CN207575862U CN201721489335.XU CN201721489335U CN207575862U CN 207575862 U CN207575862 U CN 207575862U CN 201721489335 U CN201721489335 U CN 201721489335U CN 207575862 U CN207575862 U CN 207575862U
Authority
CN
China
Prior art keywords
level
sedimentation basin
partition wall
pond
settling pond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721489335.XU
Other languages
Chinese (zh)
Inventor
叶文平
叶勇
郑洪弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen East Dayang Cement Products Co Ltd
Original Assignee
Shenzhen East Dayang Cement Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen East Dayang Cement Products Co Ltd filed Critical Shenzhen East Dayang Cement Products Co Ltd
Priority to CN201721489335.XU priority Critical patent/CN207575862U/en
Application granted granted Critical
Publication of CN207575862U publication Critical patent/CN207575862U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of concrete sewage sedimentation basins convenient for scavenger precipitation object, its drip irrigation device includes pond body, the pond body includes four side walls and the level-one partition wall and two level partition wall that are fixed between two opposite side walls and are arranged in parallel, the level-one partition wall and two level partition wall will be divided into first stage precipitation tank, second-level settling pond and three-level sedimentation basin inside pond body, the second-level settling pond and three-level sedimentation basin bottom wall are both provided with collecting tank, are provided in the collecting tank and agree with and carry upwardly opening collection box with it.Sediment on second-level settling pond and three-level sedimentation basin bottom wall is swept into collection box, then is toppled over after collection box is pulled out out of collecting tank, just can complete the removing of sediment in second-level settling pond and three-level sedimentation basin.The utility model has the advantages that the mode for cleaning sediment in second-level settling pond and three-level sedimentation basin is simple, efficient.

Description

A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object
Technical field
The utility model is related to concrete sewage sedimentation basins, more particularly to a kind of concrete sewage convenient for scavenger precipitation object Sedimentation basin.
Background technology
Regeneration concrete refers to the novel concrete that discarded concrete is formed after series of processes.Wherein regenerate coagulation Soil can generate a large amount of sewage when passing through mixing plant, be needed before sewage discharge or recycling by three-level sedimentation basin Reason.
Notification number is that the Chinese patent of CN202700156U discloses a kind of concrete mixing plant detention tank.By level-one Sedimentation basin, second-level settling pond, three-level sedimentation basin, are sequentially connected composition, first stage precipitation tank, second-level settling pond and three-level sedimentation basin by Sedimentation basin partition wall separates, and first stage precipitation tank bottom plate is ramp, and sedimentation basin partition wall is equipped with gap.It sinks in three-level and sets in pond Recycle immersible pump.The detention tank improves settlement of sewage effect, and the water quality after three-level precipitates is improved, can be with It directly recycles for mixing concrete, realizes sewage " zero " discharge, avoid pollution environment;First stage precipitation tank bottom plate is set Sloping road structure is counted, mechanical scarfing cinder is facilitated, improves work efficiency, reduce cost, improve civilized construction.
Although above-mentioned concrete mixing plant detention tank is set by the slope of first stage precipitation tank bottom plate and convenient for one The sediment of grade sedimentation basin carries out mechanical chipping, but the sediment removing that second-level settling pond and three-level sedimentation basin generate still is compared It is more difficult, it takes time and effort.
Utility model content
For above-mentioned technological deficiency, the purpose of this utility model is to provide a kind of concrete sewage convenient for scavenger precipitation object Sedimentation basin, convenient for being purged to the sediment in second-level settling pond and three-level sedimentation basin.
To achieve the above object, the utility model provides following technical solution:
A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object, including pond body, the pond body include four side walls with And the level-one partition wall and two level partition wall for being fixed between two opposite side walls and being arranged in parallel, the level-one partition wall and two level partition wall First stage precipitation tank, second-level settling pond and three-level sedimentation basin, the second-level settling pond and three-level sedimentation basin will be divided into inside pond body Bottom wall is both provided with collecting tank, is provided in the collecting tank and agrees with and carry upwardly opening collection box with it.
By using above-mentioned technical proposal, sewage a large amount of sediment after first stage precipitation tank falls within first stage precipitation tank bottom Wall so that sewage enters contained contents of precipitate after second-level settling pond and greatly reduces.Sediment on bottom wall is swept into In collection box, then topple over after collection box is pulled out out of collecting tank, just can complete the clear of sediment in second-level settling pond It removes, the reset mode of sediment is same as above in three-level sedimentation basin.The reset mode is simple and convenient, greatly improves elimination efficiency.
The utility model is further arranged to:The level-one partition wall be provided with for sewage by the first-level filtering mouth of a river, it is described Two level partition wall be provided with for sewage by two level drainage mouth, the first-level filtering mouth of a river and two level drainage mouth are located at not homonymy.
By using above-mentioned technical proposal, the distance between the first-level filtering mouth of a river and two level drainage mouth increase so that sewage leads to Spending the time of second-level settling pond increases, so as to enhance the filter effect of second-level settling pond.
The utility model is further arranged to:Strainer is both provided at the first-level filtering mouth of a river and two level drainage mouth.
By using above-mentioned technical proposal, partly precipitated object during sewage flows into second-level settling pond from the first-level filtering mouth of a river It is obstructed by strainer so that the content for flowing into sediment in the sewage of second-level settling pond is reduced, so as to avoid sewage in two-stage precipitation The sediment settled in pond is excessive and collecting box can not load.The effect that strainer is provided at two level drainage mouth is same as above.
The utility model is further arranged to:The first-level filtering mouth of a river and two level drainage mouth are located at level-one partition wall and two respectively The top of grade partition wall, the pond body are provided with the fixing groove being caught in for strainer.
By using above-mentioned technical proposal, strainer can be extracted and convenient for disassembly and assembly out of fixing groove, be carried out convenient for strainer Cleaning is replaced.
The utility model is further arranged to:The second-level settling pond and three-level sedimentation basin bottom wall are recessed towards ground end, institute State the lowermost end that collecting tank is located at second-level settling pond or three-level sedimentation basin bottom wall.
By using above-mentioned technical proposal, sediment that sewage is settled in second-level settling pond and three-level sedimentation basin can be along Bottom wall slips into collection box, without being artificially swept into, greatly improves the efficiency of scavenger precipitation object.
The utility model is further arranged to:There are two precipitated respectively with second-level settling pond and three-level for setting on the side wall The osculum connected inside pond, opening of the osculum inside pond body are provided with the drainage door for closing osculum, The drainage door is hinged with pond body, and the drainage door is fixedly connected with handle towards the side inside pond body.
By using above-mentioned technical proposal, pass through second-level settling pond after handle opening drainage door or the water in three-level sedimentation basin It is discharged at osculum, consequently facilitating collection box is pulled out out of collecting tank.
The utility model is further arranged to:Two opposed inner walls of collection box are provided with lifting slot.
