CN207538002U - A kind of water plant cleaning plant for river regulation - Google Patents
A kind of water plant cleaning plant for river regulation Download PDFInfo
- Publication number
- CN207538002U CN207538002U CN201721639294.8U CN201721639294U CN207538002U CN 207538002 U CN207538002 U CN 207538002U CN 201721639294 U CN201721639294 U CN 201721639294U CN 207538002 U CN207538002 U CN 207538002U
- Authority
- CN
- China
- Prior art keywords
- collecting box
- motor
- boat
- deck
- water pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cleaning Or Clearing Of The Surface Of Open Water (AREA)
Abstract
The utility model discloses a kind of water plant cleaning plants for river regulation,Including collecting box and hull,The hull upper surface is fixed with the deck of boat,The collecting box is fixed on deck of boat upper surface,Suction hose is communicated on the collecting box one side,One end connection water pipe of the suction hose far from collecting box,The collecting box is equipped with the second motor on the one side of water pipe,The second rotary shaft is rotatablely equipped on second motor,Second turbine flabellum is installed in the second rotary shaft,Water pipe is internally provided with the first rotary shaft,First rotary shaft upper end is rotatably connected to the first motor,First rotary shaft is equipped with the first turbine flabellum at the position of bottom,Strainer is installed at the position of pulsating pump inside the collecting box,Deck of boat upper surface is fixed with third motor at the position in outside,Third motor bottom is rotatably connected to shaft,Cutting blade is uniformly installed in shaft.The carry out water plant cutting recovery processing work that the utility model can be automated adequately.
Description
Technical field
The utility model is related to river regulation equipment technical field, specially a kind of water plant for river regulation is cleared up
Device.
Background technology
River regulation mainly includes the regulation of the rivers such as riverbed and river levee configuration aspects and river waters internal environment
It administers.The improvement in river directly affects the quality well run of a river ecosystem.
For the improvement inside river, it is mainly all kinds of water plant algae and breeding to be mainly reflected in various aquatic organisms
Ability breaks words stronger animals and plants of ecosystem balance ability etc., existing for the improvement of the algae such as river inside water plant
Governing measure for, the microorganisms such as algae duckweed mainly based on manually salvaging, mainly have drug for water straw or like vegetable
Improvement and artificial treatment two ways, for the improvement for water plant, drug improvement can destroy the steady of river ecological environment
Qualitative or even can cause water pollution, the artificial treatment amount of labour is big, high labor cost, so with reference to the above, existing river
In improvement field, also need further to enrich primarily directed to the processing means of the elongated class water plant such as water plant.
Utility model content
The purpose of this utility model is to provide a kind of water plant cleaning plants for river regulation, have first to water plant
The advantages of uniformly rear centralized collection is smashed in cutting, water plant processing means are single and artificial during solving existing river regulation
Drawback of high cost mostly with task amount it is big the problem of.
To achieve the above object, the utility model provides following technical solution:A kind of water plant for river regulation is clear
Device is managed, including collecting box and hull, the hull upper surface is fixed with the deck of boat, there are two the collecting box is set altogether, and receives
Header is symmetrical about deck of boat medium line, and the collecting box is fixed on deck of boat upper surface, connects on the collecting box one side
Suction hose, one end connection water pipe of the suction hose far from collecting box are connected with, the collecting box is equipped on the one side of water pipe
Second motor is rotatablely equipped with the second rotary shaft, and the second rotary shaft is horizontally installed on inside collecting box on the second motor, and second
Second turbine flabellum is installed, water pipe is passed through at the position in outside from the deck of boat and extended under hull in rotary shaft
Side, water pipe are internally provided with the first rotary shaft, and the first rotary shaft upper end is rotatably connected to the first motor, and the first motor is fixed on
The upper surface of water pipe, the first rotary shaft are equipped with the first turbine flabellum at the position of bottom, prolong on the collecting box back side
Drainpipe is extended with, pulsating pump is installed on drainpipe, and drainpipe extends to the outside of hull, inside the collecting box
Strainer is installed at the position of pulsating pump, deck of boat upper surface is fixed with third motor, third electricity at the position in outside
Motor spindle is rotatably connected to shaft, and shaft passes through the lower section for extending to hull from the deck of boat, is uniformly equipped in shaft
Cutting blade.
Preferably, the deck of boat is protruded relative to hull both sides and is set.
Preferably, the water pipe is vertical setting with respect to suction hose.
Preferably, the water pipe bottom is set for opening.
Preferably, the first turbine flabellum and the second turbine flabellum periphery are both provided with grid case.
Preferably, there are two the third motor is set altogether, and third motor is symmetrical about deck of boat center line.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is mainly for the elongated class water plant process problem such as water plant during existing river regulation,
By the way that hull is set to be used as carrier, the water in the waters passed through to hull of cutting blade in shaft is driven using the second motor
Grass carries out uniform cutting process, therewith under the movement of hull effect, subsequently by the first turbine flabellum under turning effort in water
Turbine is formed at nozzle, the water plant cut of water pipe bottom and flow are adsorbed, into the water plant in oral siphon and flow
And then enter collecting box under the turbine suction-operated formed under the second turbine flabellum turning effort, reach and water plant has first been cut
Enter the effect in collecting box in centralized collection.
2nd, the utility model can reach further by being provided with drainpipe and pulsating pump at collecting box back to receiving
The effect that flow inside header is discharged, while by setting strainer inside collecting box, can be to the water that will discharge
The water plant being mingled in stream is filtered, and avoids the secondary effective collection work for entering in river, may finally completing water plant of water plant.
3rd, the utility model is using hull as motion carrier, can further carry out cycle operation, past by doing so
Multiple cycle can adequately be handled the water plant in river, due to the utility model either collecting box or third motor
The cutting blade of drive is symmetrical about hull, ensure that hull is stablized relatively while being normally carried out work.
Description of the drawings
Fig. 1 is the rearview of the utility model;
Fig. 2 is the front view of Fig. 1;
Fig. 3 is the side view of the utility model.
In figure:1- the first turbine flabellums;2- water pipes;The first rotary shafts of 3-;The first motors of 4-;5- suction hoses;6- collecting boxs;
7- the second turbine flabellums;The second rotary shafts of 8-;The second motors of 9-;The 10- decks of boat;11- grid casees;The 12- decks of boat;13- third motors;
14- shafts;15- cutting blades;16- drainpipes;17- pulsating pumps;18- strainers.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
It please refers to Fig.1 to 3, a kind of embodiment provided by the utility model:A kind of water plant for river regulation is cleared up
Device, including collecting box 6 and hull 10,10 upper surface of hull is fixed with the deck of boat 12, and the deck of boat 12 is protruded relative to 10 both sides of hull
Setting, for collecting box 6 altogether there are two settings, and collecting box 6 is symmetrical about 12 medium line of the deck of boat, collecting box 6 is fixed on the deck of boat
12 upper surfaces are communicated with suction hose 5, one end connection water pipe 1 of the suction hose 5 far from collecting box 6, water on 6 one side of collecting box
Pipe 1 is vertical setting with respect to suction hose 5, and 1 bottom of water pipe is set for opening, and collecting box 6 is equipped on the one side of water pipe 1
Second motor 9 is rotatablely equipped with the second rotary shaft 8, and the second rotary shaft 8 is horizontally installed in collecting box 6 on second motor 9
Portion is equipped with the second turbine flabellum 7 in the second rotary shaft 8, and water pipe 1 is passed through at the position in outside from the deck of boat 12 and prolonged always
The lower section of hull 10 is extended to, water pipe 1 is internally provided with the first rotary shaft 3, and 3 upper end of the first rotary shaft is rotatably connected to the first motor
4, and the first motor 4 is fixed on the upper surface of water pipe 1, the first rotary shaft 3 is equipped with the first turbine fan at the position of bottom
Leaf 1, the first motor 4 and the second motor 9 select NRV110-100 worm-gear speed reducers and NRV150-100 worm and gears to slow down
Machine, the first motor 4 and the second motor 9, which play, drives the first rotary shaft 3 and the second rotary shaft 8 to rotate, then the first turbine flabellum 1
Turbine is generated inside 1 bottom of water pipe and collecting box 6 respectively with the second turbine flabellum 7, the water plant after cutting can then be assisted
With flow by being drawn into water in collecting box 6, the first turbine flabellum 1 and 7 periphery of the second turbine flabellum are both provided with grid case 11,
Grid case 11 is played avoids other magazines absorption such as water plant in the first turbine flabellum 1 and the second whirlpool in absorption water flow process is carried out
It takes turns on flabellum 7, so as to which the first turbine flabellum 1 and the second turbine flabellum 7 be protected to work normally, collecting box extends on 6 back side
There is drainpipe 16, pulsating pump 17 is installed, and drainpipe 16 extends to the outside of hull 10, collecting box 6 on drainpipe 16
Internal to be equipped with strainer 18 at the position of pulsating pump 17, the flow absorbed into collecting box 6 can be made in pulsating pump 17
It is discharged with lower by drainpipe 16, when carrying out draining, strainer 18 is filtered work and avoids the water plant after cutting collection again
Into in river, 12 upper surface of the deck of boat is fixed with third motor 13 at the position in outside, and third motor 13 is provided with two altogether
It is a, and third motor 13 is symmetrical about 12 center line of the deck of boat, 13 lower rotation of third motor is connected with shaft 14, and shaft
14 pass through the lower section for extending to hull 10 from the deck of boat 12, and cutting blade 15, third motor are uniformly equipped in shaft 14
13 select 8140B decelerating motors, which can be very good drive shaft 14 and rotated, while the motor can for decelerating motor
Different outputting torsions can be then realized to adjust the power of output motor, then can be adapted for the different river of resistance to water-flow
It is used in road, the rotation of shaft 14 is played the role of driving 15 circumgyration incision of cutting blade, and cutting blade 15 is used to contact with water plant
Carry out circumgyration incision.
Operation principle:In utility model works, carried out by the gen-set inside hull 10 for the utility model
Power supply drives shaft 14 to rotate by third motor 13, and then cutting blade 15 rotates with, and cutting blade 15 connects with water plant
It touches, carries out circumgyration incision work, water plant is cut into several deciles, the water plant after cutting is remained in river, with hull 10
Movement acts on, and water pipe 1 is moved to therewith at the position for just carrying out cutting water plant, the first rotary shaft 3 is driven to revolve by the first electricity 4
Turn, by the turning effort of the first rotary shaft 3, the first turbine flabellum 1 forms turbine in the bottom of water pipe 1, in the effect of turbine
Under, the cut water plant collaboration that the flow of 1 bottom of water pipe is included in flow is absorbed into water pipe 1 and is continued in water pipe 1
Rise, rise to water pipe 1 at bottom, drive the second rotary shaft 8 that the second turbine flabellum 7 is driven to receive by the second motor 9
The inside of header 6 forms turbine, and in the suction-operated of turbine, flow enters in collecting box 6, by the suction-operated of pulsating pump 17,
Flow in collecting box 6 is discharged by drainpipe 16, carry out drainage works while, by strainer 18 to being mingled in flow
Water plant is filtered, and water plant is retained in therewith inside collecting box 6, and flow is discharged, and water plant is carried out with the movement of hull 10
Collection work is cut, sufficient water plant processing work is carried out under cycle operation.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned exemplary embodiment, and
And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that by containing in the equivalent requirements of the claims is fallen
All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation
Involved claim.
Claims (6)
1. a kind of water plant cleaning plant for river regulation, including collecting box(6)And hull(10), it is characterised in that:Institute
State hull(10)Upper surface is fixed with the deck of boat(12), the collecting box(6)Altogether there are two settings, and collecting box(6)About the deck of boat
(12)Medium line is symmetrical, the collecting box(6)It is fixed on the deck of boat(12)Upper surface, the collecting box(6)On one side
It is communicated with suction hose(5), suction hose(5)Far from collecting box(6)One end connection water pipe(1), the collecting box(6)Away from water pipe
(1)One side on the second motor is installed(9), the second motor(9)On be rotatablely equipped with the second rotary shaft(8), and the second rotation
Shaft(8)It is horizontally installed on collecting box(6)Inside, the second rotary shaft(8)On the second turbine flabellum is installed(7), water pipe(1)From
The deck of boat(12)It is passed through at the position in outside and extends to hull(10)Lower section, water pipe(1)It is internally provided with first
Rotary shaft(3), the first rotary shaft(3)Upper end is rotatably connected to the first motor(4), and the first motor(4)It is fixed on water pipe(1)'s
Upper surface, the first rotary shaft(3)The first turbine flabellum is installed at the position of bottom(7), the collecting box(6)On the back side
Extending has drainpipe(16), drainpipe(16)On pulsating pump is installed(17), and drainpipe(16)Extend to hull
(10)Outside, the collecting box(6)Internal close pulsating pump(17)Position at strainer is installed(18), the deck of boat(12)Upper end
Face is fixed with third motor at the position in outside(13), third motor(13)Lower rotation is connected with shaft(14), and turn
Axis(14)From the deck of boat(12)In pass through extend to hull(10)Lower section, shaft(14)On cutting blade is uniformly installed
(15).
2. a kind of water plant cleaning plant for river regulation according to claim 1, it is characterised in that:The deck of boat
(12)Relative to hull(10)Both sides protrusion setting.
3. a kind of water plant cleaning plant for river regulation according to claim 1, it is characterised in that:The water pipe
(1)With respect to suction hose(5)It is vertical setting.
4. a kind of water plant cleaning plant for river regulation according to claim 1, it is characterised in that:The water pipe
(1)Bottom is set for opening.
5. a kind of water plant cleaning plant for river regulation according to claim 1, it is characterised in that:Described first
Turbine flabellum(7)With the second turbine flabellum(7)Periphery is both provided with grid case(11).
6. a kind of water plant cleaning plant for river regulation according to claim 1, it is characterised in that:The third
Motor(13)Altogether there are two settings, and third motor(13)About the deck of boat(12)Center line is symmetrical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721639294.8U CN207538002U (en) | 2017-11-30 | 2017-11-30 | A kind of water plant cleaning plant for river regulation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721639294.8U CN207538002U (en) | 2017-11-30 | 2017-11-30 | A kind of water plant cleaning plant for river regulation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207538002U true CN207538002U (en) | 2018-06-26 |
Family
ID=62616340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721639294.8U Expired - Fee Related CN207538002U (en) | 2017-11-30 | 2017-11-30 | A kind of water plant cleaning plant for river regulation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207538002U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109041763A (en) * | 2018-07-19 | 2018-12-21 | 刘庆连 | A kind of flower mountain water shield fishing device in maturity period |
CN110637601A (en) * | 2019-10-22 | 2020-01-03 | 三峡大学 | Water shield picking system and using method |
WO2022041770A1 (en) * | 2020-08-28 | 2022-03-03 | 南京灵雀智能制造有限公司 | Device for clearing object floating on water and clearing method therefor |
-
2017
- 2017-11-30 CN CN201721639294.8U patent/CN207538002U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109041763A (en) * | 2018-07-19 | 2018-12-21 | 刘庆连 | A kind of flower mountain water shield fishing device in maturity period |
CN113133344A (en) * | 2018-07-19 | 2021-07-20 | 刘庆连 | Water shield fishing device for mature period and using method |
CN113133344B (en) * | 2018-07-19 | 2022-12-16 | 王小灵 | Water shield fishing device for mature period and using method |
CN110637601A (en) * | 2019-10-22 | 2020-01-03 | 三峡大学 | Water shield picking system and using method |
WO2022041770A1 (en) * | 2020-08-28 | 2022-03-03 | 南京灵雀智能制造有限公司 | Device for clearing object floating on water and clearing method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107724353A (en) | A kind of pasture and water cleaning plant for river regulation | |
CN207538002U (en) | A kind of water plant cleaning plant for river regulation | |
CN101666168B (en) | Swimming pool bottom hydro power pushed automatic cleaner | |
CN207685803U (en) | A kind of water pipeline of anti-filter net jam | |
CN206052822U (en) | A kind of hydraulic engineering row's silt device | |
CN203735275U (en) | Device for cleaning pool | |
CN106049588A (en) | Silt discharging device for water conservancy project | |
CN207767300U (en) | Algae substances remove device in a kind of pond waters | |
CN114045894A (en) | A automation equipment for hydraulic engineering desilting construction | |
CN203735273U (en) | Movable pool washing device | |
CN210135116U (en) | Automatic cleaning device for axial flow pump | |
CN219165460U (en) | Efficient cleaning machine for aquaculture | |
CN108901314B (en) | Conveniently collect ruderal lawn mower device | |
CN216812109U (en) | Waterproof drainage device of hydraulic engineering construction | |
CN115028286B (en) | Anti-blocking sewage filtering device suitable for river channel | |
CN214457235U (en) | Treatment device for aquaculture wastewater | |
CN212271063U (en) | Hydraulic engineering desilting device | |
CN203735274U (en) | Movable hardening pool sediment washing device | |
CN211778024U (en) | Long-shaft pump for conveying rainwater | |
CN211057900U (en) | Dredging device for hydraulic engineering | |
CN210977898U (en) | Prevent gardens water pump that blocks up | |
CN211170256U (en) | Integrated buried rural domestic sewage treatment device | |
CN113683156A (en) | Surface floater processing apparatus that sea water desalination used | |
CN208735111U (en) | One boar canopy is periodically washed by water the embedded pipeline configuration that eliminates the unusual smell | |
CN208245295U (en) | A kind of artificial tooth model cleaning equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180626 Termination date: 20191130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |