CN207567081U - The ground sludge classification processing system that oil exploitation generates - Google Patents

The ground sludge classification processing system that oil exploitation generates Download PDF

Info

Publication number
CN207567081U
CN207567081U CN201721206171.5U CN201721206171U CN207567081U CN 207567081 U CN207567081 U CN 207567081U CN 201721206171 U CN201721206171 U CN 201721206171U CN 207567081 U CN207567081 U CN 207567081U
Authority
CN
China
Prior art keywords
tunnel oven
jet flow
ground
track
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721206171.5U
Other languages
Chinese (zh)
Inventor
高明逊
郭鹏
吴庆成
殷振禄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721206171.5U priority Critical patent/CN207567081U/en
Application granted granted Critical
Publication of CN207567081U publication Critical patent/CN207567081U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model belongs to the ground sludge process field of oil exploitation generation, and HW08 is classified as in the danger wastes register that ground sludge is promulgated in Chinese Ministry of Environmental Protection, so the utility model is also subordinated in field of environment protection, hazardous waste disposal.More particularly to the ground sludge classification processing system that oil exploitation generates.The ground sludge classification processing system that the oil exploitation generates, including sieve cleaning vehicle, track, jet flow cleaning tunnel oven, collecting pit, collecting cart, oil storage tank, hoist cable, hoist cable track, first order settling tank and second level settling tank.The utility model can be rapidly and efficiently the method that is detached with sundries of realization crude oil, sundries is classified according to particle, and a kind of economy efficiently method is provided for comprehensive treatment greasy filth.

Description

The ground sludge classification processing system that oil exploitation generates
Technical field
The utility model belongs to the ground sludge process field of oil exploitation generation, the danger that ground sludge is promulgated in Chinese Ministry of Environmental Protection HW08 is classified as in dangerous waste register, so the present invention is also subordinated in field of environment protection, hazardous waste disposal.More particularly to stone The ground sludge classification processing system that oil exploitation generates.
Background technology
With the rapid development of petroleum industry, caused environmental problem is more and more prominent in oil gas field production process.Its In, oily sludge is that one of important pollution generated in oil play development process and restriction oilfield environment continuous quality carry High problem;Oily sludge is mainly derived from the tank generated during the landing oily sludge of oil extraction generation, oil field gathering and transportation The oily sludge that bottom oily sludge and sewage from oil refinery treatment plant generate.Wherein, landing oily sludge is oil recovery production process In, oil that oil-producing region ground is scattered in into gathering line can not be made full use of and recycle or from stone by having part oil The oil leaked out in oil pipeline mixes oily sludge with ground gravel, silt, weeds etc.;During petroleum transportation, Also oil is had to be leaked on the ground or also result in oil leakage due to occurring accident in transportational process;In addition to this, oil fills Put and oil well disassembly process in occur oil dripping, run oil, bleed etc. also can reveal part oil on the ground, oil-well blowing or open flow Part oil can not recycle the ground sludge that can also fall on and on the ground, be formed with crude oil smell afterwards.
At present, it is main following several for the treatment process of ground sludge:(1)Chemical treatment method:It is divided into microorganism The microorganism of domestication is added in the processing of ecological method and microbial method, wherein microbial ecological method;(2)Thermal decomposition process Method:It is divided into two kinds of low-temperature treatment and high-temperature process, the decomposition temperature of high-temperature process is in 1400 DEG C, the decomposition temperature of low-temperature treatment 800℃;(3)Washup logos:Oil and solid-state sundries is allowed to peel away using medicament, physical method is recycled to be separated, and then Realize oily object recycling;(4)Solid-state facture:Blocky sundries is formed by ground sludge using chemical agent, is landed with this to be promoted The controllability of greasy filth.Wherein, sundries and the perpendicular tower of the separation of oil are mainly realized using heating in tower in existing washup logos Formula or rotating cage washing etc..
There is such Railway Projects in many processing methods of greasy filth:One is the problem of technology and economy comparison, such as Fruit can reach standard requirement, but cost is very high, present oil-sludge treatment price has reached 1500 using complicated processing method Yuan/ton.The second is the problem for the treatment of capacity, fine processing method cannot meet a large amount of oil-sludge treatments, and at present, each elephant needs The greasy filth amount of processing is very big, the oil field for producing ten million ton per year for one, can generate 100,000 tons or more of greasy filth every year, also for many years Greasy filth of accumulation etc., so the process route that demand can be handled largely.The third is for thick oil sludge processing, viscosity of thickened oil is big, Because density and water are close to 0.96 ton/cubic metre, after solid matter is adhered to, it is difficult to detach.
The processing intent of ground sludge is broadly divided into two:(1)National environmental protection department is by intra-field oil-containing Solid-state castoff is classified as in the list of hazardous waste, according to relevant law, regulation, needs to produce oil field in routine duties What is gone out is suitably handled containing solid-state castoff, and not only environmentally friendly but also harmless processing mode is handled for selection, eliminates landing The harm that greasy filth is brought promotes environmental benefit;(2)In ground sludge, containing substantial portion of recyclable crude oil, to ground sludge It carries out environmental protection and effective processing mode can play the role of resource reutilization, give oil field good economic benefit.Thus As it can be seen that the ground sludge processing unit of exploitation design strong applicability is particularly important.
Invention content
In view of the problems of the existing technology, the utility model provides the ground sludge classification that a kind of oil exploitation generates Processing system.The utility model can be rapidly and efficiently by the processing system the method that is detached with sundries of realization crude oil, sundries It is classified according to particle, a kind of economy efficiently method is provided for comprehensive treatment greasy filth.
