CN2075692U - Inverted u type telescopic derrick - Google Patents

Inverted u type telescopic derrick Download PDF

Info

Publication number
CN2075692U
CN2075692U CN 90208455 CN90208455U CN2075692U CN 2075692 U CN2075692 U CN 2075692U CN 90208455 CN90208455 CN 90208455 CN 90208455 U CN90208455 U CN 90208455U CN 2075692 U CN2075692 U CN 2075692U
Authority
CN
China
Prior art keywords
derrick
telescopic
telescopic section
section
thigh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 90208455
Other languages
Chinese (zh)
Inventor
王国智
朱炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Drill Tech Inst Xinjiang Petroleum Administration Bureau
Original Assignee
Drill Tech Inst Xinjiang Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drill Tech Inst Xinjiang Petroleum Administration Bureau filed Critical Drill Tech Inst Xinjiang Petroleum Administration Bureau
Priority to CN 90208455 priority Critical patent/CN2075692U/en
Publication of CN2075692U publication Critical patent/CN2075692U/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the technical field of a deep well boring derrick, relating to a telescopic gate type derrick which is composed of a fixed segment, a telescopic segment, a horizontal pulling rod, an inclined pulling rod, a telescopic pulley wheel, rails, a movable joint, an auxiliary frame, a two-layer platform, etc. The telescopic gate type derrick has no the problem of eccentricity because the two rails are arranged at the back side of the telescopic gate type derrick. The utility model has the advantages of reasonable structural design, convenient and rapid installation, reliable and firm connection, and can reduces the workload of installation before drilling and dismantlement carry and after drilling, reduces the labour intensity of workers and saves the production cost.

Description

Inverted U type telescopic derrick
The utility model belongs to deep-well and creeps into the derrick technical field.
At present, be used to creep into the drilling derrick of deep-well and ultradeep well both at home and abroad, mainly contain whole the rising of tower-type headframe, " A " type derrick and " Jiong " type and put three kinds on derrick.Tower-type headframe generally is to adopt section bar such as angle steel channel-section steel etc., by the bolt mother piece by piece up assembly unit get up, when this derrick is moved at every turn except on the smooth solid and ground that do not have any aerial barrage vertically the integral body, generally all be that it is splitted into the loose mail carrying, arrive behind the destination part again and up adorn, operating personnel will (more than 50 meter) operation in the high-altitude during mounting or dismounting, and labour intensity is very big, and abnormally dangerous, time-consuming taking a lot of work.Especially on the winter or ocean of north cold, mounting or dismounting are just difficult and dangerous more.When loose mail is removed in addition, cause easily each rod member distortion, damage, lose, and the damage of attachment bolt nut with lose just more serious.The distortion of rod member not only makes installs the difficulty that becomes, and has reduced the supporting capacity of derrick.Whole the rising of " A " type put derrick, adopts the tubing assembly welding to become the two legs of rectangular cross section, is divided into plurality of sections, installs under the level of ground (low level) by pin, by rig power derrick worked the operated in vertical position state that is raised to then.The same with the tower derrick can only be smooth solid, the whole haul in the area of aerial clear.The location, oil field in general, ground and out-of-flatness, and aerial high-voltage line interweaves as net.Drag derrick and derrick lowering or cut off high-voltage line and lose more than gain for whole, and have a strong impact on the oil field and recover the oil and produce.So after this derrick generally adopts derrick lowering, leg is splitted into several sections resettlements.Because two legs is that tubing is welded into, and can collide inevitably in transit, make tubing that depression and distortion take place.These behaviour's damages can't be repaired and proofread and correct at all, seriously influence its supporting capacity, even the forfeiture supporting capacity, cause derrick to scrap in advance." Jiong " type derrick, its section configuration are " Jiong " font structure that differs in size, and generally use hot rolling i iron (or wide flange steel section or welding I beam) assembly welding to become several sections laminated structures (being that foreleg and back leg are formed sheet by web member).Couple together between their back legs by diagonal member, drag link and pin, also couple together formation " Jiong " font work structuring between sheet and the sheet with pin, the same with " A " type derrick, install the back at low level and rise with the rig dynamic entirety and put.Because its structure is undefined structure, thus with preceding two kinds of derricks mutually weight/power ratio obviously increase, required large-scale crane quantity obviously increases during installation, installs much also time-consuming.Also unavoidably need fall during same the resettlement and break.The shortcoming of above-mentioned three kinds of derricks is conspicuous.
Have both at home and abroad at present to plant and be used for the flexible derrick of light-duty oil-well rig or workover rig shown in figure six.Its cross section also is " Jiong " font, the straight barrel structure of two sections.It is very little that shelves are opened in the front, can't adapt to moving up and down of traveling system.Derrick (well head direction) angle that tilts forward when therefore working is so this derrick also claims the masts type derrick.Service load must be shared fractional load with the canopy rope except derrick itself bears.So supporting capacity is less relatively.Only be applicable to 2000 meters with interior rig or workover rig.On its structure, it is gone up hypomere and links up by wedge block (19) (or water chestnut seat), and tubular telescopic section (18) active force is delivered to tubular canned paragraph (21) by wedge block (19).There is eccentric throw in the thigh position, and supporting capacity is restricted.Again because (21) four legs of canned paragraph are the slide rail of telescopic section (18), so, just be easy to make on the derrick and clamp between the hypomere if generation is turned round partially when flexible.Be subjected to structure influence simultaneously, the general height of this flexible derrick can not satisfy the technological requirement of creeping into deep-well about 30m.
Continuous development along with drilling technology, requirement to drilling equipment is also more and more higher, except that the requirement of satisfying growing new drilling, it is quick and convenient also must to reach installation, reduce and bore preceding installation workload, reduce labor strength and producing cost, but both satisfied drilling technology and the requirement of removal of home fast from being used to creep at present the drilling derrick of deep-well ultradeep well both at home and abroad, not having which kind of derrick to reach.
At present domestic and international various derrick disadvantages, the utility model has designed the flexible derrick of this novel " Jiong " font section.It is positive the same substantially with conventional " Jiong " derrick with side view.It can satisfy the requirement of boring deep-well, ultradeep well, in the time of and the place removal of home of high-voltage line being arranged in the landform of complexity again, carries out whole horizontal or vertical removal of home.And during with the haul of marine drilling or offshore boring island, the invasion that can hide typhoon.
" Jiong " flexible derrick mainly contains canned paragraph (figure three), telescopic section (figure four), drag link (10), diagonal member (9), flexible head pulley and auxilliary positive pulley (5), track (7), active section (12), auxiliary frame (6), quadruple board platform compositions such as (13).Each joint also adopts shaped steel (i iron, welding I beam, wide flange steel section) assembly welding slabbing, links up with attachment pegs (2) with diagonal member (9), drag link (10) between section and section, joint and the joint.Easy for installation.Connect reliable.Two tracks place the derrick back leg to look like figure (five) outward, so just can guarantee the derrick telescopic section neatly to dock and do not have off-centre with canned paragraph, owing to have only two tracks, except the head pulley that bears flexible load, auxilliary positive pulley has also been arranged in the telescopic section both sides, guarantees that telescopic section is capable of expansion and contraction.Derrick gets up to install (or level is flexible install after withdrawal again) at level telescopic section and canned paragraph cover.Or after integral body hauls new well location, can adopt multiple mode that it is hoisted into plumbness (and conventional " Jiong " type, " A " type derrick must can rise with rig power and put), because orthocenter is much far away than new design derrick from fulcrum during the derrick level, it is much bigger far away to play lift.After derrick erects, by flexible block pulley system (4) telescopic section has slowly been stretched, the at this moment flexible motion principle of head pulley (5) in track moves the same in slideway with forklift, forklift frame.Telescopic section rises and is raised to certain altitude and just active section is opened automatically.Treat telescopic section put in place the back it active section resets to nature under resetting-mechanism (14) effect opening again, dock together with telescopic section (a little higher than active section of telescopic section), and put on attachment pegs and fix, at this moment the rig front shape is stressed the same with routine " Jiong " derrick.The thigh position is alignment, continuous.During resettlement, earlier telescopic section is mentioned slightly, active section (12) is outwards opened, telescopic section just can be contracted down smoothly, after waiting to fix, can vertically haul,, at this moment haul much more steady than aforementioned three kinds of derricks because center of gravity reduces.Also can whole withdrawal level, hauled by the exclusive trail car level after falling, derrick is distorted, bending is sent out change and caused damage and can not make, at this moment can carry out remote integral moving, all dismounting at every turn when this generally speaking thus derrick is moved, reduce labor strength, saved producing cost.If on marine drilling platform, running into typhoon (or in platform haul) can withdraw telescopic section, reduces the derrick center of gravity and reduces wind area, has improved its safety, and this derrick is that other any large-scale derrick is incomparable.Now that description of drawings is as follows:
Figure one, rig front figure
Figure two, derrick side view
Figure three, derrick canned paragraph front view
Figure four, derrick telescopic section front view
Figure five, derrick canned paragraph section (overlook and cut open) figure
Figure six, light-duty flexible rig front sketch
1, joint, 2, attachment pegs on the telescopic section, 3, save under the telescopic section, 4, flexible block pulley 5, flexible head pulley and auxilliary positive pulley, 6, auxiliary frame, 7, track, 8, save on the canned paragraph, 9, diagonal member, 10, drag link, 11, the following joint of canned paragraph, 12, active section, 13, quadruple board platform, 14, open resetting-mechanism, 15, position-limit mechanism, 16, derrick foreleg, 17, the derrick back leg, 18, the tubular telescopic section, 19, wedge block (water chestnut seat), 20, pin, 21, the tubular canned paragraph.
The utility model is compared with prior art, reasonable in design, install quick and convenient, connect solid and reliable, can reduce remove after installing before boring and boring, the workload of resettlement, can reduce labour intensity again, save producing cost.

Claims (3)

1, a kind of deep-well creeps into derrick, mainly form by canned paragraph and telescopic section, it is characterized in that at the back fan of canned paragraph two slideways being installed, telescopic section back is equipped with not only lifting but also plays the pulley of centralizing function, and the derrick telescopic section is flexible by itself pulley and the slideway on the canned paragraph.
2, derrick according to claim 1, when it is characterized in that derrick is in running order, four thigh connection place end faces of canned paragraph and telescopic section align, the zero lap section, the center line of four thighs is continuous separately.
3, derrick according to claim 1 is characterized in that the thigh center lines constitute behind the thigh or two before two front or back geometry are trapezoidal, and preceding thigh is approximately square with the side view that constitutes with the rear flank thigh.
CN 90208455 1990-06-12 1990-06-12 Inverted u type telescopic derrick Withdrawn CN2075692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90208455 CN2075692U (en) 1990-06-12 1990-06-12 Inverted u type telescopic derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90208455 CN2075692U (en) 1990-06-12 1990-06-12 Inverted u type telescopic derrick

Publications (1)

Publication Number Publication Date
CN2075692U true CN2075692U (en) 1991-04-24

Family

ID=4888700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90208455 Withdrawn CN2075692U (en) 1990-06-12 1990-06-12 Inverted u type telescopic derrick

Country Status (1)

Country Link
CN (1) CN2075692U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105643207A (en) * 2016-01-11 2016-06-08 南通振华重型装备制造有限公司 Construction technology of derrick of self-elevating drilling platform
CN106050125A (en) * 2016-07-01 2016-10-26 珠海市英格尔特种钻探设备有限公司 Portable full hydraulic engineering investigation drilling rig
CN109577866A (en) * 2018-10-18 2019-04-05 中石化四机石油机械有限公司 Hydraulic telescopic derrick construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105643207A (en) * 2016-01-11 2016-06-08 南通振华重型装备制造有限公司 Construction technology of derrick of self-elevating drilling platform
CN105643207B (en) * 2016-01-11 2017-11-14 南通振华重型装备制造有限公司 A kind of self-elevating drilling platform derrick building technology
CN106050125A (en) * 2016-07-01 2016-10-26 珠海市英格尔特种钻探设备有限公司 Portable full hydraulic engineering investigation drilling rig
CN106050125B (en) * 2016-07-01 2018-05-29 珠海市英格尔特种钻探设备有限公司 A kind of portable all-hydraulic engineering investigation drilling machine
CN109577866A (en) * 2018-10-18 2019-04-05 中石化四机石油机械有限公司 Hydraulic telescopic derrick construction method

Similar Documents

Publication Publication Date Title
CN111472789B (en) Pipe jacking construction process
CN111029968B (en) Multilayer modularization spanning frame that does not have a power failure suitable for intensive block construction
CN206288191U (en) A kind of rudder oar fixture vehicle
CN201068371Y (en) Self-hoisting tower crane
CN216474543U (en) Stay cable crane for offshore cable-stayed bridge construction
CN208292485U (en) TBM headstock turnniing over and lifting device
CN2075692U (en) Inverted u type telescopic derrick
CN217419356U (en) Self-lifting pier high-altitude construction anti-falling device
CN206279527U (en) A kind of deep concrete mixture ship pile frame system
CN213356779U (en) Overweight steel column translation transportation installation device
CN212866926U (en) Movable supporting beam dismounting device
CN208327150U (en) New engineering machinery repairs platform
CN111396076A (en) Pipe jacking construction equipment
CN216429655U (en) Jet fan arrangement structure for subway tunnel
CN216999624U (en) Device for flexible support construction under complex marine working condition environment
CN215160545U (en) Arch rib cross brace hoisting device
CN217872835U (en) Tunnel top-lifting arch bracket tool suitable for assisting tunnel-to-main-tunnel construction
CN211167337U (en) Novel installation of screw device
CN2651086Y (en) Multifunctional explosion-proof emergency drainage vehicle
CN114197313B (en) Intelligent monitoring device for construction safety of tower for hoisting river-crossing arch bridge
CN208056602U (en) Tool adhesion type material automatic climbing mechanism
CN218561055U (en) Tourist bus slide mechanism suitable for trailer bores platform
CN212202062U (en) Pipe jacking construction equipment
CN212105054U (en) Hole drilling operation platform in tunnel of electrified railway
CN213387468U (en) Super-large tower crane ballast underframe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee