CN207596567U - A kind of modularized artificial wetland integration apparatus - Google Patents

A kind of modularized artificial wetland integration apparatus Download PDF

Info

Publication number
CN207596567U
CN207596567U CN201721593462.4U CN201721593462U CN207596567U CN 207596567 U CN207596567 U CN 207596567U CN 201721593462 U CN201721593462 U CN 201721593462U CN 207596567 U CN207596567 U CN 207596567U
Authority
CN
China
Prior art keywords
inlet channel
canal
inverted trapezoidal
pipe
carbon steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721593462.4U
Other languages
Chinese (zh)
Inventor
刘宝文
肖超
王志超
高邦霞
唐婷
张娟娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'anshan Three Pagoda Environmental Protection Technology Co Ltd
Original Assignee
Ma'anshan Three Pagoda Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'anshan Three Pagoda Environmental Protection Technology Co Ltd filed Critical Ma'anshan Three Pagoda Environmental Protection Technology Co Ltd
Priority to CN201721593462.4U priority Critical patent/CN207596567U/en
Application granted granted Critical
Publication of CN207596567U publication Critical patent/CN207596567U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Biological Treatment Of Waste Water (AREA)

Abstract

The utility model discloses a kind of modularized artificial wetland integration apparatus, including carbon steel pond body, inlet channel and sewage collecting pool are provided in the carbon steel pond body, inlet channel is internally provided with down-the-hole deflector, water inlet pipe and inlet valve are provided on front side of the inlet channel, the side of inlet channel is provided with ventilation type direct current sewage pipe, and the lower end of ventilation type direct current sewage pipe is provided with L-shaped sludge diversion pipe, and the upper end of ventilation type direct current sewage pipe is provided with central inverted trapezoidal closed stream lending canal.The carbon steel pond body of this modularized artificial wetland integration apparatus is refined by the processing method of oxy-acetylene welding, that is, is buried and filled out, reduce expense, shorten construction period;The vertical snorkel and zigzag elongated shape apopore of design can prevent from blocking;By the way that inlet channel is divided into three sections, water inlet flow velocity is delayed, has ensured effluent quality;Whole labour cost is low, and short construction period is not easy to plug, and effluent quality is good.

Description

A kind of modularized artificial wetland integration apparatus
Technical field
The utility model is related to ecological equipment technical field, specially a kind of modularized artificial wetland integration apparatus.
Background technology
Artificial swamp is the synthesis ecosystem similar with marshland by manually building and controlling operation, is mainly utilized Triple one handled sewage, sludge that act synergistically of soil, artificial dielectric, plant, the physics of microorganism, chemistry, biology Kind technology;Wherein, the vital component part of vegetation, it is the important leverage of microorganism healthy growth and reaches sewage The important leverage of high-quality treatment effect;Pond body is crucial in artificial swamp and the component part of core, it is planted in artificial swamp The important carrier of quilt, matrix, while also a metastable living environment, traditional people are created for the microorganism in sewage Work wetland is mainly the artificial means by adding in some modernizations to natural wetland, to reach control and carry out sewage disposal Purpose, but its there are many drawbacks of.First, it takes up a large area;Second, matrix easily blocks;Third, oxygen turns Move that rate is low, the removal rate for leading to total nitrogen is relatively low etc.;For this it is a series of the problem of, with the depth of the research to artificial swamp Enter many small-sized improvement steel bars also occur to mix artificial swamp.It takes up a large area and supports not although solving well The problem of sufficient, still, matrix easily blocks, intake flow instability the problems such as again without being well solved, together When, the pond body long construction period of armored concrete, capital construction, the problems such as labour cost is big be especially prominent;Therefore a kind of modularization is needed Artificial swamp integration apparatus.
Utility model content
The purpose of this utility model is to provide a kind of modularized artificial wetland integration apparatus, low with labour cost, The advantages of short construction period is not easy to plug, and effluent quality is good, solve prior art mesostroma easily block, water of intaking Flow it is unstable etc., the problem of pond body long construction period, labour cost is big.
To achieve the above object, the utility model provides following technical solution:A kind of modularized artificial wetland integration is set It is standby, including carbon steel pond body, inlet channel and sewage collecting pool are provided in the carbon steel pond body, inlet channel is internally provided with down-the-hole Deflector, down-the-hole deflector are two pieces, and two pieces of down-the-hole deflector sealings are securedly mounted in inlet channel and inlet channel is equidistant It is divided into three sections, the rear side of two pieces of down-the-hole deflectors and inlet channel is installed with diaphragm valve, down-the-hole deflector on front side of inlet channel And the down-the-hole deflector of the rear side of inlet channel is mounted on bottom end, diaphragm valve is mounted on the upside of down-the-hole deflector on rear side of inlet channel; Water inlet pipe and inlet valve are provided on front side of the inlet channel, water inlet pipe is fastened and connected with inlet channel, and inlet valve is solid Dingan County is on water inlet pipe;The side of the inlet channel is provided with ventilation type direct current sewage pipe, under ventilation type direct current sewage pipe End is provided with L-shaped sludge diversion pipe, and the upper end of ventilation type direct current sewage pipe is provided with central inverted trapezoidal closed stream lending canal, ventilation type The upper end of direct current sewage pipe is connected with the bottom end of central inverted trapezoidal closed stream lending canal, on the canal wall of central inverted trapezoidal closed stream lending canal Offer elongated shape apopore;The upper end of the carbon steel pond body is equipped with inspection shaft, and the side of carbon steel pond body is provided with stage casing U-shaped Connection is connected by U-shaped connecting tube with inlet channel in connecting tube, central inverted trapezoidal closed stream lending canal;The side of the sewage collecting pool It is connected with carbon steel pond body, the side of sewage collecting pool is provided with inverted trapezoidal outlet canal, and sewage collecting pool is discharged with inverted trapezoidal Canal is connected by diaphragm valve and connected;The end of the inverted trapezoidal outlet canal is provided with outlet pipe, outlet pipe and inverted trapezoidal outlet canal It is fastened and connected.
Preferably, the inspection shaft on fibreglass reinforced plastic cover is installed.
Preferably, the tube bottom of the ventilation type direct current sewage pipe is provided with triangular support mould bases, and tube head is equipped with vertically Snorkel.
Preferably, the aperture designs of the elongated shape apopore are zigzag.
Preferably, glass-fiber reinforced plastic grille pedal, the canal face of inverted trapezoidal outlet canal are installed at the top of the inverted trapezoidal outlet canal It is provided with smooth fine flour ceramic tile.
Preferably, the lower end of the sewage collecting pool is provided with removable cover.
Preferably, the carbon steel pond body is formed by oxy-acetylene welding processing and refining.
Compared with prior art, the beneficial effects of the utility model are as follows:
The carbon steel pond body of this modularized artificial wetland integration apparatus is refined by the processing method of oxy-acetylene welding, then It is easy to process using multi-layer anticorrosion technique, amount of excavation reduces, bury fill out and with capital construction, labour cost is low and constructs Period such as is shortened at the apparent advantage significantly;Beginning is designed with vertical snorkel, bottom at the top of central inverted trapezoidal closed stream lending canal Tip designs have L-shaped sludge diversion pipe, and canal wall offers elongated shape apopore, and sets sewage collecting pool, center during work Inverted trapezoidal closed stream lending canal comes together in sewage in water channel, then by the uniform cloth of elongated shape apopore equally distributed on canal wall Water, the impurity that the zigzag unique design of elongated shape apopore is reduced in matrix enters central inverted trapezoidal closed stream lending canal, into one Step prevents from blocking, meanwhile, L-shaped sludge diversion pipe is provided at canal bottom end by the dirt in central inverted trapezoidal closed stream lending canal Mud is guided to sewage collecting pool, is convenient to clean, it is therefore provided that the susceptible to plugging problem of artificial swamp is resolved, has ensured equipment Operation without any confusion;By installing down-the-hole deflector in inlet channel, inlet channel is divided into three sections, the design of three-stage delays Water inlet flow velocity reduces water impact, has ensured enough waters while increasing hydraulic detention time again, ensured water outlet Water quality;Whole labour cost is low, and short construction period is not easy to plug, and effluent quality is good.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is that the inlet channel of the utility model is main to sectional view.
Fig. 3 is the inlet channel side view of the utility model.
Fig. 4 is the sewage collecting pool side view of the utility model.
In figure:1 carbon steel pond body, 2 inlet channels, 3 sewage collecting pools, 4 down-the-hole deflectors, 5 diaphragm valves, 6 water inlet pipes, 7 water inlets Valve, 8 ventilation type direct current sewage pipes, 9L shape sludge diversion pipe, 10 central inverted trapezoidal closed stream lending canals, 11 elongated shape apopores, 12 inspection shafts, 13 stage casing U-shaped connecting tubes, 14 inverted trapezoidal outlet canals, 15 outlet pipes, 16 triangular support mould bases, 17 vertical ventilations Pipe, 18 glass-fiber reinforced plastic grille pedals, 19 smooth fine flour ceramic tiles, 20 removable covers.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, a kind of modularized artificial wetland integration apparatus including carbon steel pond body 1, is set in carbon steel pond body 1 It is equipped with inlet channel 2 and sewage collecting pool 3, inlet channel 2 is internally provided with down-the-hole deflector 4, and down-the-hole deflector 4 is two pieces, and two The sealing of block down-the-hole deflector 4 is securedly mounted to equidistantly be divided into three sections in inlet channel 2 and by inlet channel 2, two pieces of down-the-hole deflectors 4 And the rear side of inlet channel 2 is installed with diaphragm valve 5, the rear side of 2 front side down-the-hole deflector 4 of inlet channel and inlet channel 2 it is latent Hole deflector 4 is mounted on bottom end, and 2 rear side diaphragm valve 5 of inlet channel is mounted on the upside of down-the-hole deflector 4;The front side of inlet channel 2 is set Water inlet pipe 6 and inlet valve 7 are equipped with, water inlet pipe 6 is fastened and connected with inlet channel 2, and inlet valve 7 is fixedly mounted on water inlet pipe On 6;The side of inlet channel 2 is provided with ventilation type direct current sewage pipe 8, and the lower end of ventilation type direct current sewage pipe 8 is provided with L-shaped sludge Diversion pipe 9, the upper end of ventilation type direct current sewage pipe 8 are provided with central inverted trapezoidal closed stream lending canal 10, ventilation type direct current sewage pipe 8 Upper end be connected with the bottom end of central inverted trapezoidal closed stream lending canal 10, offered on the canal wall of central inverted trapezoidal closed stream lending canal 10 Elongated shape apopore 11, the aperture designs of elongated shape apopore 11 are zigzag, and the tube bottom of ventilation type direct current sewage pipe 8 is provided with Triangular support mould bases 16, tube head are equipped with vertical snorkel 17, can be that artificial swamp leads to increase oxygen content amount, reach water quality treatment To better level;The upper end of carbon steel pond body 1 is equipped with inspection shaft 12, and fibreglass reinforced plastic cover is equipped on inspection shaft 12, can be right Artificial swamp is monitored, and the side of carbon steel pond body 1 is provided with stage casing U-shaped connecting tube 13, central inverted trapezoidal closed stream lending Canal 10 is connected by U-shaped connecting tube 13 with inlet channel 2 and connected;The side of sewage collecting pool 3 is connected with carbon steel pond body 1, dirty The lower end of water collecting pit 3 is provided with removable cover 20, convenient for the cleaning of sludge in artificial swamp, prevents artificial swamp from occurring stifled Plug, the side of sewage collecting pool 3 are provided with inverted trapezoidal outlet canal 14, and sewage collecting pool 3 passes through water conservancy diversion with inverted trapezoidal outlet canal 14 The conducting connection of valve 5;The end of inverted trapezoidal outlet canal 14 is provided with outlet pipe 15, and outlet pipe 15 fastens close with inverted trapezoidal outlet canal 14 Envelope, the top of inverted trapezoidal outlet canal 14 are equipped with glass-fiber reinforced plastic grille pedal 18, and the canal face of inverted trapezoidal outlet canal 14 is provided with smooth Fine flour ceramic tile 19, it is convenient that water quality and water yield are sampled and monitored;The modularized artificial wetland integration apparatus is working When;Inlet valve 7 on sewage intercepting well water inlet pipe 6 can freely adjust appropriate water and enter inlet channel 2, utilize stage casing U-shaped Sewage is drained to central inverted trapezoidal closed stream lending canal 10 by connecting tube 13, during extraneous oxygen is imported by vertical snorkel 17 It entreats in inverted trapezoidal closed stream lending canal 10, the oxygen content amount in water can be increased, thus to increase the activity of processing bacterium, improve to be discharged and imitate Fruit, sludge are imported by L-shaped sludge diversion pipe 9 to the sewage collecting pool 3 of end;Carbon steel pond body 1 by oxy-acetylene welding processing and refining and Into, it is easy to process then using multi-layer anticorrosion technique, amount of excavation reduce, bury fill out and with low with capital construction, labour cost The apparent advantage such as it is shortened significantly with construction period;Central 10 top beginning of inverted trapezoidal closed stream lending canal is designed with vertical ventilation Pipe 17, bottom end are designed with L-shaped sludge diversion pipe 9, and canal wall offers elongated shape apopore 11, and sets sewage collecting pool 3, center inverted trapezoidal closed stream lending canal 10 comes together in sewage in water channel during work, then by equally distributed elongated shape on canal wall 11 water distribution uniformity of apopore, the impurity that 11 zigzag unique design of elongated shape apopore is reduced in matrix enter central inverted trapezoidal Closed stream lending canal 10 further prevents blocking, meanwhile, L-shaped sludge diversion pipe 9 is provided at canal bottom end center is terraced Sludge in Shape closed diversion channel 10 is guided to sewage collecting pool 3, is convenient to clean, it is therefore provided that the susceptible to plugging problem of artificial swamp It is resolved, has ensured the operation of equipment without any confusion;By the installation down-the-hole deflector 4 in inlet channel 2, by inlet channel 2 It is divided into three sections, the design of three-stage has delayed water inlet flow velocity, reduces water impact, is protected again while increasing hydraulic detention time Hinder enough waters, ensure effluent quality;Whole labour cost is low, and short construction period is not easy to plug, and effluent quality is good.
In summary:The carbon steel pond body 1 of this modularized artificial wetland integration apparatus is smart by the processing method of oxy-acetylene welding Make, it is easy to process then using multi-layer anticorrosion technique, amount of excavation reduce, bury fill out and with capital construction, labour cost The apparent advantage such as it is shortened significantly with low and construction period;Central 10 top beginning of inverted trapezoidal closed stream lending canal is designed with vertically Snorkel 17, bottom end are designed with L-shaped sludge diversion pipe 9, and canal wall offers elongated shape apopore 11, and sewage is set to receive Collect pond 3, center inverted trapezoidal closed stream lending canal 10 comes together in sewage in water channel during work, then by equally distributed thin on canal wall Elongated 11 water distribution uniformity of apopore, the impurity that 11 zigzag unique design of elongated shape apopore is reduced in matrix enter center and fall Trapezoidal closed stream lending canal 10, further prevents blocking, meanwhile, L-shaped sludge diversion pipe 9 is provided at canal bottom end will be central Sludge in inverted trapezoidal closed stream lending canal 10 is guided to sewage collecting pool 3, is convenient to clean, it is therefore provided that artificial swamp is susceptible to plugging Problem is resolved, and has ensured the operation of equipment without any confusion;By the installation down-the-hole deflector 4 in inlet channel 2, will intake It is three sections that canal 2, which divides, and the design of three-stage has delayed water inlet flow velocity, reduces water impact, while increasing hydraulic detention time Enough waters have been ensured again, have ensured effluent quality;Whole labour cost is low, and short construction period is not easy to plug, effluent quality It is good.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of modularized artificial wetland integration apparatus, including carbon steel pond body(1), it is characterised in that:The carbon steel pond body(1) Inside it is provided with inlet channel(2)And sewage collecting pool(3), inlet channel(2)Be internally provided with down-the-hole deflector(4), down-the-hole water conservancy diversion Plate(4)It is two pieces, two pieces of down-the-hole deflectors(4)Sealing is securedly mounted to inlet channel(2)It is interior and by inlet channel(2)Equidistantly it is divided into Three sections, two pieces of down-the-hole deflectors(4)And inlet channel(2)Rear side be installed with diaphragm valve(5), inlet channel(2)It dives front side Hole deflector(4)And inlet channel(2)Rear side down-the-hole deflector(4)Mounted on bottom end, inlet channel(2)Rear side diaphragm valve(5) Mounted on down-the-hole deflector(4)Upside;The inlet channel(2)Front side be provided with water inlet pipe(6)And inlet valve(7), into Water pipe(6)With inlet channel(2)It is fastened and connected, inlet valve(7)It is fixedly mounted on water inlet pipe(6)On;The inlet channel(2) Side be provided with ventilation type direct current sewage pipe(8), ventilation type direct current sewage pipe(8)Lower end be provided with L-shaped sludge diversion pipe (9), ventilation type direct current sewage pipe(8)Upper end be provided with central inverted trapezoidal closed stream lending canal(10), ventilation type direct current sewage pipe (8)Upper end and central inverted trapezoidal closed stream lending canal(10)Bottom end conducting, central inverted trapezoidal closed stream lending canal(10)Canal wall On offer elongated shape apopore(11);The carbon steel pond body(1)Upper end inspection shaft is installed(12), carbon steel pond body(1)'s Side is provided with stage casing U-shaped connecting tube(13), central inverted trapezoidal closed stream lending canal(10)With inlet channel(2)Pass through U-shaped connecting tube (13)Conducting connection;The sewage collecting pool(3)Side and carbon steel pond body(1)It connects, sewage collecting pool(3)Side It is provided with inverted trapezoidal outlet canal(14), sewage collecting pool(3)With inverted trapezoidal outlet canal(14)Pass through diaphragm valve(5)Conducting connection; The inverted trapezoidal outlet canal(14)End be provided with outlet pipe(15), outlet pipe(15)With inverted trapezoidal outlet canal(14)It fastens close Envelope connection.
2. a kind of modularized artificial wetland integration apparatus according to claim 1, it is characterised in that:The inspection shaft (12)On fibreglass reinforced plastic cover is installed.
3. a kind of modularized artificial wetland integration apparatus according to claim 1, it is characterised in that:The ventilation type is straight Flow sewage pipe(8)Tube bottom be provided with triangular support mould bases(16), tube head is equipped with vertical snorkel(17).
4. a kind of modularized artificial wetland integration apparatus according to claim 1, it is characterised in that:The elongated shape goes out Water hole(11)Aperture designs be zigzag.
5. a kind of modularized artificial wetland integration apparatus according to claim 1, it is characterised in that:The inverted trapezoidal goes out Water channel(14)Top glass-fiber reinforced plastic grille pedal is installed(18), inverted trapezoidal outlet canal(14)Canal face be provided with smooth fine flour porcelain Brick(19).
6. a kind of modularized artificial wetland integration apparatus according to claim 1, it is characterised in that:The sewage collecting Pond(3)Lower end be provided with removable cover(20).
7. a kind of modularized artificial wetland integration apparatus according to claim 1, it is characterised in that:The carbon steel pond body (1)It is formed by oxy-acetylene welding processing and refining.
CN201721593462.4U 2017-11-24 2017-11-24 A kind of modularized artificial wetland integration apparatus Active CN207596567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721593462.4U CN207596567U (en) 2017-11-24 2017-11-24 A kind of modularized artificial wetland integration apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721593462.4U CN207596567U (en) 2017-11-24 2017-11-24 A kind of modularized artificial wetland integration apparatus

Publications (1)

Publication Number Publication Date
CN207596567U true CN207596567U (en) 2018-07-10

Family

ID=62759673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721593462.4U Active CN207596567U (en) 2017-11-24 2017-11-24 A kind of modularized artificial wetland integration apparatus

Country Status (1)

Country Link
CN (1) CN207596567U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107720974A (en) * 2017-11-24 2018-02-23 马鞍山三塔环保科技有限公司 A kind of modularized artificial wetland integration apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107720974A (en) * 2017-11-24 2018-02-23 马鞍山三塔环保科技有限公司 A kind of modularized artificial wetland integration apparatus
CN107720974B (en) * 2017-11-24 2023-08-22 马鞍山三塔环保科技有限公司 Modularized constructed wetland integrated equipment

Similar Documents

Publication Publication Date Title
CN107381887A (en) A kind of municipal sewage environmental protection precipitation treatment device
CN204824550U (en) A device for rural domestic sewage treatment
CN103833138B (en) View tower type device for water aeration and biological purification, and purification method
CN103739167A (en) Rain and sewage dual-purpose landscape type ecological purification system
CN206599473U (en) Landscape type effluent treatment plant
CN207596567U (en) A kind of modularized artificial wetland integration apparatus
CN201296752Y (en) Turbulent-flow biogas tank
CN104628147B (en) High-ridge reinforced surface-flow constructed wetland system and operation method thereof
CN207193035U (en) A kind of processing structure of country sewage floss hole
CN206828312U (en) A kind of buried sewage treatment equipment
CN107720974A (en) A kind of modularized artificial wetland integration apparatus
CN201250233Y (en) Tunnel biogas pool with water return on the top
CN217163310U (en) Totally enclosed aeration grit chamber
CN106186527B (en) Environmentally friendly sewage integrated treatment device
CN211570396U (en) Energy-conserving efficient sewage treatment system
CN204932958U (en) A kind of sedimentation basin for sewage disposal
CN205590364U (en) Integration sewage primary treatment device
CN203935651U (en) A kind of novel sedimentation basin
CN206699165U (en) A kind of running water crawl
CN203803164U (en) Efficient mud-water separation precipitation system
CN203999117U (en) Integral life sewage handler
CN203451279U (en) Activated sludge sewage treatment device
CN207512045U (en) A kind of rural scattered domestic sewage processing system
CN209749487U (en) Large-scale ecological aquaculture pond
CN105366817A (en) Multi-stage filler constructed wetland construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant