CN212202062U - Pipe jacking construction equipment - Google Patents
Pipe jacking construction equipment Download PDFInfo
- Publication number
- CN212202062U CN212202062U CN202020681326.6U CN202020681326U CN212202062U CN 212202062 U CN212202062 U CN 212202062U CN 202020681326 U CN202020681326 U CN 202020681326U CN 212202062 U CN212202062 U CN 212202062U
- Authority
- CN
- China
- Prior art keywords
- plate
- jack
- push
- pipe jacking
- construction equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000010276 construction Methods 0.000 title claims abstract description 41
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 54
- 239000010959 steel Substances 0.000 claims abstract description 54
- 238000009434 installation Methods 0.000 claims abstract description 19
- 239000000463 material Substances 0.000 claims description 24
- 230000008878 coupling Effects 0.000 claims 2
- 238000010168 coupling process Methods 0.000 claims 2
- 238000005859 coupling reaction Methods 0.000 claims 2
- 230000005012 migration Effects 0.000 claims 1
- 238000013508 migration Methods 0.000 claims 1
- 238000009417 prefabrication Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 7
- 230000007306 turnover Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 230000002441 reversible effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及一种顶管施工设备,包括设置在工作井的预埋钢板,预埋钢板上设置有用于固定千斤顶缸体的安装位,预埋钢板上设置有至少两个推动单元管节的推板,推板的板面立式布置且对称设置在预埋钢板上,千斤顶的油缸启动且连动推板水平移动,推板与单元管节的一端抵靠且朝向工作井的洞口移动,该顶管施工设备在实际施工过程中,在待施工的路径中段位置挖设工作井,将该顶管施工设备的预埋钢板吊送至工作井的低端位置,而后安装固定,并且将千斤顶缸体固定在预埋钢板的安装位,用于推送单元管节的推板对称设置在预埋钢板上,启动千斤顶能够实现对工作井双向的井孔进行顶管操作,显著机头的周转利用率,进而可显著提高顶管的施工效率。
The utility model relates to a pipe jacking construction equipment, comprising a pre-embedded steel plate arranged in a working well, an installation position for fixing a jack cylinder body is arranged on the pre-embedded steel plate, and at least two push-unit pipe sections are arranged on the pre-embedded steel plate. Push plate, the plate surface of the push plate is arranged vertically and symmetrically on the embedded steel plate, the oil cylinder of the jack starts and moves the push plate horizontally, the push plate abuts one end of the unit pipe section and moves towards the hole of the working well, In the actual construction process of the pipe jacking construction equipment, a working well is dug at the middle of the path to be constructed, the pre-embedded steel plate of the pipe jacking construction equipment is hoisted to the low end of the working well, and then installed and fixed, and the jack The cylinder body is fixed at the installation position of the embedded steel plate, and the push plate used to push the unit pipe section is symmetrically arranged on the embedded steel plate. The start-up jack can realize the pipe jacking operation of the two-way well hole of the working well, and the turnover of the machine head can be greatly utilized. rate, which can significantly improve the construction efficiency of pipe jacking.
Description
技术领域technical field
本实用新型涉及工程技术领域,尤其是一种顶管施工设备。The utility model relates to the technical field of engineering, in particular to a pipe jacking construction equipment.
背景技术Background technique
顶管机在常规的泥水平衡(土压平衡)施工中经常见到,上述泥水平衡施工工艺中,顶管机顶压住单元管节单次只能向一个方向顶进,这是因为用于顶压单元管节朝向洞口内移动的千斤顶缸体需要后靠背支撑,所述靠背设置在顶进的反方向,上述的靠背多为混凝土成型靠背,在单元管节顶入洞口施工之前,需要在工作井的底部用混凝土制作成靠背,待2到3天方能确保靠背完全凝固,而后对千斤顶的安装,因此在实施对单元管节顶管操作时,造成效率低下,在实施对洞口另一端的管节顶管操作时,需要重新安装轨道和重新调入机头,花费时间很长,降低了机头的周转利用率。The pipe jacking machine is often seen in the conventional mud-water balance (earth pressure balance) construction. In the above mud-water balance construction process, the pipe jacking machine can only push the unit pipe section in one direction at a time. The jack cylinder that pushes the unit tube section toward the hole needs to be supported by a backrest, and the backrest is arranged in the opposite direction of the jacking. The above-mentioned backrests are mostly concrete formed backrests. The bottom of the working well is made of concrete as the backrest. It takes 2 to 3 days to ensure that the backrest is completely solidified, and then the jack is installed. Therefore, when the pipe jacking operation of the unit pipe section is carried out, it will cause low efficiency. During the pipe jacking operation of the pipe section, it is necessary to re-install the track and re-adjust the machine head, which takes a long time and reduces the turnover rate of the machine head.
实用新型内容Utility model content
本实用新型的目的在于:提供一种顶管施工设备,可显著提高顶管施工的效率,能够同时实现对工作井多方向的顶管操作。The purpose of the utility model is to provide a pipe jacking construction equipment, which can significantly improve the efficiency of the pipe jacking construction, and can simultaneously realize the multi-directional pipe jacking operation of the working well.
本实用新型中的解决技术问题采用如下技术方案:Solving the technical problem in the utility model adopts the following technical scheme:
一种顶管施工设备,包括设置在工作井的预埋钢板,所述预埋钢板上设置有用于固定千斤顶缸体的安装位,所述预埋钢板上设置有至少两个推动单元管节的推板,所述推板的板面立式布置且对称设置在预埋钢板上,所述千斤顶的油缸启动且连动推板水平移动,所述推板与单元管节的一端抵靠且朝向工作井的洞口移动。A pipe jacking construction equipment includes a pre-embedded steel plate arranged in a working well, the pre-embedded steel plate is provided with a mounting position for fixing a jack cylinder, and at least two push-unit pipe sections are provided on the pre-embedded steel plate. Push plate, the plate surface of the push plate is vertically arranged and symmetrically arranged on the embedded steel plate, the oil cylinder of the jack is activated and moves horizontally in conjunction with the push plate, the push plate abuts against one end of the unit tube section and faces toward The opening of the working well moves.
本实用新型还存在以下技术特征:The utility model also has the following technical features:
所述千斤顶的缸体竖直布置,所述千斤顶通过连动机构与推板连接,所述千斤顶竖直移动且连动推板水平移动。The cylinder body of the jack is arranged vertically, the jack is connected with the push plate through a linkage mechanism, and the jack moves vertically and moves horizontally in conjunction with the push plate.
所述预埋钢板的周向方向间隔设置有撑杆,所述撑杆的杆端与工作井的内壁抵靠。The pre-embedded steel plate is provided with struts at intervals in the circumferential direction, and the rod ends of the struts abut against the inner wall of the working well.
所述撑杆的一端与预埋钢板铰接,所述撑杆的铰接轴水平布置,所述撑杆与支撑机构连接,所述支撑机构用于调节撑杆与预埋钢板之间的夹角。One end of the strut is hinged with the embedded steel plate, the hinge axis of the strut is arranged horizontally, and the strut is connected with a support mechanism for adjusting the angle between the strut and the embedded steel plate.
所述支撑机构包括支撑滚轮,所述支撑滚轮的轮芯水平且与撑杆长度方向垂直,所述支撑滚轮的轮缘与撑杆的杆身抵靠,所述支撑滚轮的轮架固定在调节板上,所述调节板上立式布置有调节丝杆,所述调节丝杆的上端伸出预埋钢板的上板面,所述调节丝杆的上端设置有调节螺母。The support mechanism includes a support roller, the wheel core of the support roller is horizontal and perpendicular to the length direction of the strut, the rim of the support roller is in contact with the shaft of the strut, and the wheel frame of the support roller is fixed on the adjusting rod. On the plate, an adjustment screw is vertically arranged on the adjustment plate, the upper end of the adjustment screw extends out of the upper plate surface of the pre-embedded steel plate, and the upper end of the adjustment screw is provided with an adjustment nut.
所述撑杆为伸缩杆结构,所述撑杆的前端铰接设置有弧形顶板,所述弧形顶板的外缘与工作井的内壁抵靠,所述弧形顶板的铰接轴水平且与撑杆垂直布置。The strut is a telescopic rod structure, the front end of the strut is hingedly provided with an arc top plate, the outer edge of the arc top plate abuts against the inner wall of the working well, and the hinge axis of the arc top plate is horizontal and is in line with the strut. The rods are arranged vertically.
所述推板的下端与轨道构成水平方向的滑动配合,所述轨道水平且平行间隔设置有两排。The lower end of the push plate and the rail form a horizontal sliding fit, and the rail is arranged in two rows horizontally and at a parallel interval.
所述轨道的前端设置有承接单元管节的接料滑架,所述接料滑架由多根接料滑杆水平间隔构成,所述多根接料滑杆与轨道平行布置,所述多根接料滑杆围合成弧形板结构,所述接料滑架与轨道构成长度方向的位置可调配合。The front end of the track is provided with a material receiving carriage for receiving the unit tube section, and the material receiving carriage is composed of a plurality of material receiving sliding bars at horizontal intervals, and the plurality of material receiving sliding bars are arranged in parallel with the track, and the The root splicing slide bar is enclosed into an arc-shaped plate structure, and the splicing carriage and the track form an adjustable fit in the length direction.
所述多根接料滑杆的两端设置有安装支杆,所述安装支杆竖直向下延伸且构成一体,所述推板的外缘整体呈圆弧形板状结构,所述推板的边缘设置有避让缺口,所述避让缺口沿着沿着推板的长度方向贯穿布置,所述避让缺口用于与接料滑杆形成避让。The two ends of the plurality of material receiving sliding rods are provided with installation support rods, the installation support rods extend vertically downward and form an integral body, and the outer edge of the push plate has an arc-shaped plate structure as a whole. The edge of the plate is provided with avoidance gaps, the avoidance gaps are arranged along the length direction of the push plate, and the avoidance gaps are used to form a gap with the material receiving slide bar.
所述预埋钢板上立式设置有立柱,所述立柱上设置有用于固定千斤顶的固定法兰盘,所述千斤顶的活塞杆竖直向下且与推杆的一端铰接,所述推杆的另一端与推板铰接,所述推杆两端的铰接轴水平且与推板的移动方向垂直,所述工作井的底部预制有底板,所述底板上立式设置有预留螺栓,所述预留螺栓上端伸出固定法兰盘的上板面且设置有螺母。The pre-embedded steel plate is vertically provided with a column, and the column is provided with a fixed flange for fixing the jack. The piston rod of the jack is vertically downward and is hinged with one end of the push rod. The other end is hinged with the push plate, the hinge shafts at both ends of the push rod are horizontal and perpendicular to the moving direction of the push plate, the bottom of the working well is prefabricated with a bottom plate, and the bottom plate is vertically provided with reserved bolts. The upper end of the left bolt protrudes from the upper plate surface of the fixed flange and is provided with a nut.
与已有技术相比,本实用新型的有益效果体现在:该顶管施工设备在实际施工过程中,在待施工的路径中段位置挖设工作井,将该顶管施工设备的预埋钢板吊送至工作井的低端位置,而后安装固定,并且将千斤顶缸体固定在预埋钢板的安装位,用于推送单元管节的推板对称设置在预埋钢板上,启动千斤顶能够实现对工作井双向的井孔进行顶管操作,显著机头的周转利用率,进而可显著提高顶管的施工效率。Compared with the prior art, the beneficial effect of the present utility model is reflected in: in the actual construction process of the pipe jacking construction equipment, a working well is dug at the middle of the path to be constructed, and the pre-embedded steel plate of the pipe jacking construction equipment is hoisted. It is sent to the low-end position of the working well, and then installed and fixed, and the jack cylinder is fixed at the installation position of the embedded steel plate, and the push plate used to push the unit pipe section is symmetrically arranged on the embedded steel plate. The pipe jacking operation is carried out in the two-way wellbore of the well, which can significantly improve the turnover rate of the machine head, thereby significantly improving the construction efficiency of the pipe jacking.
附图说明Description of drawings
图1和图2是顶管施工设备位于工作井内的两种视角结构示意图;Fig. 1 and Fig. 2 are two kinds of perspective structure schematic diagrams that the pipe jacking construction equipment is located in the working well;
图3是顶管施工设备位于工作井内且移出底板后的结构示意图;Fig. 3 is the structural schematic diagram after the pipe jacking construction equipment is located in the working well and removed from the bottom plate;
图4是顶管施工设备为与工作井内的主视图;Fig. 4 is the front view of pipe jacking construction equipment and working well;
图5是顶管施工设备的结构示意图;Fig. 5 is the structural representation of pipe jacking construction equipment;
图6是顶管施工设备的主视图;Fig. 6 is the front view of pipe jacking construction equipment;
图7和图8是顶管施工设备中部分结构的两种视角结构示意图;Fig. 7 and Fig. 8 are two kinds of perspective structure schematic diagrams of the partial structure in the pipe jacking construction equipment;
图9是推板的结构示意图。FIG. 9 is a schematic diagram of the structure of the push plate.
具体实施方式Detailed ways
参照图1至图9,对本顶管施工设备的结构特征详述如下:1 to 9, the structural features of the pipe jacking construction equipment are described in detail as follows:
一种顶管施工设备,包括设置在工作井10的预埋钢板20,所述预埋钢板20上设置有用于固定千斤顶30缸体的安装位,所述预埋钢板20上设置有至少两个推动单元管节的推板40,所述推板40的板面立式布置且对称设置在预埋钢板20上,所述千斤顶30的油缸启动且连动推板40水平移动,所述推板40与单元管节的一端抵靠且朝向工作井10的洞口移动;A pipe jacking construction equipment includes a
结合图1至图5所示,该顶管设备设备吊送至工作井10内之前,首先需要进行工作井10的挖设,在顶管施工路径的中段位置挖设该工作井10,工作井10内预先预留安装螺栓用于安装预埋钢板20,利用桁吊将该预埋钢板20吊设在工作筋10内,并且通过预埋螺栓固定,而后,将千斤顶30的缸体安装在预埋钢板20的安装位上,启动千斤顶30,连动推板40朝向各自的洞口顶进,从而实现对工作井10双向的同时顶管操作,当工作井的井孔一侧的机头出现故障时,工作井另一侧还能正常行进,以减少由于单向顶进时出现机头故障导致整个工程停工的严重问题。1 to 5, before the pipe jacking equipment is hoisted into the working well 10, the working well 10 needs to be excavated first, and the working well 10 is dug at the middle position of the pipe jacking construction path. Installation bolts are reserved in advance in the 10 for installing the embedded
作为本实用新型的优选方案,为减少千斤顶30占用工作井10的横向空间,使得工作井10留有充足的横向空间用来布置其他设备,所述千斤顶30的缸体竖直布置,所述千斤顶30通过连动机构与推板40连接,所述千斤顶30竖直移动且连动推板40水平移动;As a preferred solution of the present invention, in order to reduce the horizontal space of the working well 10 occupied by the
上述的千斤顶30竖直移动,将竖直移动转化为推板40的水平移动,从而实现对单元管节一端的顶进操作,逐渐对顶管进行顶进,完成施工操作,上述的千斤顶30竖向布置,使得千斤顶30在工作井10内的横向占用空间较小,从而预留有足够的空间供其他设备安装。The above-mentioned
为实现对预埋钢板20的稳定可靠安装,所述预埋钢板20的周向方向间隔设置有撑杆50,所述撑杆50的杆端与工作井10的内壁抵靠;In order to realize the stable and reliable installation of the embedded
首先利用桁吊设备将预埋钢板20吊设在工作井10内,并且平稳安装,利用撑杆50的杆端与工作井10的内壁抵靠并且安装,从而可有效实现对该预埋钢板20进行有效的固定安装,避免千斤顶30工作时的反向作用下,使得预埋钢板20抬起;First, the embedded
为实现对撑杆50与工作井10的内壁有效抵靠,确保整个设备的稳定安装,所述撑杆50的一端与预埋钢板20铰接,所述撑杆50的铰接轴水平布置,所述撑杆50与支撑机构连接,所述支撑机构用于调节撑杆50与预埋钢板20之间的夹角;In order to effectively abut the
桁吊设备吊送预埋钢板20时,撑杆50斜向下延伸,并且预埋钢板20水平状态沉入工作井10的井底位置,而后撑杆50的杆端与工作井10的内壁抵靠,调节支撑机构,减少撑杆50与预埋钢板20之间的夹角,使得夹角变小,进而能够使得撑杆50的杆端与工作井10的内壁稳定抵靠,以确保对整个设备的顶紧安装操作。When the truss hoisting equipment lifts the embedded
为实现对撑杆50与预埋钢板20之间夹角的调整,所述支撑机构包括支撑滚轮51,所述支撑滚轮51的轮芯水平且与撑杆50长度方向垂直,所述支撑滚轮51的轮缘与撑杆50的杆身抵靠,所述支撑滚轮51的轮架固定在调节板52上,所述调节板52上立式布置有调节丝杆53,所述调节丝杆53的上端伸出预埋钢板20的上板面,所述调节丝杆53的上端设置有调节螺母54;In order to realize the adjustment of the angle between the
在实际调节操作时,当预埋钢板20吊设在工作井10的井底后,利用大扳手工具拧动调节螺母54,使得调节板52向上抬升,从而使得支撑滚轮51朝向撑杆51的杆端移动,进而使得撑杆51与预埋钢板20之间的夹角变小,从而能够有效将预埋钢板20固定在工作井10内,以实现对设备的有效固定。During the actual adjustment operation, after the
更为具体地,所述撑杆50为伸缩杆结构,所述撑杆50的前端铰接设置有弧形顶板55,所述弧形顶板55的外缘与工作井10的内壁抵靠,所述弧形顶板55的铰接轴水平且与撑杆50垂直布置;More specifically, the
上述的撑杆50为套杆状结构,从而方便实现对撑杆50长度进行调节,调节合适的长度后,将整个预埋钢板20及撑杆50吊设在工作井10内,以实现对预埋钢板20的固定,而后转动调节螺母54,使得弧形顶板55的边缘与工作井10的内壁抵靠,以实现对整个设备的稳定固定,并且调整好推板40的位置,使得推板40的移动方向恰好位于井孔的孔口位置处。The above-mentioned
为实现对单元管节的水平渐进式推送,所述推板40的下端与轨道60构成水平方向的滑动配合,所述轨道60水平且平行间隔设置有两排。In order to realize the horizontal and progressive push of the unit tube section, the lower end of the
更为优选地,所述轨道60的前端设置有承接单元管节的接料滑架61,所述接料滑架61由多根接料滑杆611水平间隔构成,所述多根接料滑杆611与轨道60平行布置,所述多根接料滑杆611围合成弧形板结构,所述接料滑架61与轨道60构成长度方向的位置可调配合;More preferably, the front end of the
上述的接料滑架61能够有效实现对单个单元管节的兜起来,使得单元管节为管芯水平的状态与接料滑杆611的杆身抵靠,启动上述的千斤顶30,使得推板40水平移动且与接料滑杆611的移动方向平行,从而能够有效将单元管节水平推送至井孔内,以实现对单元管节的逐渐推送操作。The above-mentioned
更为具体地,为有效将单元管节推送至井孔内,并且使得单元管节与滑架61分离,所述多根接料滑杆611的两端设置有安装支杆612,所述安装支杆612竖直向下延伸且构成一体,所述推板40的外缘整体呈圆弧形板状结构,所述推板40的边缘设置有避让缺口41,所述避让缺口41沿着沿着推板40的长度方向贯穿布置,所述避让缺口41用于与接料滑杆611形成避让;More specifically, in order to effectively push the unit pipe section into the wellbore and separate the unit pipe section from the
千斤顶30启动后,连动推板40水平移动,推板40水平移动且使得避让缺口41与接料滑杆611形成水平方向移动时的避让,从而能够有效将接料滑杆611上的单元管节从井孔的一端逐渐顶入,以完成顶管操作,通过调节接料滑架61与轨道60的位置,以适配接料滑架61与井孔的位置,以确保单元管节顶入井孔后,能够与接料滑架61有效脱离。After the
最后,为实现对推板40的水平驱动,所述预埋钢板20上立式设置有立柱71,所述立柱71的上端设置有用于固定千斤顶30的固定法兰盘72,所述千斤顶30的活塞杆竖直向下且与推杆73的一端铰接,所述推杆73的另一端与推板40铰接,所述推杆73两端的铰接轴水平且与推板40的移动方向垂直,所述工作井10的底部预制有底板80,所述底板80上立式设置有预留螺栓81,所述预留螺栓81上端伸出固定法兰盘72的上板面且设置有螺母;Finally, in order to realize the horizontal driving of the
上述的千斤顶30活塞竖直布置,通过固定法兰盘72能够实现对千斤顶30缸体的有效固定,千斤顶30竖直移动且对推杆73的驱动时,连动推板40沿着轨道60滑动,从而实现对单元管节一端的水平顶进操作,完成对顶管施工;The above-mentioned piston of the
在实际操作时,根据工作井10的直径和所需要推进的管节数量、管节直径以及推进长度,对千斤顶30的尺寸作出合适的选择,针对与现有施工时,千斤顶30的长度多为1.5m,固定法兰盘72的直径多为2m,所述底板80的直径为2~3m,所述预留螺栓81沿着底板80周向方向等角度间隔设置16到24组,并且在固定法兰盘72上设置同样数量的穿孔;In actual operation, the size of the
当实施对千斤顶30安装时,利用起吊设备将千斤顶30吊挂至工作井10内,而后使得固定法兰盘72上的穿孔全部穿过预留螺栓81,使得固定法兰盘72与底板80贴合,而后在预留螺栓81上分别设置螺母,从而可有效实现对千斤顶30的有效固定,确保与工作井10底部固定的可靠度。When carrying out the installation of the
上述的千斤顶30推送推杆73的受力分析可以得出,千斤顶30的缸体承受竖直向上的反向分力,因此,该预制有底板80与预留螺栓81通过多个安装位实现紧固,进而实现对设备的稳定安装。The above-mentioned force analysis of the
下面介绍一下该顶管施工工艺,所述顶管施工工艺使用了上述的设备,所述顶管施工工艺包含如下步骤:The pipe jacking construction process is described below. The pipe jacking construction process uses the above-mentioned equipment, and the pipe jacking construction process includes the following steps:
第一步、确定好顶进路线,在顶进路线的中段位置挖设工作井10;The first step is to determine the jacking route, and dig a working well 10 in the middle of the jacking route;
第二步、在工作井10的底部浇筑混凝土基预埋螺栓,在工作井内壁上同样设置预埋螺栓;The second step is to pour concrete-based embedded bolts at the bottom of the working well 10, and also set the embedded bolts on the inner wall of the working well;
第三步、在工作井10的底部挖设基坑,在基坑内浇筑混凝土,而后混凝土凝固后,将底板80放置在基坑内,使得底板80摆放平整,在基坑内再次浇筑混凝土,将混凝土覆盖住底板80,在底板80的周向方向间隔布置预留螺栓81,在工作井内壁上同样设置预埋螺栓;In the third step, a foundation pit is dug at the bottom of the working well 10, concrete is poured in the foundation pit, and then after the concrete is solidified, the
第四步、调节支撑机构,使得撑杆50与预埋钢板20之间的夹角变小,并且使得撑杆50的杆端与工作筋10的孔壁抵靠,并且通过螺母与工作井10内壁的预埋螺栓紧固;The fourth step is to adjust the support mechanism so that the angle between the
第五步、调试好液压站,将单个单元管节吊送至接料滑架61上,使得单元管节的管口与井孔的孔口对应;The fifth step is to debug the hydraulic station, and hoist the single unit pipe section to the
第六步、启动千斤顶30,使得千斤顶30的活塞杆伸长,连动推板40水平移动,且推送单元管节顶入井孔内,完成对单个单元管节的顶进;The sixth step, start the
第七步、重复第五步及第六步,直至将井孔内排布好单元管节。Step 7: Repeat steps 5 and 6 until the unit pipe sections are arranged in the wellbore.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments are to be considered in all respects as exemplary and not restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is therefore intended that the All changes within the meaning and range of the required equivalents are embraced within the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of embodiments, not each embodiment only includes an independent technical solution, and this description in the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020681326.6U CN212202062U (en) | 2020-04-29 | 2020-04-29 | Pipe jacking construction equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020681326.6U CN212202062U (en) | 2020-04-29 | 2020-04-29 | Pipe jacking construction equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212202062U true CN212202062U (en) | 2020-12-22 |
Family
ID=73831939
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020681326.6U Withdrawn - After Issue CN212202062U (en) | 2020-04-29 | 2020-04-29 | Pipe jacking construction equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212202062U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111396076A (en) * | 2020-04-29 | 2020-07-10 | 安徽开源路桥有限责任公司 | Pipe jacking construction equipment |
-
2020
- 2020-04-29 CN CN202020681326.6U patent/CN212202062U/en not_active Withdrawn - After Issue
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111396076A (en) * | 2020-04-29 | 2020-07-10 | 安徽开源路桥有限责任公司 | Pipe jacking construction equipment |
| CN111396076B (en) * | 2020-04-29 | 2025-01-21 | 安徽开源路桥有限责任公司 | Pipe jacking equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111472789B (en) | Pipe jacking construction process | |
| CN107311015B (en) | Construction elevator installed downwards and installation platform thereof | |
| CN110510527A (en) | Installation system of high slope variable cross-section slope precast block and construction method thereof | |
| CN212202062U (en) | Pipe jacking construction equipment | |
| CN107119966B (en) | A pole-holding upside-down assembly lifting device | |
| CN111396076A (en) | Pipe jacking construction equipment | |
| CN113479787B (en) | Side-feeding gallery machine and pipeline gallery construction technology | |
| CN115012950A (en) | A construction method for pipe jacking of water-rich sand layer near subway | |
| CN114908745A (en) | A kind of high slope bolt anchor cable support operation platform and construction method thereof | |
| CN111877165B (en) | Bailey beam translation device in limited space and construction method thereof | |
| CN101599619A (en) | Installation device and installation method for spanning column | |
| CN102305035B (en) | Device for adjusting centration of complete vehicle-mounted service machine to wellhead | |
| CN206815943U (en) | A kind of pole upside-down mounting group founds lifting device | |
| CN219431845U (en) | Tunnel supporting system penetrating through existing slide-resistant pile | |
| CN219691551U (en) | Tunnel arch frame mounting system | |
| CN218320407U (en) | Lifting and jacking integrated crown block system | |
| CN117246893A (en) | A core-piercing hoisting device in a restricted space for large motors and its use method | |
| CN116219896A (en) | Bridge substructure prefabrication and installation device and construction method | |
| CN111945572B (en) | Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method | |
| CN212202063U (en) | Unit pipe joint pushing mechanism for pipe jacking machine | |
| CN108840234B (en) | Hoisting device for prefabricated section and hoisting method thereof | |
| CN216198095U (en) | Underground passage steel platform construction structure | |
| CN221027332U (en) | Complex interactive boulder stratum rotary digging pore-forming cast-in-place pile | |
| CN115288038B (en) | Bracket device for installing railway box girder anti-falling beam stop block and use method | |
| CN214423202U (en) | Cast-in-place concrete beam construction support of municipal works |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20201222 Effective date of abandoning: 20250121 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20201222 Effective date of abandoning: 20250121 |
|
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |
