CN109577866A - Hydraulic telescopic derrick construction method - Google Patents

Hydraulic telescopic derrick construction method Download PDF

Info

Publication number
CN109577866A
CN109577866A CN201811444326.8A CN201811444326A CN109577866A CN 109577866 A CN109577866 A CN 109577866A CN 201811444326 A CN201811444326 A CN 201811444326A CN 109577866 A CN109577866 A CN 109577866A
Authority
CN
China
Prior art keywords
derrick
section
saved
oil cylinder
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811444326.8A
Other languages
Chinese (zh)
Other versions
CN109577866B (en
Inventor
方刚
陈新龙
彭太锋
金宗祥
张斌
张振勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Equipment Corp
Sinopec Siji Petroleum Machinery Co Ltd
Original Assignee
Sinopec Oilfield Equipment Corp
Sinopec Siji Petroleum Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Equipment Corp, Sinopec Siji Petroleum Machinery Co Ltd filed Critical Sinopec Oilfield Equipment Corp
Publication of CN109577866A publication Critical patent/CN109577866A/en
Application granted granted Critical
Publication of CN109577866B publication Critical patent/CN109577866B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/24Devices, e.g. jacks, adapted for uninterrupted lifting of loads fluid-pressure operated
    • B66F3/25Constructional features
    • B66F3/30Constructional features with positive brakes or locks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F2700/00Lifting apparatus
    • B66F2700/05Hydraulic jacks
    • B66F2700/055Jacks with a single cylinder
    • B66F2700/057Pistons, e.g. telescopic; Cylinders or sealing joints; Hydraulic travel-limiting devices or shock damping

Abstract

The present invention provides a kind of hydraulic telescopic derrick construction method, comprising the following steps: s1, will save under derrick, save mutual fitting on section and derrick in derrick, and passing through locking pin and lock;S2, derrick is transported to construction site with transport vehicle;S3, crane lifting derrick simultaneously make section and derrick footing pin joint under derrick;S4, crane assist derrick telescoping to working position, install guy wire, are reliably fixed derrick;S5, the locking pin for unclamping section under derrick, being saved in derrick on section and derrick, connect and open hydraulic station, first save on section and derrick in section telescopic oil cylinder jacking derrick in starting, and section in derrick is set locking by starting latch gear afterwards in place;Telescopic oil cylinder is saved in starting to jack section on derrick in place, is locked the position saved on derrick by self-locking device;By above step, derrick lifting construction is realized.The present invention can overcome defect in the prior art, and transportation lengths are smaller, and road transport performance is more preferably.

Description

Hydraulic telescopic derrick construction method
Technical field
The present invention relates to the derrick field of oil and gas industry well workover, especially a kind of hydraulic telescopic derrick Construction method.
Background technique
Currently, oil and gas industry workover rig mainly uses self-propelled truck mounted well servicing unit.However in China Sichuan oil The oil/gas well multidigit on the ground such as field, Changqing oilfields is in mountain area, hilly country, and oily area's road transport condition is poor, and conventional is self-propelled Truck mounted well servicing unit leads to the work that its passage capacity is bad, can not adapt to such area because of the reasons such as cross-country power, turning radius Industry environment.
According to investigation and analysis, to solve this problem, the mainstream solution taken is as follows in oily area: using a kind of passability Fabulous crawler-type pigging machine substitutes the winch of conventional workover rig, cooperates a kind of free-standing two sections pin joint or bolted derrick, should Derrick head room 29m, two section foldings are hauled with platform trailer when transport, and when operation first uses crane to assist will upper and lower two section company It is connected together, is then lifted to a kind of dedicated derrick and stands up on the bracket of vehicle, stand up the lift oil tank on vehicle by derrick and push Bracket derrick telescoping in place, then accomplishes fluently guy wire, and derrick stands up after vehicle withdraws bracket and voluntarily sails out of, crawler-type pigging machine in place into Row workover treatment.Such as the big operating space telescope pole recorded in Chinese patent literature CN2769489Y.
Main problem existing for the solution is as follows:
1, the derrick transportation lengths of free-standing two section pin joints or bolt are larger.A height of 29 meters of headroom of two section pin joints or bolt well Frame, the folded total length of two section of travel position are about 15 meters, and turning radius requires high;
2, the process being attached upper and lower two sections derrick is time-consuming, laborious and safety is bad, raising operating difficulties;
3, derrick lifts to derrick to the process for standing up trolley bracket is time-consuming, laborious and safety is bad;
4, it is with high costs to stand up vehicle for the derrick being equipped with.Conventional derrick stands up car owner will be by second-class chassis, hydraulic oil container, preceding branch The compositions such as support, rear support, derrick bracket, lift oil tank, locking cylinder, adjusting oil cylinder, cost is costly.
5, during derrick lifting, the lifting capacity of crane is needed to reach 25 tons or more, and sling height is more demanding.? There are security risks in work progress.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of hydraulic telescopic derrick construction methods, can shorten The erection difficulty of derrick is greatly reduced in the transportation lengths of derrick, reduces the raising operation difficulty of derrick.
In order to solve the above technical problems, the technical scheme adopted by the invention is that: a kind of hydraulic telescopic derrick is applied Work method, the following steps are included:
S1, it will be saved under derrick, save mutual fitting on section and derrick in derrick, and passed through locking pin and lock;
S2, derrick is transported to construction site with transport vehicle;
S3, crane lifting derrick simultaneously make section and derrick footing pin joint under derrick;
S4, crane assist derrick telescoping to working position, install guy wire, are reliably fixed derrick;
S5, the locking pin for saving under derrick, saving in derrick and saving on derrick is unclamped, connects and open hydraulic station, first saves and stretch in starting It is saved on section and derrick in contracting cylinder jacking derrick, starts latch gear afterwards in place for section in derrick and set locking;
Telescopic oil cylinder is saved in starting to jack section on derrick in place, is locked the position saved on derrick by self-locking device;
By above step, derrick lifting construction is realized.
In preferred scheme, when derrick recycles, first section telescopic oil cylinder section will be withdrawn on derrick in starting, be locked with locking pin It is saved on derrick, then section telescopic oil cylinder section and section on derrick will be withdrawn in derrick in starting, to save in locking pin locking derrick, be hung Vehicle integral lifting derrick unclamps guy wire, to horizontal position, will complete derrick reclaimer operation by above step below derrick.
In preferred scheme, in step s4, during derrick telescoping, from a derrick removal at least section telescopic oil cylinder;
In the lower section of horizontal position derrick setting jacking foundation pit, one end of telescopic oil cylinder is installed in jacking foundation pit by twisted seat, stretches The other end of oil cylinder is connect by twisted seat with derrick, and during crane raising, the piston rod of telescopic oil cylinder is synchronous to be stretched out;
After the completion of raising, telescopic oil cylinder is reinstalled into derrick.
In preferred scheme, in the derrick, it is being equipped with middle section telescopic oil cylinder between section in section under derrick and derrick, In derrick section and derrick on section between be equipped with upper section telescopic oil cylinder;
It includes saving to save bottom boom frame, lower section bottom boom frame and lower section side under side truss and one under two that cross section is saved under the derrick The end of truss is fixedly connected;
It includes saving to save bottom boom frame in side truss and one in two that cross section is saved in the derrick, middle section bottom boom frame and in Section side truss end position be fixedly connected, in derrick save cross section at " H " shape, middle section telescopic oil cylinder be located at lower section bottom boom frame and Between middle section bottom boom frame;
Section cross section includes two upper section side truss and upper section bottom boom framves, upper section bottom boom frame and close upper section side on the derrick The position of truss end is fixedly connected, and cross section is saved on derrick into " H " shape, upper section telescopic oil cylinder is located at middle section bottom boom frame and upper section Between telescopic oil cylinder.
In preferred scheme, in lower section side, the inside both ends of truss are respectively equipped with lower section bottom gag lever post and the limit of lower section top Bar;
Bottom gag lever post and middle section top gag lever post, lower section bottom gag lever post and middle section lowest limit position are saved in the difference of the both ends of middle section side truss Sliding contact between bar, sliding contact between lower section top gag lever post and middle section top gag lever post;
In middle section side, the inner free end of truss is equipped with middle the first gag lever post of section, and the second limit is saved in middle section bottom boom is provided with Bar, in upper section side, the both ends of truss are respectively equipped with upper section top gag lever post and upper section bottom gag lever post, middle the first gag lever post of section and upper section Push up sliding contact between gag lever post, sliding contact between middle the second gag lever post of section and upper section bottom gag lever post.
In preferred scheme, telescopic oil cylinder is above saved being equipped with one between section on section in derrick and derrick, is additionally provided with oil Cylinder guiding device, in the oil cylinder guiding device, two upper guiding swing arms are located at the two sides of upper section telescopic oil cylinder, and upper guiding is put Arm with to be installed in the upper guide swinging seat that saves in derrick hinged, be equipped with upper guide ring in the free end of upper guiding swing arm;
Upper guiding tension spring is equipped in upper guiding swing arm and derrick between section;
Be equipped with upper guiding collision block in upper guiding swing arm, be installed with upper directive slide track on section on derrick, upper directive slide track with lead To collision block sliding contact, so that upper guiding swing arm is saved on derrick in open configuration in the partial journey of jacking, and in part Guide ring, which closes up, in stroke embraces section telescopic oil cylinder;
Middle section telescopic oil cylinder there are two setting between saving in section under derrick and derrick, is additionally provided with oil cylinder guiding device, the oil In cylinder guiding device, it is located in the middle under middle guiding swing arm and derrick that the lower section bottom boom frame that saves is hinged, the middle side positioned at two sides is led The lower section side truss saved under to swing arm and derrick is hinged, and the free end of middle guiding swing arm and the guiding swing arm of middle side is equipped with middle guiding Ring;
Middle guiding swing arm is connected by saving under middle guiding tension spring and derrick, and middle side guiding swing arm is oriented to tension spring and derrick by middle side Lower section connection;
Directive slide track, middle directive slide track and middle guiding swing arm and middle side in being additionally provided with are saved in derrick is oriented to swing arm sliding contact, So that middle guiding swing arm and the guiding swing arm of middle side are saved in derrick in open configuration in the partial journey of jacking, and in part row Middle guide ring, which closes up, in journey embraces middle section telescopic oil cylinder.
In preferred scheme, is saved under derrick and be equipped with latch gear, the latch gear close to the position of top end In, seat of shipping and reselling on another market is fixedly connected with section under derrick, and the one end shipped and resell on another market and seat of shipping and reselling on another market are hinged, and it is described to ship and resell on another market as L shape, in shipping and reselling on another market The outside of portion's bending is equipped with lug boss, and lock pin cylinder one end is connect with lug boss, and the other end is fixedly connected with section under derrick, works as lock pin When cylinder retracts, the free end shipped and resell on another market is extend under derrick in section;
It is saved on derrick and is equipped with self-locking device close to the position of bottom end, in the self-locking device, be located at two sides It is saved on one end of self-locking voussoir and derrick hingedly, self-locking voussoir is L shape, the outside bent in the middle part of self-locking voussoir and self-locking push rod One end it is hinged, the other end of self-locking push rod and self-locking swing rod are hinged, and hinged, self-locking pendulum is saved on the middle part of self-locking swing rod and derrick Bar, which also passes through to save on self-locking tension spring and derrick, to be connected, so that self-locking voussoir tends to open and free end reaches except saving on derrick State;
The free end of self-locking voussoir is equipped with lozenges, so that section can slip off during jacking on derrick, and in dropping process Middle formation support.
In preferred scheme, is saved under derrick and be additionally provided with antihunting device, the vibrationproof with the tip position saved in derrick Device is located in the position of bottom boom frame, the antihunting device, and vibrationproof crossbeam is slidably connected with bottom boom frame, vibrationproof crossbeam Side is installed with the vibrationproof voussoir for being inserted between gag lever post, and vibrationproof crossbeam is connect by vibrationproof tension spring with bottom boom frame, anti- It shakes to be equipped between crossbeam and bottom boom frame and disengages cylinder;
Derrick lifting in place after, the vibrationproof voussoir of antihunting device is inserted under derrick in section and derrick between section and derrick On middle section and derrick between section.
In preferred scheme, the side saved under derrick is connect with derrick brace, is adjusted derrick and is tilted 3 ~ 8 °.
In preferred scheme, before derrick lifting, when derrick is in a horizontal position, the top mounting suspension saved on derrick is total At;
It saves and installs the operating platform in derrick.
A kind of hydraulic telescopic derrick construction method provided by the invention, by using above scheme, have with Under the utility model has the advantages that
1, defect in the prior art can be overcome, transportation lengths are smaller, and road transport performance is more preferably.The three of a height of 29 meters of headroom Telescope pole is saved, the total length saved after being retracted to lower section with middle section in travel position is only 12.8 meters, longer than the former transport It spends 2.2 meters short.
2, installation process of the invention is more convenient, safe.Hydraulic telescopic derrick, is saved on derrick when transport and well Section is recycled under derrick in section in frame, and when operation first assists to sling on derrick using crane, and is embedded near well head in anchor hole Derrick footing pin joint, reuse crane by derrick it is whole by horizontality be lifted to about 85 ° of ground state, draw good taut Rope, manipulation telescopic oil cylinder successively stretches out in save, upper section, crawler-type pigging machine can carry out workover treatment in place.
3, it is many also to stand up vehicle economy than derrick for the hydraulic station provisioned in the present invention and telescopic oil cylinder.It is put down used in the present invention Plate trailer, crane, hydraulic station, derrick stand up vehicle can be achieved multi-well location share, they can complete one-to-manyly derrick transport, Raising, decentralization operation.Therefore in more free-standing two sections pin joint or bolted derrick and three-section type hydraulic of the invention When the cost of telescopic derrick, the difference is that, the former needs to be equipped with dedicated derrick and stands up vehicle, and the present invention is then only needed to match and is ready for use on The hydraulic station and telescopic oil cylinder of derrick lifting, being capable of substantially save the cost.