To achieve these goals, the utility model provides the ground sludge classification processing system that oil exploitation generates, packet Track platform, jet flow cleaning tunnel oven are included, the jet flow cleaning tunnel oven is located on track platform, which is characterized in that track platform is located at Be provided with flute profile collecting pit in the middle part of jet flow cleaning tunnel oven inner segment, the top of the collecting pit with jet flow cleaning tunnel oven most There is a distance in vertical direction between lower end;One inner wall of the collecting pit passes through outside connecting tube and jet flow cleaning tunnel oven Oil storage tank be connected, another inner wall of the collecting pit passes through connecting tube and the first order settling tank one outside jet flow cleaning tunnel oven Inner wall is connected;Be provided with power rail on the track platform, the power rail be located at collecting pit and jet flow cleaning tunnel oven it Between, it is parallel between two tracks of the power rail and is provided with water pipe, the water pipe is equipped with multiple jet streams Nozzle;Be provided with the sieve cleaning vehicle that can freely walk on the power rail, four sides of the sieve cleaning vehicle and Bottom surface is made of steel wire;The jet flow cleaning tunnel oven, which is corresponded on the inner wall of sieve cleaning vehicle both sides, sets multiple jet streams to spray Mouth;The front end of the track platform with the level ground equipped with power rail by cushioning rail platform transition, after the track platform End top is corresponding with the initiating terminal of delivery track that the outer top of the jet flow cleaning tunnel oven is set, the end of the delivery track It is corresponding with the level ground equipped with power rail;The delivery track is equipped with the lifting hoist cable for being capable of free-running operation;It leans on The level ground of the nearly track platform rear end is equipped with collecting cart.
The collecting pit is located at the underface of jet flow cleaning tunnel oven;The top of the collecting pit and jet flow cleaning tunnel Distance about 300mm between the bottom of kiln, the collecting pit are less than cleaning vehicle net for collecting cleaning process Zhong Shui, oil and grain size The material in aperture.
The nozzle is staggered in arrangement, opposed jets.
Another inner wall of the first order settling tank is connected by connecting tube with an inner wall of second level settling tank;Described Level-one settling tank is placed in the side of collecting pit with the second level settling tank laid out in parallel;The oil storage tank is located at the another of collecting pit Side.The sieve cleaning vehicle is placed on the level ground equipped with power rail, by power rail from cushioning rail platform Into jet flow cleaning tunnel oven;The mesh aperture of the wire side of the sieve cleaning vehicle is identical.
During jet flow cleaning, the sieve cleaning vehicle in jet flow cleaning tunnel oven can be multiple.
The lifting hoist cable can send sieve cleaning vehicle back to material by delivery track and fill for lifting by crane sieve cleaning vehicle Carry area.
Collection, transhipment of the collecting cart for material or waste material after cleaning.
As a kind of preferred embodiment of the utility model, the size of the jet flow cleaning tunnel oven(Length × width × height)It is 15 ×2×1(Unit m);The size of the sieve cleaning vehicle(Length × width × height)It is 0.8 × 0.8 × 0.1(Unit m).
As another preferred embodiment of the utility model, the sum of length of the multiple sieve cleaning vehicle and jet flow cleaning Tunnel oven length is identical.
As another preferred embodiment of the utility model, the jet flow cleaning tunnel oven jet length can be according to processing net The total length of sieve cleaning vehicle voluntarily adjusts.
The method of processing ground sludge is classified using processing system described in the utility model, specifically includes following steps.
Step 1, ground sludge cut into bulk through shredding machine, and lumpy sizes are not more than 200 × 200 × 200 (units Mm), the material loading area that level ground is equipped with power rail is placed in, it is spare.
Material after cutting is put into net diameter size as in 10 × 10 (unit mm) sieve cleaning vehicles, material accounts for vehicle by step 2 2/3rds of volume;Material loading area can freely advance to power rail, sieve cleaning vehicle is laid between material cleaning area On power rail;Jet flow cleaning tunnel oven is equipped in the material cleaning area, sieve cleaning vehicle is entered by power rail Jet flow cleaning tunnel oven, the jet nozzle of jet flow cleaning tunnel oven two side be arranged below jet flow cleaning tunnel oven and parallel Jet flow cleaning processing is carried out to the two sides of sieve cleaning vehicle and bottom in the nozzle on the water pipe of power rail, it is specific to locate Reason process is as follows.
(1)First segment low temperature jet flow cleaning treatment:Low temperature is carried out first slightly washes section, 45-55 DEG C of jet stream coolant-temperature gage, during jet stream Between for 3 minutes, jet stream water pressure is not less than 1Mpa.
(2)Second segment high temp jet water cleans:Second segment is directly entered after first segment cleans, cleaning way is identical, high Warm cleaning section jet stream coolant-temperature gage is not less than 85 DEG C, and the jet stream time is 3 minutes, and washing water pressure is not less than 1Mpa;After jet stream, Material of the grain size more than 10mm is stayed in sieve cleaning vehicle, and material, water and oil of the grain size no more than 10mm directly fall in collecting pit It is interior.
(3)Floating oil collecting:Different according to density, oil float will collect pool surface on the collecting pit water surface, using press over system On crude oil overflow be transported in oil storage tank;Indwelling material of the grain size more than 10mm is poured into receipts by sieve cleaning vehicle through lifting hoist cable Collect vehicle, material is returned to material loading area by collecting cart, and sieve cleaning vehicle by delivery track or passes through power rail using hoist cable Return to material loading area.
(4)Handle the material in collecting pit:The sludge in collecting pit, Sewage are handled by screw conveyor or sludge pump Mud is again respectively after the sedimentation of first order settling tank and second level settling tank;By the sludge of extraction, being packed into screen mesh size is(3- 5)×(3-5)In the sieve cleaning vehicle of (unit mm), repeat above-mentioned(1)、(2)With(3)Process, realize classification processing landing Greasy filth process.
The remarkable result of the utility model.
Ground sludge is placed in the cleaning method of track sieve car by the utility model, is superior to rotating cage sieve, vibrating screen, is erected The cleaning structures form such as tower;Using mesh screen cleaning vehicle closed circuit circulatory system, cleaning vehicle is walked in closed loop tracks, and can be led to It crosses hoist cable circular orbit and sends the sieve cleaning vehicle after discharging back to material loading area, realize charging, cleaning, the discharging circulatory system, It is efficient, treating capacity is big;The utility model is cleaned using the jet nozzle high-pressure jet of jet flow cleaning tunnel oven two sides installation Realize opposite-flushing type cleaning and the jet nozzle height on the water pipe of jet flow cleaning tunnel oven bottom in the both sides of sieve cleaning vehicle Jet flow realizes fluidization cleaning from sieve cleaning vehicle bottom-purge, and the nozzle stagger arrangement arrangement of jet flow cleaning tunnel oven side increases Add jet cleaning area, hence it is evident that improve jet cleaning efficiency;And nozzle spray penetration can be cleaned according to processing in tunnel oven The total length of vehicle is adjusted, and achievees the purpose that save water source and cost;The utility model can using high and low temperature classification cleaning Save heat so that cleaning is more thorough, and flushing dose is big, and cleaning speed is fast, and single cleaning ground sludge production line can accomplish 20t/ h;The sieve cleaning vehicle aperture size selection that the utility model uses is different, and ground sludge is carried out gradation degree according to granularity difference Processing, high treating effect;The present invention is settled when handling the sludge in collecting cart using two-stage, makes the sludge content that sedimentation obtains bright It is aobvious to improve.
Description of the drawings
Fig. 1, the utility model ground sludge jet flow cleaning processing system vertical view.
Fig. 2, the utility model ground sludge jet cleaning device front view.
The sectional view of Fig. 3, the utility model jet flow cleaning tunnel oven.
Wherein, 1 it is sieve cleaning vehicle, 2 be track platform, 3 be jet flow cleaning tunnel oven, 4 be nozzle, 5 be collecting pit, 6 is Collecting cart, 7 be hoist cable, 8 be hoist cable track, 9 be oil storage tank, 10 be first order settling tank, 11 be second level settling tank, 12 be company It takes over, 13 be power rail, 14 be water pipe.
Specific embodiment
The utility model is described further with reference to specific embodiment.
Embodiment 1.
Ground sludge jet flow cleaning processing system vertical view, is shown in Fig. 1;Ground sludge jet cleaning device front view, is shown in figure 2;The sectional view of jet flow cleaning tunnel oven is shown in Fig. 3.
The ground sludge classification processing system that oil exploitation generates used by the utility model, including track platform 2, jet stream Tunnel oven 3 is cleaned, the jet flow cleaning tunnel oven 3 is located on track platform 2, and track platform 2 is located in 3 inner segment of jet flow cleaning tunnel oven Portion is provided with flute profile collecting pit 5, has a distance in the vertical direction between the collecting pit 5 and jet flow cleaning tunnel oven 3;Institute The inner wall for stating collecting pit 5 is connected by connecting tube 12 with the oil storage tank 9 outside jet flow cleaning tunnel oven 3, the collecting pit 5 it is another One inner wall is connected by connecting tube 12 with 10 1 inner wall of first order settling tank outside jet flow cleaning tunnel oven 3;On the track platform 2 Power rail 13 is provided with, the power rail 13 is parallel to described dynamic between collecting pit 5 and jet flow cleaning tunnel oven 3 Water pipe 14 is provided between two tracks of power track 13, the water pipe 14 is equipped with multiple jet nozzles 4;It is described Be provided with the sieve cleaning vehicle 1 that can freely walk on power rail 13, four sides and bottom surface of the sieve cleaning vehicle 1 by Steel wire is formed;3 inner wall of jet flow cleaning tunnel oven sets jet nozzle 4 corresponding to 1 both sides of sieve cleaning vehicle;The spray Mouth 4 is staggered in arrangement, opposed jets;The front end of the track platform 2 passes through cushioning rail with the level ground equipped with power rail 13 Platform transition, the rear end top of the track platform 2 and the starting of the delivery track 8 of the outer top setting of the jet flow cleaning tunnel oven 3 Section is corresponding, and the latter end of the delivery track 8 is corresponding with the level ground equipped with power rail 13;The delivery track 8 is equipped with It is capable of the lifting hoist cable 7 of free-running operation;Collecting cart 6 is equipped with close to the level ground of 2 rear end of track platform.
The collecting pit 5 is located at the underface of jet flow cleaning tunnel oven 3.
Another inner wall of the first order settling tank 10 is connected by connecting tube 12 with an inner wall of second level settling tank 11; The first order settling tank 10 is placed in the side of collecting pit 5 with 11 laid out in parallel of second level settling tank;9, the oil storage tank In the opposite side of collecting pit 5.
The sieve cleaning vehicle 1 is placed on the level ground equipped with power rail 13, is postponed by power rail 13 It rushes track platform and enters jet flow cleaning tunnel oven 3;The mesh aperture of the wire side of the sieve cleaning vehicle 1 is identical.
During jet flow cleaning, the sieve cleaning vehicle 1 in jet flow cleaning tunnel oven 3 can be multiple.
The lifting hoist cable 7 can send sieve cleaning vehicle 1 back to object for lifting by crane sieve cleaning vehicle 1 by delivery track 8 Expect loading area.
Collection, transhipment of the collecting cart 6 for material or waste material after cleaning.
The application method of ground sludge classification processing system that oil exploitation described in the utility model generates:Cleaning treatment Before, the sieve cleaning vehicle 1 being placed on the level ground equipped with power rail 13 fills ground sludge material, sieve cleaning vehicle 1 Jet flow cleaning tunnel oven 3 is entered by the power rail 13 of cushioning rail platform;During cleaning, on 3 two side of jet flow cleaning tunnel oven The nozzle 4 being staggered in arrangement and the height projected jointly in the nozzle 4 on the water pipe 14 of power rail 13 positioned at base portion parallel Injection flowing water is sprayed onto in the sieve cleaning vehicle 1 for being loaded with material, realizes fluidization of material and low temperature, the mistake of high temp jet cleaning material Journey;Track platform 2 is located at the flute profile collecting pit 5 set in the middle part of 3 inner segment of jet flow cleaning tunnel oven, in flushing process water, oil and The material that grain size is less than 1 screen distance of sieve cleaning vehicle is collected;Crude oil on 5 surface of collecting pit is overflowed to by connecting tube 12 In oil storage tank 9, the collection to crude oil is realized;The precipitating sludge in collecting pit 5 is taken out by external screw conveyor or sludge pump Go out, after then the sewage sludge in collecting pit by being settled in advance in the entrance first order of connecting tube 12 settling tank 10, the first order Sewage sludge in settling tank 10, which enters using connecting tube 12 in second level settling tank 11, carries out secondary settlement, and sedimentation is substantially complete Entirely, the sludge of extraction is subjected to secondary cycle cleaning treatment, during secondary cycle cleaning treatment, the sieve cleaning vehicle of use 1 aperture reduces, and processing procedure is as previously mentioned, the sludge extracted out after after-treatment is substantially free of oil composition;After cleaning treatment, Sieve cleaning vehicle 1 with retained thing runs to track platform end, starts the conveying for being set to the outer top of jet flow cleaning tunnel oven 3 Lifting hoist cable 7 on track 8, the lifting hoist cable 7 in elongation state is with after one jiao of fixation of 1 bottom surface of sieve cleaning vehicle, lifting Hoist cable carries out retracted state, and retained thing in sieve cleaning vehicle 1 is poured into collecting cart 6;Finally, lifting hoist cable 7 passes through conveying The sieve cleaning vehicle 1 of no material is sent back to material loading area by track 8;Waste material is transported to object by the collecting cart 6 for filling retained thing Expect loading area.
Ground sludge hierarchical processing method, specifically includes following steps.
Step 1, ground sludge cut into bulk through shredding machine, and lumpy sizes are not more than 200 × 200 × 200 (units Mm), the material loading area that level ground is equipped with power rail 13 is placed in, it is spare.
Material after cutting is put into net diameter size as in 10 × 10 (unit mm) sieve cleaning vehicles 1, material is accounted for by step 2 2/3rds of vehicle volume;For material loading area to power rail 13 is laid between material cleaning area, sieve cleaning vehicle 1 can be free It is traveling on power rail 13;Jet flow cleaning tunnel oven 3 is equipped in the material cleaning area, sieve cleaning vehicle 1 passes through power Track 13 enters jet flow cleaning tunnel oven 3, the jet nozzle 4 of 3 two side of jet flow cleaning tunnel oven and is arranged on and is parallel to power Nozzle 4 on the water pipe 14 of track 13 carries out jet flow cleaning processing to sieve cleaning vehicle 1, and concrete processing procedure is as follows.
(1)First segment low temperature jet flow cleaning treatment:Low temperature is carried out first slightly washes section, 55 DEG C of jet stream coolant-temperature gage, jet stream time It it is 3 minutes, jet stream water pressure is not less than 1Mpa.
(2)Second segment high temp jet water cleans:Second segment is directly entered after first segment cleans, cleaning way is identical, high Warm 95 DEG C of cleaning section jet stream coolant-temperature gage, jet stream time are 3 minutes, and washing water pressure is not less than 1Mpa;After jet stream, grain size is big It is stayed in sieve cleaning vehicle 1 in the material of 10mm, material, water and oil of the grain size no more than 10mm are directly fallen in collecting pit 5.
(3)Floating oil collecting:Different according to density, oil float will collect pool surface on the collecting pit water surface, using press over system On crude oil overflow be transported in oil storage tank 9;Sieve cleaning vehicle pours into indwelling material of the grain size more than 10mm through lifting hoist cable 7 Material is returned to material loading area by collecting cart 6, collecting cart 6, and sieve cleaning vehicle 1 passes through delivery track 8 or power rail using hoist cable 7 Road 13 returns to material loading area.
(4)Handle the material in collecting pit:The sludge in collecting pit, Sewage are handled by screw conveyor or sludge pump Mud is again respectively after communicating the sedimentation of first order settling tank 10 and second level settling tank 11 by connecting tube 12;By the dirt of extraction Mud, being packed into screen mesh size is(3-5)×(3-5)In the sieve cleaning vehicle 1 of (unit mm), repeat above-mentioned(1)、(2)With(3)'s Process realizes classification processing ground sludge process.
Classification cleaning treatment, handling result are carried out to ground sludge using the processing method of the present embodiment(Score by weight Meter)It is as follows:It is 3% more than the sandstone that 10mm sundries is 17%, grain size is 5-10mm, less than 5mm oil sludge and sands is 5%, oil, water and light Matter floccule 75%.

Claims (7)

1. the ground sludge classification processing system that oil exploitation generates, including track platform(2)With jet flow cleaning tunnel oven(3), institute State jet flow cleaning tunnel oven(3)Positioned at track platform(2)On, which is characterized in that track platform(2)Positioned at jet flow cleaning tunnel oven(3) Flute profile collecting pit is provided in the middle part of inner segment(5), the collecting pit(5)The top and jet flow cleaning tunnel oven(3)Bottom Between vertical direction on have a distance;The collecting pit(5)An inner wall pass through connecting tube(12)With jet flow cleaning tunnel Kiln(3)Outer oil storage tank(9)It is connected, the collecting pit(5)Another inner wall pass through connecting tube(12)With jet flow cleaning tunnel oven (3)Outer first order settling tank(10)One inner wall is connected;The track platform(2)On be provided with power rail(13), the power Track(13)Positioned at collecting pit(5)With jet flow cleaning tunnel oven(3)Between, it is parallel to the power rail(13)Two tracks Between be provided with water pipe(14), the water pipe(14)It is equipped with multiple jet nozzles(4);The power rail(13) The sieve cleaning vehicle of upper setting(1), the sieve cleaning vehicle(1)Four sides and bottom surface be made of steel wire;The jet stream Clean tunnel oven(3)Inner wall corresponds to sieve cleaning vehicle(1)Both sides set jet nozzle(4);The track platform(2)Front end with Equipped with power rail(13)Ground pass through cushioning rail platform transition, the track platform(2)Rear end above it is clear with the jet stream Wash tunnel oven(3)The delivery track of outer top setting(8)The initial segment correspond to, the delivery track(8)Latter end with equipped with dynamic Power track(13)Ground correspond to;The delivery track(8)It is equipped with the lifting hoist cable for being capable of free-running operation(7);Close to described Track platform(2)The ground of rear end is equipped with collecting cart(6).
2. the ground sludge classification processing system that oil exploitation as described in claim 1 generates, which is characterized in that the collection Pond(5)Positioned at jet flow cleaning tunnel oven(3)Underface;The collecting pit(5)The top and jet flow cleaning tunnel oven(3)'s Distance 300mm between bottom.
3. the ground sludge classification processing system that oil exploitation as described in claim 1 generates, which is characterized in that the spray Mouth(4)It is staggered in arrangement, opposed jets.
4. the ground sludge classification processing system that oil exploitation as described in claim 1 generates, which is characterized in that described first Grade settling tank(10)Another inner wall pass through connecting tube(12)With second level settling tank(11)An inner wall be connected.
5. the ground sludge classification processing system that oil exploitation as described in claim 1 generates, which is characterized in that the sieve Cleaning vehicle(1)It is placed in described equipped with power rail(13)Level ground on, pass through power rail(13)From cushioning rail platform into Incident flow cleans tunnel oven(3);The sieve cleaning vehicle(1)Wire side mesh aperture it is identical;Jet flow cleaning tunnel oven(3)In Sieve cleaning vehicle(1)It is multiple.
6. the ground sludge classification processing system that oil exploitation as described in claim 1 generates, which is characterized in that the jet stream Clean tunnel oven(3)Length × width × height for 15 × 2 × 1, unit m;The sieve cleaning vehicle(1)Length × width × height be 0.8 × 0.8 × 0.1, unit m.
7. the ground sludge classification processing system that oil exploitation as claimed in claim 5 generates, which is characterized in that described is more A sieve cleaning vehicle(1)The sum of length and jet flow cleaning tunnel oven(3)Length is identical.
CN201721206171.5U 2017-09-20 2017-09-20 The ground sludge classification processing system that oil exploitation generates Active CN207567081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721206171.5U CN207567081U (en) 2017-09-20 2017-09-20 The ground sludge classification processing system that oil exploitation generates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721206171.5U CN207567081U (en) 2017-09-20 2017-09-20 The ground sludge classification processing system that oil exploitation generates

Publications (1)

Publication Number Publication Date
CN207567081U true CN207567081U (en) 2018-07-03

Family

ID=62698327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721206171.5U Active CN207567081U (en) 2017-09-20 2017-09-20 The ground sludge classification processing system that oil exploitation generates

Country Status (1)

Country Link
CN (1) CN207567081U (en)

Similar Documents

Publication Publication Date Title
CN102718375B (en) Oily sediment treatment method and device
CN202785917U (en) Oily sludge purifying treatment system
CN104646407B (en) Cleaning system for contaminated building clinkers in contaminated sites and cleaning method thereof
CN105567289B (en) Dehydration degassing movement system and the method for a kind of closed petroleum coke
CN104529126A (en) Recycling and using method of oil-gas exploration water-base mud well drilling solid waste
CN208599895U (en) Steel slag hot crushing device
CN107640878B (en) Intensive greasy dirt mud handles sled
CN202729965U (en) Oil field skid-mounted type oil field waste treatment device
CN103071582B (en) Garbage water classification system
CN207567081U (en) The ground sludge classification processing system that oil exploitation generates
CN202893482U (en) Construction rubbish wood waste water concentrator
CN111389828B (en) Cleaning equipment and process for external floating roof oil tank for recycling oil
CN109365090A (en) Steel slag hot crushing device
CN107445430A (en) Ground sludge hierarchical processing method and its processing system caused by oil exploitation
CN207862145U (en) A kind of disposal of oily sludge system
CN206112366U (en) Curved buffer that wear -resistants who is used for non -pressure transport among civil engineering
CN105019649A (en) Recovery method for cleaned crushing material of building template
CN110628971B (en) Energy-saving environment-friendly slag flushing method and device
CN205055841U (en) Crude oil purification system and oil storage tank cleaning system
CN107159441A (en) One kind adopts sand sandstone desludging device
CN203429012U (en) Efficient energy-saving pollution-free dry processing system of bauxite washing tailing pulp
CN207483597U (en) A kind of oil sludge processing is prized with water-oil separating
CN202968277U (en) Oil-field sewage treatment device
CN207483575U (en) A kind of intensive style greasy dirt processing sled