CN219948218U - River slope greening construction equipment - Google Patents
River slope greening construction equipment Download PDFInfo
- Publication number
- CN219948218U CN219948218U CN202320700908.8U CN202320700908U CN219948218U CN 219948218 U CN219948218 U CN 219948218U CN 202320700908 U CN202320700908 U CN 202320700908U CN 219948218 U CN219948218 U CN 219948218U
- Authority
- CN
- China
- Prior art keywords
- dolly
- construction equipment
- trolley
- stripper
- slope greening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 238000004804 winding Methods 0.000 claims abstract description 17
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 230000005484 gravity Effects 0.000 abstract description 3
- 230000000712 assembly Effects 0.000 abstract 2
- 238000000429 assembly Methods 0.000 abstract 2
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000006096 absorbing agent Substances 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Cultivation Of Plants (AREA)
Abstract
The utility model discloses river slope greening construction equipment, which comprises a trolley, wherein a stripper plate is rotatably arranged on one side surface of the trolley, a slot is formed in one end of the trolley far away from the stripper plate, a plug-in column is arranged at the position, close to the slot, of the top of the trolley, winding assemblies are symmetrically and fixedly arranged at the top of the trolley, connecting ropes are respectively wound on the two winding assemblies, one ends of the two connecting ropes are respectively and fixedly connected to one end of a top plate of the stripper plate, and when the device is used, the stripper plate is pulled out from the slot by pulling the plug-in column under the action of gravity when the trolley moves to a specified position, so that turf piled in the trolley is rapidly discharged through the stripper plate.
Description
Technical Field
The utility model relates to the technical field of greening construction, in particular to river slope greening construction equipment.
Background
The slope protection refers to the collective name of various paving and planting on the slope surface for preventing the slope from being washed. At present, the slope protection structure is more focused on the fusion with the environment, especially the slope protection of a water conservancy river course, is more focused on ecology, often lays turf on the slope protection after the slope protection structure is erected, needs to use corresponding construction equipment in the greening construction process of the river course slope, and at present, because the length of the river course slope protection is generally longer, workers need to transport a part of turf on the slope protection through a cart every other section of distance for workers to use.
But be used for river course slope protection greening to plant dolly that turf transported and common dolly structure is similar, so the dolly that fills turf is when unloading, generally wholly takes out the turf through the manual work one by one, perhaps wholly lifts the dolly and makes it slope to make the turf discharge in the car hopper of dolly, but the dolly weight that fills turf is great, and the workman needs to use great effort to realize unloading the processing, in sum, there is the inconvenience of unloading when unloading, is unfavorable for accelerating the problem of whole efficiency of construction in the dolly that is used for transporting turf at present.
Disclosure of Invention
The utility model aims to solve the defects in the prior art and provides river slope greening construction equipment.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a river course domatic afforestation construction equipment, includes the dolly, a side rotation of dolly is installed the stripper, the slot has been seted up to the one end of keeping away from the stripper, just the top of dolly is being close to the position department of slot and is equipped with the spliced pole, the top symmetry fixed mounting of dolly has wire winding subassembly, two wire winding subassembly is last to be wound respectively and is equipped with the connection rope, two the one end of connecting rope is fixed connection respectively in the one end of stripper roof, the spout has been seted up at the one end symmetry of keeping away from wire winding subassembly at the dolly top, two place a side of spout inner wall is fixed mounting respectively has the spring damper, and two places the inside of spout is slidable mounting respectively has the slider, and two the one end that the connection rope corresponds is fixed connection respectively in a side of corresponding the slider, two the side that the slider corresponds is divided into respectively fixedly connected with connecting rod, two connecting rod fixedly connected with connecting plate jointly, the spliced pole runs through the roof of connecting plate and peg graft to in the slot.
Preferably, two connecting rings are symmetrically and fixedly arranged at the top of the stripper plate, and the connecting ropes are fixedly connected to the corresponding connecting rings.
Preferably, fixed pulleys are symmetrically arranged at one end, close to the stripper plate, of the top of the trolley, and the connecting ropes are contacted with the fixed pulleys.
Preferably, a through hole is formed in the middle of the top plate of the connecting plate in a penetrating manner, and the through hole and the slot are located on the same central line.
Preferably, the through holes and the trolley have dimensions corresponding to those of the plug-in posts, respectively.
Preferably, handles are fixedly installed at two ends of the top plate of the connecting plate respectively, the top of the plug-in column is connected with a rubber rope, and one end corresponding to the rubber rope is connected to the top of the trolley.
The utility model has the following beneficial effects:
1. through setting up stripper, wire winding subassembly, connecting rope, connecting plate and spliced pole's effect, when using this device, wait that the dolly removes to appointed position, through extracting spliced pole from the slot in, the stripper takes place to incline under the effect of gravity to make the turf of piling up in the dolly inside discharge through the stripper fast, compare in the unloading mode of current dolly, this device has the benefit of being convenient for unload, saves the labour, so indirect acceleration work efficiency;
2. through setting up spout, slider and spring damper's effect, when extracting the spliced pole and unloading, the spout can carry out spacing processing to the turned angle of stripper, prevents that stripper striking ground from causing the damage, and spring damper can play the cushioning effect, so can play the guard action to connecting the rope, extension connecting the life of rope.
Drawings
FIG. 1 is a schematic diagram of a front view structure according to the present utility model;
FIG. 2 is a schematic view of an assembly structure according to the present utility model;
FIG. 3 is a schematic view of a partial enlarged structure of the portion A in FIG. 2 according to the present utility model;
fig. 4 is a schematic view of a partial enlarged structure at B in fig. 2 according to the present utility model.
In the figure: 1. a trolley; 101. a slot; 2. a stripper plate; 3. a winding assembly; 4. a connecting rope; 5. a chute; 6. a slide block; 7. a connecting rod; 8. a connecting plate; 9. a through hole; 10. a plug-in column; 11. spring damper.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1-4, a river slope greening construction equipment, including dolly 1, when using, at first remove the dolly 1 that is full of turf to the adjacent appointed position department of river bank protection and carry out the processing of unloading, a side rotation of dolly 1 is installed stripper 2, slot 101 has been seted up to the one end that keeps away from stripper 2 to dolly 1, and the top of dolly 1 is equipped with spliced pole 10 in the position department that is close to slot 101, the symmetrical fixed mounting in top of dolly 1 has wire winding subassembly 3, be equipped with connecting rope 4 around respectively on two wire winding subassemblies 3, further, wire winding subassembly 3 comprises wire winding wheel and two backup pads, rotate on two backup pads and install wire winding wheel, and be equipped with connecting rope 4 around on the wire winding wheel, the one end of two connecting ropes 4 is fixed connection respectively in the one end of stripper 2 roof, spout 5 has been seted up at the one end symmetry of keeping away from wire winding subassembly 3, a side of two chute 5 inner wall is fixed mounting respectively has spring damper 11, and the inside of two chute 5 is slidable mounting respectively has slider 6, and two connecting rope 4 correspond to be fixed connection piece 6 respectively in the corresponding side of slider 6 and connect to connecting rod 8 in the connecting rod 8 is fixed connection piece 8, connect together, connecting rod 8 is connected together.
In this embodiment, as shown in fig. 1, 2 and 3, two connecting rings are symmetrically and fixedly installed on the top of the stripper plate 2, and the connecting ropes 4 are fixedly connected to the corresponding connecting rings.
In this embodiment, as shown in fig. 1, 2 and 3, the fixed pulleys are symmetrically installed at one end of the top of the trolley 1 near the stripper plate 2, and the connecting rope 4 contacts with the fixed pulleys, and further, the fixed pulleys play a role in guiding the connecting rope 4, so that abrasion of the connecting rope 4 is reduced.
In this embodiment, as shown in fig. 3 and 4, a through hole 9 is formed in the middle of the top plate of the connecting plate 8, and the through hole 9 and the slot 101 are located on the same central line.
In the present embodiment, as shown in fig. 1, 2 and 4, the through hole 9 and the cart 1 have dimensions corresponding to those of the plug-in post 10, respectively.
In this embodiment, as shown in fig. 1, 2, 3 and 4, handles are fixedly mounted at two ends of a top plate of the connecting plate 8, respectively, and a rubber rope is connected to the top of the plug-in column 10, and one end corresponding to the rubber rope is connected to the top of the trolley 1.
The application method and the advantages of the utility model are as follows: when the river slope greening construction equipment is used, the working process is as follows:
as shown in fig. 1, fig. 2, fig. 3 and fig. 4, when the device is used, when the trolley 1 filled with turf moves to a specified position beside a slope protection, then a worker pulls out the plug-in post 10 from the slot 101, at this time, the connecting plate 8 loses a limiting function, and the stripper plate 2 rotates under the action of gravity to incline, so that the turf stacked inside the trolley 1 is rapidly discharged through the stripper plate 2.
And in the rotation and inclination process of the stripper plate 2, the stripper plate 2 drives the connecting rope 4 to move, so that the connecting rope 4 drives the sliding block 6 to slide in the sliding groove 5, the sliding block 6 slides and collides on the spring shock absorber 11, namely, the sliding groove 5 can limit the rotation angle of the stripper plate 2, the stripper plate 2 is prevented from being broken due to collision with the ground, the spring shock absorber 11 can play a buffering role, the connecting rope 4 can be protected, and the service life of the connecting rope 4 is prolonged.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.
Claims (6)
1. River course slope greening construction equipment, including dolly (1), its characterized in that: the utility model discloses a connecting rod, including connecting rod, tip, stripper (2) is installed in rotation of a side of dolly (1), slot (101) has been seted up at the one end of keeping away from stripper (2) to dolly (1), just the tip of dolly (1) is equipped with grafting post (10) in the position department that is close to slot (101), the top symmetry fixed mounting of dolly (1) has wire winding subassembly (3), two on wire winding subassembly (3) respectively around being equipped with connecting rope (4), two the one end of connecting rope (4) is fixed connection respectively in the one end of stripper (2) roof, spout (5) have been seted up at the one end symmetry of keeping away from wire winding subassembly (3) in dolly (1) top, two a side of spout (5) inner wall is fixed mounting respectively has spring damper (11), and two the inside of spout (5) is slidable mounting respectively has slider (6), and two the one end that connecting rope (4) corresponds is fixed connection respectively in a side of corresponding slider (6), two slider (6) is fixed connection respectively (7) connecting rod (8) are connected together in the connecting rod (8) fixedly to peg graft post (8).
2. The river slope greening construction equipment according to claim 1, wherein: two connecting rings are symmetrically and fixedly arranged at the top of the stripper plate (2), and the connecting ropes (4) are fixedly connected to the corresponding connecting rings.
3. The river slope greening construction equipment according to claim 1, wherein: the top of the trolley (1) is symmetrically provided with fixed pulleys at one end close to the stripper plate (2), and the connecting rope (4) is contacted with the fixed pulleys.
4. The river slope greening construction equipment according to claim 1, wherein: a through hole (9) is formed in the middle of the top plate of the connecting plate (8) in a penetrating mode, and the through hole (9) and the slot (101) are located on the same central line.
5. The river slope greening construction equipment according to claim 4, wherein: the sizes of the through holes (9) and the trolley (1) respectively correspond to the sizes of the inserting columns (10).
6. The river slope greening construction equipment according to claim 1, wherein: handles are fixedly installed at two ends of a top plate of the connecting plate (8), rubber ropes are connected to the tops of the plug-in columns (10), and one ends corresponding to the rubber ropes are connected to the tops of the trolleys (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320700908.8U CN219948218U (en) | 2023-04-03 | 2023-04-03 | River slope greening construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320700908.8U CN219948218U (en) | 2023-04-03 | 2023-04-03 | River slope greening construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219948218U true CN219948218U (en) | 2023-11-03 |
Family
ID=88535451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320700908.8U Active CN219948218U (en) | 2023-04-03 | 2023-04-03 | River slope greening construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219948218U (en) |
-
2023
- 2023-04-03 CN CN202320700908.8U patent/CN219948218U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219948218U (en) | River slope greening construction equipment | |
CN110061447A (en) | A kind of power transmission lines overhauling is with can obstacle detouring electric aerodyne | |
CN104577870A (en) | Automatic obstacle-crossing type overhead earth wire pay-off tool for maintenance | |
CN206471750U (en) | A kind of across obstacle Poling Construction protection structure | |
CN114875802B (en) | Folding and unfolding type bridge hanging basket construction device with windproof shaking structure | |
CN202673193U (en) | Drill stem automatic stacking and transporting device | |
CN111788937A (en) | Picking device suitable for fruit is difficult for picking on branch head upper portion | |
CN214734238U (en) | Elevating gear for construction | |
CN114751276B (en) | Safe anti-falling device for building construction | |
CN115594097A (en) | Mobile submersible pump lifting device for flood prevention of transformer substation | |
CN214935558U (en) | Lever linkage type anti-falling ladder stand | |
CN212295877U (en) | Over-and-under type rail for municipal works | |
CN209891739U (en) | Construction overhanging type mobile discharging platform | |
CN207418090U (en) | A kind of construction lifting gear | |
CN208966338U (en) | A kind of telescopic moving system for coal seam driving transport | |
CN210957557U (en) | Insulated delivery vehicle for equipotential operation | |
CN203394536U (en) | Excavation work bench for tunnel engineering | |
CN207375716U (en) | The aerial cableway that a kind of mountainous region pipeline is laid with | |
US2317075A (en) | Load lifting and dumping machine | |
CN110707595A (en) | Safety method for lightning arrester line to enter equipotential in live state | |
CN221481364U (en) | Anti-falling lifting device | |
CN212044682U (en) | PF line removes maintenance platform | |
CN216842879U (en) | Protector for aerial working platform | |
CN211273582U (en) | Active guiding device capable of stretching uniformly | |
CN212771884U (en) | Earthwork crushing device for traffic engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |