CN207528706U - It is a kind of to be leaked for evaluating spray with the experimental provision for depositing well section plugging effect - Google Patents
It is a kind of to be leaked for evaluating spray with the experimental provision for depositing well section plugging effect Download PDFInfo
- Publication number
- CN207528706U CN207528706U CN201721620363.0U CN201721620363U CN207528706U CN 207528706 U CN207528706 U CN 207528706U CN 201721620363 U CN201721620363 U CN 201721620363U CN 207528706 U CN207528706 U CN 207528706U
- Authority
- CN
- China
- Prior art keywords
- experimental provision
- plugging effect
- well section
- leak
- spray
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model offer is a kind of for evaluating the same experimental provision for depositing well section plugging effect of spray leakage, including:Cylinder body, side wall are equipped with simulation fracture and at least one air admission hole;Cylinder cap matches with the opening of the cylinder body;The cylinder cap is equipped with drilling tool hole;Drilling tool is simulated, first end stretches into the inside of the cylinder body across the drilling tool hole;Liquid holding device is connected by circulating pressure pump with the simulation drilling tool;Lost fluid recover is connected with the simulation fracture.The utility model in cylinder body by setting simulation fracture and air admission hole, the spray leakage in Process of Leaking Stoppage is simulated with the formation condition deposited, in addition, the leak stopping slurry cyclic process of device setting, the true Process of Leaking Stoppage reflected in blocking construction, its experimental result can really reflect spray leakage with plugging effect under the formation condition deposited, simulation effect can be reality blocking construction during plugging material preferably provide technical support with the optimization of plugging formula.
Description
Technical field
The utility model is related to a kind of experimental provision for plugging effect during appraisal drilling more particularly to a kind of use
In evaluation spray leakage with the experimental provision for depositing well section plugging effect.
Background technology
With deepening continuously for Oil And Gas Exploration And Development, with extensive low taste petroleum resources and DEEP MARINE carbonate
Difficulty based on oil gas pool employs the emphasis that petroleum resources are increasingly becoming oil-gas exploration and development.DEEP MARINE carbonate rock hydrocarbon reservoir
With fracture development, there are the geology characteristics of abnormal pressure, and leakage, overflow easily occur in drilling process, sprays and leaks same deposit
Complex situations seriously affect the exploration and development process of petroleum resources.
Same deposit of spray leakage refers in drilling process since strata pressure changes irregular, low high pressure zone alternating, by well bore knot
The limitation of structure, can not be separated each transition, because occurring overflow in drilling process and missing simultaneous underground
Complex situations.Same deposit of spray leakage generally has 3 kinds of situations:It is leaked under upper spray;On leak down spray;Same layer simultaneous happeness of loss circulation and blowout.
When being crept into using conventional drilling liquid, because head of liquid is excessive, more than crack the first transaction of a day's business stress, so as to cause crack
It opens, new leakage occurs;If reducing drilling fluid density, head of liquid, which declines, is excessively not enough to balance gas-bearing formation, and gas can be without control
System ground enters pit shaft and causes blowout.It statistically sees, same deposit of spray leakage is generally present in fractured reservoir, and can also result in storage
Layer injury, blowout out of control, drilling period extends and cost is significantly increased, and even results in scrapping for whole mouth well.
At present, leak stopping kill-job and pressurization sealing are to solve spray leakage with the important technical deposited, and plugging formula is preferred
It carries out, such as casting bed leaking stoppage experiment, aperture plate leaking stoppage experiment, tested often by conventional plugging material evaluation experimental
There is no consider influence of the gas intrusion to leaking stoppage experiment result in gas-bearing formation, therefore cause the plugging material type preferably gone out in journey
The needs of live blocking construction can not be fully met with the adaptability of the plugging formula of formation.
Utility model content
The feature and advantage of the utility model are partly stated or can be shown from the description and easy in the following description
See or can be learnt by putting into practice the utility model.
To overcome problem of the prior art, the utility model offer is a kind of, and for evaluating, spray leakage is same to deposit well section plugging effect
Experimental provision, including:
Cylinder body, side wall are equipped with simulation fracture and at least one air admission hole;
Cylinder cap matches with the opening of the cylinder body;The cylinder cap is equipped with drilling tool hole;
Drilling tool is simulated, first end stretches into the inside of the cylinder body across the drilling tool hole;
Liquid holding device is connected by circulating pressure pump with the simulation drilling tool;
Lost fluid recover is connected with the simulation fracture.
Optionally, at least one air inlet includes parallel feed mouth, is oppositely arranged with the simulation fracture.
Optionally, at least one air inlet further includes enterprising gas port, positioned at the top of the simulation fracture.
Optionally, at least one air inlet further includes lower air inlet, positioned at the lower section of the simulation fracture.
Optionally, at least one gas injection pump is further included, is connected respectively at least one air inlet.
Optionally, it further includes:
Sliding block is arranged on the simulation fracture;
Displacement propeller is connected with the sliding block, for pushing sliding block to adjust the width of the simulation fracture;
Boost pump is connected with the displacement propeller.
Optionally, it further includes:
Heating mantle is set in the outside of the cylinder body;
Temperature controller is connected with the heating mantle.
Optionally, volume gauger is further included, is connected with the lost fluid recover.
Optionally, the cylinder cap is equipped with return port, and the return port is connected with the liquid holding device.
Optionally, return flow meter is further included, is arranged between the return port and the liquid holding device.
The utility model provides a kind of sprayed for evaluation and leaks the same experimental provision for depositing well section plugging effect, by cylinder body
Middle setting simulation fracture and air admission hole simulate the spray leakage in Process of Leaking Stoppage with the formation condition deposited, and experimental result can be true
Real reflection spray leakage with plugging effect under the formation condition deposited, for during practical blocking construction plugging material preferably and leak stopping
The optimization of formula provides technical support.
By reading specification, the feature of these technical solutions and interior will be best understood in those of ordinary skill in the art
Hold.
Description of the drawings
The utility model is specifically described below with reference to attached drawing and with reference to example, the advantages of the utility model and realization
Mode will be more obvious, and content is only used for the explanation to the utility model wherein shown in attached drawing, without forming to this reality
With it is novel in all senses on limitation, in the accompanying drawings:
Fig. 1 is showing for evaluating spray leakage with the structure of experimental provision for depositing well section plugging effect for the utility model embodiment
It is intended to.
Specific embodiment
As shown in Figure 1, the utility model offer is a kind of to leak the same experimental provision for depositing well section plugging effect, packet for evaluating spray
Include cylinder body 1, cylinder cap 2, simulation drilling tool 6, liquid holding device 3, lost fluid recover 20.Wherein:
Cylinder body 1 is placed vertically, and side wall is equipped with simulation fracture 19 and at least one air admission hole.At least one air admission hole
Including at least one of enterprising stomata 13, parallel feed hole 15, lower air admission hole 17;Above-mentioned enterprising stomata 13 is located at simulation fracture
19 top, parallel feed hole 15 are oppositely arranged with simulation fracture 19, and lower air inlet 17 is located at the lower section of simulation fracture 19.
When implementing, further including can be pumped at least one gas injection, be connected respectively at least one air inlet.More specifically,
Including the upper gas injection pump 14 being connected with enterprising stomata 13, the parallel gas injection pump 16 being connected with parallel feed hole 15, with lower air inlet
17 connected bet air pumps 18.
Cylinder cap 2 and the opening of cylinder body 1 match;Cylinder cap 2 is equipped with drilling tool hole.The first end for simulating drilling tool 6 passes through cylinder cap 2
On drilling tool hole stretch into the inside of cylinder body 1.Pressurization hole 9 is additionally provided on cylinder cap 2, pressurization hole 9 is connected with force (forcing) pump 10.In addition, cylinder
Return port 7 is additionally provided on lid 2, return port 7 is connected with liquid holding device 3;Return flow meter 8 is further included, is arranged on return port 7 with containing liquid
Between device 3.
Liquid holding device 3 is connected by circulating pressure pump 4 with simulation drilling tool 6;Lost fluid recover 20 is connected with simulation fracture 19.
Volume gauger 21 is further included, is connected with lost fluid recover 20.
In order to preferably adjust the size of simulation fracture 19, further include:Sliding block 22, displacement propeller 23 and boost pump
24.Wherein, sliding block 22 is arranged on simulation fracture 19;Displacement propeller 23 is connected with sliding block 22, for pushing sliding block to adjust
The width of simulation fracture;Boost pump 24 is connected with displacement propeller 23.
In order to simulate down-hole formation temperature condition, heating mantle 11 and temperature controller 12 can also be included;11 sets of the heating mantle
It is located at the outside of cylinder body;Temperature controller 12 is then connected with heating mantle 11.
Above-mentioned force (forcing) pump 10, temperature controller 12, gas injection pump 14,16,18 and volume gauger 21 can be with computers 25
It is connected, is controlled by computer.It should be noted that above-mentioned force (forcing) pump 10, temperature controller 12, gas injection pump 14,16,18 and
Volume gauger 21 can also be controlled by respective controller, without being controlled using computer 21
During test, first by setting one of air admission hole (enterprising stomata 13, parallel feed hole 15 or lower injecting hole
17) admission pressure, gas injection pump that admission pressure size is connected due to computer 25 (upper gas injection pump 14, parallel gas injection 16, under
Injecting hole 17 and bet air pump 18) control;Sliding block 22 is made to generate displacement by displacement propeller 23, so as to change simulation fracture 19
Width, reach the size in setting leakage crack, motive force is by the boost pump that is connected with computer 25 and displacement propeller 23
24 provide;Simulation fracture 19 is connected with lost fluid recover 20, to collect the working solution missed in leak stopping operation, misses work
The volume for making liquid is measured by volume gauger 21, is as a result transferred to the computer 25 being attached thereto;By being connected with computer 25
Temperature controller 12 control heating mantle 11 temperature, to simulate down-hole formation temperature condition;In addition, setting pressurization hole 9 on cylinder cap 2,
Pressurization hole 9 is connected with force (forcing) pump 10, builds the pressure process for the annular space during simulated leaking stoppage, and size is connected due to force (forcing) pump 10
Computer 25 control.
Leak stopping slurry is put into liquid holding device 3, ON cycle compression pump 4, leak stopping slurry by feed liquor pipeline flow meter 5 into
Enter to simulate drilling tool 6 and simulate the annular space between drilling tool 6 and cylinder body 1, if leak stopping success, simulation fracture 19 can be blocked in spillage
Plugging material seals, and leak stopping slurry can flow back into liquid holding device 3 by the return port 7 on cylinder cap 2;If leak stopping is failed, leak stopping slurry
It will be flowed out from simulation fracture 19, it is impossible to establish cycle;If slight leakage occurs in Process of Leaking Stoppage or after leak stopping, it is arranged on return duct
The uninterrupted of working solution in 8 measurable reflux pipeline of flowmeter on line reflects plugging effect.
It is provided by the utility model that for evaluating, spray leakage is same to deposit the experimental provision of well section plugging effect by being set in cylinder body
Simulation fracture and air admission hole are put, the spray leakage in Process of Leaking Stoppage is simulated with the formation condition deposited, in addition, the leak stopping of device setting
Cyclic process is starched, really reflects the Process of Leaking Stoppage in blocking construction, experimental result can really reflect spray leakage with the ground deposited
Plugging effect under the conditions of layer, simulation effect can be during practical blocking construction plugging material preferably and plugging formula
Optimization provide technical support.
Above by reference to the preferred embodiment for having illustrated the utility model, it is new that those skilled in the art do not depart from this practicality
The scope and spirit of type can realize the utility model there are many variant scheme.For example, as the part of one embodiment
The feature for showing or describing can be used for another embodiment to obtain another embodiment.It these are only that the utility model is preferably feasible
Embodiment not thereby limits to the interest field of the utility model, all to use the utility model specification and accompanying drawing content
The equivalence changes made, are both contained within the interest field of the utility model.
Claims (10)
1. a kind of leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that including:
Cylinder body, side wall are equipped with simulation fracture and at least one air admission hole;
Cylinder cap matches with the opening of the cylinder body;The cylinder cap is equipped with drilling tool hole;
Drilling tool is simulated, first end stretches into the inside of the cylinder body across the drilling tool hole;
Liquid holding device is connected by circulating pressure pump with the simulation drilling tool;
Lost fluid recover is connected with the simulation fracture.
2. according to claim 1 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that institute
It states at least one air inlet and includes parallel feed mouth, be oppositely arranged with the simulation fracture.
3. according to claim 2 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that institute
It states at least one air inlet and further includes enterprising gas port, positioned at the top of the simulation fracture.
4. according to claim 2 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that institute
It states at least one air inlet and further includes lower air inlet, positioned at the lower section of the simulation fracture.
5. according to claim 1 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that also
It pumps including at least one gas injection, is connected respectively at least one air inlet.
6. according to claim 1 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that also
Including:
Sliding block is arranged on the simulation fracture;
Displacement propeller is connected with the sliding block, for pushing sliding block to adjust the width of the simulation fracture;
Boost pump is connected with the displacement propeller.
7. according to claim 1 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that also
Including:
Heating mantle is set in the outside of the cylinder body;
Temperature controller is connected with the heating mantle.
8. according to claim 1 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that also
Including volume gauger, it is connected with the lost fluid recover.
9. according to claim 1 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that institute
Cylinder cap is stated equipped with return port, the return port is connected with the liquid holding device.
10. according to claim 9 leak for evaluating spray with the experimental provision for depositing well section plugging effect, which is characterized in that
Return flow meter is further included, is arranged between the return port and the liquid holding device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721620363.0U CN207528706U (en) | 2017-11-28 | 2017-11-28 | It is a kind of to be leaked for evaluating spray with the experimental provision for depositing well section plugging effect |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721620363.0U CN207528706U (en) | 2017-11-28 | 2017-11-28 | It is a kind of to be leaked for evaluating spray with the experimental provision for depositing well section plugging effect |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207528706U true CN207528706U (en) | 2018-06-22 |
Family
ID=62581048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721620363.0U Active CN207528706U (en) | 2017-11-28 | 2017-11-28 | It is a kind of to be leaked for evaluating spray with the experimental provision for depositing well section plugging effect |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207528706U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112855121A (en) * | 2021-01-14 | 2021-05-28 | 北京探矿工程研究所 | Medium-high voltage visual type leaking stoppage simulation evaluation device |
CN114858981A (en) * | 2022-07-06 | 2022-08-05 | 中国石油大学(华东) | Drilling complex overflow simulation and acoustoelectric coupling overflow monitoring experiment system |
US11821273B1 (en) | 2022-07-28 | 2023-11-21 | Southwest Petroleum University | Experimental system and a method for wellbore pressure testing under the coexistence of gas-kick and loss-circulation |
-
2017
- 2017-11-28 CN CN201721620363.0U patent/CN207528706U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112855121A (en) * | 2021-01-14 | 2021-05-28 | 北京探矿工程研究所 | Medium-high voltage visual type leaking stoppage simulation evaluation device |
CN112855121B (en) * | 2021-01-14 | 2023-11-10 | 北京探矿工程研究所 | Medium-high pressure visual type plugging simulation evaluation device |
CN114858981A (en) * | 2022-07-06 | 2022-08-05 | 中国石油大学(华东) | Drilling complex overflow simulation and acoustoelectric coupling overflow monitoring experiment system |
CN114858981B (en) * | 2022-07-06 | 2022-09-09 | 中国石油大学(华东) | Drilling complex overflow simulation and acoustoelectric coupling overflow monitoring experiment system |
US11821273B1 (en) | 2022-07-28 | 2023-11-21 | Southwest Petroleum University | Experimental system and a method for wellbore pressure testing under the coexistence of gas-kick and loss-circulation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100445741C (en) | Intelligent high-temperature high-voltage experimental instrument for dynamic leak stopping evaluation | |
CN104747187B (en) | A kind of high temperature and pressure borehole wall strengthens drilling fluid simulated experimental provision and method | |
CN207528706U (en) | It is a kind of to be leaked for evaluating spray with the experimental provision for depositing well section plugging effect | |
CN207499866U (en) | A kind of experimental provision for being used to evaluate horizontal well plugging effect | |
CN104632205B (en) | Fracture-cavity carbonate reservoir storage type distinguishing method | |
Qin et al. | Interference well-test model for vertical well with double-segment fracture in a multi-well system | |
CN103953332B (en) | Experimental device and experimental method for simulating dynamic leakage and leaking stoppage of drilling fluid | |
CN204945112U (en) | Foaming agent benchmark test system | |
US10942105B1 (en) | Experimental device for carbon dioxide imbition, diffusion and oil discharge in tight oil reservoir | |
CN107288632B (en) | Coal-rock reservoir drainage and production water source and pressure drop path simulation device and method | |
CN102507879A (en) | Foaming agent evaluation test device and method | |
He et al. | Analytical interference testing analysis of multi-segment horizontal well | |
CN202451142U (en) | Subsurface environment simulator | |
CN2849724Y (en) | Intelligent high temp. high pressure dynamic leaking stoppage evaluating tester | |
CN1332195C (en) | High temperature, high pressure core dynamic harm valuation test instrument | |
CN104373106A (en) | Experimental method and experimental system of gas sealing performance of underground packer | |
CN103674593B (en) | A kind of device and method for simulating the flood pot test of low permeability reservoir pressure break straight well | |
CN208137906U (en) | Actual triaxial testing apparatus is used in a kind of temporarily stifled steering behaviour evaluation | |
CN206256908U (en) | A kind of pit shaft and formation fracture Coupled Flow analogue experiment installation | |
CN106482924A (en) | Rock hydrocarbon simulated flowing apparatus | |
CN103257215B (en) | The visual core holding unit of a kind of coalbed methane reservoir rock sample | |
CN202330397U (en) | Foaming agent evaluation experiment device | |
CN2682411Y (en) | High temperature and high pressure core dynamic damage evaluation tester | |
CN112360430B (en) | Experimental device for crack plugging simulation evaluation | |
CN112610203A (en) | Simulation device and method for natural fracture stratum respiration effect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |