CN207555916U - A kind of refrigeration equipment connecting tube being easily installed - Google Patents
A kind of refrigeration equipment connecting tube being easily installed Download PDFInfo
- Publication number
- CN207555916U CN207555916U CN201721344944.6U CN201721344944U CN207555916U CN 207555916 U CN207555916 U CN 207555916U CN 201721344944 U CN201721344944 U CN 201721344944U CN 207555916 U CN207555916 U CN 207555916U
- Authority
- CN
- China
- Prior art keywords
- connecting tube
- main body
- tube
- bursting
- refrigeration equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Filtering Of Dispersed Particles In Gases (AREA)
Abstract
The utility model discloses a kind of refrigeration equipment connecting tubes being easily installed, including connecting tube main body, the both ends of the connecting tube main body are welded with the first connecting flange, the side of first connecting flange far from connecting tube main body is bonded with gasket, the surface of the connecting tube main body is circumferentially socketed with muff, one end of the connecting tube main body is welded with bursting tube, pressure gauge is installed at the top of bursting tube, the lower end of pressure gauge extends to the inside of bursting tube, the lower end of bursting tube is connected with efferent duct, safety valve is installed on efferent duct, the lower end of efferent duct is connected with baffle-box, delivery pipe is connected at the top of baffle-box, the one end of bursting tube far from connecting tube main body is sealed and installed with purification pipe by the second connecting flange, material storage tube is installed in the purification pipe, cleanser is filled in material storage tube.The utility model structure novel, ingenious in design, structure novel is ingenious in design, rational in infrastructure, safe, is suitble to promote.
Description
Technical field
The utility model is related to connecting tube technical field more particularly to a kind of refrigeration equipment connecting tubes being easily installed.
Background technology
Equipment used in refrigerating operation.Different refrigerating methods use different equipment, and most widely used at present is vapour pressure
Contraction is cold, and capital equipment has compressor (see fluid conveying machine), condenser, evaporator and throttle valve.Refrigeration equipment is refrigeration
Machine and the combined device of facility using cold.Design and construction refrigerating plant, are in order to which cold is efficiently used
Chilled food or other articles;The performance test of product and scientific research experiment are carried out at low temperature;It realizes in the industrial production
Certain cooling procedures carry out air conditioning.Article will release certain heat when cooling down or freezing, and refrigerating plant encloses
Protection structure can also be passed to certain heat when in use.Therefore to keep the cryogenic conditions in refrigerating plant, system must just be installed
Cold, continuously to remove these heats or to absorb these heats using the fusing of ice or the distillation of dry ice.
Wherein, existing connection tube for air conditioner is simple in structure, does not have heat insulation function, and safety is poor, easy booster,
And there is no purifier in connecting tube, for this purpose, the utility model proposes a kind of refrigeration equipment connecting tubes being easily installed.
Utility model content
The purpose of this utility model is to solve shortcoming in the prior art, and what is proposed a kind of is easily installed
Refrigeration equipment connecting tube.
To achieve these goals, the utility model employs following technical solution:
A kind of refrigeration equipment connecting tube being easily installed, including connecting tube main body, the both ends of the connecting tube main body are equal
The first connecting flange is welded with, the side of first connecting flange far from connecting tube main body is bonded with gasket, the connection
The surface of pipe main body is circumferentially socketed with muff, and one end of the connecting tube main body is welded with bursting tube, the top peace of bursting tube
Equipped with pressure gauge, the lower end of pressure gauge extends to the inside of bursting tube, and the lower end of bursting tube is connected with efferent duct, pacifies on efferent duct
Equipped with safety valve, the lower end of efferent duct is connected with baffle-box, delivery pipe is connected at the top of baffle-box, bursting tube is far from connecting tube
One end of main body is sealed and installed with purification pipe by the second connecting flange, and described purify is equipped with material storage tube in pipe, in material storage tube
Filled with cleanser.
Preferably, gasket structure annular in shape, and gasket is made using rubber material.
Preferably, the muff is oblong-shaped cotton, and cotton is wrapped in the week of connecting tube main body by velcro
To.
Preferably, the described one end of purification pipe far from connecting tube main body is fixed with installing pipe by flange, and installing pipe is separate
One end of purification pipe is welded with the first connecting flange.
Preferably, the cleanser uses active carbon particle.
Preferably, the material storage tube includes cylinder and two filter screens, one of filter screen are welded on one end of cylinder,
Another filter screen is bolted on the other end of cylinder.
Compared with prior art, the beneficial effects of the utility model are:Is welded with by the both ends of connecting tube main body
One connecting flange, side of first connecting flange far from connecting tube main body are bonded with gasket, are realized in this way by flange quick
Installation, good airproof performance are welded with bursting tube by one end of connecting tube main body, pressure gauge, pressure are equipped at the top of bursting tube
The lower end of table extends to the inside of bursting tube, and the lower end of bursting tube is connected with efferent duct, is equipped with safety valve on efferent duct, works as sky
When recalling existing blocking, ensure connecting tube will not booster, when pressure is excessive, safety valve can releasing pressure automatically, pressure gauge can be with sighting tube
In pressure value, by purifying the design of pipe, outside air can be filtered, gas indoor in this way is cleaner, fit
People's breathing is closed, the utility model structure novel, ingenious in design, structure novel is ingenious in design, rational in infrastructure, safe, fits
It closes and promotes.
Description of the drawings
Fig. 1 be the utility model proposes a kind of structure diagram of refrigeration equipment connecting tube being easily installed;
Fig. 2 be the utility model proposes a kind of refrigeration equipment connecting tube being easily installed in material storage tube structural representation
Figure.
In figure:1 connecting tube main body, 2 muffs, 3 first connecting flanges, 4 gaskets, 5 pressure gauges, 6 bursting tubes, 7 safety
Valve, 8 baffle-boxs, 9 delivery pipes, 10 purification pipes, 11 material storage tubes, 111 cylinders, 112 filter screens, 113 bolts, 12 cleansers, 13 the
Two connecting flanges, 14 installing pipes.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.
With reference to Fig. 1-2, a kind of refrigeration equipment connecting tube being easily installed, including connecting tube main body 1, connecting tube main body 1
Both ends be welded with the first connecting flange 3, the first side of the connecting flange 3 far from connecting tube main body 1 is bonded with gasket 4,
The surface of connecting tube main body 1 is circumferentially socketed with muff 2, and one end of connecting tube main body 1 is welded with bursting tube 6, the top of bursting tube 6
Portion is equipped with pressure gauge 5, and the lower end of pressure gauge 5 extends to the inside of bursting tube 6, and the lower end of bursting tube 6 is connected with efferent duct, defeated
Safety valve 7 is installed, the lower end of efferent duct is connected with baffle-box 8, and the top of baffle-box 8 is connected with delivery pipe 9, safety in outlet pipe
The one end of pipe 6 far from connecting tube main body 1 is sealed and installed with purification pipe 10 by the second connecting flange 13, purifies and is equipped in pipe 10
Material storage tube 11, material storage tube 11 is interior to be filled with cleanser 12.
In the utility model, 4 structure annular in shape of gasket, and gasket 4 is made using rubber material, muff 2
For oblong-shaped cotton, and cotton is wrapped in the circumferential direction of connecting tube main body 1 by velcro, and purification pipe 10 is far from connecting tube main body
1 one end is fixed with installing pipe 14 by flange, and the one end of installing pipe 14 far from purification pipe 10 is welded with the first connecting flange 3,
Cleanser 12 uses active carbon particle, and material storage tube 11 includes cylinder 111 and two filter screens 112, and one of filter screen 112 welds
One end of cylinder 111 is connected on, another filter screen is fixed on the other end of cylinder 111 by bolt 113.
When the utility model is used, being welded with the first connecting flange 3 by the both ends of connecting tube main body 1, first connects
Side of the acting flange 3 far from connecting tube main body 1 is bonded with gasket 4, in this way by flange realize Fast Installation, good airproof performance,
Bursting tube 6 is welded with by one end of connecting tube main body 1, the top of bursting tube 6 is equipped with pressure gauge 5, and the lower end of pressure gauge 5 is prolonged
The inside of bursting tube 6 is extended to, the lower end of bursting tube 6 is connected with efferent duct, safety valve 7 is equipped on efferent duct, when air-conditioning occurs
During blocking, ensure connecting tube will not booster, when pressure is excessive, safety valve 7 can releasing pressure automatically, pressure gauge 5 can be in sighting tube
Pressure value by purifying the design of pipe 10, can be filtered outside air, and gas indoor in this way is cleaner, be suitble to
People breathe, and the utility model structure novel, ingenious in design, structure novel is ingenious in design, rational in infrastructure, safe, are suitble to
It promotes.
The preferable specific embodiment of the above, only the utility model, but the scope of protection of the utility model is not
This is confined to, in the technical scope that any one skilled in the art discloses in the utility model, according to this practicality
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of refrigeration equipment connecting tube being easily installed, including connecting tube main body (1), which is characterized in that the connecting tube
The both ends of main body (1) are welded with the first connecting flange (3), first connecting flange (3) far from connecting tube main body (1) one
Side bonds have gasket (4), and the surface of the connecting tube main body (1) is circumferentially socketed with muff (2), the connecting tube main body
(1) one end is welded with bursting tube (6), and pressure gauge (5) is equipped at the top of bursting tube (6), and the lower end of pressure gauge (5) extends to
The inside of bursting tube (6), the lower end of bursting tube (6) are connected with efferent duct, safety valve (7) are equipped on efferent duct, efferent duct
Lower end is connected with baffle-box (8), delivery pipe (9) is connected at the top of baffle-box (8), bursting tube (6) is far from connecting tube main body (1)
One end by the second connecting flange (13) be sealed and installed with purification pipe (10), it is described purification pipe (10) in material storage tube is installed
(11), cleanser (12) is filled in material storage tube (11).
A kind of 2. refrigeration equipment connecting tube being easily installed according to claim 1, which is characterized in that the gasket
(4) structure annular in shape, and gasket (4) is made using rubber material.
A kind of 3. refrigeration equipment connecting tube being easily installed according to claim 1, which is characterized in that the muff
(2) it is oblong-shaped cotton, and cotton is wrapped in the circumferential direction of connecting tube main body (1) by velcro.
A kind of 4. refrigeration equipment connecting tube being easily installed according to claim 1, which is characterized in that the purification pipe
(10) one end far from connecting tube main body (1) is fixed with installing pipe (14) by flange, and installing pipe (14) is far from purification pipe (10)
One end be welded with the first connecting flange (3).
A kind of 5. refrigeration equipment connecting tube being easily installed according to claim 1, which is characterized in that the cleanser
(12) using active carbon particle.
A kind of 6. refrigeration equipment connecting tube being easily installed according to claim 1, which is characterized in that the material storage tube
(11) including cylinder (111) and two filter screens (112), one of filter screen (112) is welded on one end of cylinder (111),
Another filter screen (112) is fixed on the other end of cylinder (111) by bolt (113).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721344944.6U CN207555916U (en) | 2017-10-18 | 2017-10-18 | A kind of refrigeration equipment connecting tube being easily installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721344944.6U CN207555916U (en) | 2017-10-18 | 2017-10-18 | A kind of refrigeration equipment connecting tube being easily installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207555916U true CN207555916U (en) | 2018-06-29 |
Family
ID=62674312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721344944.6U Expired - Fee Related CN207555916U (en) | 2017-10-18 | 2017-10-18 | A kind of refrigeration equipment connecting tube being easily installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207555916U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049969A (en) * | 2020-09-07 | 2020-12-08 | 杨维 | High-pressure protection mechanism for liquid pipeline conveying |
CN112503646A (en) * | 2020-12-15 | 2021-03-16 | 马鞍山市博浪热能科技有限公司 | Protective buckle for air conditioner outdoor unit filter and preparation method and application thereof |
-
2017
- 2017-10-18 CN CN201721344944.6U patent/CN207555916U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049969A (en) * | 2020-09-07 | 2020-12-08 | 杨维 | High-pressure protection mechanism for liquid pipeline conveying |
CN112503646A (en) * | 2020-12-15 | 2021-03-16 | 马鞍山市博浪热能科技有限公司 | Protective buckle for air conditioner outdoor unit filter and preparation method and application thereof |
CN112503646B (en) * | 2020-12-15 | 2024-05-24 | 马鞍山市博浪热能科技有限公司 | Protective buckle for air conditioner outdoor unit filter and preparation method and application thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207555916U (en) | A kind of refrigeration equipment connecting tube being easily installed | |
CN202923340U (en) | Air conditioning pipeline assembly of automobile | |
CN102614598A (en) | Positive pressure oxygen breathing apparatus | |
CN207849840U (en) | A kind of novel oil catcher | |
CN101706176B (en) | Adsorption refrigerator | |
CN212320121U (en) | Refrigerating equipment for freezing-proof refrigerator container door | |
CN207300510U (en) | Automotive air-conditioning condenser pressure monitoring device | |
CN210625027U (en) | Long-life high performance type vehicle air conditioner stock solution drying bottle | |
CN202497576U (en) | Positive-pressure oxygen breathing apparatus | |
CN108488548B (en) | A kind of corrosion-resistant vacuum heat-preserving pipe device | |
CN211120151U (en) | Movable molecular sieve dryer | |
CN105533840A (en) | Cooling vest | |
CN204717944U (en) | Cooling and warming all-in-one car air-conditioning | |
CN207438930U (en) | Split type cooling-water machine | |
CN217929369U (en) | Novel pressure relief structure for hot gas defrosting refrigeration system | |
CN208567226U (en) | A kind of air-conditioning refrigerating defroster | |
CN108902126A (en) | A kind of biological material low temperature storage device | |
CN109625664A (en) | A kind of aluminium alloy oil tank that security performance is high | |
CN204115306U (en) | A kind of automobile evaporator | |
CN220959204U (en) | Purification equipment | |
KR102638880B1 (en) | Refrigerated cooler installed SCBA compressor and refrigerated cooler | |
CN210933292U (en) | Oxygen respirator | |
CN108444158A (en) | A kind of air-conditioning refrigerating defroster and method | |
CN207317325U (en) | A kind of air conditioning condenser left side plate | |
CN202510153U (en) | CO2 humiture adjusting and air cleaning system used for confined space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180629 Termination date: 20181018 |