CN207539523U - A kind of pipe perforation fast blockage fixture - Google Patents
A kind of pipe perforation fast blockage fixture Download PDFInfo
- Publication number
- CN207539523U CN207539523U CN201721664073.6U CN201721664073U CN207539523U CN 207539523 U CN207539523 U CN 207539523U CN 201721664073 U CN201721664073 U CN 201721664073U CN 207539523 U CN207539523 U CN 207539523U
- Authority
- CN
- China
- Prior art keywords
- holder
- sides
- clipping part
- fixed
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model is related to a kind of pipe perforation fast blockage fixtures, including by both sides pinch and being fixed on the holder that the crossbeam of angle upper end forms, gripping mechanism is provided on the both sides pinch and upper end floor beam of the holder, the gripping mechanism includes wearing the driving screw connect with holder both sides pinch and upper end floor beam, the front end connection bearing of the driving screw is fixed, the connection bearing is fixed on mounting blocks, the mounting blocks are fixed on the rear end face of clipping part, leak stopping alignment block is set on the both sides of the face of the clipping part, two guiding polished rods are arranged in parallel on the rear end face of clipping part, the both sides pinch for being oriented to polished rod and holder and upper end floor beam are worn and are connect, and connect end set connecting plate being oriented to wearing for polished rod.The utility model can be adjusted according to different pipe diameter sizes and clamp, and applicable difference duct size leak stopping clamp uses, and pipeline clamps easy to operate, and service efficiency is high, and suitable conduit range is wide, reduces pipeline and ties up leak stopping maintenance cost.
Description
Technical field
The utility model is related to conduit leak gripping device technical field more particularly to a kind of pipe perforation fast blockage fixtures.
Background technology
In crude oil production and the production processes such as chemical engineering industry, due to the influence of the corrosion of external environment and medium,
And artificial pilferage behavior, oil, gas and water pipeline breaking perforation accident is caused often to occur, not only causes oil, the gas and water energy
Leakage loss, but also environment is polluted, however halt production is handled, and certainly will influence oil field production, it is therefore desirable to frequent son with pressure of checking card
Leak stopping pipeline is handled, but conventional clamp, without relief hole, son with pressure of checking card is awkward, the pipe of the defeated conveyance conduit of main problem
Diameter is not of uniform size, and existing leak stopping clip cannot the pipe diameter size of basis be adjusted, need big according to different calibers
It is small to formulate specific leak stopping clip, which not only adds leak stopping cost, and the clip storage not convenient for transportation of a variety of sizes.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provide a kind of pipe perforation fast blockage card
Tool, can be adjusted according to different pipe diameter sizes and clamp, and applicable difference duct size leak stopping clamps use, and pipeline clamps
Easy to operate, service efficiency is high, and suitable conduit range is wide, reduces pipeline dimension leak stopping maintenance cost.
The utility model is achieved through the following technical solutions:A kind of pipe perforation fast blockage fixture, including being pressed from both sides by both sides
Foot and be fixed on angle upper end crossbeam composition holder, be provided with clip machine on the both sides pinch and upper end floor beam of the holder
Structure, the gripping mechanism include wearing the driving screw connect with holder both sides pinch and upper end floor beam, before the driving screw
End connection bearing is fixed, and the connection bearing is fixed on mounting blocks, and the mounting blocks are fixed on the rear end face of clipping part, described
Leak stopping alignment block on the both sides of the face of clipping part is set, two guiding polished rods are arranged in parallel on the rear end face of clipping part, it is described to lead
It wears and connects to the both sides pinch and upper end floor beam of polished rod and holder, and end set connecting plate is connect being oriented to wearing for polished rod.
The further junction of holder both sides pinch and the crossbeam of upper end setting fastening block.
Further the driving screw and the connecting plate of guiding polished rod end are worn and are connect.
Several side-friction slots are further arranged in parallel on the front end face of the clipping part.
Further the leak stopping alignment block is equipped with leak stopping jack hole.
Compared with prior art, the beneficial effects of the utility model are:The clip tool of the utility model by holder and is set
The both sides pinch put in holder sends the gripping mechanism composition on end floor beam, by gripping mechanism to the left and right sides portion of pipeline and
The direction progress of three, top is clamping, in use, the driving screw of rotation gripping mechanism, makes the clipping part on the both sides pinch of holder
Clipping part on end floor beam on the left and right sides of pipeline, holder is located at the top of pipeline, then reversely rotates driving screw, makes
Lower Forward is moved, and clamp with pipeline both side surface in clipping part on the both sides pinch of holder in driving silk ribbon, and the upper end of holder is horizontal
Clipping part on beam is clamped with pipeline upper surface, it is achieved thereby that three faces to pipeline are clamping, pipeline clamp it is easy to operate, according to
Pipe diameter size can drive screw to adjust the forward-reverse distance of clipping part by rotation, can be big according to different pipe diameters
Small be adjusted clamps, and applicable difference duct size leak stopping clamps use, and service efficiency is high, and suitable conduit range is wide, reduces
Pipeline dimension leak stopping maintenance cost, while the front-end surface that clipping part is contacted with pipe surface is improved equipped with side-friction slot
Clipping part and pipe surface clamp patch firmness, and clip clamps securely with pipeline.
Description of the drawings
Fig. 1 is structure diagram when the utility model pipe perforation fast blockage fixture clamps pipeline;
Fig. 2 is the front view of the utility model pipe perforation fast blockage fixture;
Fig. 3 is the clipping part rear end face schematic diagram of the utility model pipe perforation fast blockage fixture;
Fig. 4 is the clipping part front end face schematic diagram of the utility model pipe perforation fast blockage fixture.
Wherein:1st, holder;2nd, clipping part;3rd, mounting blocks;4th, bearing is connected;5th, leak stopping alignment block;6th, it is oriented to polished rod;7th, even
Fishplate bar;8th, screw is driven;9th, fastening block;10th, leak stopping jack hole;11st, side-friction slot.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention is further described in detail.It should be appreciated that specific embodiment described herein is only explaining this
Utility model is not used to limit the utility model.
As shown in Figure 1, 2, the utility model is related to a kind of pipe perforation fast blockage fixture, including by both sides pinch and admittedly
The holder 1 of the crossbeam composition of angle upper end is scheduled on, gripping mechanism is provided on the both sides pinch and upper end floor beam of the holder 1,
The gripping mechanism includes wearing the driving screw 8 connect with 1 both sides pinch of holder and upper end floor beam, before the driving screw 8
End connection bearing 4 is fixed, and the connection bearing 4 is fixed on mounting blocks 3, and the mounting blocks 3 are fixed on 2 rear end face of clipping part
On, and two guiding polished rods 6, the both sides pinch for being oriented to polished rod 6 and holder 1 are arranged in parallel on the rear end face of clipping part 2
It wears and connects with upper end floor beam, and end set connecting plate 7 is connect being oriented to wearing for polished rod 6, the horizontal stroke of the 1 both sides pinch of holder and upper end
The connecting plate 7 of the junction setting fastening block 9 of beam, the driving screw 8 and 6 end of guiding polished rod, which is worn, to be connect.
As shown in Figure 3,4, leak stopping alignment block 5 is set on the both sides of the face of the clipping part 2, on the leak stopping alignment block 5
Equipped with leak stopping jack hole 10, several side-friction slots 11 are arranged in parallel on the front end face of the clipping part 2.
Embodiment 1
This clip tool is sent the gripping mechanism on end floor beam with the both sides pinch for being arranged on holder 1 by holder 1 and is formed, and passes through
Gripping mechanism is clamping to the left and right sides portion of pipeline and the direction progress of three, top, in use, the driving silk of rotation gripping mechanism
Bar 8 makes the clipping part 2 on the both sides pinch of holder 1 be located at the left and right sides of pipeline, the clipping part 2 on holder 1 on end floor beam
At the top of pipeline, driving screw 8 is then reversely rotated, the clipping part 2 on the both sides pinch of holder 1 is made to be driven in driving screw 8
Lower Forward, and clamped with pipeline both side surface, the clipping part 2 on the upper end floor beam of holder 1 is clamped with pipeline upper surface, so as to real
Show clamping to three faces of pipeline, pipeline clamps easy to operate, according to pipe diameter size, screw 8 can be driven to adjust by rotation
The forward-reverse distance of clipping part 2 is saved, can be adjusted and clamped according to different pipe diameter sizes, therefore, is applicable in different pipelines
Size leak stopping clamps use, and service efficiency is high, and suitable conduit range is wide, reduces pipeline dimension leak stopping maintenance cost, while clip
The front-end surface that portion 2 is contacted with pipe surface is equipped with side-friction slot 11, improves clipping part 2 and pastes jail with clamping for pipe surface
Soundness, clip clamp securely with pipeline.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (5)
1. a kind of pipe perforation fast blockage fixture, including by both sides pinch and being fixed on the holder that the crossbeam of angle upper end forms
(1), which is characterized in that the holder(1)Both sides pinch and upper end floor beam on be provided with gripping mechanism, the gripping mechanism packet
It includes and holder(1)Both sides pinch and upper end floor beam wear the driving screw connect(8), the driving screw(8)Front end connection
Bearing(4)It is fixed, the connection bearing(4)It is fixed on mounting blocks(3), the mounting blocks(3)It is fixed on clipping part(2)Rear end face
On, the clipping part(2)Both sides of the face on set leak stopping alignment block(5), clipping part(2)Rear end face on be arranged in parallel two
It is oriented to polished rod(6), the guiding polished rod(6)With holder(1)Both sides pinch and upper end floor beam wear and connect, and be oriented to polished rod(6)
Wear and connect end set connecting plate(7).
A kind of 2. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the holder(1)Both sides
The junction of pinch and the crossbeam of upper end sets fastening block(9).
A kind of 3. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the driving screw(8)
With being oriented to polished rod(6)The connecting plate of end(7)It wears and connects.
A kind of 4. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the clipping part(2)'s
Several side-friction slots are arranged in parallel on front end face(11).
A kind of 5. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the leak stopping alignment block
(5)It is equipped with leak stopping jack hole(10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721664073.6U CN207539523U (en) | 2017-12-04 | 2017-12-04 | A kind of pipe perforation fast blockage fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721664073.6U CN207539523U (en) | 2017-12-04 | 2017-12-04 | A kind of pipe perforation fast blockage fixture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207539523U true CN207539523U (en) | 2018-06-26 |
Family
ID=62616769
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721664073.6U Expired - Fee Related CN207539523U (en) | 2017-12-04 | 2017-12-04 | A kind of pipe perforation fast blockage fixture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207539523U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110682254A (en) * | 2019-10-24 | 2020-01-14 | 深圳海油工程水下技术有限公司 | Sea pipe leaking stoppage pipe clamp installation device |
CN110864183A (en) * | 2019-11-29 | 2020-03-06 | 宝泉安全防护用品(金华)有限公司 | Emergency device for repairing water leakage port of water hose for fire fighting |
CN112923164A (en) * | 2021-04-16 | 2021-06-08 | 攀钢集团西昌钢钒有限公司 | Leakage blocking method and leakage blocking device |
-
2017
- 2017-12-04 CN CN201721664073.6U patent/CN207539523U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110682254A (en) * | 2019-10-24 | 2020-01-14 | 深圳海油工程水下技术有限公司 | Sea pipe leaking stoppage pipe clamp installation device |
CN110682254B (en) * | 2019-10-24 | 2024-03-29 | 中海油深圳海洋工程技术服务有限公司 | Sea pipe plugging pipe clamp installation device |
CN110864183A (en) * | 2019-11-29 | 2020-03-06 | 宝泉安全防护用品(金华)有限公司 | Emergency device for repairing water leakage port of water hose for fire fighting |
CN110864183B (en) * | 2019-11-29 | 2021-05-25 | 宝泉安全防护用品(金华)有限公司 | Emergency device for repairing water leakage port of water hose for fire fighting |
CN112923164A (en) * | 2021-04-16 | 2021-06-08 | 攀钢集团西昌钢钒有限公司 | Leakage blocking method and leakage blocking device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207539523U (en) | A kind of pipe perforation fast blockage fixture | |
CN202336765U (en) | Mechanical hand structure of clamping workpiece | |
CN204962156U (en) | Pipe hole hole leakage point leaking stoppage ware | |
CN202176875U (en) | Thimble leakage blocking body and pipeline rush-repair fixture for pipeline rush-repair | |
CN204171588U (en) | A kind of elbow pipe welding fixture | |
CN203679781U (en) | Turning positioning device for bent pipe flange | |
CN212081595U (en) | Air pipe for decoration | |
CN203751729U (en) | Elbow end face machining tool | |
CN205380212U (en) | Pipe shrinking machine | |
CN208068091U (en) | Aircraft harness crimping tool fixing device | |
CN209484155U (en) | The novel press leak stoppage tool of oil pipeline | |
CN204304378U (en) | A kind of tank chain cable protecting device | |
CN204546394U (en) | A kind of harmless pipe wrench | |
CN202252598U (en) | Flange instant sealing device in hydraulic pressure test | |
CN203156379U (en) | Process unit for drilling of three-way elbow | |
CN207539524U (en) | A kind of pipe pressurized hole plugging device | |
CN102434720A (en) | Creeper tread set device | |
CN202498471U (en) | High-efficient vacuum clamp | |
CN204704540U (en) | A kind of conduit leak gripping device | |
CN203696196U (en) | Improved flame cutting vehicle towing chain device | |
CN205638291U (en) | Clamp mechanism of directional rig of level | |
CN205147893U (en) | Machine anchor clamps are attacked to desk -top brill | |
CN204639317U (en) | For the positioning and clamping mechanism of pipeline scroll saw | |
CN205363588U (en) | Cutting -off grinder's V type groove anchor clamps | |
CN205021254U (en) | Engine metal water pipe processing clamping anchor clamps |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180626 Termination date: 20181204 |