By using above-mentioned technical proposal, lifting slot is as stress point, convenient for manually or mechanically by collection box from collecting tank Interior pull-out.
The utility model is further arranged to:The collection groove bottom wall is provided with through-hole.
By using above-mentioned technical proposal, the part of contaminated water that collection box accidentally pours out when being pulled out out of collecting tank can It is discharged from through hole, so as to avoid the trouble artificially removed.
In conclusion the utility model has the advantages that:
1. by the setting of collection box, it is purged convenient for the sediment in second-level settling pond and three-level sedimentation basin, significantly Improve elimination efficiency;
2. pass through the setting of the first-level filtering mouth of a river and two level drainage mouth position so that the filter effect enhancing of second-level settling pond.
Description of the drawings
Fig. 1 is the structure diagram of embodiment;
Fig. 2 is the exploded perspective view of embodiment;
Fig. 3 is the a-quadrant enlarged diagram of Fig. 2;
Fig. 4 is the B area enlarged diagram of Fig. 2.
Reference sign:1st, pond body;2nd, side wall;3rd, level-one partition wall;31st, the first-level filtering mouth of a river;4th, two level partition wall;41st, two Grade drainage mouth;5th, first stage precipitation tank;6th, second-level settling pond;7th, three-level sedimentation basin;8th, collecting tank;9th, collection box;10th, strainer;11、 Fixing groove;12nd, osculum;13rd, drainage door;14th, handle;15th, slot is lifted;16th, through-hole.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object, as shown in Figure 1, including pond body 1, pond body 1 includes four A side wall 2 and the level-one partition wall 3 for being fixed between two opposite side walls 2 and being arranged in parallel and two level partition wall 4, level-one partition wall 3 First stage precipitation tank 5, second-level settling pond 6 and three-level sedimentation basin 7 will be divided into inside pond body 1 with two level.Sewage enters level-one at first Sedimentation basin 5, and in the sediment of the sedimentation overwhelming majority in first stage precipitation tank 5.Sewage enters the precipitation settled after second-level settling pond 6 Object has greatly reduced.
As shown in Fig. 2, the bottom wall of second-level settling pond 6 and three-level sedimentation basin 7 is both provided with collecting tank 8, set in collecting tank 8 Have and agree with and carry upwardly opening collection box 9 with it.The bottom wall of second-level settling pond 6 and three-level sedimentation basin 7 is recessed towards ground end, Collecting tank 8 is located at the lowermost end of 7 bottom wall of second-level settling pond 6 or three-level sedimentation basin.7 bottom wall of second-level settling pond 6 and three-level sedimentation basin Sediment slip into collection box 9 by gravity and along bottom wall, after collection box 9 is pulled out from collecting tank 8 after the completion of precipitation Toppled over, just complete the cleaning of second-level settling pond 6 and three-level sedimentation basin 7, cleaning mode is simple, and cleaning efficiency is high.
As shown in Fig. 2, there are two the rows connected respectively with second-level settling pond 6 and 7 inside of three-level sedimentation basin for setting on side wall 2 Water hole 12, opening of the osculum 12 inside pond body 1 are provided with the drainage door 13 for closing osculum 12.Open drainage door Water after 13 in second-level settling pond 6 or three-level sedimentation basin 7 is discharged at osculum 12, so that collection box 9 is from collecting tank 8 It is more laborsaving without being subjected to hydraulic pressure during pull-out.Drainage door 13 is hinged with pond body 1, is tightly pressed at drainage door 13 by hydraulic pressure The inlet of osculum 12 with pond body 1 without detaching.Drainage door 13 is fixedly connected with handle towards the side inside pond body 1 14, convenient for the opening of drainage door 13.
As shown in Fig. 2, due to had when collection box 9 is pulled out out of collecting tank 8 part of contaminated water scatter and in 8 heap of collecting tank Product needs the trouble being purged to sewage so as to which collection box 9 be caused to be difficult to be caught in collecting tank 8.Therefore 8 bottom wall of collecting tank is set Through-hole 16 is equipped with, sewage can discharge at through-hole 16, avoid artificially removing the trouble of sewage.
As shown in Fig. 2, be respectively arranged on level-one partition wall 3 and two level partition wall 4 for sewage by 31 He of the first-level filtering mouth of a river Two level drainage mouth 41.The first-level filtering mouth of a river 31 and two level drainage mouth 41 are located at not homonymy so that the first-level filtering mouth of a river 31 and two level drainage The distance between 41 increases of mouth, and then increase test specimen of the sewage by second-level settling pond 6 so that the filtering effect of second-level settling pond 6 Fruit enhances.
As shown in figure 3, it is both provided with strainer 10 at the first-level filtering mouth of a river 31 and two level drainage mouth 41 so that sewage enters two level The content of sediment in the sewage for flowing into second-level settling pond 6 is obstructed and greatly reduced before sedimentation basin 6 by strainer 10, so as to avoid dirt The situation that the sediment that water settles in second-level settling pond 6 is excessive and collecting box is caused to be fully loaded with.Collecting box pulls out after being fully loaded with to be compared Difficulty, and need in advance to be purged the sediment for exceeding collecting box, it is cumbersome.The first-level filtering mouth of a river 31 and two level drainage Mouth 41 is located at the top of level-one partition wall 3 and two level partition wall 4 respectively, and pond body 1 is provided with the fixing groove 11 being caught in for strainer 10.Strainer 10 need to be caught in fixing groove 11 or be extracted when removing and installing, very convenient, are cleaned or are replaced convenient for strainer 10.
As shown in figure 4,9 liang of opposed inner walls of collection box are provided with lifting slot 15, convenient for manually or mechanically by collection box 9 from receipts Collect in slot 8 and pull out.
The course of work:
It needs before carrying out the removing of sediment to second-level settling pond 6 and three-level sedimentation basin 7, opens drainage door 13, it will be in it Water release.Then to lift slot 15 as stress point pull-out out of collecting tank 8 by collection box 9.Finally topple over collection box 9, it is complete Into the cleaning of second-level settling pond 6 and three-level sedimentation basin 7.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as it is all protected in the right of the utility model by Patent Law.

Claims (8)

1. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object, including pond body (1), the pond body (1) includes four sides Wall (2) and the level-one partition wall (3) for being fixed between two opposite side walls (2) and being arranged in parallel and two level partition wall (4), described one Grade partition wall (3) and two level partition wall (4) will be divided into first stage precipitation tank (5), second-level settling pond (6) and three-level inside pond body (1) and sink Shallow lake pond (7), it is characterised in that:The second-level settling pond (6) and three-level sedimentation basin (7) bottom wall are both provided with collecting tank (8), described It is provided in collecting tank (8) and agrees with and carry upwardly opening collection box (9) with it.
2. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object according to claim 1, it is characterised in that:It is described Level-one partition wall (3) be provided with for sewage by the first-level filtering mouth of a river (31), the two level partition wall (4) be provided with for sewage by Two level drainage mouth (41), the first-level filtering mouth of a river (31) and two level drainage mouth (41) are positioned at not homonymy.
3. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object according to claim 2, it is characterised in that:It is described Strainer (10) is both provided at the first-level filtering mouth of a river (31) and two level drainage mouth (41).
4. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object according to claim 3, it is characterised in that:It is described The first-level filtering mouth of a river (31) and two level drainage mouth (41) are located at the top of level-one partition wall (3) and two level partition wall (4), the pond body respectively (1) it is provided with the fixing groove (11) being caught in for strainer (10).
5. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object according to claim 1, it is characterised in that:It is described Second-level settling pond (6) and three-level sedimentation basin (7) bottom wall are recessed towards ground end, the collecting tank (8) positioned at second-level settling pond (6) or The lowermost end of three-level sedimentation basin (7) bottom wall.
6. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object according to claim 1, it is characterised in that:It is described There are two the osculum (12) connected respectively with second-level settling pond (6) and three-level sedimentation basin (7) inside, institutes for setting on side wall (2) It states osculum (12) and the internal opening of pond body (1) is provided with the drainage door (13) for closing osculum (12), the row Water valve (13) is hinged with pond body (1), and the drainage door (13) is fixedly connected with handle (14) towards the internal side of pond body (1).
7. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object according to claim 1, it is characterised in that:It is described (9) two opposed inner walls of collection box are provided with lifting slot (15).
8. a kind of concrete sewage sedimentation basin convenient for scavenger precipitation object according to claim 1, it is characterised in that:It is described Collecting tank (8) bottom wall is provided with through-hole (16).
CN201721489335.XU 2017-11-09 2017-11-09 A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object Expired - Fee Related CN207575862U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721489335.XU CN207575862U (en) 2017-11-09 2017-11-09 A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721489335.XU CN207575862U (en) 2017-11-09 2017-11-09 A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object

Publications (1)

Publication Number Publication Date
CN207575862U true CN207575862U (en) 2018-07-06

Family

ID=62731197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721489335.XU Expired - Fee Related CN207575862U (en) 2017-11-09 2017-11-09 A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object

Country Status (1)

Country Link
CN (1) CN207575862U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112811736A (en) * 2021-01-16 2021-05-18 昆山同济市政工程有限公司 Multistage tandem type municipal sewage recovery device and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112811736A (en) * 2021-01-16 2021-05-18 昆山同济市政工程有限公司 Multistage tandem type municipal sewage recovery device and use method thereof

Similar Documents

Publication Publication Date Title
CN203447826U (en) Oil-water separator
CN208883626U (en) A kind of oil field produced water treatment facilities
CN107694156B (en) Ship type sewage precipitation treatment device
CN207324202U (en) The anti-blocking strainer of one kind unhurried current and net-filter assembly
CN207575862U (en) A kind of concrete sewage sedimentation basin convenient for scavenger precipitation object
CN215781702U (en) Sewage sedimentation tank mounting structure
CN207462730U (en) A kind of boat form settlement of sewage processing unit
CN110075575A (en) A kind of sewage treatment subsider of timely sediment separate out
CN210974348U (en) Multistage degritting filter residue pond
CN213313517U (en) Rural domestic sewage impurity precipitation device
CN208865300U (en) Sewage running piping device for filtering and collecting impurities
CN206715476U (en) A kind of high-efficiency sewage handles settling apparatus
CN209790954U (en) Sewage sedimentation treatment device
CN209638778U (en) Pipeline structure is used in the cleaning of biological bacteria equipment water tank
CN108245940A (en) A kind of settling tank in sanitary sewage disposal
CN208843825U (en) Integrated precipitating pond
CN208145616U (en) Novel settler
CN208120858U (en) A kind of purification apparatus applied to sanitary sewage
CN206404448U (en) A kind of sewage treatment water leg
CN207462735U (en) A kind of regeneration concrete detention tank
CN207228301U (en) Intercepting pollution for rainwater facility
CN219518106U (en) Sewage integrated treatment equipment
CN220589188U (en) Water treatment facilities based on slant filter
CN213760879U (en) Sewage pipeline dirt settling device
CN218740739U (en) Impurity removal device for settling basin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706