4, by using the mode of telescopic oil cylinder and crane auxiliary raising, it can be improved the safety during raising.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
Structural schematic diagram when Fig. 1 is derrick transport in the present invention.
Fig. 2 is the structural schematic diagram of raising process of the present invention.
Fig. 3 is the structural schematic diagram that raising of the present invention is completed.
Fig. 4 is the structural schematic diagram after the present invention is installed.
Fig. 5 is cross-sectional view of the invention.
Structural schematic diagram when oil cylinder guiding device of the Fig. 6 between section on section in derrick in the present invention and derrick closes up.
Structural schematic diagram when oil cylinder guiding device of the Fig. 7 between section on section in derrick in the present invention and derrick opens.
Fig. 8 is B-B schematic cross-sectional view in Fig. 7.
Fig. 9 is A-A schematic cross-sectional view in Fig. 6.
The schematic view of the front view of oil cylinder guiding device of the Figure 10 between section in section under derrick in the present invention and derrick.
The schematic view of the front view of oil cylinder guiding device of the Figure 11 between section in section under derrick in the present invention and derrick.
Figure 12 is structural representation when middle guiding swing arm is opened in middle directive slide track drive cylinder guiding device in the present invention Figure.
Figure 13 is the C-C schematic cross-sectional view of Figure 11.
Figure 14 is the structural schematic diagram of hanger assembly in the present invention.
Figure 15 is the structural schematic diagram of latch gear in the present invention.
Figure 16 is the structural schematic diagram of self-locking device in the present invention.
Figure 17 is the structural schematic diagram of antihunting device in the present invention.
In figure: save 1 under derrick, lower section side truss 101, lower section limited block 102, lower section bottom boom frame 103, lower section bottom gag lever post 104, lower section top gag lever post 105 saves 2 in derrick, middle the first gag lever post of section 201, middle section top gag lever post 202, middle section side truss 203, middle section bottom gag lever post 204, middle section bottom boom frame 205, middle section telescopic oil cylinder 206, middle the second gag lever post of section 207 saves on derrick 3, upper section top gag lever post 301, upper section side truss 302, upper section bottom gag lever post 303, upper section bottom boom frame 304, upper section telescopic oil cylinder 305, antihunting device 4, vibrationproof voussoir 41, vibrationproof crossbeam 42, disengagement cylinder 43, vibrationproof tension spring 44, derrick footing 5, hanger assembly 6, Hanger assembly 6, the first directive wheel 62, pulley blocks 63, the second directive wheel 64, self-locking device 7, self-locking voussoir 71, self-locking push rod 72, Self-locking tension spring 73, self-locking swing rod 74, oil cylinder guiding device 8, upper guiding swing arm 81, upper guiding collision block 82, upper guide ring 83 are above led To tension spring 84, upper directive slide track 85, upper guide swinging seat 86, middle guiding swing arm 801, middle guide ring 802, middle side is oriented to swing arm 803, middle side is oriented to tension spring 804, middle guiding tension spring 805, middle directive slide track 806, latch gear 9, seat 91 of shipping and reselling on another market, and ships and resell on another market 92, convex Rise portion 93, lock pin cylinder 94, derrick brace 10, well head center line 11, operating platform 12, guy wire assembly 13, cover conjunction state derrick 14, Transport support 15, locking pin 16, derrick 1000, crane 1001, telescopic oil cylinder 1002 jack foundation pit 1003.
Specific embodiment
Embodiment 1:
In conjunction with attached drawing, the hydraulic telescopic derrick for the method for the present invention as shown in Fig. 3 ~ 5, stretch by a kind of hydraulic Contracting derrick, it include mutual fitting derrick under section 1, save 3 on section 2 and derrick in derrick, saved under derrick 1 with save 2 in derrick Between be equipped with middle section telescopic oil cylinder 206, in derrick section 2 and derrick on section 3 between be equipped with upper section telescopic oil cylinder 305.Thus it ties Structure, by saving 1 under the derrick of mutual fitting, in derrick, transportation lengths can be greatly reduced in section 3 on section 2 and derrick, reduce turning Radius can adapt to the transport routes feature in mountain area oil field.The jacking cylinder of setting can be greatly reduced to crane sling height Demand.
In preferred scheme such as Fig. 5, it includes saving under side truss 101 and one under two that 1 cross section is saved under the derrick Bottom boom frame 103 is saved, lower section bottom boom frame 103 is fixedly connected with the end of lower section side truss 101;
It includes saving to save bottom boom frame 205, middle section bottom boom frame in side truss 203 and one in two that 2 cross sections are saved in the derrick 205 are fixedly connected with the position close to 203 end of middle section side truss, and 2 cross sections are saved in derrick into " H " shape, middle section telescopic oil cylinder 206 between lower section bottom boom frame 103 and middle section bottom boom frame 205;
It includes two upper section side truss 302 and upper section bottom boom framves 304 that 3 cross sections are saved on the derrick, upper section bottom boom frame 304 with Position close to 302 end of upper section side truss is fixedly connected, and 3 cross sections are saved on derrick into " H " shape, upper section telescopic oil cylinder 305 Between Yu Zhongjie bottom boom frame 205 and upper section telescopic oil cylinder 305.Thus structure can obtain the position of biggish installation jacking cylinder Between emptying.And stress condition is also more reliable.It is further preferred that the upper section telescopic oil cylinder 305 and middle section in this example are flexible Oil cylinder 206 uses the structure of multi-stage oil cylinder, such as three-level oil cylinder, and thus structure, further decreases the installation space of oil cylinder.Into one It walks in preferred scheme, is additionally provided with orifice plate on middle section bottom gag lever post 204 and lower section bottom gag lever post 104, when fitting, two orifice plates Overlapping, convenient for penetrating locking pin, to avoid being disengaged in transportational process.Gag lever post 303 and middle the second gag lever post of section 207 at upper section bottom Between also be provided with orifice plate for locking mutually.Convenient for penetrating locking pin, to avoid being disengaged in transportational process.
In preferred scheme such as Fig. 5, in lower section side, the inside both ends of truss 101 are respectively equipped with 104 He of lower section bottom gag lever post Lower section top gag lever post 105;
Bottom gag lever post 204 and middle section top gag lever post 202, lower section bottom gag lever post 104 are saved in the difference of the both ends of middle section side truss 203 The sliding contact between middle section bottom gag lever post 204, sliding contact between lower section top gag lever post 105 and middle section top gag lever post 202;
In middle section side, the inner free end of truss 203 is equipped with middle the first gag lever post of section 201, is equipped with middle section in middle section bottom boom frame 205 Second gag lever post 207, in upper section side, the both ends of truss 302 are respectively equipped with upper section top gag lever post 301 and upper section bottom gag lever post 303, Sliding contact between middle the first gag lever post of section 201 and upper section top gag lever post 301, middle the second gag lever post of section 207 and upper section lowest limit position Sliding contact between bar 303.Thus structure can be improved section 1 under derrick, the sliding saved on 2 and derrick between section 3 in derrick is matched Precision is closed, saves the gap saved in 1, derrick saved between 3 on 2 and derrick in this application, under derrick within 5mm.Higher essence Degree advantageously reduces the vibration of derrick.
In preferred scheme such as Fig. 6 ~ 9, telescopic oil cylinder is above saved being equipped with one between section 3 on section 2 in derrick and derrick 305, it is additionally provided with oil cylinder guiding device 8, in the oil cylinder guiding device 8, it is flexible oily that two upper guiding swing arms 81 are located at upper section The two sides of cylinder 305, upper guiding swing arm 81 and the upper guide swinging seat 86 for being installed in section 2 in derrick are hinged, in upper guiding swing arm 81 Free end be equipped with upper guide ring 83;
Upper guiding tension spring 84 is equipped in upper guiding swing arm 81 and derrick between section 2;
It is equipped with upper guiding collision block 82 in upper guiding swing arm 81, is saved on derrick and is installed with upper directive slide track 85 on 3, upper guiding is slided Rail 85 and guiding 82 sliding contact of collision block, so that the upper partial journeys for being oriented to swing arm 81 and saving 3 jackings on derrick, such as jacking Open configuration is in preceding half of stroke, and guide ring 83 closes up and embraces in partial journey, such as rear half of stroke of jacking Upper section telescopic oil cylinder 305.By the oil cylinder guiding device 8 of setting, the movement of section telescopic oil cylinder 305 can be guided, in reduction Save the lateral force of telescopic oil cylinder 305.The upper directive slide track 85 being arranged and the upper guiding swing arm 81 swung, can avoid interfering.
In preferred scheme such as Figure 10 ~ 13, middle section telescopic oil cylinder there are two setting between 2 is saved in section 1 under derrick and derrick 206, it is additionally provided with oil cylinder guiding device, in the oil cylinder guiding device, is located in the middle middle guiding swing arm 801 and is saved under derrick 1 lower section bottom boom frame 103 is hinged, and the lower section side truss 101 of section 1 is hinged under the guiding swing arm 803 of middle side and derrick positioned at two sides, The free end of middle guiding swing arm 801 and the guiding swing arm 803 of middle side is equipped with middle guide ring 802;
Middle guiding swing arm 801 is connect by middle guiding tension spring 805 with section 1 under derrick, and middle side guiding swing arm 803 is oriented to by middle side Tension spring 804 is connect with section 1 under derrick;
In derrick section 2 be additionally provided in directive slide track 806, middle directive slide track 806 and middle guiding swing arm 801 and the guiding swing arm of middle side 803 sliding contacts, so that middle guiding swing arm 801 and the guiding swing arm 803 of middle side save the partial journey of 2 jackings in derrick, such as Open configuration, and the middle guide ring 802 in partial journey, such as rear half of stroke of jacking are in preceding half of stroke of jacking Close up and embraces middle section telescopic oil cylinder 206.By above-mentioned structure, can guide in save the movement of telescopic oil cylinder 206, save in reduction and stretch The lateral force of contracting oil cylinder 206 improves the reliability and safety of jacking.
In preferred scheme such as Figure 15,1 is saved under derrick and is equipped with latch gear 9 close to the position of top end, it is described In latch gear 9, seat 91 of shipping and reselling on another market 1 is fixedly connected with section under derrick, ship and resell on another market 92 one end and seat 91 of shipping and reselling on another market it is hinged, described ships and resell on another market 92 be L shape, and shipping and reselling on another market, the outside that 92 middle parts are bent is equipped with lug boss 93, and 94 one end of lock pin cylinder is connect with lug boss 93, another End 1 is fixedly connected with section under derrick, and when lock pin cylinder 94 retracts, 92 free end of shipping and reselling on another market extend under derrick and saves in 1.Thus it ties Structure, before section 3 starts jacking on derrick, the piston rod of lock pin cylinder 94 stretches out, and makes 92 rotations of shipping and reselling on another market, and 92 freedom portion of shipping and reselling on another market is left The side wall of section 1 under derrick, section 2 can be jacked freely in derrick at this time.When section 2 jacks in place in derrick, the work of lock pin cylinder 94 Stopper rod retracts, and makes 92 rotations of shipping and reselling on another market, and shipping and reselling on another market 92 is shelved on and ships and resell on another market on seat 91, and 92 free end of shipping and reselling on another market extend under derrick and saves 1 It is interior, saved in derrick 2 lower section or derrick in section 2 pin hole in, telescopic oil cylinder 206 is saved in pressure release at this time, saves 2 in derrick It falls in and ships and resell on another market on 92, it will 2 support of section in derrick.
In preferred scheme such as Figure 16,3 are saved on derrick and is equipped with self-locking device 7 close to the position of bottom end, it is described In self-locking device 7, being located at section 3 on one end and derrick of the self-locking voussoir 71 of two sides, hingedly, self-locking voussoir 71 is L shape, The outside bent in the middle part of self-locking voussoir 71 and one end of self-locking push rod 72 are hinged, the other end of self-locking push rod 72 and self-locking swing rod 74 Hingedly, 3 are saved hingedly on the middle part of self-locking swing rod 74 and derrick, self-locking swing rod 74 also passes through self-locking tension spring 73 and 3 company of section on derrick It connects, so that self-locking voussoir 71 tends to open and free end reaches the state saved except 3 on derrick;
The free end of self-locking voussoir 71 is equipped with lozenges, so that section 3 can slip off during jacking on derrick, and is falling Support is formed in journey.Thus structure, when saving 3 on jacking derrick, due to the presence of lozenges, self-locking voussoir 71 not will form dry It relates to, and saves telescopic oil cylinder 305 after section 3 jacks in place on derrick, in pressure release, section 3 is fallen on self-locking voussoir 71 on derrick, is formed Secure support.In preferred scheme, it is additionally provided with rotational pin, section 3 is hinged on rotational pin and derrick, and the top of rotational pin, which is equipped with, to be hooked Head is equipped with pin on self-locking voussoir 71, and rotational pin is used to catch on the pin of self-locking voussoir 71 when self-locking voussoir 71 is shunk, from And lock the position of self-locking voussoir 71, in order to which section 3 is fallen on derrick.
In preferred scheme such as Figure 17, the tip position that section 2 in 1 and derrick is saved under derrick is additionally provided with antihunting device 4, institute The antihunting device 4 stated is located in the position of bottom boom frame, the antihunting device 4, and vibrationproof crossbeam 42 and the sliding of bottom boom frame connect It connects, the side of vibrationproof crossbeam 42 is installed with the vibrationproof voussoir 41 for being inserted between gag lever post, and vibrationproof crossbeam 42 is drawn by vibrationproof Spring 44 is connect with bottom boom frame, is equipped between vibrationproof crossbeam 42 and bottom boom frame and is disengaged cylinder 43.Thus structure can be avoided under derrick The shaking on 2 and derrick between section 3 is saved in section 1, derrick, improves the stability of entire derrick, especially reduces what vibration generated Influence of the alternate stress to entire derrick.Under default conditions, vibrationproof voussoir 41, which is inserted under derrick in section 1 and derrick, saves 2, or It is saved between 3 on section 2 and derrick in derrick, when needing to jack or withdrawing derrick, disengages the piston rod stretching of cylinder 43, make vibrationproof wedge Block 41 is deviate from.
Preferred scheme such as Fig. 3, in 4, saved under derrick 1 bottom and derrick footing 5 it is hinged, saved under derrick 1 side with Derrick brace 10 connects, so that entire derrick tilts 3 ~ 8 °.In preferred scheme, derrick tilts 5 °.Thus structure increases derrick Working space.
In preferred scheme such as Fig. 4, entire derrick is connect with guy wire assembly 13, to ensure consolidating for derrick;
Preferred scheme such as Fig. 2, in 12, the top that 3 are saved on derrick is equipped with hanger assembly 6;In the hanger assembly 6, hang The first directive wheel 62, pulley blocks 63 and the second directive wheel 64 are equipped in frame 61, for installing wirerope.
In preferred scheme such as Fig. 4,2 are saved in derrick and is equipped with operating platform 12.
Embodiment 2:
On the basis of embodiment 1, as in Fig. 1 ~ 3, a kind of hydraulic telescopic derrick construction method, comprising the following steps:
S1, it will be saved under derrick in 1, derrick and save 3 mutual fittings on section 2 and derrick, and locked by locking pin 16;
S2, derrick 1000 is transported to construction site with transport vehicle;
S3, crane 1001 lift by crane derrick 1000 and make section 1 and 5 pin joint of derrick footing under derrick;
In preferred scheme, before 1000 raising of derrick, when derrick 1000 is in a horizontal position, 3 top installation is saved on derrick Hanger assembly 6;
Section 2 installs the operating platform 12 in derrick.Thus structure avoids operation in the sky, further increases construction safety.Or Under horizontality, 12 foundation structure is first installed the operating platform, to reduce the intensity of aerial work.
S4, crane 1001 assist derrick telescoping 1000 to working position, install guy wire, are reliably fixed derrick 1000;
In preferred scheme such as Fig. 2, during derrick telescoping, from a derrick removal at least section telescopic oil cylinder 1002;
Ground is set lower than in the lower section of horizontal position derrick 1000, inclined jacking foundation pit 1003, the one of telescopic oil cylinder 1002 End is installed in jacking foundation pit 1003 by twisted seat, and the other end of telescopic oil cylinder 1002 is connect with derrick 1000 by twisted seat, hung During 1001 raising of vehicle, the piston rod of telescopic oil cylinder 1002 is synchronous to be stretched out;Raising is assisted by the telescopic oil cylinder 1002 of setting, It is capable of providing auxiliary lifting force, to reduce the lifting tonnage demand to crane, construction equipment cost is reduced, also solves on mountain In area's road, the passage problem of heavy construction equipment.And telescopic oil cylinder 1002 can also mention derrick 1000 during raising For Auxiliary support, so that the safety during greatly improving raising, avoids accident caused by human operational error.
After the completion of raising, telescopic oil cylinder 1002 is reinstalled into derrick 1000.
S5, it unclamps section 1 under derrick, section 2 and the locking pin 16 for saving 3 on derrick in derrick, connects and open hydraulic station, first open Section telescopic oil cylinder 206, which jacks in derrick, in dynamic saves 3 on section 2 and derrick, and starting latch gear 9 will save 2 positions afterwards in derrick in place Locking;
Telescopic oil cylinder 305 is saved in starting to jack section 3 on derrick in place, is locked the position of section 3 on derrick by self-locking device 7 It is fixed;
In preferred scheme such as Fig. 3,1000 raising of derrick in place after, the vibrationproof voussoir 41 of antihunting device 4 is inserted under derrick It is saved between 3 on section 2 and derrick between section 2 and in derrick in section 1 and derrick.
In preferred scheme, the side of section 1 is connect with derrick brace 10 under derrick, is adjusted derrick 1000 and is tilted 3 ~ 8 °.By This structure can reduce interference of the derrick 1000 to operating equipment.
By above step, derrick lifting construction is realized.
In preferred scheme, when derrick recycles, first section telescopic oil cylinder 305 withdraws section 3 on derrick in starting, with locking pin 3 are saved on 16 locking derricks, then section telescopic oil cylinder 206 withdraws section 3 on section 2 in derrick and derrick in starting, with locking pin 16 2 are saved in locking derrick, 1001 integral lifting derrick 1000 of crane unclamps guy wire, by 1000 lower section of derrick to horizontal position, derrick Transport support 15 is arranged in 1000 lower sections, convenient for transporting derrick 1000 by flat car.Derrick 1000 is completed by above step to return It brings drill to an end work.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as limitation of the invention, this Shen Please in embodiment and embodiment in feature in the absence of conflict, can mutual any combination.Protection model of the invention The technical solution that should be recorded with claim is enclosed, the equivalent replacement side of technical characteristic in the technical solution recorded including claim Case is protection scope.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.

Claims (10)

1. a kind of hydraulic telescopic derrick construction method, it is characterized in that the following steps are included:
S1, (1) will be saved under derrick, save (3) mutual fitting on section (2) and derrick in derrick, and pass through locking pin (16) locking;
S2, derrick (1000) are transported to construction site with transport vehicle;
S3, crane (1001) lifting derrick (1000) simultaneously make to save (1) and derrick footing (5) pin joint under derrick;
S4, crane (1001) auxiliary derrick telescoping (1000) to working position, install guy wire, are reliably fixed derrick (1000);
S5, it unclamps section (1) under derrick, section (2) and the locking pin (16) for saving (3) on derrick in derrick, connects and open hydraulic station, It is saved in section telescopic oil cylinder (206) jacking derrick in first starting and saves (3) on (2) and derrick, start latch gear (9) afterwards in place for well The locking of (2) position is saved in frame;
Telescopic oil cylinder (305) are saved in starting (3) jacking is saved on derrick in place, (3) will be saved on derrick by self-locking device (7) Position locking;
By above step, derrick lifting construction is realized.
2. a kind of hydraulic telescopic derrick construction method according to claim 1, it is characterized in that: when derrick recycles, First section telescopic oil cylinder (305) will save (3) withdrawal in starting on derrick, to save (3) on locking pin (16) locking derrick, then start Middle section telescopic oil cylinder (206) is withdrawn section (3) on (2) and derrick is saved in derrick, to save (2) in locking pin (16) locking derrick, Crane (1001) integral lifting derrick (1000) unclamps guy wire, complete by above step by derrick (1000) lower section to horizontal position At derrick (1000) reclaimer operation.
3. a kind of hydraulic telescopic derrick construction method according to claim 1, it is characterized in that: in step s4, During derrick telescoping, from a derrick removal at least section telescopic oil cylinder (1002);
It is solid by twisted seat in one end of the lower section of horizontal position derrick (1000) setting jacking foundation pit (1003), telescopic oil cylinder (1002) It is located at jacking foundation pit (1003), the other end of telescopic oil cylinder (1002) is connect by twisted seat with derrick (1000), in crane (1001) during raising, the piston rod of telescopic oil cylinder (1002) is synchronous to be stretched out;
After the completion of raising, telescopic oil cylinder (1002) is reinstalled into derrick (1000).
4. a kind of hydraulic telescopic derrick construction method according to claim 1, it is characterized in that: the derrick (1000) in, middle section telescopic oil cylinder (206) is equipped between (2) saving to save in (1) and derrick under derrick, saved in derrick (2) and It is saved on derrick and is equipped with upper section telescopic oil cylinder (305) between (3);
It includes saving to save bottom boom frame (103) under side truss (101) and one under two that (1) cross section is saved under the derrick, lower section Bottom boom frame (103) is fixedly connected with the end of lower section side truss (101);
It includes saving in side truss (203) and one to save bottom boom frame (205) in two that (2) cross section is saved in the derrick, middle section Bottom boom frame (205) is fixedly connected with close to the position of middle section side truss (203) end, (2) cross section is saved in derrick into " H " shape, Middle section telescopic oil cylinder (206) is between lower section bottom boom frame (103) and middle section bottom boom frame (205);
It includes two upper section side truss (302) He Shangjie bottom boom framves (304), upper section bottom boom that (3) cross section is saved on the derrick Frame (304) is fixedly connected with the position close to upper section side truss (302) end, and (3) cross section is saved on derrick into " H " shape, upper section Telescopic oil cylinder (305) is between middle section bottom boom frame (205) and upper section telescopic oil cylinder (305).
5. a kind of hydraulic telescopic derrick construction method according to claim 4, it is characterized in that: in lower section side truss (101) inside both ends are respectively equipped with lower section bottom gag lever post (104) and lower section top gag lever post (105);
Bottom gag lever post (204) and middle section top gag lever post (202), the lower section lowest limit are saved in the difference of the both ends of middle section side truss (203) Sliding contact between position bar (104) and middle section bottom gag lever post (204), lower section top gag lever post (105) and middle section top gag lever post (202) Between sliding contact;
It is equipped with middle the first gag lever post of section (201) in the inner free end of middle section side truss (203), is set in middle section bottom boom frame (205) There is middle the second gag lever post of section (207), is respectively equipped with upper section top gag lever post (301) He Shangjie at the both ends of upper section side truss (302) Bottom gag lever post (303), sliding contact between middle the first gag lever post of section (201) and upper section top gag lever post (301), middle section second limit Sliding contact between bar (207) and upper section bottom gag lever post (303).
6. a kind of hydraulic telescopic derrick construction method according to claim 4, it is characterized in that: being saved in derrick (2) and on derrick it saves and is equipped with upper section telescopic oil cylinder (305) between (3), be additionally provided with oil cylinder guiding device (8), the oil In cylinder guiding device (8), two upper guiding swing arm (81) are located at the two sides of upper section telescopic oil cylinder (305), upper guiding swing arm (81) Be installed in derrick save (2) upper guide swinging seat (86) hingedly, it is upper guiding swing arm (81) free end be equipped with upper guiding Ring (83);
It is saved in upper guiding swing arm (81) and derrick and is equipped with upper guiding tension spring (84) between (2);
It is equipped with upper guiding collision block (82) on upper guiding swing arm (81), is saved on derrick and is installed with upper directive slide track (85) on (3), Upper directive slide track (85) and guiding collision block (82) sliding contact, so that upper guiding swing arm (81) saves the portion of (3) jacking on derrick Open configuration is in branch's journey, and guide ring (83) closes up and embraces upper section telescopic oil cylinder (305) in partial journey;
It is set between (2) there are two middle section telescopic oil cylinder (206) saving to save in (1) and derrick under derrick, is additionally provided with oil cylinder guiding dress It sets, in the oil cylinder guiding device, is located in the middle the lower section bottom boom frame for saving (1) under middle guiding swing arm (801) and derrick (103) hingedly, positioned at two sides middle side guiding swing arm (803) and derrick under save (1) lower section side truss (101) hingedly, in lead Middle guide ring (802) are equipped with to the free end of swing arm (801) and middle side guiding swing arm (803);
Middle guiding swing arm (801) is connect by middle guiding tension spring (805) with section (1) under derrick, and middle side guiding swing arm (803) passes through Middle side guiding tension spring (804) connect with section (1) under derrick;
It saves (2) in derrick to be additionally provided with middle directive slide track (806), middle directive slide track (806) and middle guiding swing arm (801) and middle side It is oriented to swing arm (803) sliding contact, so that middle guiding swing arm (801) and middle side guiding swing arm (803) save (2) jacking in derrick Partial journey in be in open configuration, and middle guide ring (802) closes up and embraces middle section telescopic oil cylinder in partial journey (206).
7. a kind of hydraulic telescopic derrick construction method according to claim 1, it is characterized in that: being saved under derrick (1) position close to top end is equipped with latch gear (9), in the latch gear (9), saves under seat of shipping and reselling on another market (91) and derrick (1) be fixedly connected, ship and resell on another market (92) one end and ship and resell on another market seat (91) hingedly, described ship and resell on another market (92) are L shape, are being shipped and resell on another market in (92) The outside of portion's bending is equipped with lug boss (93), and lock pin cylinder (94) one end is connect with lug boss (93), saves (1) under the other end and derrick Be fixedly connected, when lock pin cylinder (94) retract when, ship and resell on another market (92) free end extend under derrick save (1) in;
(3) are saved on derrick is equipped with self-locking device (7) close to the position of bottom end, in the self-locking device (7), difference position In saving (3) hingedly on one end of the self-locking voussoir (71) of two sides and derrick, self-locking voussoir (71) is L shape, self-locking voussoir (71) The outside of middle part bending and one end of self-locking push rod (72) are hinged, and the other end of self-locking push rod (72) and self-locking swing rod (74) are cut with scissors It connects, saves (3) hingedly on the middle part of self-locking swing rod (74) and derrick, self-locking swing rod (74) is also by self-locking tension spring (73) and derrick (3) connection is saved, so that self-locking voussoir (71) tends to open and free end reaches the state saved except (3) on derrick;
The free end of self-locking voussoir (71) is equipped with lozenges, so that (3) are saved on derrick can slip off during jacking, and under Support is formed during falling.
8. according to a kind of described in any item hydraulic telescopic derrick construction methods of claim 4 ~ 7, it is characterized in that: in well The tip position that section (2) in (1) and derrick is saved under frame is additionally provided with antihunting device (4), and the antihunting device (4) is located at the bottom of close to The position of truss, in the antihunting device (4), vibrationproof crossbeam (42) is slidably connected with bottom boom frame, and the one of vibrationproof crossbeam (42) Side is installed with the vibrationproof voussoir (41) for being inserted between gag lever post, and vibrationproof crossbeam (42) passes through vibrationproof tension spring (44) and bottom boom frame Connection is equipped between vibrationproof crossbeam (42) and bottom boom frame and disengages cylinder (43);
Derrick (1000) raising in place after, the vibrationproof voussoir (41) of antihunting device (4) is inserted under derrick and saves in (1) and derrick It saves between (2) and is saved in derrick and saved between (3) on (2) and derrick.
9. a kind of hydraulic telescopic derrick construction method according to claim 1, it is characterized in that: saving (1) under derrick Side connect with derrick brace (10), adjust derrick (1000) tilt 3 ~ 8 °.
10. a kind of hydraulic telescopic derrick construction method according to claim 1 or 2, it is characterized in that: derrick (1000) before raising, when derrick (1000) is in a horizontal position, the top mounting suspension assembly (6) of (3) is saved on derrick;
(2) are saved in derrick installs the operating platform (12).
CN201811444326.8A 2018-10-18 2018-11-29 Construction method of independent hydraulic telescopic derrick Active CN109577866B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201811216282 2018-10-18
CN2018112162823 2018-10-18

Publications (2)

Publication Number Publication Date
CN109577866A true CN109577866A (en) 2019-04-05
CN109577866B CN109577866B (en) 2020-09-08

Family

ID=65925292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811444326.8A Active CN109577866B (en) 2018-10-18 2018-11-29 Construction method of independent hydraulic telescopic derrick

Country Status (1)

Country Link
CN (1) CN109577866B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719241A (en) * 2021-09-03 2021-11-30 中石化四机石油机械有限公司 Derrick structure of ocean workover rig and installation method thereof
CN114961583A (en) * 2022-08-01 2022-08-30 胜利油田利丰石油设备制造有限公司 Vertical sleeved self-elevating derrick
CN115231469A (en) * 2022-06-02 2022-10-25 浙江工业大学台州研究院 Steel reinforcement cage hoisting seat capable of avoiding bending of steel reinforcement

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2469551B1 (en) * 1979-11-12 1985-01-25 Boniface Andre
CN2075692U (en) * 1990-06-12 1991-04-24 新疆石油管理局钻井工艺研究所 Inverted u type telescopic derrick
CN2426912Y (en) * 2000-02-13 2001-04-18 河南石油勘探局南阳石油机械厂 Oil derrick for petroleum drilling and repairing equipment
CN2769489Y (en) * 2004-06-18 2006-04-05 宝鸡石油机械有限责任公司 Large operating space telescopic pole
CN201650135U (en) * 2010-03-11 2010-11-24 中国石化集团江汉石油管理局第四机械厂 Novel vertical telescopic derrick
CN205063812U (en) * 2015-09-01 2016-03-02 山东科瑞机械制造有限公司 Novel drilling machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2469551B1 (en) * 1979-11-12 1985-01-25 Boniface Andre
CN2075692U (en) * 1990-06-12 1991-04-24 新疆石油管理局钻井工艺研究所 Inverted u type telescopic derrick
CN2426912Y (en) * 2000-02-13 2001-04-18 河南石油勘探局南阳石油机械厂 Oil derrick for petroleum drilling and repairing equipment
CN2769489Y (en) * 2004-06-18 2006-04-05 宝鸡石油机械有限责任公司 Large operating space telescopic pole
CN201650135U (en) * 2010-03-11 2010-11-24 中国石化集团江汉石油管理局第四机械厂 Novel vertical telescopic derrick
CN205063812U (en) * 2015-09-01 2016-03-02 山东科瑞机械制造有限公司 Novel drilling machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719241A (en) * 2021-09-03 2021-11-30 中石化四机石油机械有限公司 Derrick structure of ocean workover rig and installation method thereof
CN115231469A (en) * 2022-06-02 2022-10-25 浙江工业大学台州研究院 Steel reinforcement cage hoisting seat capable of avoiding bending of steel reinforcement
CN115231469B (en) * 2022-06-02 2023-11-14 浙江工业大学台州研究院 Steel reinforcement cage lifting seat capable of avoiding bending steel reinforcement
CN114961583A (en) * 2022-08-01 2022-08-30 胜利油田利丰石油设备制造有限公司 Vertical sleeved self-elevating derrick
CN114961583B (en) * 2022-08-01 2022-10-21 胜利油田利丰石油设备制造有限公司 Vertical sleeved self-elevating derrick

Also Published As

Publication number Publication date
CN109577866B (en) 2020-09-08

Similar Documents

Publication Publication Date Title
CN101809248B (en) Inland rig
RU2483186C2 (en) Method for facilitating drilling plant installation
CN109577866A (en) Hydraulic telescopic derrick construction method
CN105019930B (en) A kind of mine hydraulic bracket assembly platform
CN203296707U (en) Telescopic mounting type derrick
WO2022247957A1 (en) Hydraulic lifting apparatus, hydraulic lifting system having same, and lifting cargo carrying platform
CN101655000B (en) Full-hydraulic top-drive truck-mounted drilling rig
CN104727745B (en) Method and apparatus for setting up drilling rig
CN201486467U (en) Fully hydraulic top-drive truck-mounted drilling rig
CN201027495Y (en) Drill floor base of oil-well rig
CN209053569U (en) Hydraulic telescopic derrick
CN106245984B (en) Jack up Multifunctional creeping gin pole
CN204827251U (en) Novel suit derrick upright
US20140259987A1 (en) Telescoping Derrick
CN210659920U (en) Pulling type drilling machine derrick base structure
CN104709154B (en) Movable engineering vehicle for motor vehicle service and maintenance
CN109611031A (en) Hydraulic telescopic derrick
RU2538550C1 (en) Mobile telescopic drilling device of vertical drilling
CN110526141A (en) A kind of crane arm apparatus for turning of type fast erecting tower crane
CN207999221U (en) A kind of marine floating type platform tourist bus integral type compensation device
CN110029946A (en) A kind of installation method of vertical derrick telescoping
CN212958595U (en) Multifunctional well testing vehicle
CN104481417A (en) Linear guide rail type speed-multiplying feeding device for coal bed gas vehicle-mounted drilling machine
CN215208156U (en) Vehicle-mounted lifting device
RU211095U1 (en) MOBILE INSTALLATION

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant