CN207513188U - A kind of piping installation of multi-joint foldable form - Google Patents
A kind of piping installation of multi-joint foldable form Download PDFInfo
- Publication number
- CN207513188U CN207513188U CN201720454076.0U CN201720454076U CN207513188U CN 207513188 U CN207513188 U CN 207513188U CN 201720454076 U CN201720454076 U CN 201720454076U CN 207513188 U CN207513188 U CN 207513188U
- Authority
- CN
- China
- Prior art keywords
- pipe group
- group
- tube
- tubes
- elbow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joints Allowing Movement (AREA)
Abstract
The utility model provides a kind of piping installation of multi-joint foldable form, and including pipe group single-piece, the pipe group single-piece is made of more U-tubes and multiple elbows either more U-tubes, more straight tubes and multiple elbows;The piping installation is preferably formed by that can change the folded tube group of length, fixing pipe group and can change the swing pipe group in orientation.Using the technical solution of the utility model, effect is:The structure of pipe group single-piece is simplified, and its spatial position can be changed according to actual demand by the pipe group single-piece of this structure design, highly practical.
Description
Technical field
The utility model is related to technical field of concrete construction, and in particular to a kind of pipeline dress of multi-joint foldable form
It puts.
Background technology
During tunnel double-lining concrete construction, need concrete pumping to template and excavation face through different location in template
Between cavity in complete to pour.At present, it is connected between pump tubing length by pipe clamp with sealing ring, then platform is fixed on by fixed frame
Che Shang.Concrete pumping interface is needed replacing when changing delivery position in construction, the pumping that need to stop concrete being assisted by several people
It is same first to remove pipe clamp, sealing ring, the pump line on pump line, it is heavy after the pump line of suitable length to be replaced and the outlet of adjustment conduit positions
Newly with being installed and being fixed again after next pumping interface docking, pump concrete is then proceeded to.In the pump line changed
Remaining concrete need to be cleared up and be cleaned in time.
Defect is:Pump line is longer, heavier, troublesome in poeration and dangerous in the narrow space of trolley top;Pump
Between pipe using pipe clamp, sealing ring installation is fixed and sealing, frequently replace pumping interface, every time more alias be required to tear open pipe,
Pipe is changed, cleans, take over and fixes, installation contraposition is difficult, and workload and labor intensity are big, and time-consuming;When pump concrete interrupts
Between it is long, the loss of the slump that is trapped in pump line easily causes plugging, and newly-laid concrete and pours before
Concrete, which easily forms cold seam, influences pouring quality;It frequently replaces and pumps interface, residual concrete in the concrete and pipe of spilling
Cleaning, cause waste and scene pollution.
In conclusion being badly in need of that a kind of structure is simplified, the piping installation of easy to operate multi-joint foldable form is to solve
Problems of the prior art.
Utility model content
The utility model aim be to provide a kind of structure simplify, easy to operate and spatial position can according to actual conditions into
The piping installation for the multi-joint foldable form that row changes, specific technical solution are as follows:
A kind of piping installation of multi-joint foldable form, including pipe group single-piece, the pipe group single-piece by more U-tubes and
Multiple elbows either more U-tubes, more straight tubes and multiple elbows composition.
It is preferred in above technical scheme, the piping installation include changing folded tube group, the fixing pipe group of length with
And the swing pipe group in orientation can be changed, the arrival end rotary type flexible connection concrete conveyance outer tube or mixed of the folded tube group
Solidifying soil delivery pump, the both ends of the fixing pipe group are respectively communicated with the port of export of the folded tube group and the entrance of the swing pipe group
End, the port of export connection concrete conveyance outer tube or concrete grouting mouth of the swing pipe group;
The folded tube group and the swing pipe group are comprising at least one set of pipe group single-piece.
In order to reach superior technique effect, further include moving trolley and walking track, the moving trolley include this
Body and ground-engaging element, the fixing pipe group setting is on the body;The ground-engaging element is arranged on the bottom of the ontology
And match with the walking track.
In order to reach superior technique effect, locking member is further included, the locking member is used for the moving trolley
It is fixed on the walking track;
The locking member and the ground-engaging element are integrated or the locking member and the running part
Part is set independently of each other, and the locking member is movably arranged on the ontology.
