CN207539523U - A kind of pipe perforation fast blockage fixture - Google Patents

A kind of pipe perforation fast blockage fixture Download PDF

Info

Publication number
CN207539523U
CN207539523U CN201721664073.6U CN201721664073U CN207539523U CN 207539523 U CN207539523 U CN 207539523U CN 201721664073 U CN201721664073 U CN 201721664073U CN 207539523 U CN207539523 U CN 207539523U
Authority
CN
China
Prior art keywords
holder
sides
clipping part
fixed
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721664073.6U
Other languages
Chinese (zh)
Inventor
崔建
陈强
韩丽玲
李丽
崔先美
郑冬梅
徐玉惠
辛琳
杜肖飞
李甜甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721664073.6U priority Critical patent/CN207539523U/en
Application granted granted Critical
Publication of CN207539523U publication Critical patent/CN207539523U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model is related to a kind of pipe perforation fast blockage fixtures, including by both sides pinch and being fixed on the holder that the crossbeam of angle upper end forms, gripping mechanism is provided on the both sides pinch and upper end floor beam of the holder, the gripping mechanism includes wearing the driving screw connect with holder both sides pinch and upper end floor beam, the front end connection bearing of the driving screw is fixed, the connection bearing is fixed on mounting blocks, the mounting blocks are fixed on the rear end face of clipping part, leak stopping alignment block is set on the both sides of the face of the clipping part, two guiding polished rods are arranged in parallel on the rear end face of clipping part, the both sides pinch for being oriented to polished rod and holder and upper end floor beam are worn and are connect, and connect end set connecting plate being oriented to wearing for polished rod.The utility model can be adjusted according to different pipe diameter sizes and clamp, and applicable difference duct size leak stopping clamp uses, and pipeline clamps easy to operate, and service efficiency is high, and suitable conduit range is wide, reduces pipeline and ties up leak stopping maintenance cost.

Description

A kind of pipe perforation fast blockage fixture
Technical field
The utility model is related to conduit leak gripping device technical field more particularly to a kind of pipe perforation fast blockage fixtures.
Background technology
In crude oil production and the production processes such as chemical engineering industry, due to the influence of the corrosion of external environment and medium, And artificial pilferage behavior, oil, gas and water pipeline breaking perforation accident is caused often to occur, not only causes oil, the gas and water energy Leakage loss, but also environment is polluted, however halt production is handled, and certainly will influence oil field production, it is therefore desirable to frequent son with pressure of checking card Leak stopping pipeline is handled, but conventional clamp, without relief hole, son with pressure of checking card is awkward, the pipe of the defeated conveyance conduit of main problem Diameter is not of uniform size, and existing leak stopping clip cannot the pipe diameter size of basis be adjusted, need big according to different calibers It is small to formulate specific leak stopping clip, which not only adds leak stopping cost, and the clip storage not convenient for transportation of a variety of sizes.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provide a kind of pipe perforation fast blockage card Tool, can be adjusted according to different pipe diameter sizes and clamp, and applicable difference duct size leak stopping clamps use, and pipeline clamps Easy to operate, service efficiency is high, and suitable conduit range is wide, reduces pipeline dimension leak stopping maintenance cost.
The utility model is achieved through the following technical solutions:A kind of pipe perforation fast blockage fixture, including being pressed from both sides by both sides Foot and be fixed on angle upper end crossbeam composition holder, be provided with clip machine on the both sides pinch and upper end floor beam of the holder Structure, the gripping mechanism include wearing the driving screw connect with holder both sides pinch and upper end floor beam, before the driving screw End connection bearing is fixed, and the connection bearing is fixed on mounting blocks, and the mounting blocks are fixed on the rear end face of clipping part, described Leak stopping alignment block on the both sides of the face of clipping part is set, two guiding polished rods are arranged in parallel on the rear end face of clipping part, it is described to lead It wears and connects to the both sides pinch and upper end floor beam of polished rod and holder, and end set connecting plate is connect being oriented to wearing for polished rod.
The further junction of holder both sides pinch and the crossbeam of upper end setting fastening block.
Further the driving screw and the connecting plate of guiding polished rod end are worn and are connect.
Several side-friction slots are further arranged in parallel on the front end face of the clipping part.
Further the leak stopping alignment block is equipped with leak stopping jack hole.
Compared with prior art, the beneficial effects of the utility model are:The clip tool of the utility model by holder and is set The both sides pinch put in holder sends the gripping mechanism composition on end floor beam, by gripping mechanism to the left and right sides portion of pipeline and The direction progress of three, top is clamping, in use, the driving screw of rotation gripping mechanism, makes the clipping part on the both sides pinch of holder Clipping part on end floor beam on the left and right sides of pipeline, holder is located at the top of pipeline, then reversely rotates driving screw, makes Lower Forward is moved, and clamp with pipeline both side surface in clipping part on the both sides pinch of holder in driving silk ribbon, and the upper end of holder is horizontal Clipping part on beam is clamped with pipeline upper surface, it is achieved thereby that three faces to pipeline are clamping, pipeline clamp it is easy to operate, according to Pipe diameter size can drive screw to adjust the forward-reverse distance of clipping part by rotation, can be big according to different pipe diameters Small be adjusted clamps, and applicable difference duct size leak stopping clamps use, and service efficiency is high, and suitable conduit range is wide, reduces Pipeline dimension leak stopping maintenance cost, while the front-end surface that clipping part is contacted with pipe surface is improved equipped with side-friction slot Clipping part and pipe surface clamp patch firmness, and clip clamps securely with pipeline.
Description of the drawings
Fig. 1 is structure diagram when the utility model pipe perforation fast blockage fixture clamps pipeline;
Fig. 2 is the front view of the utility model pipe perforation fast blockage fixture;
Fig. 3 is the clipping part rear end face schematic diagram of the utility model pipe perforation fast blockage fixture;
Fig. 4 is the clipping part front end face schematic diagram of the utility model pipe perforation fast blockage fixture.
Wherein:1st, holder;2nd, clipping part;3rd, mounting blocks;4th, bearing is connected;5th, leak stopping alignment block;6th, it is oriented to polished rod;7th, even Fishplate bar;8th, screw is driven;9th, fastening block;10th, leak stopping jack hole;11st, side-friction slot.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention is further described in detail.It should be appreciated that specific embodiment described herein is only explaining this Utility model is not used to limit the utility model.
As shown in Figure 1, 2, the utility model is related to a kind of pipe perforation fast blockage fixture, including by both sides pinch and admittedly The holder 1 of the crossbeam composition of angle upper end is scheduled on, gripping mechanism is provided on the both sides pinch and upper end floor beam of the holder 1, The gripping mechanism includes wearing the driving screw 8 connect with 1 both sides pinch of holder and upper end floor beam, before the driving screw 8 End connection bearing 4 is fixed, and the connection bearing 4 is fixed on mounting blocks 3, and the mounting blocks 3 are fixed on 2 rear end face of clipping part On, and two guiding polished rods 6, the both sides pinch for being oriented to polished rod 6 and holder 1 are arranged in parallel on the rear end face of clipping part 2 It wears and connects with upper end floor beam, and end set connecting plate 7 is connect being oriented to wearing for polished rod 6, the horizontal stroke of the 1 both sides pinch of holder and upper end The connecting plate 7 of the junction setting fastening block 9 of beam, the driving screw 8 and 6 end of guiding polished rod, which is worn, to be connect.
As shown in Figure 3,4, leak stopping alignment block 5 is set on the both sides of the face of the clipping part 2, on the leak stopping alignment block 5 Equipped with leak stopping jack hole 10, several side-friction slots 11 are arranged in parallel on the front end face of the clipping part 2.
Embodiment 1
This clip tool is sent the gripping mechanism on end floor beam with the both sides pinch for being arranged on holder 1 by holder 1 and is formed, and passes through Gripping mechanism is clamping to the left and right sides portion of pipeline and the direction progress of three, top, in use, the driving silk of rotation gripping mechanism Bar 8 makes the clipping part 2 on the both sides pinch of holder 1 be located at the left and right sides of pipeline, the clipping part 2 on holder 1 on end floor beam At the top of pipeline, driving screw 8 is then reversely rotated, the clipping part 2 on the both sides pinch of holder 1 is made to be driven in driving screw 8 Lower Forward, and clamped with pipeline both side surface, the clipping part 2 on the upper end floor beam of holder 1 is clamped with pipeline upper surface, so as to real Show clamping to three faces of pipeline, pipeline clamps easy to operate, according to pipe diameter size, screw 8 can be driven to adjust by rotation The forward-reverse distance of clipping part 2 is saved, can be adjusted and clamped according to different pipe diameter sizes, therefore, is applicable in different pipelines Size leak stopping clamps use, and service efficiency is high, and suitable conduit range is wide, reduces pipeline dimension leak stopping maintenance cost, while clip The front-end surface that portion 2 is contacted with pipe surface is equipped with side-friction slot 11, improves clipping part 2 and pastes jail with clamping for pipe surface Soundness, clip clamp securely with pipeline.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (5)

1. a kind of pipe perforation fast blockage fixture, including by both sides pinch and being fixed on the holder that the crossbeam of angle upper end forms (1), which is characterized in that the holder(1)Both sides pinch and upper end floor beam on be provided with gripping mechanism, the gripping mechanism packet It includes and holder(1)Both sides pinch and upper end floor beam wear the driving screw connect(8), the driving screw(8)Front end connection Bearing(4)It is fixed, the connection bearing(4)It is fixed on mounting blocks(3), the mounting blocks(3)It is fixed on clipping part(2)Rear end face On, the clipping part(2)Both sides of the face on set leak stopping alignment block(5), clipping part(2)Rear end face on be arranged in parallel two It is oriented to polished rod(6), the guiding polished rod(6)With holder(1)Both sides pinch and upper end floor beam wear and connect, and be oriented to polished rod(6) Wear and connect end set connecting plate(7).
A kind of 2. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the holder(1)Both sides The junction of pinch and the crossbeam of upper end sets fastening block(9).
A kind of 3. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the driving screw(8) With being oriented to polished rod(6)The connecting plate of end(7)It wears and connects.
A kind of 4. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the clipping part(2)'s Several side-friction slots are arranged in parallel on front end face(11).
A kind of 5. pipe perforation fast blockage fixture according to claim 1, which is characterized in that the leak stopping alignment block (5)It is equipped with leak stopping jack hole(10).
CN201721664073.6U 2017-12-04 2017-12-04 A kind of pipe perforation fast blockage fixture Expired - Fee Related CN207539523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721664073.6U CN207539523U (en) 2017-12-04 2017-12-04 A kind of pipe perforation fast blockage fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721664073.6U CN207539523U (en) 2017-12-04 2017-12-04 A kind of pipe perforation fast blockage fixture

Publications (1)

Publication Number Publication Date
CN207539523U true CN207539523U (en) 2018-06-26

Family

ID=62616769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721664073.6U Expired - Fee Related CN207539523U (en) 2017-12-04 2017-12-04 A kind of pipe perforation fast blockage fixture

Country Status (1)

Country Link
CN (1) CN207539523U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110682254A (en) * 2019-10-24 2020-01-14 深圳海油工程水下技术有限公司 Sea pipe leaking stoppage pipe clamp installation device
CN110864183A (en) * 2019-11-29 2020-03-06 宝泉安全防护用品(金华)有限公司 Emergency device for repairing water leakage port of water hose for fire fighting
CN112923164A (en) * 2021-04-16 2021-06-08 攀钢集团西昌钢钒有限公司 Leakage blocking method and leakage blocking device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110682254A (en) * 2019-10-24 2020-01-14 深圳海油工程水下技术有限公司 Sea pipe leaking stoppage pipe clamp installation device
CN110682254B (en) * 2019-10-24 2024-03-29 中海油深圳海洋工程技术服务有限公司 Sea pipe plugging pipe clamp installation device
CN110864183A (en) * 2019-11-29 2020-03-06 宝泉安全防护用品(金华)有限公司 Emergency device for repairing water leakage port of water hose for fire fighting
CN110864183B (en) * 2019-11-29 2021-05-25 宝泉安全防护用品(金华)有限公司 Emergency device for repairing water leakage port of water hose for fire fighting
CN112923164A (en) * 2021-04-16 2021-06-08 攀钢集团西昌钢钒有限公司 Leakage blocking method and leakage blocking device

Similar Documents

Publication Publication Date Title
CN207539523U (en) A kind of pipe perforation fast blockage fixture
CN202336765U (en) Mechanical hand structure of clamping workpiece
CN204962156U (en) Pipe hole hole leakage point leaking stoppage ware
CN202176875U (en) Thimble leakage blocking body and pipeline rush-repair fixture for pipeline rush-repair
CN204171588U (en) A kind of elbow pipe welding fixture
CN203679781U (en) Turning positioning device for bent pipe flange
CN212081595U (en) Air pipe for decoration
CN203751729U (en) Elbow end face machining tool
CN205380212U (en) Pipe shrinking machine
CN208068091U (en) Aircraft harness crimping tool fixing device
CN209484155U (en) The novel press leak stoppage tool of oil pipeline
CN204304378U (en) A kind of tank chain cable protecting device
CN204546394U (en) A kind of harmless pipe wrench
CN202252598U (en) Flange instant sealing device in hydraulic pressure test
CN203156379U (en) Process unit for drilling of three-way elbow
CN207539524U (en) A kind of pipe pressurized hole plugging device
CN102434720A (en) Creeper tread set device
CN202498471U (en) High-efficient vacuum clamp
CN204704540U (en) A kind of conduit leak gripping device
CN203696196U (en) Improved flame cutting vehicle towing chain device
CN205638291U (en) Clamp mechanism of directional rig of level
CN205147893U (en) Machine anchor clamps are attacked to desk -top brill
CN204639317U (en) For the positioning and clamping mechanism of pipeline scroll saw
CN205363588U (en) Cutting -off grinder's V type groove anchor clamps
CN205021254U (en) Engine metal water pipe processing clamping anchor clamps

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180626