CN207525899U - Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure - Google Patents

Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure Download PDF

Info

Publication number
CN207525899U
CN207525899U CN201721656467.7U CN201721656467U CN207525899U CN 207525899 U CN207525899 U CN 207525899U CN 201721656467 U CN201721656467 U CN 201721656467U CN 207525899 U CN207525899 U CN 207525899U
Authority
CN
China
Prior art keywords
sleeper
prefabricated
preburying part
ontology
connecting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721656467.7U
Other languages
Chinese (zh)
Inventor
李青山
马云飞
杨逸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Construction Technology Co Ltd
Original Assignee
31 Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 31 Construction Technology Co Ltd filed Critical 31 Construction Technology Co Ltd
Priority to CN201721656467.7U priority Critical patent/CN207525899U/en
Application granted granted Critical
Publication of CN207525899U publication Critical patent/CN207525899U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structures, are related to wall construction mounting technology field.The prefabricated sleeper includes preburying part, connecting portion and sleeper ontology;The preburying part is set on the joint face of the sleeper ontology;The connecting portion includes connection ring and dowel, and the connection ring is movably arranged in the preburying part, and the dowel is movably arranged in the connection ring.The prefabricated sleeper of the utility model, preburying part is set on the joint face of sleeper ontology, connecting portion is set in preburying part, the preburying part and wallboard body or other components for making sleeper ontology are connected with each other, so as to which connecting portion coordinates with preburying part so that sleeper ontology is connect with wallboard body or other components, it avoids connecting elements and goes out muscle, the connecting elements for solving the problems, such as assembly of shear wall structure is not easy to installation, has larger application value.

Description

Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure
Technical field
The utility model is related to wall construction mounting technology field, more particularly to a kind of prefabricated sleeper and prefabricated sleeper and in advance Wallboard connecting structure processed.
Background technology
At present, the interconnection technique of assembly of shear wall structure reaches its maturity, and still, most of structural system node is using existing Pour sleeper connection.
Existing prefabricated panel and prefabricated sleeper go out muscle, bring inconvenience to the production of component, transport and installation, lead Comprehensive cost is caused to improve.
In this background, building trade enables to corresponding prefabricated components system there is an urgent need for a kind of completely new connection mode Make simple, easy for installation.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure, with solution The connecting elements of assembly of shear wall structure certainly in the prior art is not easy to the technical issues of installation.
To achieve these goals, the utility model uses following technical scheme:
A kind of prefabricated sleeper provided by the utility model, including preburying part, connecting portion and sleeper ontology;
The preburying part is set on the joint face of the sleeper ontology;
The connecting portion includes connection ring and dowel;
The connection ring is movably arranged in the preburying part;
The dowel is movably arranged in the connection ring.
Further, the connection ring includes the body of rod and ring body;
Described body of rod one end is movably arranged in the preburying part;
The ring body is fixed at the body of rod other end.
Further, the preburying part includes embedded sleeve barrel.
Further, the embedded sleeve barrel is screw shell.
Further, the body of rod is screw-rod structure.
Further, the dowel is reinforcing bar.
Further, preformed groove is further included;
The preformed groove is set on the joint face of the sleeper ontology.
Further, the preburying part is set in the preformed groove.
The utility model also provides a kind of prefabricated sleeper and prefabricated panel connection structure, including wallboard body and as the aforementioned Prefabricated sleeper;
The joint face of the wallboard body is equipped with preburying part;
Preburying part on the sleeper ontology is connect with the preburying part in the wallboard body by the connecting portion.
Further, the joint face of the wallboard body is equipped with preformed groove.
Prefabricated sleeper provided by the utility model and prefabricated sleeper and prefabricated panel connection structure, preburying part are set on sleeper sheet The joint face of body, connecting portion is set in preburying part, makes the preburying part of sleeper ontology and wallboard body or other components mutual Connection causes sleeper ontology to be connect with wallboard body or other components, avoids connection structure so as to which connecting portion coordinates with preburying part Part goes out muscle, and the connecting elements for solving the problems, such as assembly of shear wall structure is not easy to installation, suitable for promoting and applying.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution of the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be the utility model some embodiments, for those of ordinary skill in the art, do not paying creativeness Under the premise of labour, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is a kind of structure diagram of prefabricated sleeper provided by the utility model;
Fig. 2 is a kind of another structure diagram of prefabricated sleeper provided by the utility model;
Fig. 3 is a kind of another structure diagram of prefabricated sleeper provided by the utility model;
Fig. 4 is the structure diagram of connection ring in a kind of prefabricated sleeper provided by the utility model.
Reference numeral:
1- preburying parts;2- connecting portions;3- wallboard bodies;
4- sleeper ontologies;6- preformed grooves;21- connection rings;
22- dowels;The 211- bodies of rod;212- ring bodies.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model part of the embodiment, instead of all the embodiments.Based on the embodiment in the utility model, sheet Field those of ordinary skill all other embodiments obtained without making creative work, belong to this practicality Novel protected range.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instructions such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only The utility model must have specific with the device or element for simplifying description rather than instruction or hint meaning for ease of description Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.In addition, term " the One ", " second ", " third " are only used for description purpose, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integrally Connection;Can be mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, It can be the connection inside two elements.For the ordinary skill in the art, can above-mentioned art be understood with concrete condition Concrete meaning of the language in the utility model.
Embodiment one:
In the alternative of the present embodiment, a kind of prefabricated sleeper provided in this embodiment, including preburying part 1, connecting portion 2 And sleeper ontology 4;
The preburying part 1 is set on the joint face of the sleeper ontology 4;
The connecting portion 2 includes connection ring 21 and dowel 22;The connection ring 21 is movably arranged in the preburying part 1; The dowel 22 is movably arranged in the connection ring 21.
Most of structural system node of existing fabricated shear wall is connected using sleeper, and existing sleeper goes out muscle, Inconvenience is brought, and the steel bar arrangement of existing sleeper is complicated, is installed to component to component installation, production and transport Bring more inconvenience.
In the present embodiment, connecting portion 2 is movably connected in preburying part 1, by sleeper ontology 4 and wallboard body 3 or other Component connects, so as to be connected adjacent two pieces of wallboard bodies 3 or be connected with each other other components;Preburying part 1 is matched with connecting portion 2 It closes and uses, instead of the connection mode of existing sleeper connecting elements, avoid the problem that connecting elements goes out muscle so that wallboard body 3 connection and wallboard body 3 and the connection of other structures component with sleeper ontology 4 is more convenient, also eliminates existing company A variety of inconvenience in production that connection member is brought due to steel bar arrangement complexity, while also avoid the inconvenience in transport.
Specifically, connecting portion 2 includes connection ring 21 and dowel 22;Connection ring 21 is movably arranged in preburying part 1;Dowel 22 are movably arranged in connection ring 21, and the preburying part 1 on sleeper ontology 4 can be made to be connect with the preburying part 1 in wallboard body 3, into And adjacent two pieces of wallboard bodies 3 are connected with each other.
That is, dowel 22 is movably set in connection ring 21, connection ring 21 is movably arranged in preburying part 1 again.
When sleeper ontology 4 is connect with wallboard body 3, make mutual corresponding joint face between sleeper ontology 4 and wallboard body 3 On connection ring 21 be overlapped, and overlapping connection ring 21 in be inserted into dowel 22, i.e., by dowel 22 by sleeper ontology 4 with Connection ring 21 in wallboard body 3 is cascaded, and then pours into slurry, and slurry fills up the company of sleeper ontology 4 and wallboard body 3 The connection between sleeper ontology 4 and wallboard body 3 is realized in gap between junction.
Specifically, two pieces of wallboard bodies 3 can realize that a word connects by sleeper ontology 4, that is, two pieces of wallboard bodies 3 after connecting In the same plane;Two pieces of wallboard bodies 3 also can realize that corner connects by sleeper ontology 4, that is, two pieces of wallboard bodies 3 after connecting Between into angle;Frequently, two pieces of wallboard bodies 3 are connected at a right angle by sleeper ontology 4.
It is appreciated that the preburying part 1 on sleeper ontology 4 is set on the position of respective joint face with the preburying part 1 in wallboard body 3 Put can difference, during in order to be connected with each other, sleeper ontology 4 and the preburying part 1 in wallboard body 3 can mutual dislocation, and then Can be overlapped, so as to which the connection ring 21 being connected on preburying part 1 can be overlapped.
Specifically, sleeper ontology 4 is set with 1 mutual dislocation of preburying part on the opposite joint face of wallboard body 3, and same The relative position of preburying part 1 on the different joint faces of one sleeper ontology 4 is identical, meanwhile, the left and right of same wallboard body 3 two The relative position of preburying part 1 on joint face is identical, the relative position of preburying part 1 on upper and lower two joint faces is also identical, this The standardization of sleeper ontology 4 and wallboard body 3 can just be helped somewhat to so that sleeper ontology 4 and wallboard body 3 Can obtain it is quick, produce in bulk.
Also, it is to be understood that sleeper ontology 4 can be there are many structure type, as shown in Figure 1, for " L-type sleeper ";Such as Fig. 2 institutes Show, be " T-shaped sleeper ";As shown in figure 3, for " cross sleeper ".
In the alternative of the present embodiment, as shown in figure 4, connection ring 21 includes the body of rod 211 and ring body 212;The body of rod 211 One end is movably arranged in preburying part 1, and ring body 212 is fixed at 211 other end of the body of rod.
In the present embodiment, ring body 212 is connected to by the body of rod 211 on preburying part 1.
In the alternative of the present embodiment, preburying part 1 includes embedded sleeve barrel.
In the alternative of the present embodiment, embedded sleeve barrel uses screw shell.
In the alternative of the present embodiment, the body of rod 211 uses screw-rod structure.
In the present embodiment, screw-rod structure is connected with screw shell, easy to connect.
In the alternative of the present embodiment, dowel 22 uses reinforcing bar.
In the present embodiment, dowel 22, i.e. reinforcing bar penetrate ring body 212, will be more on sleeper ontology 4 and wallboard body 3 A ring body 212 is connected;It is easier for installation using reinforcing bar so that the structure of 2 entirety of connecting portion is simpler, meanwhile, reinforcing bar is Building trade is often relatively easy to, also, also allow for bulk transport with component, production and acquisition.
In the alternative of the present embodiment, preformed groove 6 is further included;Preformed groove 6 is used for the connection set on sleeper ontology 4 Face.
In the present embodiment, preformed groove 6 can accommodate connection slurry, by dowel 22 by sleeper ontology 4 and wallboard sheet After connection ring 21 on body 3 is cascaded, slurry is poured into, slurry fills up preformed groove 6 and sleeper ontology 4 and wallboard body 3 Joint face between gap so that the connection of sleeper ontology 4 and wallboard body 3 is more firm.
In the alternative of the present embodiment, preburying part 1 is set in preformed groove 6.
In the present embodiment, preburying part 1 is mounted in preformed groove 6 rather than is directly installed on the joint face of sleeper ontology 4 On so that it can be linked into an integrated entity between sleeper ontology 4 and wallboard body 3 with smaller gap so that connected by wallboard body 3 The structure of the wall formed is more stablized.
It is appreciated that the quantity of preformed groove 6 is identical with the quantity of preburying part 1, alternatively, the quantity of preformed groove 6 is more than pre-buried The quantity in portion 1;The interval of multiple preformed grooves 6 on the same joint face of sleeper ontology 4 is uniformly arranged.
Embodiment two:
In the alternative of the present embodiment, a kind of prefabricated sleeper provided in this embodiment and prefabricated panel connection structure, Prefabricated sleeper including wallboard body 3 and as described in embodiment one;
The joint face of wallboard body 3 is equipped with preburying part 1;
Preburying part 1 on sleeper ontology 4 is connect with the preburying part 1 in wallboard body 3 by connecting portion 2.
In the present embodiment, when sleeper ontology 4 is connect with wallboard body 3, make connection ring 21 and wallboard on sleeper ontology 4 Connection ring 21 on ontology 3 is overlapped, and dowel 22 is inserted into the connection ring 21 of overlapping, then pours into slurry, slurry fills up Sleeper ontology 4 and the company of wallboard body 3 are realized in gap between the joint face of sleeper ontology 4 and the joint face of wallboard body 3 It connects.
In the alternative of the present embodiment, the joint face of wallboard body 3 is additionally provided with preformed groove 6.
In the present embodiment, the preburying part 1 of wallboard body 3 can be mounted in its preformed groove 6 rather than be directly installed on wall On the joint face of plate ontology 3 so that can be linked into an integrated entity between sleeper ontology 4 with smaller gap.
Also, the quantity of preformed groove 6 is identical with the quantity of preburying part 1, alternatively, the quantity of preformed groove 6 is more than preburying part 1 Quantity;The interval of multiple preformed grooves 6 on the same joint face of wallboard body 3 is uniformly arranged.
It is appreciated that sleeper ontology 4 can meet differently use demand there are many structure type;Specifically, " L-type is dark The interconnection of two pieces of wallboard bodies 3 can be achieved in column ";The interconnection of three pieces of wallboard bodies 3 can be achieved in " T-shaped sleeper ";" cross The interconnection of four pieces of wallboard bodies 3 can be achieved in type sleeper ".
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should Understand:It can still modify to the technical solution recorded in foregoing embodiments either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacement, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of prefabricated sleeper, which is characterized in that including preburying part (1), connecting portion (2) and sleeper ontology (4);
The preburying part (1) is set on the joint face of the sleeper ontology (4);
The connecting portion (2) includes connection ring (21) and dowel (22);
The connection ring (21) is movably arranged in the preburying part (1);
The dowel (22) is movably arranged in the connection ring (21).
2. prefabricated sleeper according to claim 1, which is characterized in that the connection ring (21) includes the body of rod (211) and ring Body (212);
The described body of rod (211) one end is movably arranged in the preburying part (1);
The ring body (212) is fixed at the body of rod (211) other end.
3. prefabricated sleeper according to claim 1, which is characterized in that the preburying part (1) is including embedded sleeve barrel.
4. prefabricated sleeper according to claim 3, which is characterized in that the embedded sleeve barrel is screw shell.
5. prefabricated sleeper according to claim 2, which is characterized in that the body of rod (211) is screw-rod structure.
6. prefabricated sleeper according to claim 1, which is characterized in that the dowel (22) is reinforcing bar.
7. prefabricated sleeper according to claim 1, which is characterized in that further include preformed groove (6);
The preformed groove (6) is set on the joint face of the sleeper ontology (4).
8. prefabricated sleeper according to claim 7, which is characterized in that the preburying part (1) is set on the preformed groove (6) It is interior.
9. a kind of prefabricated sleeper and prefabricated panel connection structure, which is characterized in that including wallboard body (3) and such as claim 1- The prefabricated sleeper of 8 any one of them;
The joint face of the wallboard body (3) is equipped with preburying part (1);
Preburying part (1) on the sleeper ontology (4) passes through the connecting portion with the preburying part (1) in the wallboard body (3) (2) it connects.
10. prefabricated sleeper according to claim 9 and prefabricated panel connection structure, which is characterized in that the wallboard body (3) joint face is equipped with preformed groove (6).
CN201721656467.7U 2017-12-01 2017-12-01 Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure Active CN207525899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721656467.7U CN207525899U (en) 2017-12-01 2017-12-01 Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721656467.7U CN207525899U (en) 2017-12-01 2017-12-01 Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure

Publications (1)

Publication Number Publication Date
CN207525899U true CN207525899U (en) 2018-06-22

Family

ID=62578578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721656467.7U Active CN207525899U (en) 2017-12-01 2017-12-01 Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure

Country Status (1)

Country Link
CN (1) CN207525899U (en)

Similar Documents

Publication Publication Date Title
CN207512932U (en) Prefabricated panel and precast floor slab connection structure
CN208251372U (en) A kind of assembled steel reinforced concrete shear force wall
CN204456877U (en) For the split bolt syndeton of construction formwork
CN207525899U (en) Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure
CN204590589U (en) Precast facade level connection joint ater-casting steel template
CN207525900U (en) Prefabricated panel
CN207211400U (en) Suitable for the outer wall of basement seal plate of tape frame post
CN204715739U (en) A kind of shear wall formwork ruggedized construction
CN204940585U (en) The precast wall body of assembled-type house
CN204370700U (en) Built-in pipe reinforcement lapping connection component
CN207499205U (en) Prefabricated panel and prefabricated foundation connection structure
CN207959596U (en) Shear wall connection structure and shear wall connect system
CN204738446U (en) Prefabricated restraint concrete shear force wall wallboard
CN211172507U (en) Novel energy-saving building wall
CN204001431U (en) The connection grout sleeve of prefabricated member reinforcing steel bar
CN210562651U (en) Prefabricated concrete wallboard and building main body's assembled connection structure
CN203145457U (en) Wall column external angle formwork connecting member
CN209494093U (en) A kind of assembled architecture installation curtain wall connection component
CN209585295U (en) Tower crane attaches wall built-in fitting
CN207419781U (en) A kind of T shaped steels pipe bundle combinations welding structure device
CN207892016U (en) A kind of H profile steel combination pedestal in house
CN104790566A (en) Prefabricated embedded column overlapped plate type shear wall component with end sealing plates
CN109372251A (en) It is a kind of can rapid shaping construction processes steel form
CN210238799U (en) Prefabricated rectangular column for prefabricated building and prefabricated rectangular column and prefabricated beam combined connection structure
CN209025466U (en) For multilayer assembled architecture dry wall slab anchor ring structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 102200 1st floor, building 6, No.8 Beiqing Road, Huilongguan town, Changping District, Beijing

Patentee after: Sany Construction Technology Co.,Ltd.

Address before: 102206, Beijing Changping District Huilongguan North Road 31 Industrial Park

Patentee before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address