CN207553572U CN201721589352.0U CN201721589352U CN207553572U CN 207553572 U CN207553572 U CN 207553572U CN 201721589352 U CN201721589352 U CN 201721589352U CN 207553572 U CN207553572 U CN 207553572U
Authority
CN
China
Prior art keywords
protection network
installing frame
scaffold
network installing
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721589352.0U
Other languages
Chinese (zh)
Inventor
陈马欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRSC Engineering Group Electrical Engineering Co Ltd
Original Assignee
CRSC Engineering Group Electrical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRSC Engineering Group Electrical Engineering Co Ltd filed Critical CRSC Engineering Group Electrical Engineering Co Ltd
Priority to CN201721589352.0U priority Critical patent/CN207553572U/en
Application granted granted Critical
Publication of CN207553572U publication Critical patent/CN207553572U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses scaffold protection networks, including protection network installing frame, protection network, protection network installing frame connector and scaffolding pole connecting hoop, the protection network installing frame is equipped with engaging lug, the engaging lug is equipped with connecting hole, the engaging lug be equipped with it is multiple, and it is uniform be distributed in protection network installing frame surrounding edge, the protection network installing frame is equipped with upper and lower two layers, the protection network is located between two layers of protection network installing frame, and is structure as a whole by being welded to connect.This practicality is by using the mounting structure of piecemeal type and the making material of stainless steel, not only increase the convenience of scaffold protection network installation, and dismounting is convenient to after use, preservation can be removed after use for reusing, so as to effectively save construction cost.

Description

Scaffold protection network
Technical field
The utility model is related to building engineering fields, specially scaffold protection network.
Background technology
In building construction process, need to build scaffolding structure in the wall periphery of building, and scaffold outside needs One layer of protection network for protection staff personal safety is installed, such protection network is to be directly anchored to scaffold using rope In connecting rod, the protection network used that is currently used for matching with scaffold is typically all nylon wire material, since protection network is set In the periphery of scaffold, it is caused to be chronically under the irradiation of sunlight and rainwash, often engineering does not complete foot also The anti-skid mesh of hand cradle has just corroded, and does not have the effect of protection safety, the safety accident that people can also be caused to rely on it not only Occur, existing protection network is an entire volume structure when unused in addition, need to lay layer by layer cause to install it is relatively difficult, and And using it is rear mostly be all to do to scrap processing, this not only increases the difficulty of installation but also also adds construction funds.
Utility model content
Problem to be solved in the utility model is:Scaffold protection network is provided, by using the mounting structure of piecemeal type With the making material of stainless steel, the convenience of scaffold protection network installation is not only increased, and is dismantled after use It is very convenient, preservation can be removed after use for reusing, it can be to solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides following technical solution, and scaffold protection network is installed including protection network Frame, protection network, protection network installing frame connector and scaffolding pole connecting hoop, the protection network installing frame is equipped with engaging lug, described Engaging lug is equipped with connecting hole, the engaging lug be equipped with it is multiple, and it is uniform be distributed in protection network installing frame surrounding edge, it is described anti- Protecting wire net installing frame is equipped with upper and lower two layers, and the protection network is located between two layers of protection network installing frame, and is one by being welded to connect Body structure.
Preferably, the protection network installing frame, protection network, protection network installing frame connector and scaffolding pole connecting hoop are adopted It is made of stainless steel.
Preferably, it can be connected between the protection network installing frame by the connecting hole I that protection network installing frame connector is equipped with Expand usable floor area.
Preferably, the scaffolding pole connecting hoop is equipped with hanging hole and threaded securing bores.
Preferably, the scaffolding pole connecting hoop is connect with scaffold, and is threadably secured hole and is fixed one end, the foot Hand cradle bar connecting hoop is connect by hanging hole with protection network installing frame, is connected between the hanging hole and protection network installing frame by tension spring It connects.
Preferably, the protection network installing frame single chip architecture thickness is 1.5mm between 2mm.
Compared with prior art, the beneficial effects of the utility model are:
By using the mounting structure of piecemeal type and the making material of stainless steel, scaffold protection network is not only increased The convenience of installation, and dismounting is convenient to after use, preservation can be removed after use for reusing, so as to have Effect saves construction cost.
The utility model provides scaffold protection network, including protection network installing frame, protection network, protection network installing frame connector With scaffolding pole connecting hoop, the protection network installing frame is equipped with engaging lug, and the engaging lug is equipped with connecting hole, and the engaging lug is set Have it is multiple, and it is uniform be distributed in protection network installing frame surrounding edge, the protection network installing frame is equipped with upper and lower two layers, described anti- Protecting wire net is located between two layers of protection network installing frame, and is structure as a whole by being welded to connect.
Further, the protection network installing frame, protection network, protection network installing frame connector and scaffolding pole connecting hoop are equal It is made of stainless steel.There is the benefit for increasing scaffold protection network service life with this solution.
Further, can be connected between the protection network installing frame by the connecting hole I that protection network installing frame connector is equipped with Connect expansion usable floor area.There is the flexible performance for increasing the application of scaffold protection network with this solution.
Further, the scaffolding pole connecting hoop be equipped with hanging hole and threaded securing bores, the scaffolding pole connecting hoop with Scaffold connects, and is threadably secured hole and fixes one end, and the scaffolding pole connecting hoop passes through hanging hole and protection network installing frame Connection, is connected, the protection network installing frame single chip architecture thickness is between the hanging hole and protection network installing frame by tension spring 1.5mm is between 2mm.It can be good at increasing the facility of scaffold anti-skid mesh installation with this solution, and can also after use Enough dismountings preserve to reuse, and construction funds are saved for the realm of building construction.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, for ordinary skill people For member, without creative efforts, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model overall separation formula structure diagram;
Fig. 3 is the utility model protecting screen structure schematic diagram;
Fig. 4 is the utility model protection network installing frame connecting-piece structure schematic diagram;
Fig. 5 is the utility model scaffolding pole connecting hoop structure diagram.
In figure:1. protection network installing frame, 2. protection networks, 3. engaging lugs, 4. connecting holes, 5. protection network installing frame connectors, 6. connecting hole I, 7. scaffolding pole connecting hoops, 8. hanging holes, 9. threaded securing bores.
Specific embodiment
To be easy to understand technological means of the utility model, creation characteristic, the purpose reached and effect, under Face combines specific embodiment, and the utility model is expanded on further.
As shown in Figure 1 to Figure 3, scaffold protection network connects including protection network installing frame 1, protection network 2, protection network installing frame Fitting 5 and scaffolding pole connecting hoop 7, the protection network installing frame 1 are equipped with engaging lug 3, and the engaging lug 3 is equipped with connecting hole 4, institute State engaging lug 3 be equipped with it is multiple, and it is uniform be distributed in 1 surrounding edge of protection network installing frame, the protection network installing frame 1 is equipped with upper Two layers lower, the protection network 2 is located between two layers of protection network installing frame 1, and is structure as a whole by being welded to connect.
The utility model scaffold protection network, by using the mounting structure of piecemeal type and the making material of stainless steel Matter not only increases the convenience of scaffold protection network installation, and dismounting is convenient to after use, can be after use Preservation is removed for reusing, so as to effectively save construction cost.
Wherein, the protection network installing frame 1, protection network 2, protection network installing frame connector 5 and scaffolding pole connecting hoop 7 are equal It is made of stainless steel.
Wherein, it can be connected between the protection network installing frame 1 by the connecting hole I 6 that protection network installing frame connector 5 is equipped with Expand usable floor area.
Wherein, the scaffolding pole connecting hoop 7 is equipped with hanging hole 8 and threaded securing bores 9.
Wherein, the scaffolding pole connecting hoop 7 is connect with scaffold, and is threadably secured hole 9 and is fixed one end, the foot Hand cradle bar connecting hoop 7 is connect by hanging hole 8 with protection network installing frame 1, passes through drawing between the hanging hole 8 and protection network installing frame 1 Spring connects.
Wherein, the 1 single chip architecture thickness of protection network installing frame is 1.5mm between 2mm.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. scaffold protection network, including protection network installing frame (1), protection network (2), protection network installing frame connector (5) and foot hand Hack lever connecting hoop (7), it is characterised in that:The protection network installing frame (1) is equipped with engaging lug (3), and the engaging lug (3) is equipped with even Connect hole (4), the engaging lug (3) is uniformly distributed in protection network installing frame (1) surrounding edge, the protection equipped with multiple For net installing frame (1) equipped with upper and lower two layers, the protection network (2) passes through the company of welding between two layers of protection network installing frame (1) It is connected in integral structure.
2. scaffold protection network according to claim 1, it is characterised in that:The protection network installing frame (1), protection network (2), protection network installing frame connector (5) and scaffolding pole connecting hoop (7) are made of stainless steel.
3. scaffold protection network according to claim 1, it is characterised in that:It can lead between the protection network installing frame (1) It crosses connecting hole I (6) connection that protection network installing frame connector (5) is equipped with and expands usable floor area.
4. scaffold protection network according to claim 1, it is characterised in that:The scaffolding pole connecting hoop (7) is equipped with extension Hole (8) and threaded securing bores (9).
5. scaffold protection network according to claim 1, it is characterised in that:The scaffolding pole connecting hoop (7) and foot hand Frame connects, and is threadably secured hole (9) and fixes one end, and the scaffolding pole connecting hoop (7) is pacified by hanging hole (8) and protection network Frame up (1) connection, is connect between the hanging hole (8) and protection network installing frame (1) by tension spring.
6. scaffold protection network according to claim 1, it is characterised in that:Protection network installing frame (1) single chip architecture Thickness is 1.5mm between 2mm.
CN201721589352.0U 2017-11-24 2017-11-24 Scaffold protection network Expired - Fee Related CN207553572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721589352.0U CN207553572U (en) 2017-11-24 2017-11-24 Scaffold protection network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721589352.0U CN207553572U (en) 2017-11-24 2017-11-24 Scaffold protection network

Publications (1)

Publication Number Publication Date
CN207553572U true CN207553572U (en) 2018-06-29

Family

ID=62679966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721589352.0U Expired - Fee Related CN207553572U (en) 2017-11-24 2017-11-24 Scaffold protection network

Country Status (1)

Country Link
CN (1) CN207553572U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537871A (en) * 2018-11-16 2019-03-29 中国建筑第八工程局有限公司 Building safety protective net and its application method
CN109736559A (en) * 2019-01-06 2019-05-10 谢世琴 A kind of overhanging scaffold protective net apparatus and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537871A (en) * 2018-11-16 2019-03-29 中国建筑第八工程局有限公司 Building safety protective net and its application method
CN109736559A (en) * 2019-01-06 2019-05-10 谢世琴 A kind of overhanging scaffold protective net apparatus and its installation method

Similar Documents

Publication Publication Date Title
CN207553572U (en) Scaffold protection network
CN107295768A (en) A kind of instrument and meter case fixing device
CN210342860U (en) Reinforcing apparatus of electric power angle steel iron tower
CN105606858A (en) Polycarbonate meter box fixing rack
CN204942962U (en) Monitoring support
CN103967314B (en) A kind of 10kv-110kv emergency first-aid repair bar
CN209413406U (en) A kind of electric power tower main material bracing means
CN201066770Y (en) Quick elevated supporting frame for combined communication cable
CN211549044U (en) Stay bar
CN212176765U (en) Single-pipe iron tower for power transmission
CN208776187U (en) A kind of wooden frame lifting device
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN207791710U (en) A kind of enamel assembling tank stirrup short-circuit structure and enamel assembling tank
CN204940844U (en) A kind of quick supporting mechanism based on standard combination template
CN206495486U (en) A kind of means for fastening scaffolding
CN207920678U (en) A kind of chassis structure for steam turbine installation
CN205809366U (en) A kind of assembled conical tower optical cable fiber-dividing box fixing device
CN206352368U (en) A kind of roof clamp being easily installed
CN209114879U (en) Coagulation pump pipe fixing device can be had enough to meet the need
CN211818443U (en) Reinforcing apparatus of electric power angle steel iron tower
CN213508959U (en) Improved steel structure fastening device
CN215439423U (en) Tower machine equipment of convenient hoist and mount is with protection frame
CN212866361U (en) Building house supporting beam convenient to equipment
CN218346757U (en) Inverted cone water tower construction operation platform
CN209175726U (en) Movable stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629

Termination date: 20211124

CF01 Termination of patent right due to non-payment of annual fee