CN207535961U - Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle - Google Patents
Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle Download PDFInfo
- Publication number
- CN207535961U CN207535961U CN201721205156.9U CN201721205156U CN207535961U CN 207535961 U CN207535961 U CN 207535961U CN 201721205156 U CN201721205156 U CN 201721205156U CN 207535961 U CN207535961 U CN 207535961U
- Authority
- CN
- China
- Prior art keywords
- chassis
- bracket
- buffer board
- connecting shaft
- collecting vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000008595 infiltration Effects 0.000 title abstract description 7
- 238000001764 infiltration Methods 0.000 title abstract description 7
- 230000003139 buffering effect Effects 0.000 claims abstract description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000010276 construction Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 3
- 230000007423 decrease Effects 0.000 claims 1
- 230000006378 damage Effects 0.000 abstract description 6
- 241000237858 Gastropoda Species 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Body Structure For Vehicles (AREA)
Abstract
Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle, it is characterised in that:The collecting vehicle is to adapt to the anti-collision structure in field, which includes the chassis of support sample devices(1)It is arranged on chassis(1)The traveling wheel of bottom(2)And Lateral Collision Avoidance structure;The collecting vehicle protects chassis and its carrier to greatest extent when side is hit by the buffering of two levels; meanwhile mobile chassis can also protect the tie point between traveling wheel and chassis well, avoid more serious damage; the practicality is strong, and conducive to operation in the wild when uses.
Description
Technical field
Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle.
Background technology
Upper library, diversion steel pipe and the underground power house in power station are arranged in underground at present, for the infiltration situation of underground power house
It is difficult to accurately detected by common detection method, it is therefore desirable to find one kind and be suitable for underground workshop leakage
The method of detection can distinguish the source of underground power house percolating water.This just needs to carry out multipoint acquisition in the wild, and huge sets
Standby not portable, this just needs a kind of load bearing equipment and the micro-collection vehicle of experimental result, and this vehicle uses hand push or drawing
Realize movement, but use common trolley, impact resistance is poor, once receive in the wild shock car body will be caused it is serious
Injury, especially the junction between wheel and chassis is easiest to damage, and so not only be easy to cause the damage of equipment, also
The loss of experimental result can be caused, causes serious consequence.
Invention content
Goal of the invention:
Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle, it is the problems of previous the purpose is to solve.
Technical solution:
The collecting vehicle is to adapt to the anti-collision structure in field, and the chassis which includes support sample devices is arranged on chassis
The traveling wheel of bottom and Lateral Collision Avoidance structure;
Traveling wheel is in parallel two, and two traveling wheel coaxial arrangements, two common connecting shafts of traveling wheel pass through opening
Chassis is connected to towards sideways U-bracket;The lower end of U-bracket puts in connecting shaft and can do what is pulled and pushed relative to connecting shaft
Mobile, the upper end of U-bracket is connected to tray bottom by vertical thick stick;
Lateral Collision Avoidance structure includes buffer board, buffer pocket and lifting inserted link, buffer board and is arranged on two sides on chassis, delays
The side that the lower part of punching is arranged on chassis by pivot shaft forms movable lever construction;Pivot shaft is arranged on buffer board
The position of close bottom endpoint the top of buffer board is caused to form laborsaving lever;The position of the pivot shaft is also at chassis
The bottom of side;
Buffer pocket is arranged on the both sides of the bottom on chassis, and worm gear and the worm screw with worm gear, snail are provided in buffer pocket
Bar is set perpendicular to the bottom surface on chassis, and buffer pocket is stretched out in the bottom of worm screw, and the lower section of worm screw is corresponding with one end of release lever, should
The fulcrum of release lever is arranged on U-bracket, and the other end of release lever is flexibly connected with lifting inserted link;In the shaft of worm gear
The drawstring for pulling worm gear rotation is wound with, drawstring is connected to the bottom end of buffer board;
Through-hole is provided in connecting shaft, the through-hole is corresponding with the groove position on U-bracket, during normal work, lifting
Connecting shaft and U-bracket are relatively fixed by inserted link across insertion pit is interior after through-hole;When the top of buffer board is hit, delay
The bottom end of punching pulls worm gear rotation so that worm screw declines, and worm screw pushes release lever and so that lifting inserted link rises, and lifts inserted link
It leaves through-hole and pit completes unlock.
First-level buffer spring is provided between buffer board and the side on chassis.
The part that U-bracket puts in connecting shaft is cased with level 2 buffering spring, and level 2 buffering spring one end connects U-bracket,
The other end is connected to the inner wall of connecting shaft, and when U-bracket moves outside connecting shaft, level 2 buffering spring is in tensional state.
Advantageous effect:
The collecting vehicle is protected chassis and its is held to greatest extent when side is hit by the buffering of two levels
Loading, meanwhile, mobile chassis can also protect the tie point between traveling wheel and chassis well, avoid more serious ruin
Damage, the practicality is strong, and conducive to operation in the wild when uses.
Description of the drawings:
Fig. 1 is overall structure diagram;
Fig. 2 is state diagram when being impacted.
Specific embodiment:
Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle, it is characterised in that:The collecting vehicle is to adapt to the anticollision knot in field
Structure, the chassis 1 which includes support sample devices are arranged on the traveling wheel 2 of 1 bottom of chassis and Lateral Collision Avoidance structure;
Traveling wheel 2 is in parallel two, and two traveling wheels 2 are coaxially disposed, and the common connecting shaft 3 of two traveling wheels 2 passes through
Opening is connected to chassis 1 towards sideways U-bracket 4;The lower end of U-bracket puts in connecting shaft 3 and can be relative to connecting shaft 3
The movement pulled and pushed is done, the upper end of U-bracket is connected to 1 bottom of chassis by vertical thick stick 5;
Lateral Collision Avoidance structure includes buffer board 6, buffer pocket 7 and lifting inserted link 8, buffer board 6 and is arranged on two sides on chassis 1
Face, the side that the lower part of buffer board 6 is arranged on chassis 1 by pivot shaft form the lever construction of activity;Pivot shaft is set
The top of buffer board 6 is caused to form laborsaving lever in the position of the close bottom endpoint of buffer board 6;The position of the pivot shaft
It is in the bottom of the side on chassis 1;
Buffer pocket 7 is arranged on the both sides of the bottom on chassis 1, and worm gear 9 and the snail coordinated with worm gear 9 are provided in buffer pocket 7
Bar 10, worm screw 10 are set perpendicular to the bottom surface on chassis 1, and buffer pocket 7, lower section and the unlock thick stick of worm screw 10 are stretched out in the bottom of worm screw 10
One end of bar 11 corresponds to, and the fulcrum of the release lever 11 is arranged on U-bracket 4, and the other end and the lifting of release lever 11 are inserted
Bar 8 is flexibly connected;As shown in Figure 1, the other end of the release lever 11 at both ends is flexibly connected jointly with lifting the top of inserted link 8,
The drawstring 14 that worm gear 9 is pulled to rotate is wound in the shaft of worm gear 9, drawstring 14 is connected to the bottom end of buffer board 6;
Through-hole 12 is provided in connecting shaft 3, the through-hole is corresponding with 13 position of pit on U-bracket 4, normal work
When, connecting shaft 3 and U-bracket 4 are relatively fixed by lifting inserted link 8 across insertion pit 13 is interior after through-hole 12;It is upper when buffer board 6
When portion is hit, the bottom end of buffer board 6 pulls worm gear 9 to rotate so that worm screw 10 declines, and worm screw 10, which pushes release lever 11, to be made
Inserted link 8 must be lifted to rise, lifting inserted link 8 leaves through-hole 12 and pit 13 completes unlock.
First-level buffer spring 16. is provided between the side on buffer board 6 and chassis 1
The part that U-bracket 4 puts in connecting shaft 3 is cased with level 2 buffering spring 15,15 one end of level 2 buffering spring connection U-shaped
Stent 4, the other end are connected to the inner wall of connecting shaft 3, when U-bracket 4 moves outside connecting shaft 3, at level 2 buffering spring 15
In tensional state.
The collecting vehicle using when as shown in Fig. 2, when receiving shock, such as it is shown in Fig. 2 by figure right side hit
It hits, 6 top of buffer board is extruded, and 6 lower end of buffer board pulls worm gear 9 to rotate so that worm screw 10 declines, and worm screw 10 pushes unlock thick stick
Bar 11 is so that lifting inserted link 8 rises, and lifting inserted link 8 leaves through-hole 12 and pit 13 completes unlock, at the same time, first-level buffer bullet
Spring 16 is compressed, and realizes first-level buffer, and when pressure continues, chassis 1 is moved to the left, and level 2 buffering spring 15, which stretches, realizes two
Grade buffering, thus well unloads impact force, realizes buffering, prevents the damage of the equipment of chassis 1 and its carrying, hits it
Afterwards, it is only necessary to chassis be resetted, be inserted into pit 13 after lifting inserted link 8 is passed through through-hole 12, which can be fine
Be incorporated in field acquisition operation, push a wide range of popularization and application.
Claims (3)
- The collecting vehicle 1. Pumped Storage Plant Underground Powerhouse seeps water, it is characterised in that:The collecting vehicle is to adapt to the anti-collision structure in field, The collecting vehicle includes the chassis of support sample devices(1)It is arranged on chassis(1)The traveling wheel of bottom(2)And Lateral Collision Avoidance knot Structure;Traveling wheel(2)It is in parallel two, two traveling wheels(2)Coaxial arrangement, two traveling wheels(2)Common connecting shaft(3) By being open towards sideways U-bracket(4)It is connected to chassis(1);The lower end of U-bracket puts in connecting shaft(3)Interior and energy phase For connecting shaft(3)The movement pulled and pushed is done, the upper end of U-bracket is by founding thick stick(5)It is connected to chassis(1)Bottom;Lateral Collision Avoidance structure includes buffer board(6), buffer pocket(7)With lifting inserted link(8), buffer board(6)It is arranged on chassis(1)'s Two sides, buffer board(6)Lower part chassis is arranged on by pivot shaft(1)Side formed activity lever construction;Branch Point shaft is arranged on buffer board(6)The position of close bottom endpoint cause buffer board(6)Top form laborsaving lever;The branch The position of point shaft is also at chassis(1)Side bottom;Buffer pocket(7)It is arranged on chassis(1)Bottom both sides, buffer pocket(7)Inside it is provided with worm gear(9)With with worm gear(9)Match The worm screw of conjunction(10), worm screw(10)Perpendicular to chassis(1)Bottom surface setting, worm screw(10)Bottom stretch out buffer pocket(7), worm screw (10)Lower section and release lever(11)One end correspond to, the release lever(11)Fulcrum be arranged on U-bracket(4)On, solution Lock lever(11)The other end with lifting inserted link(8)Flexible connection;Worm gear(9)Shaft on be wound with pulling worm gear(9)Rotation Drawstring(14), drawstring(14)It is connected to buffer board(6)Bottom end;In connecting shaft(3)On be provided with through-hole(12), the through-hole and U-bracket(4)On pit(13)Position corresponds to, normal work When making, inserted link is lifted(8)Across through-hole(12)After be inserted into pit(13)It is interior by connecting shaft(3)With U-bracket(4)It is relatively fixed; Work as buffer board(6)Top when being hit, buffer board(6)Bottom end pull worm gear(9)Rotation so that worm screw(10)Decline, Worm screw(10)Push release lever(11)So that lifting inserted link(8)Rise, lift inserted link(8)Leave through-hole(12)And pit(13) Complete unlock.
- The collecting vehicle 2. Pumped Storage Plant Underground Powerhouse according to claim 1 seeps water, it is characterised in that:Buffer board(6) With chassis(1)Side between be provided with first-level buffer spring(16).
- The collecting vehicle 3. Pumped Storage Plant Underground Powerhouse according to claim 2 seeps water, it is characterised in that:U-bracket(4) Put in connecting shaft(3)Part be cased with level 2 buffering spring(15), level 2 buffering spring(15)One end connects U-bracket(4), separately One end is connected to connecting shaft(3)Inner wall, work as U-bracket(4)To connecting shaft(3)When outer mobile, level 2 buffering spring(15)Place In tensional state.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721205156.9U CN207535961U (en) | 2017-09-15 | 2017-09-15 | Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721205156.9U CN207535961U (en) | 2017-09-15 | 2017-09-15 | Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207535961U true CN207535961U (en) | 2018-06-26 |
Family
ID=62608075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721205156.9U Active CN207535961U (en) | 2017-09-15 | 2017-09-15 | Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207535961U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107487347A (en) * | 2017-09-15 | 2017-12-19 | 国家电网公司 | Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle is surveyed based on isotope tracer technique |
-
2017
- 2017-09-15 CN CN201721205156.9U patent/CN207535961U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107487347A (en) * | 2017-09-15 | 2017-12-19 | 国家电网公司 | Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle is surveyed based on isotope tracer technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207535961U (en) | Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle | |
CN107253465A (en) | A kind of logistics goods distribution device | |
CN201075645Y (en) | Cable pulling apparatus for coal face | |
CN108454637A (en) | A kind of remote-controlled mountainous region monorail conveyer of electric traction formula | |
CN107487347A (en) | Pumped Storage Plant Underground Powerhouse infiltration collecting vehicle is surveyed based on isotope tracer technique | |
CN204224170U (en) | A kind of truck tail bay-lift | |
CN208198514U (en) | A kind of Hardware fitting transport device with pooling feature | |
CN112978187B (en) | Intelligent shuttle trolley applied to stacker and application method of intelligent shuttle trolley | |
CN208469828U (en) | A kind of electric locomotive car slipping protective device of shield-tunneling construction | |
CN205079953U (en) | Dynamic loading testing equipment of tunnel power test system | |
CN207863979U (en) | A kind of device for suspending duct pieces of shield machine | |
CN204453647U (en) | Drawer type belt feeder and cargo transfer mechanism | |
CN201498222U (en) | Novel irradiation trolley | |
CN202245902U (en) | Lifting type winch | |
CN105346557A (en) | Inclined shaft running cart protecting device used in coal mine | |
CN203845780U (en) | Roller crowbar | |
CN207565606U (en) | Play formula buffer stop to a kind of electropneumatic | |
CN207209563U (en) | A kind of cable stroller with adjusting carrier roller function | |
CN219948218U (en) | River slope greening construction equipment | |
CN204979944U (en) | Pail device from loading and unloading formula garbage truck | |
CN205224916U (en) | Be applied to multidimension degree draw gear that gate supported | |
CN205186181U (en) | Inclined shaft sports car protector in colliery | |
CN204195539U (en) | A kind of shot-blasting machine with feed hopper and cylinder | |
CN207683821U (en) | A kind of packaging material vacuum is stopped leakage in the roof and liquid filling apparatus | |
CN203960835U (en) | Floating embankment guiding buffer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |