CN207538067U - A kind of equipment prefabricated foundation locator - Google Patents
A kind of equipment prefabricated foundation locator Download PDFInfo
- Publication number
- CN207538067U CN207538067U CN201721641972.4U CN201721641972U CN207538067U CN 207538067 U CN207538067 U CN 207538067U CN 201721641972 U CN201721641972 U CN 201721641972U CN 207538067 U CN207538067 U CN 207538067U
- Authority
- CN
- China
- Prior art keywords
- injection molding
- prefabricated
- equipment
- locator
- prefabricated foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 238000001746 injection moulding Methods 0.000 claims description 65
- 239000000463 material Substances 0.000 claims description 10
- 238000007789 sealing Methods 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 4
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 101100366940 Mus musculus Stom gene Proteins 0.000 description 1
- 239000004677 Nylon Substances 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model is related to a kind of equipment prefabricated foundation locator, including bolt, prefabricated direction locator and equipment prefabricated foundation pedestal;The prefabricated direction locator is a square tube, and the center offers the circular hole through the prefabricated direction locator;The prefabricated direction locator is fixedly connected with round steel at four horizontal direction ends, forms cross;The prefabricated direction locator is rotatablely connected by the circular hole and the bolt;Each round steel offers location hole far from described prefabricated direction locator one end, is additionally provided with the mounting pin that may pass through the location hole;The equipment prefabricated foundation pedestal is square groove frame, and quadrangle end offers mounting hole, each mounting hole is respectively sleeved at across in each mounting pin after the location hole, so as to which the equipment prefabricated foundation pedestal be fixed, equipment prefabricated foundation can be set in the equipment prefabricated foundation pedestal.
Description
Technical field
The utility model is related to a kind of equipment prefabricated foundation locators, belong to technical field of building construction.
Background technology
2016 Nian Guowang companies propose ten innovation pilot projects in power grid construction field, and wherein modular transformer substation is to become
Overall process is followed " standardized designs, batch production processing, dress by a kind of innovation mode of power plant construction from the construction period is designed into
With formula construction " management philosophy.At present prefabricated buildings, enclosure wall, gutter, inspection shaft, inlet for stom water, cable channel cover plate, bear down on one
Wait prefabricated components technology ripe.But pre- control equipment prefabricated foundation really few applications, to find out its cause, equipment prefabricated foundation is conducted oneself with dignity
Greatly, to it is live in place, leveling is highly difficult.
Utility model content
In order to solve above-mentioned problems of the prior art, the utility model provides a kind of equipment prefabricated foundation positioning
Device, can prepare the scene levelling problems in place of equipment prefabricated foundation in advance, and may be reused.
The technical solution of the utility model is as follows:
A kind of equipment prefabricated foundation locator, including bolt, prefabricated direction locator and equipment prefabricated foundation pedestal;It is described
Prefabricated direction locator is a square tube, and the center offers the circular hole through the prefabricated direction locator;The prefabricated side
Round steel is fixedly connected at four horizontal direction ends to locator, forms cross;The prefabricated direction locator passes through described
Circular hole is rotatablely connected with the bolt;Each round steel offers location hole far from described prefabricated direction locator one end, also sets
It is equipped with the mounting pin that may pass through the location hole;The equipment prefabricated foundation pedestal is square groove frame, and quadrangle end offers
Each mounting hole is respectively sleeved at across in each mounting pin after the location hole by mounting hole, so as to be set described
Standby prefabricated foundation pedestal is fixed, and equipment prefabricated foundation can be set in the equipment prefabricated foundation pedestal.
Further, the equipment prefabricated foundation pedestal is made of support portion and injection molding portion;The injection molding portion is welded in institute
It states in support portion, the support portion forms the recess of inverted trapezoidal with the injection molding portion, and casting concrete is used in the injection molding portion,
And equipment prefabricated foundation can be sheathed in the injection molding portion;The mounting hole is opened in the quadrangle end in the injection molding portion.
Further, injection molding mechanism is further included;The injection molding mechanism includes connection frame and injection molding block, the connection frame shape
Size and the shape of injection molding portion upper surface match, and the injection molding block is sheathed in the connection frame, on the injection molding block
Offer the material filling mouth through the injection molding block upper and lower end face;The connection frame side offers screw thread mouth, with bolt thread
Cooperation, tightens the fixable injection molding block of bolt.
Further, the sidewall slope setting of the material filling mouth, forms funnel-form.
Further, setting is fluted on the outside of the injection molding block lower end, and sealing ring is arranged on the groove, described close
Seal can prevent rain or grail in injection molded process from falling into the injection molding portion influence molding.
Further, the support portion medial surface is provided with slideway in the vertical direction, and the connection is provided in outer frame week
With the sliding slot of slideway cooperation.
The utility model has the advantages that:
1st, accurate equipment prefabricated foundation base mounting orientation is made by prefabricated direction locator, then passes through injection molding mechanism
Concrete cushion is made for equipment prefabricated foundation, equipment prefabricated foundation need to be only caught in the prefabricated base of equipment by installation equipment prefabricated foundation
It is placed on concrete cushion in the injection molding portion of plinth pedestal, step is simple, solves equipment prefabricated foundation scene in place and adjusts
The problem of flat.
2nd, the bolt in this equipment prefabricated foundation locator, prefabricated direction locator, injection molding mechanism and equipment prefabricated foundation
Pedestal can be taken out and be reused, save cost after installation is complete in equipment prefabricated foundation.
3rd, concrete cushion is configured to obtain by injection molding machine, can accurate control concrete cushion height problem, reduction pours
Build the difficulty of Concrete.
Description of the drawings
Fig. 1 is the utility model installation is complete schematic diagram;
Fig. 2 is the foundation pit elevation after bolt and alignment stake positioning;
Fig. 3 is the foundation pit plan view after bolt and alignment stake positioning;
Fig. 4 is the foundation pit elevation of prefabricated direction locator and mounting pin after installation is complete;
Fig. 5 is prefabricated direction locator structure schematic diagram;
Fig. 6 is foundation pit plan view of the mounting pin after installation is complete;
Fig. 7 is equipment prefabricated foundation understructure schematic diagram;
Fig. 8 is the vertical view of equipment prefabricated foundation pedestal;
Fig. 9 is the foundation pit elevation after equipment prefabricated foundation floor installation;
Figure 10 is injection molding mechanism structure diagram;
Figure 11 is note modular structure schematic diagram;
Figure 12 is the structure diagram of the groove of injection molding block;
Figure 13 is the foundation pit elevation after the installation of injection molding mechanism.
Reference numeral is expressed as in figure:
1st, bolt;10th, equipment prefabricated foundation;11st, alignment stake;2nd, direction locator;21st, circular hole;22nd, round steel;23rd, it positions
Hole;24th, mounting pin;3rd, equipment prefabricated foundation pedestal;30th, mounting hole;31st, support portion;311st, slideway;32nd, injection molding portion;4th, injection molding
Mechanism;41st, frame is connected;411st, screw thread mouth;412nd, sliding slot;42nd, injection molding block;421st, material filling mouth;422nd, groove;423rd, sealing ring;
5th, bolt;6th, foundation pit;7th, concrete cushion.
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
Referring to Fig. 1 to Figure 13, a kind of equipment prefabricated foundation locator, including bolt 1, prefabricated direction locator 2 and equipment
Prefabricated foundation pedestal 3;The prefabricated direction locator 2 is a square tube, and the center is offered to be positioned through the prefabricated direction
The circular hole 21 of device 2;The prefabricated direction locator 2 is fixedly connected with round steel 22 at four horizontal direction ends, forms cross;Institute
Prefabricated direction locator 2 is stated to be rotatablely connected by the circular hole 21 and the bolt 1;Each round steel 22 is far from the prefabricated side
Location hole 23 is offered to 2 one end of locator, is additionally provided with the mounting pin 24 that may pass through the location hole 23;The equipment is prefabricated
Sole plate 3 is square groove frame, and quadrangle end offers mounting hole 30, and each mounting hole 30 is respectively sleeved at across institute
It states in each mounting pin 24 after location hole 23, so as to which the equipment prefabricated foundation pedestal 3 be fixed, equipment prefabricated foundation 10
It can be set in the equipment prefabricated foundation pedestal 3.
Further, the equipment prefabricated foundation pedestal 3 is made of support portion 31 and injection molding portion 32;The injection molding portion 32 is welded
It is connected in the support portion 31, the support portion 31 and the recess of the injection molding portion 32 formation inverted trapezoidal, in the injection molding portion 32
For casting concrete, and equipment prefabricated foundation 10 can be sheathed in the injection molding portion 32;The mounting hole 30 is opened in described
The quadrangle end in injection molding portion 32.
Further, injection molding mechanism 4 is further included;The injection molding mechanism 4 includes connection frame 41 and injection molding block 42, the connection
41 shape size of frame and the shape of 32 upper surface of injection molding portion match, and the injection molding block 42 is sheathed on the connection frame 41
It is interior, the material filling mouth 421 through 42 upper and lower end face of injection molding block is offered on the injection molding block 42;It opens 41 side of the connection frame
Equipped with screw thread mouth 411, with 5 thread fitting of bolt, the fixable injection molding block 42 of bolt 5 is tightened.
Further, the sidewall slope setting of the material filling mouth 421, forms funnel-form.
Further, fluted 422 are set on the outside of 42 lower end of injection molding block, sealing is arranged on the groove 422
Circle 423, the sealing ring 423 can prevent rain or grail in injection molded process from falling into the influence of injection molding portion 32 molding.
Further, 31 medial surface of support portion is provided with slideway 311,41 periphery of the connection frame in the vertical direction
It is provided with the sliding slot 412 coordinated with the slideway 311.
The workflow of the utility model is as follows:
Foundation pit 6 is dug out according to the size of equipment prefabricated foundation 10 first;Again on the basis of 10 axis of equipment prefabricated foundation, point
Base center position O points and four direction stake 11, same axis are made at hole bottom by sash weight not on infall and extending direction
Nylon rope mark axis is fastened between alignment stake 11 on line, bolt 1 is hammered into O points;
Then it is positioned into line direction, 21 alignment pins 1 of circular hole of the prefabricated direction locator 2 is perforated insertions, rotated
The prefabricated direction locator 2 makes the square four edges that four mounting holes 30 are formed parallel with axis respectively, then will
Four mounting pins 24 hammer into 6 bottom of foundation pit from each location hole 23, then take out bolt 1, prefabricated direction locator 2 and each side
To stake 11;
Then installation equipment prefabricated foundation pedestal 3 is carried out;Take out bolt 1, prefabricated direction locator 2 and all directions stake 11
Afterwards, 6 bottom of foundation pit leaves behind each mounting pin 24, and each mounting hole 30 on the equipment prefabricated foundation pedestal 3 is aligned respectively
After the mounting pin 24, the equipment prefabricated foundation pedestal 3 is fixed in foundation pit 6 by perforation after being inserted into;
Casting concrete bed course 7 again;By level measurement, the elevation of top of bottom of foundation bed course is made, and obtains absolute altitude
Line adjusts 42 lower face of injection molding block to the connection frame 41 to the distance of 32 upper surface of injection molding portion according to this distance
The distance of lower face tightens injection molding block 42 described in 5 tightening of bolt after adjusting;Then pass through the sliding slot 412 and the slideway
The connection frame 41 is erected at 32 upper end of injection molding portion by 311;Concrete is poured by the injection molding by the material filling mouth 421
In portion 32, the no longer material filling when the material filling mouth 421 overflows takes out the injection molding mechanism 4, by 7 surface evening of concrete cushion;
Last hanging device prefabricated foundation 10;After the solidification of concrete cushion 7, mortar is carried out to 7 surface of concrete cushion
It is levelling;Then equipment prefabricated foundation 10 is lifted to 3 top of equipment prefabricated foundation pedestal, it then will be under equipment prefabricated foundation 10
End is caught in the injection molding portion 32, and is padded on concrete cushion 7;Take out the equipment prefabricated foundation pedestal 3 and the installation
Pin 24.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every
Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is directly or indirectly used in
Other related technical areas are equally included in the patent within the scope of the utility model.
Claims (6)
1. a kind of equipment prefabricated foundation locator, it is characterised in that:Including bolt(1), prefabricated direction locator(2)It is pre- with equipment
Sole plate processed(3);The prefabricated direction locator(2)For a square tube, the center is offered determines through the prefabricated direction
Position device(2)Circular hole(21);The prefabricated direction locator(2)Round steel is fixedly connected at four horizontal direction ends(22), shape
Across;The prefabricated direction locator(2)Pass through the circular hole(21)With the bolt(1)Rotation connection;Each circle
Steel(22)Far from the prefabricated direction locator(2)One end offers location hole(23), it is additionally provided with and may pass through the location hole
(23)Mounting pin(24);The equipment prefabricated foundation pedestal(3)For square groove frame, and quadrangle end offers mounting hole
(30), by each mounting hole(30)It is respectively sleeved at across the location hole(23)Each mounting pin afterwards(24)On, from
And by the equipment prefabricated foundation pedestal(3)It is fixed, equipment prefabricated foundation(10)The equipment prefabricated foundation pedestal can be set in
(3)It is interior.
2. a kind of equipment prefabricated foundation locator according to claim 1, it is characterised in that:The equipment prefabricated foundation bottom
Seat(3)By support portion(31)With injection molding portion(32)Composition;The injection molding portion(32)It is welded in the support portion(31)It is interior, the branch
Support part(31)With the injection molding portion(32)Form the recess of inverted trapezoidal, the injection molding portion(32)It is interior to be used for casting concrete, and set
Standby prefabricated foundation(10)The injection molding portion can be sheathed on(32)It is interior;The mounting hole(30)It is opened in the injection molding portion(32)Four
Angle end.
3. a kind of equipment prefabricated foundation locator according to claim 2, it is characterised in that:Further include injection molding mechanism(4);
The injection molding mechanism(4)Including connecting frame(41)With injection molding block(42), the connection frame(41)Shape size and the injection molding portion
(32)The shape of upper surface matches, the injection molding block(42)It is sheathed on the connection frame(41)It is interior, the injection molding block(42)On
It offers through the injection molding block(42)The material filling mouth of upper and lower end face(421);The connection frame(41)Side offers screw thread mouth
(411), with bolt(5)Thread fitting tightens bolt(5)The fixable injection molding block(42).
4. a kind of equipment prefabricated foundation locator according to claim 3, it is characterised in that:The material filling mouth(421)'s
Sidewall slope is set, and forms funnel-form.
5. a kind of equipment prefabricated foundation locator according to claim 4, it is characterised in that:The injection molding block(42)Lower end
Setting is fluted on the outside of portion(422), the groove(422)On be arranged with sealing ring(423), the sealing ring(423)It can prevent
Rain or grail fall into the injection molding portion in injection molded process(32)Influence molding.
6. a kind of equipment prefabricated foundation locator according to claim 5, it is characterised in that:The support portion(31)Inside
Face is provided with slideway in the vertical direction(311), the connection frame(41)Periphery is provided with and the slideway(311)The cunning of cooperation
Slot(412).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721641972.4U CN207538067U (en) | 2017-11-30 | 2017-11-30 | A kind of equipment prefabricated foundation locator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721641972.4U CN207538067U (en) | 2017-11-30 | 2017-11-30 | A kind of equipment prefabricated foundation locator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207538067U true CN207538067U (en) | 2018-06-26 |
Family
ID=62616409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721641972.4U Active CN207538067U (en) | 2017-11-30 | 2017-11-30 | A kind of equipment prefabricated foundation locator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207538067U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724419A (en) * | 2017-11-30 | 2018-02-23 | 国网湖北省电力公司咸宁供电公司 | A kind of equipment prefabricated foundation locator and its application method |
-
2017
- 2017-11-30 CN CN201721641972.4U patent/CN207538067U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724419A (en) * | 2017-11-30 | 2018-02-23 | 国网湖北省电力公司咸宁供电公司 | A kind of equipment prefabricated foundation locator and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2014283227B2 (en) | Wind turbine foundation | |
CN211735685U (en) | Concrete road surface rain sewage well lid mounting structure | |
CN106121225B (en) | Suspension active erecting device is chosen outside cast-in-place concrete eaves | |
CN207538067U (en) | A kind of equipment prefabricated foundation locator | |
CN208472756U (en) | Rim of a cup basis steel column installs verticality and absolute altitude adjuster | |
CN107724419A (en) | A kind of equipment prefabricated foundation locator and its application method | |
CN205653902U (en) | Floor entrance to a cave block structure | |
CN106436730B (en) | A kind of masonry house concrete filled steel tube pillar support shock insulating foundation structure and construction method | |
CN102296843A (en) | Multi-arch multilayer plant-separation type parking device | |
CN207469103U (en) | A kind of building bridge pier anchor ear and its escape way steel pipe frame structure | |
JP2005090116A (en) | Method for erecting steel frame column and positioning frame body used for it | |
CN106013803A (en) | Installing process of aluminum formwork | |
CN210263929U (en) | A preformed hole template for building civil engineering | |
CN210288453U (en) | Foundation bolt positioning device | |
CN210049616U (en) | Vertical pre-buried device of reservation entrance to a cave | |
CN204139369U (en) | Assembling fire wall | |
CN213418472U (en) | Subside post-cast strip bearing structure | |
CN209353838U (en) | A kind of constructing structure of large cooling column herringbone column | |
CN202970006U (en) | L-shaped prefabricated clear water bleacher plate installation construction structure | |
CN207048353U (en) | A kind of prefabricated post installed height mark control device | |
KR102291683B1 (en) | Construction method of flowerbed boundary using boundary plate | |
CN109098395A (en) | A kind of installation method of the prefabricated piping lane of assembly concrete | |
CN205367457U (en) | Cast member installs special hoist | |
CN107780659B (en) | A kind of construction method of wire netting enclosure wall | |
CN107059913A (en) | A kind of reactor built-in fitting supporting construction and method for embedding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||