CN207553208U - A kind of water supply installation for supplying more bench drills and cutting equipment construction - Google Patents

A kind of water supply installation for supplying more bench drills and cutting equipment construction Download PDF

Info

Publication number
CN207553208U
CN207553208U CN201721487426.XU CN201721487426U CN207553208U CN 207553208 U CN207553208 U CN 207553208U CN 201721487426 U CN201721487426 U CN 201721487426U CN 207553208 U CN207553208 U CN 207553208U
Authority
CN
China
Prior art keywords
scissor arms
elevating mechanism
water
sump
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721487426.XU
Other languages
Chinese (zh)
Inventor
潘鸿宝
杨光值
吕云山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201721487426.XU priority Critical patent/CN207553208U/en
Application granted granted Critical
Publication of CN207553208U publication Critical patent/CN207553208U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

The utility model provides a kind of water supply installation for supplying more bench drills and cutting equipment construction, including:Pedestal, the lower surface of pedestal are connected with walking mechanism, and the upper surface of pedestal is connected with lifting assembly;The top of lifting assembly is connect with water tank supporting table, is mounted in sump supporting table for sump;Supply more bench drills cut equipment construction water supply installation give drilling equipment provide at least two exit branch, water supply installation is enable to supply multiple drilling equipment simultaneously to use, realize that one is main for multitube, construction area bull is concentrated on to supply water, allow what water supply water pipe concentrated rule to extend to drilling equipment everywhere, effectively avoid live water and electricity supply pipeline mixed and disorderly.Water supply installation have lifting assembly liftable movement make it have transport it is easy to carry, adapt to it is various for water environment the advantages of.Water supply installation is matched with pressure water pump, simple installation, fast.Pressure reducing valve, water pressure gauge and the outlet water control valve of water supply installation make it have the characteristics of stable, safe.

Description

A kind of water supply installation for supplying more bench drills and cutting equipment construction
Technical field
The utility model is related to water supply for construction field more particularly to a kind of water supply dresses for supplying more bench drills and cutting equipment construction It puts.
Background technology
Nowadays the water supply pattern of construction site is only that water supply point draws a plurality of water pipe to construction site, and cuts and set per bench drill It is standby to need one or two water supply water pipe, drilling equipment construction is assisted as flushing liquor, when facing multiple drilling machines and operating simultaneously, The water pipe drawn by water supply point is numerous and diverse in disorder, can not ensure construction safety, supplies water even if installing common threeway, can not also solve reality Matter sex chromosome mosaicism, therefore how ensuring construction safety and reliably supplying water is current assistant officer technical problem to be solved.
Invention content
In order to overcome above-mentioned deficiency of the prior art, the utility model provides a kind of more bench drills of supply and cuts equipment construction Water supply installation, including:Pedestal, the lower surface of pedestal are connected with walking mechanism, and the upper surface of pedestal is connected with lifting assembly;Lifting The top of component is connect with water tank supporting table, is mounted in sump supporting table for sump;
Water supply orlop portion is equipped with first leg and the second supporting leg, and first leg and the second supporting leg respectively can with sump supporting table Dismantling connection;
Water supply the top of the warehouse is equipped with pressure reducing valve and pressure gauge, for sump side be equipped with the feed pipe that is connect with pressure water pump with And at least two exit branch for providing water source to drilling equipment;Water supply orlop portion is equipped with drainpipe.
Preferably, cylinder is equipped with for sump, the both ends of cylinder are respectively welded end socket;
Feed pipe is connect with end socket;Feed pipe is equipped with water inlet control valve;
At least two exit branch are connect respectively with cylinder;Each exit branch is equipped with outlet water control valve;
Drainpipe is arranged between first leg and the second supporting leg;Drainpipe is equipped with drain valve.
Preferably, first leg is connect with cylinder first end, and connecting pin between first leg and cylinder first end and Weld seam between cylinder first end and end socket is equipped with pre-determined distance;
Second supporting leg is connect with cylinder second end, and the connecting pin between the second supporting leg and cylinder second end and cylinder second Weld seam between end and end socket is equipped with pre-determined distance.
Preferably, one end of base upper surface is connected with push rod.
Preferably, lifting assembly includes:First elevating mechanism, the second elevating mechanism and hydraulic push rod;First elevating mechanism It is set up in parallel with the second elevating mechanism;The horizontal center line of the horizontal center line of first elevating mechanism and the second elevating mechanism is same One horizontal plane;
Bottom surface of the top of first elevating mechanism and the second elevating mechanism respectively with sump supporting table is connect, the first elevator The bottom end of structure and the second elevating mechanism is connect respectively with base upper surface;
The first cross bar and the second cross bar are equipped between first elevating mechanism and the second elevating mechanism;
First cross bar both ends are connect respectively with the first elevating mechanism and the second elevating mechanism;
Second cross bar both ends are connect respectively with the first elevating mechanism and the second elevating mechanism;
First cross bar is arranged on the horizontal center line of the first elevating mechanism and the horizontal center line top of the second elevating mechanism, Second cross bar is arranged on the lower part of the horizontal center line of the first elevating mechanism and the horizontal center line of the second elevating mechanism;
One end of hydraulic push rod is fixedly connected with the second cross bar, and the push rod end of hydraulic push rod is connect with the first cross bar.
Preferably, the first elevating mechanism includes:First scissor arms, the second scissor arms, third scissor arms, the 4th scissor arms, 5th scissor arms, the 6th scissor arms, the 7th scissor arms and the 8th scissor arms;
The midpoint of first scissor arms is with point articulated in the second scissor arms, the first end and base upper surface of the first scissor arms It is slidably connected;The first end of second scissor arms is fixedly connected with base upper surface;
The second end of first scissor arms is hinged with the 4th scissor arms first end;The second end of second scissor arms and third scissor Arm second end is hinged;4th scissor arms second end is hinged with the 5th scissor arms second end;Third scissor arms first end is cut with the 6th Yoke first end is hinged;6th scissor arms second end is hinged with the 7th scissor arms second end;5th scissor arms first end and the 8th Scissor arms first end is hinged;7th scissor arms first end is fixedly connected with the bottom surface of sump supporting table;8th scissor arms second end It is slidably connected with the bottom surface of sump supporting table;
The midpoint of third scissor arms is with point articulated in the 4th scissor arms, midpoint and the 6th scissor arms of the 5th scissor arms In it is point articulated, the midpoint of the 7th scissor arms with it is point articulated in the 8th scissor arms.
Preferably, walking mechanism includes:Four universal wheels, each universal wheel are connected with connector;Universal wheel passes through connection The lower surface of part and pedestal connects;
Four universal wheels are set respectively close to four vertex of pedestal.
As can be seen from the above technical solutions, the utility model has the following advantages:
Supply more bench drills cut equipment construction water supply installation give drilling equipment provide at least two exit branch, fill water supply Multiple drilling equipment can be supplied simultaneously by, which putting, uses, and realizes that one is main for multitube, concentrates on construction area bull and supply water, make water supply water pipe Rule can be concentrated extends to drilling equipment everywhere, effectively avoids live water and electricity supply pipeline mixed and disorderly.Water supply installation has lifting Component liftable movement make it have transport it is easy to carry, adapt to it is various for water environment the advantages of.Water supply installation and pressure water Pump matches, simple installation, fast.Pressure reducing valve, water pressure gauge and the outlet water control valve of water supply installation make it have stable, peace The characteristics of complete.
Description of the drawings
In order to illustrate more clearly of the technical solution of the utility model, attached drawing needed in description will be made below Simply introduce, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the utility model, for this field For those of ordinary skill, without creative efforts, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is the water supply installation overall schematic that the more bench drills of supply cut equipment construction;
Fig. 2 is the water supply installation side view that the more bench drills of supply cut equipment construction.
Specific embodiment
Purpose of utility model, feature, advantage to enable the utility model is more apparent and understandable, below will fortune With specific embodiment and attached drawing, the technical solution of the utility model protection is clearly and completely described, it is clear that below The described embodiments are only a part of the embodiments of the utility model, and not all embodiment.Based on the reality in this patent Example is applied, all other embodiment that those of ordinary skill in the art are obtained without making creative work all belongs to In the range of this patent protection.
Here may use convenient for description space relative terms, such as " ... under ", " lower section ", " lower part ", " with On ", " top " etc. the relationship of an elements or features and another elements or features as illustrated in the drawing described.It should manage Solution, space relative terms are intended to include the device different orientation in use or work except being orientated shown in figure.For example, such as Fruit turns the device in figure, be described as be in other elements or feature " under " or the element of " lower section " will be towards other " top " of elements or features.Then, exemplary term " lower section " can include above and below two kinds orientation.It can make device Other orientations (be rotated by 90 ° or other are orientated) are taken, make respective explanations used herein of spatially relative term.
The utility model provides a kind of water supply installation for supplying more bench drills and cutting equipment construction, as shown in Figure 1 and Figure 2, including: Pedestal 9, the lower surface of pedestal 9 are connected with walking mechanism, and the upper surface of pedestal 9 is connected with lifting assembly 8;The top of lifting assembly 8 End is connect with water tank supporting table 11, is mounted in sump supporting table 11 for sump 3;
For 3 bottom of sump be equipped with 12 and second supporting leg 13 of first leg, 12 and second supporting leg 13 of first leg respectively with water Storehouse supporting table 11 is detachably connected;
Pressure reducing valve 1 and pressure gauge 4 are equipped with for 3 top of sump, the water supply being connect with pressure water pump is equipped with for the side of sump 3 Pipe 5 and at least two exit branch 6 for providing water source to drilling equipment;Drainpipe 7 is equipped with for 3 bottom of sump.
Wherein, cylinder is equipped with for sump 3, the both ends of cylinder are respectively welded end socket;Feed pipe 5 is connect with end socket;It supplies water Pipe 5 is equipped with water inlet control valve;At least two exit branch 6 are connect respectively with cylinder;Each exit branch 6 is equipped with out water control Valve processed;Drainpipe 7 is arranged between 12 and second supporting leg 13 of first leg;Drainpipe 7 is equipped with drain valve.Exit branch 6 It is to be arranged along the axis of cylinder to set arrangement mode.
It is supplied water in water supply process using pressure water pump, therefore installs pressure reducing valve to control the hydraulic pressure supplied in sump, it is fixed Pressure supplies water.
Cylinder is equipped with for sump 3, the both ends of cylinder are respectively welded end socket, reduce the stress concentration for sump 3, Ke Yiyou Imitate it is against pressure explosion-proof, can be to be controlled for the hydraulic pressure in sump in work progress and for being installed on water pressure gauge and air outlet valve on sump System is safer effective.
Water pressure gauge selects low-pressure machinery water pressure gauge, installs on sump, when for sump memory storage large quantity of air, hydraulic pressure The pressure value of table can be very good to react this situation, confirm the working condition of water supply bull device device in the construction process, and add To adjust.
Feed pipe is located at the center of the side bottom surface for sump, and sets control valve, supplies water flow velocity to control, supplies water The pipe other end connects pressure water pump, to provide sufficient hydraulic pressure.
6 level of exit branch is installed on the tube wall for sump both sides, and eight water outlet straight tubes can be set per side, are each gone out Water straight tube sets control valve, to control water discharge speed.
Drainpipe is located at water supply orlop portion, after being mainly used for construction, empties for remaining water in sump.
In the present embodiment, first leg 12 is connect with cylinder first end, and between first leg 12 and cylinder first end Weld seam between connecting pin and cylinder first end and end socket is equipped with pre-determined distance;Second supporting leg 13 is connect with cylinder second end, and The weld seam between connecting pin and cylinder second end and end socket between second supporting leg 13 and cylinder second end is equipped with pre-determined distance.
One end of 9 upper surface of pedestal is connected with push rod 2.It can realize the implementation to water supply installation, be moved easily.Push rod 2 Convenient for carrying out water supply installation, push rod 2 can folding and unfolding, reduce the floor space of water supply installation, make its storage convenient.
In the present embodiment, lifting assembly 8 includes:First elevating mechanism 31, the second elevating mechanism 32 and hydraulic push rod 35;The One elevating mechanism and the second elevating mechanism are set up in parallel;The level of the horizontal center line of first elevating mechanism and the second elevating mechanism Center line is in same level;Can certainly limit the first elevating mechanism vertical centerline and the second elevating mechanism it is vertical Center line is in same vertical plane;The first elevating mechanism 31 can be realized in this way, and the second elevating mechanism 32 rises and falls simultaneously.Hydraulic push rod 35 play the role of driving the first elevating mechanism 31 and the lifting of the second elevating mechanism 32.
Bottom surface of the top of first elevating mechanism and the second elevating mechanism respectively with sump supporting table 11 is connect, the first lifting The bottom end of mechanism and the second elevating mechanism is connect respectively with 9 upper surface of pedestal;Between first elevating mechanism and the second elevating mechanism Equipped with the first cross bar 33 and the second cross bar 34;First cross bar, 33 both ends connect respectively with the first elevating mechanism and the second elevating mechanism It connects;Second cross bar, 34 both ends are connect respectively with the first elevating mechanism and the second elevating mechanism;First cross bar 33 is arranged on first liter The horizontal center line top of the horizontal center line of descending mechanism and the second elevating mechanism, the second cross bar 34 are arranged on the first elevating mechanism Horizontal center line and the second elevating mechanism horizontal center line lower part;One end of hydraulic push rod 35 is solid with the second cross bar 34 Fixed connection, the push rod end of hydraulic push rod 35 are connect with the first cross bar 33.
First elevating mechanism 31 and the second elevating mechanism 32 be respectively supported at sump supporting table 11 close to end position and First elevating mechanism 31 and the second elevating mechanism 32 are respectively supported at pedestal 9 close to end position.
In the present embodiment, the first elevating mechanism includes:First scissor arms 51, the second scissor arms 52, third scissor arms 53, the Four scissor arms 14, the 5th scissor arms 15, the 6th scissor arms 16, the 7th scissor arms 17 and the 8th scissor arms 18;
The midpoint of first scissor arms 51 and point articulated in the second scissor arms 52, the first end and pedestal of the first scissor arms 51 9 upper surface slides connect;The first end of second scissor arms 52 is fixedly connected with 9 upper surface of pedestal;
The second end of first scissor arms 51 is hinged with 14 first end of the 4th scissor arms;The second end of second scissor arms 52 and the Three scissor arms, 53 second end is hinged;4th scissor arms, 14 second end is hinged with 15 second end of the 5th scissor arms;Third scissor arms 53 First end is hinged with 16 first end of the 6th scissor arms;6th scissor arms, 16 second end is hinged with 17 second end of the 7th scissor arms;The Five scissor arms, 15 first end is hinged with 18 first end of the 8th scissor arms;The bottom of 7th scissor arms, 17 first end and sump supporting table 11 Face is fixedly connected;8th scissor arms, 18 second end and the bottom surface of sump supporting table 11 are slidably connected;
With point articulated in the 4th scissor arms 14, the midpoint of the 5th scissor arms 15 is cut with the 6th at the midpoint of third scissor arms 53 It is point articulated in yoke 16, the midpoint of the 7th scissor arms 17 with it is point articulated in the 8th scissor arms 18.
The structure type of second elevating mechanism 32 is identical with the first elevating mechanism, and concrete structure is with reference to the first elevating mechanism.
Using scissor arm configuration can effectively support it is heavier lifted for sump 3, hydraulic push rod 35 plays pair The lifting driving effect of elevating mechanism.
In the present embodiment, walking mechanism includes:Four universal wheels 42, each universal wheel 42 are connected with connector 41;It is universal Wheel 42 is connect by connector 41 with the lower surface of pedestal 9;Four universal wheels 42 are set respectively close to four vertex of pedestal 9.
Term " first " in the specification and claims of the utility model and above-mentioned attached drawing, " second ", " third " " 4th " etc., for distinguishing similar object, specific sequence or precedence is described without being used for if there is being.It should Understand that the data that use in this way can be interchanged in the appropriate case, it can be with so as to the embodiment of the utility model described herein Sequence other than those for illustrating or describing herein is implemented.In addition, term " comprising " and " having " and their times What is deformed, it is intended that covers non-exclusive include.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or new using this practicality Type.A variety of modifications of these embodiments will be apparent for those skilled in the art, determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide range consistent with features of novelty.

Claims (7)

1. a kind of water supply installation for supplying more bench drills and cutting equipment construction, which is characterized in that including:Pedestal (9), under pedestal (9) Surface is connected with walking mechanism, and the upper surface of pedestal (9) is connected with lifting assembly (8);The top of lifting assembly (8) and water tank branch It supports platform (11) to connect, be mounted in sump supporting table (11) for sump (3);
First leg (12) and the second supporting leg (13), first leg (12) and the second supporting leg (13) point are equipped with for sump (3) bottom It is not detachably connected with sump supporting table (11);
For being equipped with pressure reducing valve (1) and pressure gauge (4) at the top of sump (3), it is equipped with what is connect with pressure water pump for the side of sump (3) Feed pipe (5) and at least two exit branch (6) for providing water source to drilling equipment;Row is equipped with for sump (3) bottom Water pipe (7).
2. the more bench drills of supply according to claim 1 cut the water supply installation of equipment construction, which is characterized in that
For sump (3) equipped with cylinder, the both ends of cylinder are respectively welded end socket;
Feed pipe (5) is connect with end socket;Feed pipe (5) is equipped with water inlet control valve;
At least two exit branch (6) are connect respectively with cylinder;Each exit branch (6) is equipped with outlet water control valve;
Drainpipe (7) is arranged between first leg (12) and the second supporting leg (13);Drainpipe (7) is equipped with drain valve.
3. the more bench drills of supply according to claim 1 or 2 cut the water supply installation of equipment construction, which is characterized in that
First leg (12) is connect with cylinder first end, and the connecting pin between first leg (12) and cylinder first end and cylinder Weld seam between first end and end socket is equipped with pre-determined distance;
Second supporting leg (13) is connect with cylinder second end, and the connecting pin between the second supporting leg (13) and cylinder second end and cylinder Weld seam between second end and end socket is equipped with pre-determined distance.
4. the more bench drills of supply according to claim 1 or 2 cut the water supply installation of equipment construction, which is characterized in that
One end of pedestal (9) upper surface is connected with push rod (2).
5. the more bench drills of supply according to claim 1 or 2 cut the water supply installation of equipment construction, which is characterized in that
Lifting assembly (8) includes:First elevating mechanism (31), the second elevating mechanism (32) and hydraulic push rod (35);First lifting Mechanism and the second elevating mechanism are set up in parallel;The horizontal center line of the horizontal center line of first elevating mechanism and the second elevating mechanism In same level;
Bottom surface of the top of first elevating mechanism and the second elevating mechanism respectively with sump supporting table (11) is connect, the first elevator The bottom end of structure and the second elevating mechanism is connect respectively with pedestal (9) upper surface;
The first cross bar (33) and the second cross bar (34) are equipped between first elevating mechanism and the second elevating mechanism;
First cross bar (33) both ends are connect respectively with the first elevating mechanism and the second elevating mechanism;
Second cross bar (34) both ends are connect respectively with the first elevating mechanism and the second elevating mechanism;
First cross bar (33) is arranged on the horizontal center line of the first elevating mechanism and the horizontal center line top of the second elevating mechanism, Second cross bar (34) is arranged on the lower part of the horizontal center line of the first elevating mechanism and the horizontal center line of the second elevating mechanism;
One end of hydraulic push rod (35) is fixedly connected with the second cross bar (34), push rod end and the first cross bar of hydraulic push rod (35) (33) it connects.
6. the more bench drills of supply according to claim 5 cut the water supply installation of equipment construction, which is characterized in that
First elevating mechanism includes:First scissor arms (51), the second scissor arms (52), third scissor arms (53), the 4th scissor arms (14), the 5th scissor arms (15), the 6th scissor arms (16), the 7th scissor arms (17) and the 8th scissor arms (18);
The midpoint of first scissor arms (51) and point articulated in the second scissor arms (52), the first end of the first scissor arms (51) and bottom Seat (9) upper surface slide connection;The first end of second scissor arms (52) is fixedly connected with pedestal (9) upper surface;
The second end of first scissor arms (51) and the 4th scissor arms (14) first end are hinged;The second end of second scissor arms (52) with Third scissor arms (53) second end is hinged;4th scissor arms (14) second end and the 5th scissor arms (15) second end are hinged;Third Scissor arms (53) first end and the 6th scissor arms (16) first end are hinged;6th scissor arms (16) second end and the 7th scissor arms (17) second end is hinged;5th scissor arms (15) first end and the 8th scissor arms (18) first end are hinged;7th scissor arms (17) First end is fixedly connected with the bottom surface of sump supporting table (11);The bottom of 8th scissor arms (18) second end and sump supporting table (11) Face is slidably connected;
The midpoint of third scissor arms (53) and point articulated in the 4th scissor arms (14), the midpoint and the 6th of the 5th scissor arms (15) It is point articulated in scissor arms (16), the midpoint of the 7th scissor arms (17) with it is point articulated in the 8th scissor arms (18).
7. the more bench drills of supply according to claim 1 or 2 cut the water supply installation of equipment construction, which is characterized in that
Walking mechanism includes:Four universal wheels (42), each universal wheel (42) are connected with connector (41);Universal wheel (42) passes through Connector (41) is connect with the lower surface of pedestal (9);
Four universal wheels (42) are set respectively close to four vertex of pedestal (9).
CN201721487426.XU 2017-11-09 2017-11-09 A kind of water supply installation for supplying more bench drills and cutting equipment construction Active CN207553208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721487426.XU CN207553208U (en) 2017-11-09 2017-11-09 A kind of water supply installation for supplying more bench drills and cutting equipment construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721487426.XU CN207553208U (en) 2017-11-09 2017-11-09 A kind of water supply installation for supplying more bench drills and cutting equipment construction

Publications (1)

Publication Number Publication Date
CN207553208U true CN207553208U (en) 2018-06-29

Family

ID=62682645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721487426.XU Active CN207553208U (en) 2017-11-09 2017-11-09 A kind of water supply installation for supplying more bench drills and cutting equipment construction

Country Status (1)

Country Link
CN (1) CN207553208U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109173124A (en) * 2018-09-14 2019-01-11 山东新来电能源科技有限公司 A kind of electric firefighting vehicle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109173124A (en) * 2018-09-14 2019-01-11 山东新来电能源科技有限公司 A kind of electric firefighting vehicle

Similar Documents

Publication Publication Date Title
JP6232445B2 (en) Concrete pump with distribution boom
US11230896B2 (en) Device and method for multi-path flow from vertical hydraulic tank
CN207553208U (en) A kind of water supply installation for supplying more bench drills and cutting equipment construction
CN104254655B (en) For the suspension connector system that is used together with boat scaffold with and related methods
CN106424037A (en) Pipe cleaner ball serving device
CN107339073A (en) A kind of ground drilling rod lifting jack
CN104709831A (en) Crane for high-rise building outer wall cleaning machine
CN105000153B (en) Foot hand horse and the method for scaffold building
CN201133219Y (en) Sea derrick for drilling and repairing
CN206625215U (en) A kind of lowering device for reinforcing cage of drilled pile
CN202672687U (en) Three-point lifting scaffolding
CN203394380U (en) Hydraulic lifting device of oil pipe
CN206346188U (en) A kind of steel reinforcement cage
CN210937771U (en) Stirrup welding set convenient to adjust width
CN204934966U (en) For the welding tooling of jib for tower crane
CN207974502U (en) Operation platform in a kind of combined electrical stair shaft
CN202704925U (en) Hoisting device for ventilation duct
CN202248921U (en) Pumper
CN214917282U (en) Oil cylinder paint spraying tool
CN208163195U (en) A kind of feeding mechanism of horizontal saw mill
CN106270310B (en) The preparation method and its manufacture stand of a kind of shield duct piece steel reinforcement cage
CN206035415U (en) Novel lift combination formula oil pipe bridge
CN204800005U (en) Special supporting frame structure of top surface drilling
CN205476090U (en) Support can be spliced to instrument formula of being applied to base plate reinforcing bar support
CN205805447U (en) Multi-functional dismountable type hydraulic tube drawing bench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant