CN207553606U - A kind of mobile holder device of overhead station construction - Google Patents

A kind of mobile holder device of overhead station construction Download PDF

Info

Publication number
CN207553606U
CN207553606U CN201721594611.9U CN201721594611U CN207553606U CN 207553606 U CN207553606 U CN 207553606U CN 201721594611 U CN201721594611 U CN 201721594611U CN 207553606 U CN207553606 U CN 207553606U
Authority
CN
China
Prior art keywords
stent
platform
height
bracket component
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721594611.9U
Other languages
Chinese (zh)
Inventor
李晓超
王毅军
赵香萍
施连义
贾森皓
李晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201721594611.9U priority Critical patent/CN207553606U/en
Application granted granted Critical
Publication of CN207553606U publication Critical patent/CN207553606U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a kind of mobile holder device of overhead station construction, belongs to the technical field of overhead station construction, including pulley assembly, bracket component and operating platform;Pulley assembly includes rail wheel and scroll wheel;Rail wheel is vertically arranged, coordinates positioned at bracket component bottom and with the track in Gui Hang areas and platform slab;Scroll wheel is horizontally installed between bracket component and platform slab edge;The wheel holding mechanism for preventing wheel body from rolling is both provided on rail wheel and scroll wheel;Bracket component includes being formed by connecting by column and crossbeam high across stent and low across stent;Height is across stent and low across being both provided with the multilayer operation platform that is distributed along arc ceiling on stent.The device effectively improves the technical issues of overhead station movement stent work surface in the prior art is small, moving process easily scratches to platform slab.

Description

A kind of mobile holder device of overhead station construction
Technical field
The utility model is related to the technical fields of overhead station construction, construct mobile more particularly to a kind of overhead station Rack device.
Background technology
At present, operation of ascending a height is required in overhead station steel structure hoisting and glass curtain wall lifting, ceiling construction, for side Just construct, traditional method be using the simple falsework of spigot-and-socket, take tear open it is simple, mobile get up it is convenient, but work surface is small, generally Only there are one construction platforms, should not operate, extreme influence construction speed easily scratches to platform slab in moving process, to platform Plate damages, and permission load is small, and limit for tonnage number is few, it has not been convenient to construct, rod piece light weight is insecure, some positions cannot Meet the requirement of component slenderness ratio, special messenger to be sent to keep an eye on, otherwise easily shake or turn on one's side phenomenon, and there are security risks.
Utility model content
Stent work surface is small, moving process easily scratches for overhead station movement in the prior art in order to improve for the utility model The technical issues of to platform slab, provides a kind of mobile holder device of overhead station construction.
The utility model provides a kind of construction of overhead station mobile holder device, including pulley assembly, bracket component and Operating platform;Pulley assembly includes rail wheel and scroll wheel;Rail wheel is vertically arranged, positioned at bracket component bottom and with Gui Hang areas With the track cooperation in platform slab;Scroll wheel is horizontally installed between bracket component and platform slab edge;Rail wheel and scroll wheel On be both provided with for prevent wheel body roll wheel holding mechanism;The height that bracket component includes being formed by connecting by column and crossbeam is across branch Frame and low across stent;Height is across stent and low across being both provided with the multilayer operation platform that is distributed along arc ceiling on stent.
Further, it is provided with the column of rail wheel and is provided with fixed link between the crossbeam that is connect with column.
Further, it is high to be provided with cat ladder between operating platform two neighboring in stent;Height is operated across the top layer of stent Cat ladder is provided between platform and platform slab;It is low to be provided with cat ladder between operating platform two neighboring in stent;It is low across stent Top layer operating platform and platform slab between be provided with cat ladder.
Further, operating platform includes the multiple tie-beams being arranged on bracket component, is laid on multiple tie-beams Bottom plate and be disposed around the guardrail at bottom plate edge.
Further, it connects the crossbeam of multiple tie-beams and is provided with diagonal brace between the column that is connect with crossbeam.
Further, bracket component and guardrail are welded for galvanized pipe, weld preservative treatment;Tie-beam is zinc-plated Pipe, is welded, weld preservative treatment between crossbeam;Diagonal brace is full weld between Zinc-coated angle steel, with crossbeam and column, and weld is prevented Corruption processing.
Further, bottom plate is bamboo slab rubber.
Specifically, bracket component length is 4.5m;Height sets 5 layer operation platforms, the first layer height from top to bottom across stent For 1.0m, width 0.8m;Second layer height is 3.9m, width 1.7m;Third layer height is 5.5m, width 1.6m;4th floor height It spends for 5.2m, width 1.4m;Headroom height is 5.8m, width 3.7m;It is low that across stent, 4 layer operation platforms are set from top to bottom, the One layer height is 1.0m, width 1.2m;Second layer height is 4.2m, width 3.0m;Third layer height is 3.9m, and width is 1.4m;Headroom height is 4.2m, width 3.1m.
Compared with prior art, the advantage of the utility model is:
The mobile holder device of overhead station construction provided by the utility model, by setting rail wheel that bracket component is driven to move It is dynamic, lateral scroll wheel between bracket component and platform slab edge is set, effectively prevent station of scratching in stent moving process Tie edge;Wheel holding mechanism is set on rail wheel and scroll wheel, when the mobile holder device of overhead station construction is moved to specific bit When putting, wheel holding mechanism locks wheel body, prevents the device from slipping, effectively increases the safety of construction;According to station section arc The height setting of shape ceiling is high across stent and low across two stents of stent, is set on each stent along the radian of arched top canopy Multilayer operation platform is realized and constructs simultaneously in the multiple operating platforms of section, effectively extends work surface, and improve load Lotus can accommodate more staff, so as to improve construction efficiency.
Description of the drawings
It is required in being described below to embodiment in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing to be used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the utility model Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings Other attached drawings are obtained, wherein:
Fig. 1 is the structure diagram of the mobile holder device of overhead station construction that the utility model embodiment 1 provides;
Label:1- rail wheels;2- scroll wheels;3- high is across stent;4- is low across stent;5- operating platforms;6- fixed links;7- is climbed Ladder;8- diagonal braces;100- Gui Hang areas;200- platform slabs;300- arc ceilings.
Specific embodiment
Embodiment 1
The present embodiment provides a kind of mobile holder device of overhead station construction, as shown in Figure 1, including pulley assembly, stent Component and operating platform 5;Pulley assembly includes rail wheel 1 and scroll wheel 2;Rail wheel 1 is vertically arranged, positioned at bracket component bottom Portion and in Gui Hang areas 100 and platform slab 200 track coordinate;Scroll wheel 2 is horizontally installed on bracket component and 200 side of platform slab Between edge;The wheel holding mechanism for preventing wheel body from rolling is both provided on rail wheel 1 and scroll wheel 2;Bracket component is included by standing Column and crossbeam are formed by connecting high across stent 3 and low across stent 4;Height is across stent 3 and low is both provided with across on stent 4 along arc The multilayer operation platform 5 that ceiling 300 is distributed.
The mobile holder device of overhead station construction provided in this embodiment, by setting rail wheel 1 that bracket component is driven to move It is dynamic, lateral scroll wheel 2 is set between 200 edge of bracket component and platform slab, effectively prevent scraping in stent moving process Rub 200 edge of platform slab;Wheel holding mechanism is set on rail wheel 1 and scroll wheel 2, when the mobile holder device movement of overhead station construction During to designated position, wheel holding mechanism locks wheel body, prevents the device from slipping, effectively increases the safety of construction;According to vehicle Stand section arc ceiling 300 height setting it is high across stent 3 and low across 4 two stents of stent, along arc on each stent The radian setting multilayer operation platform 5 of ceiling 300, realizes in the multiple operating platforms 5 of a section while constructs, effectively extend Work surface, and load is improved, more staff can be accommodated, so as to improve construction efficiency.
Further, it is provided between the crossbeam that is connect with the column as shown in Figure 1, being provided with the column of rail wheel 1 Fixed link 6.Fixed link 6 is used to control the traffic direction of rail wheel 1, prevents rail wheel 1 from being skidded off from track.
Further, as shown in Figure 1, high be provided with cat ladder 7 between operating platform 5 two neighboring in stent 3;Height is across branch Cat ladder 7 is provided between the top layer operating platform 5 of frame 3 and platform slab 200;It is low between operating platform 5 two neighboring in stent 4 It is provided with cat ladder 7;It is low to be provided with cat ladder 7 between the top layer operating platform 5 of stent 4 and platform slab 200, to facilitate staff It is current up and down between each layer operation platform 5 and between top layer operating platform 5 and platform slab 200.
Further, as shown in Figure 1, operating platform 5 include be arranged on bracket component multiple tie-beams, be laid on it is more Bottom plate on a tie-beam and the guardrail for being disposed around bottom plate edge.The setting of guardrail effectively prevent material, staff careless It falls, improves safety.
Further, it is provided between the column that is connect with the crossbeam as shown in Figure 1, connecting the crossbeam of multiple tie-beams Diagonal brace 8 to add mechanical strength, keeps the steady of operating platform 5.
Further, bracket component and guardrail are welded for galvanized pipe, weld preservative treatment;Tie-beam is zinc-plated Pipe, is welded, weld preservative treatment between crossbeam;The full weld between Zinc-coated angle steel, with crossbeam and column of diagonal brace 8, weld Preservative treatment.
Further, bottom plate is bamboo slab rubber.
Embodiment 2
In Beijing Metro swallow room, line 01 marks contract section swallowization station and old town northern station, applies described in embodiment 1 overhead Station construction moves holder device.Beijing Metro swallow room line 01 marks contract section swallowization station, old town northern station principal length 118m, wide It spends for 18.4m, building height 23.55m, is three layers of island station.Rail row sector width is 4m, length 118m, is single line rail Road.Platform slab width is 10m, and the wide 0.5m of platform slab cantilevered plate, thickness 0.2cm, wire center is 1.5m away from cantilevered plate edge, Outside parapet high 0.6m, wide 0.2m are away from arc ceiling height away from platform slab cantilevered plate 4m, Gao Kuaguihang area's wire center 6.866m, high across platform slab centre-to-centre spacing arc ceiling height is 7.45m, and walking along the street centre-to-centre spacing arc ceiling height in Di Kuaguihang areas is 5.658m, low across platform slab centre-to-centre spacing arc ceiling height are 5.729m.It is high since platform center is equipped with accessible vertical lift Degree is higher by mobile stent headroom height, causes mobile stent that can not pass through, so at least ensureing to set per side, there are two overhead stations The mobile holder device of construction, a station at least set four mobile holder devices of overhead stations construction altogether.
In the present embodiment, specifically, bracket component length is 4.5m;Height sets 5 layer operations to put down from top to bottom across stent 3 Platform 5, the first layer height are 1.0m, width 0.8m;Second layer height is 3.9m, width 1.7m;Third layer height be 5.5m, width 1.6m;4th layer height is 5.2m, width 1.4m;Headroom height is 5.8m, width 3.7m;It is low to set 4 from top to bottom across stent 4 Layer operation platform 5, the first layer height are 1.0m, width 1.2m;Second layer height is 4.2m, width 3.0m;Third floor height It spends for 3.9m, width 1.4m;Headroom height is 4.2m, width 3.1m.
Further, six groups of rail wheels 1 are set in bracket component bottom, the in-orbit row area 100 of four groups of settings, two groups are arranged on Platform slab 200;Two groups of scroll wheels 2 are set between 200 edge of bracket component and platform slab;It is convenient during bracket component movement to ensure Steadily, it is firm to be braked during construction, and when construction will arrange special messenger to keep an eye on, it is ensured that rail wheel 1 and scroll wheel 2 are in on-position.
Further, in bracket component, column is the zinc-plated rectangular tubes of 80 × 80 × 4mm, and crossbeam is zinc-plated for 80 × 40 × 4mm Rectangular tube, 5 lower part diagonal brace 8 of operating platform use 50 × 50 × 4mm Zinc-coated angle steels, and angle steel, using full weld, ensures with column, crossbeam The stability of operating platform 5, the bracket component central post in platform slab 200 are controlled with crossbeam link position within 1700mm, Prevent consequent effects shield door from installing, the bracket component column in Gui Hang areas 100 and crossbeam position ensure within 600mm or Use diagonal brace 8.5 bottom side of top layer's operating platform need to be reinforced using diagonal brace 8, and top surface is reinforced using reversed diagonal brace 8, it is ensured that operation Platform 5 is solid and reliable.Weld seam firm welding everywhere, it is reliable and stable, and preservative treatment is done, regularly schedule whether special messenger checks weld seam There is crack or corrosion phenomena, every 5 maximum load of layer operation platform, entire mobile holder device maximum load should be carried out Corresponding checking computations, when construction, ensure to must not exceed peak load
Further, the tie-beam of each layer operation platform 5 is 20 × 20 × 3mm zinc-plated square tubes, and right on bracket component The crossbeam answered reliably welds, and plays bottom plate load-bearing effect, and spacing 200mm is evenly arranged from intermediate toward both sides.Bottom plate is 50mm thickness bamboos Offset plate.1.2 meters of height of guardrail of operating platform 5, using 20 × 20 × 1.5mm zinc-plated square tubes, spacing 200mm, from intermediate toward both sides It is evenly arranged.
Further, high cat ladder 7 between the top layer operating platform 5 of stent 3 and platform slab 200, low across the top of stent 4 Cat ladder 7 between layer operation platform 5 and platform slab 200 is marked time using 40 × 40 × 4mm zinc-plated square tubes, and surrounding protection is using 40 × 4mm zinc-coated flat steel sheets circumflexion is reliably welded with frame body, spacing 300mm, forms closed channel, and staff is facilitated to apply up and down Work;Cat ladder 7 between 5 each layer of operating platform, marks time using 40 × 40 × 4mm zinc-plated square tubes, facilitates between each layer of staff It is current up and down.
Swallow room line 01 marks the construction of Yan Huazhan, old town northern station, after the mobile holder device of overhead station construction, is not required to The simple falsework of spigot-and-socket is bought, 60,000 yuan can be saved on two station materials, save cost.
Yan Huazhan starts Curved beam lifting on April 13rd, 2015, has only used 11 day time, 42 Curved beams all safety Installation is complete, starts curtain wall construction, ceiling construction on April 18th, 2015, has only used 24 days curtain walls and ceiling construction all complete Into;Old town northern station starts Curved beam lifting on March 21st, 2016, has only used 10 day time, 42 Curved beams all safety peaces It installs into, starts curtain wall construction, ceiling construction on March 27th, 2016, be only fully completed with 23 days curtain walls and ceiling construction; Construction efficiency is improved, effectively shortens the duration, personnel are upper to save 250,000 yuan, and two stations is added up to save 310,000 yuan of expense. In the construction process without safety accident, obtain Beijing implementation management track company, Shanghai City Tunnel Engineering rail traffic designing institute, Beijing is excelled all others the height favorable comment of the more units such as management Co., Ltd, for similar engineering construction provide it is extremely valuable with reference to and It uses for reference, and in the overhead station Curved beam lifting of Beijing Metro swallow room line all fronts, curtain wall construction, ceiling construction promote and answer With.
From the foregoing, it will be observed that the mobile holder device of overhead station construction has construction safety reliable, construction cost is reduced, greatly The advantages that improving construction efficiency, especially in the case where the duration is relatively tighter using the mobile stent of this construction, advantage is more Significantly.
It these are only the embodiment of the utility model, it does not limit the scope of the patent of the present invention, every utilization The equivalent structure or equivalent flow shift that the utility model description is made directly or indirectly is used in other relevant Technical field is equally included in the patent within the scope of the utility model.

Claims (8)

1. a kind of mobile holder device of overhead station construction, it is characterised in that:It is flat including pulley assembly, bracket component and operation Platform(5);
The pulley assembly includes rail wheel(1)And scroll wheel(2);
The rail wheel(1)It is vertically arranged, positioned at the bracket component bottom and with Gui Hang areas(100)And platform slab(200)On Track cooperation;
The scroll wheel(2)It is horizontally installed on the bracket component and platform slab(200)Between edge;
The rail wheel(1)And scroll wheel(2)On be both provided with for prevent wheel body roll wheel holding mechanism;
The height that the bracket component includes being formed by connecting by column and crossbeam is across stent(3)With low across stent(4);
The height is across stent(3)With low across stent(4)On be both provided with along arc ceiling(300)Operation described in the multilayer of distribution Platform(5).
2. the mobile holder device of overhead station construction according to claim 1, which is characterized in that be provided with the rail wheel (1)Column and the crossbeam that is connect with the column between be provided with fixed link(6).
3. the mobile holder device of overhead station construction according to claim 1, which is characterized in that the height is across stent(3) In two neighboring operating platform(5)Between be provided with cat ladder(7);The height is across stent(3)Top layer operating platform(5)With it is described Platform slab(200)Between be provided with cat ladder(7);
It is described low across stent(4)In two neighboring operating platform(5)Between be provided with cat ladder(7);It is described low across stent(4)Top Layer operation platform(5)With the platform slab(200)Between be provided with cat ladder(7).
4. the mobile holder device of overhead station construction according to claim 1, which is characterized in that the operating platform(5) Including the multiple tie-beams being arranged on the bracket component, the bottom plate being laid on multiple tie-beams and it is disposed around the bottom The guardrail on edges of boards edge.
5. the mobile holder device of overhead station construction according to claim 4, which is characterized in that the multiple connections of connection Diagonal brace is provided between the crossbeam of beam and the column being connect with the crossbeam(8).
6. the mobile holder device of overhead station construction according to claim 5, which is characterized in that the bracket component and shield Column is welded for galvanized pipe, weld preservative treatment;
The tie-beam welds between galvanized pipe, with the crossbeam, weld preservative treatment;
The diagonal brace(8)The full weld between Zinc-coated angle steel, with the crossbeam and column, weld preservative treatment.
7. the mobile holder device of overhead station construction according to claim 4, which is characterized in that the bottom plate is bamboo glue Plate.
8. the mobile holder device of overhead station construction according to claim 1, which is characterized in that the bracket component length For 4.5m;
The height is across stent(3)5 layer operation platforms are set from top to bottom(5), the first layer height is 1.0m, width 0.8m;Second Layer height is 3.9m, width 1.7m;Third layer height is 5.5m, width 1.6m;4th layer height is 5.2m, width 1.4m;Top Layer height is 5.8m, width 3.7m;
It is described low across stent(4)4 layer operation platforms are set from top to bottom(5), the first layer height is 1.0m, width 1.2m;The Two layer heights are 4.2m, width 3.0m;Third layer height is 3.9m, width 1.4m;Headroom height is 4.2m, and width is 3.1m。
CN201721594611.9U 2017-11-25 2017-11-25 A kind of mobile holder device of overhead station construction Expired - Fee Related CN207553606U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721594611.9U CN207553606U (en) 2017-11-25 2017-11-25 A kind of mobile holder device of overhead station construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721594611.9U CN207553606U (en) 2017-11-25 2017-11-25 A kind of mobile holder device of overhead station construction

Publications (1)

Publication Number Publication Date
CN207553606U true CN207553606U (en) 2018-06-29

Family

ID=62680972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721594611.9U Expired - Fee Related CN207553606U (en) 2017-11-25 2017-11-25 A kind of mobile holder device of overhead station construction

Country Status (1)

Country Link
CN (1) CN207553606U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528846A (en) * 2019-09-04 2019-12-03 中铁二十二局集团第五工程有限公司 A kind of scaffold for railway tunnel maintenance
CN113882649A (en) * 2021-12-08 2022-01-04 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method
CN115288193A (en) * 2022-08-08 2022-11-04 中铁二局集团有限公司 Space large-span dome structure construction method based on multilayer operation platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528846A (en) * 2019-09-04 2019-12-03 中铁二十二局集团第五工程有限公司 A kind of scaffold for railway tunnel maintenance
CN113882649A (en) * 2021-12-08 2022-01-04 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method
CN113882649B (en) * 2021-12-08 2022-02-08 中铁建工集团有限公司 Slidable platform canopy decoration construction operation platform and construction method
CN115288193A (en) * 2022-08-08 2022-11-04 中铁二局集团有限公司 Space large-span dome structure construction method based on multilayer operation platform

Similar Documents

Publication Publication Date Title
LU102302B1 (en) Steel reinforcement cage for use in ventilation shaft diaphragm wall, and usage method
CN207553606U (en) A kind of mobile holder device of overhead station construction
JP6986656B1 (en) Construction method of lifting directly above a bridge with a large tonnage box girder and its erection method
CN106760529A (en) Roof system steel truss slipping and assembling operation platform and installation method
CN203361592U (en) Sliding platform used for installing arch-shaped roof truss of steel structure
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN107288352B (en) The transport of the closed shed dormer roof boarding of overlarge area and installation method
CN103821084B (en) Operational method at the bottom of implement at the bottom of beam and beam
CN107447681A (en) A kind of precast plate girder erection method
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN208455637U (en) The installation system of bracing members in a kind of foundation pit
CN107419907B (en) A kind of steel-making tower steel structure platform is staggered installation of welding method
CN204940851U (en) A kind of sideslip type operating platform
CN110777666A (en) Steel box girder construction platform and use method
CN207144332U (en) Railcar for the installation of large-scale steel structure roofing
CN110282557A (en) Assist mounting platform and the method with high vacant duct in bridge crane installation workshop
CN202899639U (en) Concrete column structure
CN214834922U (en) Super-long-distance transportation device for roof color steel plates
CN106522566B (en) A kind of roof system steel truss sliding rail and assembly and disassembly methods
CN212764064U (en) Precast beam roof plate reinforcement hoist and mount system
CN110388122B (en) Chimney steel inner cylinder installation system and installation method
CN211949691U (en) Movable protective shed for construction on running light rail
CN209179519U (en) Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top
CN208305021U (en) For continuously welding the cantilevered multilayer hanging cage of superelevation overlong welded seam
CN204401998U (en) A kind of steel structure ceiling construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629

Termination date: 20211125