector,Scanner,Audio frequency and video collector is connect by Digital Transmission device with processing module,Processing module includes Data Analysis Services unit and screening unit and storage unit,Data Analysis Services unit classifies the information that information acquisition module acquires by the single engineering project of project supervision,Memory cell contains the supervising service major tasks classification of construction project different phase and work in every guides,The database of standard,Data Analysis Services unit is transmitted the information come and is compared with the database in storage unit by screening unit,Extraction meets the related data for transmitting information,Storage unit is also connect with output module,The utility model solve management in the prior art be difficult to it is scientific,The problem of standardization and standardization.

Description

A kind of supervising service major tasks information management system
Technical field
The utility model belongs to engineering inspection & management service platform technology field, and in particular to a kind of supervising service major tasks letter Cease management system.
Background technology
At present, China's project management enterprises have more than 7,000 families, and Supervision Enterprise quantity is more, and practitioner's quality is irregular, In addition management has specification without standard, causes that management is scientific, standardization degree is poor, based on this, rely on it is information-based, it is real The scientific of existing management, standardization and standardization are trends of the times.
On the one hand management has the legal liabilities that laws and regulations assign management, on the other hand, as construction market Responsible party wants the burden of contractr and obligation, the diversity of management role and the complexity of work, often results in management Specific aim is not strong, and deeply degree is inadequate, especially in construction quality safety accident, for management not fulfilling, not as sound not Disconnected, the criminal responsibility that accident will seriously investigate Supervision Enterprise and personnel causes great risk to the personnel of enterprise therefrom.
In conventional management, supervisor is checked and is checked and accepted according to codes and standards, but due to reference according to According to lengthy and tedious complexity, supervisor is needed to consult repeatedly, contained much information, checked or the course of receiving is often not comprehensive enough, existed certain Careless omission.
It is big by supervisor's interference caused by subjective factors that opinion is checked and accepted in management, scientific, adequacy is insufficient, so as to influencing to check and The accuracy of check and acceptance result.
Utility model content
The purpose of this utility model is to provide a kind of supervising service major tasks information management system, solves the prior art Present in management be difficult to it is scientific, standardization and standardization the problem of.
The utility model the technical scheme adopted is that a kind of supervising service major tasks information management system, including according to Information acquisition module, processing module and the output module of secondary connection.
The utility model is also characterized by
Information acquisition module includes scanner, audio frequency and video collector, and scanner, audio frequency and video collector are passed by number Defeated device is connect with processing module.
Processing module includes Data Analysis Services unit and screening unit and storage unit, and Data Analysis Services unit will The information of information acquisition module acquisition is classified by the single engineering project of project supervision, and memory cell contains construction project The supervising service major tasks classification of project different phase and work in every guide, the database of standard, and screening unit divides data Analysis processing unit transmits the information come and is compared with the database in storage unit, and extraction meets the dependency number for transmitting information According to storage unit is also connect with output module.
The database of storage unit includes as follows:Professional memory module, work submodule, part-to-item project module, work Sequence submodule, form module, professional memory module, work submodule, part-to-item project module, process submodule, list mould The relationship of block is level inclusion relation, that is, the submodule that works is the next stage sort module of professional memory module, branch's subitem work Journey module is the next stage sort module of work submodule, and process submodule is the next stage classification mould of part-to-item project module Block, the next stage sort module of form module process submodule.
Output module includes the individual client end and the enterprise client that are integrated on electronic equipment or mobile terminal APP, In, output unit is also associated between individual client end and processing module, the processing knot of processing module is realized by output unit Fruit information is fed back and display, is directly connected between enterprise client and processing module, realizes database update and place in processing module Reason process trace is inquired.
The beneficial effects of the utility model are that a kind of supervising service major tasks information management system, storage unit is by more The memory module composition of a different majors type, monomer engineering project of the memory module for a many types, Mei Gecun Storage module is divided into work submodule, part-to-item project catalogue, process subdirectory and related list according to structural level, no Data are stored in key data in the corresponding working stamndard of monomer engineering project of many types in the form of list content to deposit Data information library under storage unit carries out information retrieval, and provide according to guide for management convenient for employee;At the beginning of project construction Phase, the handling result fed back by the acquisition of master data and information allow employee to be capable of involved by combing this item purpose of system And part-to-item project, professional process, fulfilling content and check item, understand and grasp this item purpose supervising service emphasis work Make, be familiar with project situation in advance, employee is effectively guided to carry out supervising service work;It, can be right by system in the project implementation process The data of field real-time acquisition carry out compliance judgement, provide theoretical foundation for site supervision services, improve management Efficiency;The initial data acquired in the project implementation process will be automatically saved in system server, and retain comparing Procedural information and comparison result retain fulfilling trace for project supervision, realize the trackability of project process data.
Description of the drawings
Fig. 1 is a kind of structure diagram of supervising service major tasks information management system of the utility model.
In figure, 1. scanners, 2. Digital Transmission devices, 3. Data Analysis Services units, 4. screening units, 5. storage units, 6. enterprise client, 7. output units, 8. individual client ends, 9. audio frequency and video collectors, 10. information acquisition modules, 11. processing Module, 12. output modules.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
A kind of supervising service major tasks information management system of the utility model, structure is as shown in Figure 1, including being sequentially connected Information acquisition module 10, processing module 11 and output module 12.
Wherein, information acquisition module 10 includes scanner 1, audio frequency and video collector 9, scanner 1, audio frequency and video collector 9 are connect by Digital Transmission device 2 with processing module 11.
Processing module 11 includes Data Analysis Services unit 3 and screening unit 4 and storage unit 5, Data Analysis Services Unit 3 classifies the information that information acquisition module 10 acquires by the single engineering project of project supervision, 5 memory storage of storage unit There are the supervising service major tasks classification of construction project different phase and work in every guide, the database of standard, screening list Data Analysis Services unit 3 is transmitted the information come and is compared with the database in storage unit 5 by member 4, and extraction meets transmission The related data of information, storage unit 5 are also connect with output module 12.
The database of storage unit 5 includes as follows:Professional memory module, work submodule, part-to-item project module, work Sequence submodule, form module, professional memory module, work submodule, part-to-item project module, process submodule, list mould The relationship of block is level inclusion relation, that is, the submodule that works is the next stage sort module of professional memory module, branch's subitem work Journey module is the next stage sort module of work submodule, and process submodule is the next stage classification mould of part-to-item project module Block, the next stage sort module of form module process submodule.Such as:Professional memory module includes building engineering and stores mould Multiple modules of this level such as block, municipal works memory module;Wherein, work submodule includes building engineering storage mould Qualification management module in the block, project checking module, quality control module, safe fulfilling management module, further include municipal works A series of submodules under memory module;Quality control module includes survey engineering module, witness in part-to-item project module Sample material module, authentication material module, other materials module, pile foundation engineering module, basement process module, reinforced concrete clay model Block, waterproofing work module, masonry project module, heat insulating work module, water supply and sewage work module, heating and ventilation project module, electrician Journey module, part-to-item project mould safe fulfilling management module in the block include safety signs management module, security protection Articles for use management module, base pit engineering management module, form bracing system management module, scaffold management module, derrick crane Management module, aerial work basket management module, construction site temporary electricity management module, is applied building hoist management module Work scene management of fire safety module;Next level of each process submodule for each part-to-item project module, such as steel Reinforced concrete module includes preliminary preparation process module, mark supports room management process module, winter construction management module, basis Engineering management process module, major project management process module, each form module is next layer of pole of each process submodule, Such as wherein foundation engineering management process module includes test process control table, bar connecting control table, beam reinforced steel bar safety Control table, the control table of wall column reinforcement installation, module installation control table, concreting control table.
Output module 12 includes the individual client end 8 and the enterprise client that are integrated on electronic equipment or mobile terminal APP 6, wherein, output unit 7 is also associated between individual client end 8 and processing module 11, processing module is realized by output unit 7 11 processing result information feedback and display, are directly connected between enterprise client 6 and processing module, realize number in processing module 11 It is inquired according to library update with processing procedure trace.
A kind of supervising service major tasks information management system of the utility model, operation principle are as follows:
As shown in Figure 1, the system mainly by enterprise client 6, individual client end 8, processing module 11, network base station and Field data acquisition module 10 forms.Output unit 7 wherein is also associated between individual client end 8 and processing module 11, is passed through Output unit 7 realizes processing result information feedback and the display of processing module 11, and the collecting device of information acquisition module 10 is by sweeping It retouches instrument 1, audio frequency and video collector 9 and Digital Transmission device 2 to form, supervision trade term built in scanner 1 and engineering fontlib, The data and feedback information of acquisition are exported by individual client end 8, and processing module 11 includes Data Analysis Services unit 3 and sieve Menu member 4 and storage unit 5, network base station use telecommunications broadband network.
As shown in Figure 1, data information by enterprise by 6 typing of enterprise client, i.e. enterprise administrator is by different majors After the key data that the corresponding working stamndard of monomer engineering project of type covers arranges, list is scanned by enterprise client 6, All data are stored in the form of electronic spreadsheet content in storage unit 5, and specific structural level is as follows:Storage unit 5 by The database storage module composition of multiple and different many types, monomer engineering item of the memory module for a many types Mesh, wherein each memory module is decomposed into different work submodules (such as quality control module) according to service content, each Module divides into part-to-item project catalogue (such as waterproofing work under quality control module) according to part-to-item project classification, should Again according to process type setting process subdirectory (such as underground waterproof engineering under waterproofing work), each process specific item under catalogue Cover related list (such as the basement roof waterproof under underground waterproof engineering for all fulfilling processes that the process is related under record Quality control fulfilling list), list main contents include each process fulfilling content, the check item involved by each many types project And corresponding data standard, finally it is aggregated to form the data information library under data storage cell.Data information library is according to specification The update of atlas version, is regularly updated by enterprise administrator.
In the engineering preparation stage, the project data of acquisition is passed through Data Analysis Services list by employee by individual client end 8 Member 3 is compared with data in storage unit 5, each profession process, each process fulfilling content involved by this project of automatic identification, Coherence check item, employee can export electronic report according to individual client end 8, this item purpose supervising service grasped before the project implementation The fulfilling content and corresponding check item, guiding employee that major tasks and each process needs are paid close attention to effectively carry out supervising service Work.
In the project implementation process, employee utilizes information acquisition module 10 (scanner 1, audio frequency and video collector 9 and number Transmitter 2) data acquisition (mainly keyword and data) is carried out, processing module 11, processing module 11 are uploaded to by network In Data Analysis Services unit 3 compared comprehensively by data screening function and the related data in storage unit 5, export Comparison result, and feed back to individual client end 8, employee obtain inspection or examination by checking the comparison result at individual client end 8 Conclusion, so as to which targetedly processing there are problem and tracks rectification as a result, realizing the standardization of supervising service work, specification Change, information system management.
For screening unit 4 when carrying out project major tasks screening, individual client end 8 can be by adopting in information acquisition module 10 The keyword and data of collection are itemized catalogue and process specific item by data screening program in storage unit 5 with preset branch Record is compared, and filters out branch's subitem catalogue relevant with gathered data and process subdirectory, exports to system information and feed back It in unit, is referred to for individual client end 8, understands the work of Project Surveillance focal points of service.In the project implementation process, information collection The data and information that module 10 is acquired, it is satisfactory to enter at data analysis comprising acquisition two contents in position and data After managing unit 3, screening unit 4 filters out relevant check item standard according to acquisition position and data content, passes through gathered data With the standard comparison filtered out in system, Data Analysis Services unit 3 is compared in the form of qualitative or quantitative and provides comparison As a result, output is checked for the employee at individual client end 8 to individual client end 8, further judges information collection position, obtain inspection It looks into or check and acceptance result, improves management efficiency.
System server automatically generates personal data files library according to the data information that individual client end acquires for the first time, subsequently The data that the individual client end is acquired, the file of the project each process subdirectory that preservation to system server is identified In, it is permanently deposited in the data storage cell of system server, after project completion, enterprise can pass through enterprise according to actual demand Industry client exports project process data acquisition and processing information so that the later stage uses from system server.

Claims (1)

1. a kind of supervising service major tasks information management system, which is characterized in that including sequentially connected information acquisition module (10), processing module (11) and output module (12), described information acquisition module (10) are adopted including scanner (1), audio frequency and video Storage (9), scanner (1), audio frequency and video collector (9) are connect by Digital Transmission device (2) with the processing module (11), institute It states processing module (11) and includes Data Analysis Services unit (3) and screening unit (4) and storage unit (5), at data analysis Reason unit (3) classifies the information that information acquisition module (10) acquires by the single engineering project of project supervision, storage unit (5) memory contains the supervising service major tasks classification of construction project different phase and work in every guide, the data of standard Data Analysis Services unit (3) is transmitted the information come and compared with the database in storage unit (5) by library, screening unit (4) Right, extraction meets the related data for transmitting information, and storage unit (5) is also connect with the output module (12), the output mould Block (12) includes the individual client end (8) being integrated on electronic equipment or mobile terminal APP and enterprise client (6), wherein, it is a Output unit (7) is also associated between people's client (8) and the processing module (11), is handled by output unit (7) realization The processing result information feedback and display, enterprise client (6) of module (11) are directly connected between processing module, realize processing mould Database update is inquired with processing procedure trace in block (11);
The database of the storage unit (5) includes as follows:Professional memory module, work submodule, part-to-item project module, Process submodule, form module, it is described profession memory module, work submodule, part-to-item project module, process submodule, The relationship of form module is level inclusion relation, that is, the submodule that works is the next stage sort module of professional memory module, branch Subdivisional work module is the next stage sort module of work submodule, and process submodule is the next stage of part-to-item project module Sort module, the next stage sort module of form module process submodule.
CN201721243042.3U 2017-09-26 2017-09-26 A kind of supervising service major tasks information management system Active CN207601845U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721243042.3U CN207601845U (en) 2017-09-26 2017-09-26 A kind of supervising service major tasks information management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721243042.3U CN207601845U (en) 2017-09-26 2017-09-26 A kind of supervising service major tasks information management system

Publications (1)

Publication Number Publication Date
CN207601845U true CN207601845U (en) 2018-07-10

Family

ID=62756044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721243042.3U Active CN207601845U (en) 2017-09-26 2017-09-26 A kind of supervising service major tasks information management system

Country Status (1)

Country Link
CN (1) CN207601845U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378674A (en) * 2019-07-20 2019-10-25 深圳市实瑞建筑技术有限公司 A kind of project delivery method information management system
CN112269728A (en) * 2020-11-03 2021-01-26 北京百度网讯科技有限公司 System performance evaluation method, device, equipment and storage medium
CN114140078A (en) * 2021-11-30 2022-03-04 鼎信项目管理咨询有限公司 Digital engineering management system
CN115409489A (en) * 2022-09-16 2022-11-29 盐城工学院 Project supervision method and system based on big data analysis

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378674A (en) * 2019-07-20 2019-10-25 深圳市实瑞建筑技术有限公司 A kind of project delivery method information management system
CN112269728A (en) * 2020-11-03 2021-01-26 北京百度网讯科技有限公司 System performance evaluation method, device, equipment and storage medium
CN112269728B (en) * 2020-11-03 2023-08-04 北京百度网讯科技有限公司 System performance evaluation method, device, equipment and storage medium
CN114140078A (en) * 2021-11-30 2022-03-04 鼎信项目管理咨询有限公司 Digital engineering management system
CN115409489A (en) * 2022-09-16 2022-11-29 盐城工学院 Project supervision method and system based on big data analysis

Similar Documents

Publication Publication Date Title
CN207601845U (en) A kind of supervising service major tasks information management system
CN106815681B (en) Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof
CN106447156A (en) Attendance management method and system
CN104361419A (en) Electric transmission and transformation equipment state monitoring defect management system and method based on regulation and control integration
CN106940839A (en) A kind of project of transmitting and converting electricity qualitative data managing and control system and method
CN103067512A (en) Intelligent meter reading system
CN108154340A (en) Prefabricated component informationization management system based on BIM cloud platforms
CN113852350B (en) Photovoltaic power plant control fortune is held system
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN107423826A (en) A kind of method for inspecting of multi-reservoir, device and system
CN112000037A (en) Environment pollution control facility information monitoring platform and method
CN201364484Y (en) Remote bridge monitoring system based on B/S mode
CN110751454A (en) Cable accessory installation process control system and method
CN115392628A (en) Emergency command and dispatch system for emergency
CN115526523A (en) Evaluation method for intelligent construction site
CN114157687A (en) Power transformation information centralized display system and method based on cloud platform deployment
CN113393342A (en) Building decoration project overall process management method and system
CN112288257A (en) Operation monitoring and collecting system for intelligent manufacturing of ship industry
CN105718602B (en) Standard cloud system for safe production of rural hydropower station
CN204883348U (en) Cement produced with dry method production line safety monitoring system
CN109165753B (en) Transformer substation defect management method based on mobile platform
CN109360291A (en) A kind of construction machinery equipment inspection service system
CN111223201A (en) WeChat small program-based substation equipment maintenance patrol method
CN116432995A (en) Survey whole process production management informatization system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 710000 Floor 15, Building A, Gaoke Shangdu ONE Shangcheng, No. 43, Zhangba Fifth Road, Hi tech Zone, Xi'an, Shaanxi

Patentee after: Xi'an High tech Juyi Construction Management Co.,Ltd.

Address before: 710075 Floor 15, Block A, Building 5, Gaoke Shangdu ONE Shangcheng, 100m north of the intersection of Jinye Road and Zhangba Fifth Road, Yanta District, Xi'an, Shaanxi

Patentee before: XI'AN HIGH-TECH CONSTRUCTION SUPERVISION CO.,LTD.

CP03 Change of name, title or address