Preferred in above technical scheme, the folded tube group includes at least two U-tubes and at least one elbow, adjacent
Two U-tubes are arranged in series with movable connection method, and the axis of adjacent two U-tubes is located at different put down
In face;Multiple elbows are arranged on the free end of the U-tube respectively with movable connection method;In the folded tube group
The horizontal or vertical arrangement of U-tube.
The fixing pipe group includes a straight tube or at least two straight tubes for being serially connected setting;
The swing pipe group includes at least two U-tubes and two groups of elbow groups, and adjacent two U-tubes are to be flexibly connected
Mode is arranged in series, and the axis of adjacent two U-tubes is located in different planes;Elbow group includes described in every group
At least two elbows connected with movable connection method, the elbow group are arranged on the U with movable connection method respectively
On shape pipe;
The port of export axis of the swing pipe group is in 45 ° -135 ° with the fixing pipe group axis.
It is preferred in above technical scheme, on the outer wall of the junction between the U-tube and the elbow, two adjacent
On the outer wall of junction on the outer wall of junction between the U-tube, between adjacent two straight tubes, the straight tube with
It is equipped on the outer wall of junction on the outer wall of junction between the elbow and between the two neighboring elbow close
Sealing assembly.
Preferred in above technical scheme, the seal assembly is made of pipe clamp and seal washer.
Using the technical solution of the utility model, have the advantages that:
(1) piping installation of the multi-joint foldable form of the utility model include pipe group single-piece, the pipe group single-piece by
More U-tubes and multiple elbows either more U-tubes, more straight tubes and multiple elbows composition.The structure essence of pipe group single-piece
Letter, and its spatial position can be changed according to actual demand by the pipe group single-piece of this structure design, it is highly practical.
(2) the utility model includes that the folded tube group of length, fixing pipe group and the swing that can change orientation can be changed
Pipe group, the arrival end rotary type flexible connection concrete conveyance outer tube or concrete pump of the folded tube group are described solid
The both ends of fixed tube group are respectively communicated with the port of export of the folded tube group and the arrival end of the swing pipe group, the swing pipe group
Arrival end connects concrete conveyance outer tube or concrete grouting mouth, by the swing of swing pipe group and flexible can realize the port of export
The transformation of first and end plan-position meets the needs of concrete grouting process.
(3) moving trolley is further included in the utility model and walking track, the moving trolley include ontology and row
Component is walked, the fixing pipe group setting is on the body;The ground-engaging element be arranged on the bottom of the ontology and with it is described
Walking track matches.Folded tube group, fixing pipe group and swing pipe group provide carrier and power part, by moving trolley and
The movement of fixing pipe group carries out folding and unfolding so as to change entering for the port of export of swing pipe group and folded tube group so as to Foldable pipe group
The transformation of mouth end lengthwise position, meets concrete grouting demand.
(4) locking member is further included in the utility model, the locking member is used to the moving trolley being fixed on institute
It states on walking track and (limits the relative position between the moving trolley and the walking track), it is ensured that the stabilization of construction
Property;There are many structure types of the locking member and the ground-engaging element:The first, both be integrated;Secondth,
The locking member and the ground-engaging element are set independently of each other, and the locking member is movably arranged on the ontology.Meet
Different demands.
(5) folded tube group described in the utility model includes at least two U-tubes and at least one elbow, the fixing pipe
Group includes a straight tube or at least two straight tubes for being serially connected setting, and the swing pipe group includes two U-tubes and two groups
Elbow group, elbow group described in every group include two two elbows connected with movable connection method.The U-tube can be
Whole or by two elbows and a straight tube or by an elbow and a L-type pipe (by a straight tube and an elbow structure
Into) acquisition is formed, structure is simplified;The concrete structure and connection relation of the folded tube group, fixing pipe group and swing pipe group, and institute
The port of export axis and the fixing pipe group axis for stating swing pipe group are in 45 ° -135 ° (preferably 90 °), can meet the needs of real,
It is highly practical.
(6) on the outer wall of the junction between U-tube described in the utility model and the elbow, adjacent two U
On the outer wall of junction on the outer wall of junction between shape pipe, between adjacent two straight tubes, the straight tube with it is described
Sealing group is equipped on the outer wall of junction on the outer wall of junction between elbow and between the two neighboring elbow
Part.The design of seal assembly can not only reinforce connection, but also can play sealing function well;The seal assembly is by pipe clamp
It is formed with seal washer, component is easy to get, and can realize the double requirements of reinforcing and sealing.
Other than objects, features and advantages described above, the utility model also has other purposes, feature and excellent
Point.Below with reference to figure, the utility model is described in further detail.
Description of the drawings
The attached drawing for forming the part of the application is used to provide a further understanding of the present invention, the utility model
Illustrative embodiments and their description do not form the improper restriction to the utility model for explaining the utility model.In attached drawing
In:
Fig. 1 is that (swing pipe group is there are three position for the structure diagram of the piping installation of the multi-joint foldable form of embodiment 1
Put state);
Fig. 2 is the structure diagram when piping installation of multi-joint foldable form in Fig. 1 is located at two positions;
Fig. 3 is structure diagram when folded pipeline folds;
Fig. 4 is structure diagram when folded pipeline is opened;
Wherein, 1, folded tube group, 2, fixing pipe group, 3, swing pipe group, 4, moving trolley, 4.1, ontology, 4.2, running part
Part, 5, walking track, 6, seal assembly;
A, U-tube, B, elbow, C, straight tube.
Specific embodiment
The embodiment of the utility model is described in detail below in conjunction with attached drawing, but the utility model can be according to power
Profit requirement limits and the multitude of different ways of covering is implemented.
Embodiment 1:
A kind of piping installation of multi-joint foldable form, including an at least pipe group single-piece, pipe group single-piece is by more U-tubes
A and multiple elbow B either more U-tube A, more straight tube C and multiple elbow B compositions.
The piping installation of the present embodiment referring to Fig. 1 and Fig. 2 (unidirectional arrow in Fig. 1 and Fig. 2 is concrete conveyance direction,
The swing and direction of rotation of dotted line four-headed arrow in Fig. 1 for swing pipe group, the solid two-way arrow in Fig. 2 are the movement of trolley
Direction), the folded tube group 1 (referring to Fig. 3 and Fig. 4 signals) of length can be changed, fixing pipe group 2, can change orientation by specifically including
Swing pipe group 3, moving trolley 4 and walking track 5, the arrival end rotary type flexible connection concrete of the folded tube group 1
Conveying outer tube or concrete pump, the both ends of the fixing pipe group 2 are respectively communicated with the port of export and the institute of the folded tube group 1
State the arrival end of swing pipe group 3, the arrival end connection concrete conveyance outer tube or concrete grouting mouth of the swing pipe group 3, institute
Fixing pipe group 2 is stated to be arranged on the ontology 4.1 of the moving trolley 4;The ground-engaging element 4.2 is arranged on the ontology 4.1
Bottom and with it is described walking track 5 match, Details as Follows:
The folded tube group 1 and the swing pipe group 3 include at least one set of pipe group single-piece, herein preferably:The folding
Folded pipe group 1 includes two U-tube A and two elbows B, two U-tube A and is carried out so that movable connection method is (preferably hinged)
It is arranged in series, and the axis of two U-tube A is located in different planes;Two elbow B are respectively with flexible connection side
Formula is arranged on the free end of two U-tube A.The U-tube A in the folded tube group 1 can be horizontally disposed,
It can arrange, be selected according to different demands vertically.The swing pipe group 3 includes two U shape pipe A and two groups of elbow groups,
Two U-tube A are arranged in series with movable connection method, and the axis of two U shapes pipe A is located at different put down
In face;Elbow group described in every group includes two two elbow B to connect with movable connection method, elbow component described in two groups
It is not arranged on movable connection method on the free end of two U-tube A.The port of export axis of the swing pipe group 3 and institute
2 axis of fixing pipe group is stated in 90 °, other number of degrees in 45 ° -135 ° can also be selected according to actual demand.
The fixing pipe group 2 includes a straight tube C or at least two straight tube C for being serially connected setting.
The structure acquisition pattern of above-mentioned U-tube has:It is straight for the pipeline of whole U-shaped structure or by two elbows and one
Pipe assembles or is assembled by an elbow and a L-type pipe, can also use its other party that can obtain U-shaped structure
Formula.
The piping installation of the present embodiment further includes locking member (not shown), and the locking member is used to limit the movement
Position between trolley 4 and the walking track 5, the locking member and the ground-engaging element 4.2 are integrated (such as band
Have the roller group of brake) or the setting independently of each other of the locking member and the ground-engaging element 4.2 (such as ground-engaging element is
Roller group, and locking member is other component), the locking member is movably arranged on the ontology 1.
Company on the outer wall of junction between the U-tube A and the elbow B, between adjacent two U-tube A
It connects on the outer wall of the junction on the outer wall at place, between adjacent two straight tube C, between the straight tube C and the elbow B
Junction outer wall on and the two neighboring elbow B between junction outer wall on be equipped with seal assembly 6, institute
Seal assembly 6 is stated to be made of pipe clamp and seal washer.
Using the technical solution of the present embodiment, details are:
The installation of piping installation:First fixing pipe group 2 is fixed on the ontology 4.1 of trolley 4;Again by 1 He of folded tube group
Swing pipe group 3 connects that (folded tube group and swing pipe group can be assembled first respectively, refolding pipe group with fixing pipe group 2 respectively
Entirety and the entirety of swing pipe group be attached with fixing pipe group or using being attached otherwise, satisfaction makes
With demand);The port of export of swing pipe group is finally connected into concrete conveyance outer tube or concrete grouting mouth, by folded tube group
1 arrival end rotary type flexible connection concrete conveyance outer tube or concrete pump.
Filling process:After piping installation installs, start the switch of concrete pump, be in the milk.If desired change
The relative tertiary location of the entrance and exit of piping installation can move realization (such as Fig. 2) by trolley along walking track.
Using the technical solution of the utility model, effect is:(1) piping installation structure is simplified, and component is easy to get;(2)
By the flexible connection (preferably hinged) of the components such as U-tube, elbow, the spatial position of the entrance and exit of piping installation can root
(variation of a dimension can generally be changed by increasing a hinge joint) is changed according to actual demand, meets the needs of different;(3)
By the combination of trolley, walking track, folded tube group, fixing pipe group and swing pipe group, meets the needs of concrete grouting.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.
Claims (6)
1. a kind of piping installation of multi-joint foldable form, which is characterized in that the piping installation includes that length can be changed
Folded tube group (1), fixing pipe group (2) and the swing pipe group (3) that can change orientation, the arrival end of the folded tube group (1) can
Rotary flexible connection concrete conveyance outer tube or concrete pump, the both ends of the fixing pipe group (2) are respectively communicated with described
The arrival end of the port of export of folded tube group (1) and the swing pipe group (3), the port of export connection coagulation of the swing pipe group (3)
Soil conveying outer tube or concrete grouting mouth;
The folded tube group (1) and the swing pipe group (3) are comprising at least one set of pipe group single-piece, and the pipe group single-piece is by more
U-tube (A) and multiple elbows (B) or more U-tubes (A), more straight tubes (C) and multiple elbows (B) composition.
2. the piping installation of multi-joint foldable form according to claim 1, which is characterized in that further include moving trolley
(4) and walking track (5), the moving trolley (4) include ontology (4.1) and ground-engaging element (4.2), the fixing pipe group
(2) it is arranged on the ontology (4.1);The ground-engaging element (4.2) be arranged on the bottom of the ontology (4.1) and with the row
Track (5) is walked to match.
3. the piping installation of multi-joint foldable form according to claim 2, which is characterized in that further include tight lock part
Part, the locking member are used to the moving trolley (4) being fixed on the walking track (5);
The locking member and the ground-engaging element (4.2) are integrated or the locking member and the walking
Component (4.2) is set independently of each other, and the locking member is movably arranged on the ontology (4.1).
4. the piping installation of the multi-joint foldable form according to claim 1-3 any one, which is characterized in that described
Folded tube group (1) includes at least two U-tubes (A) and at least one elbow (B), and adjacent two U-tubes (A) are connected with activity
The mode of connecing is arranged in series, and the axis of adjacent two U-tubes (A) is located in different planes;Multiple elbows
(B) it is arranged on the free end of the U-tube (A) with movable connection method respectively;The U-shaped in the folded tube group (1)
Manage (A) horizontal or vertical arrangement;
The straight tube (C) that the fixing pipe group (2) is serially connected setting including a straight tube (C) or at least two;
The swing pipe group (3) includes at least two U-tubes (A) and two groups of elbow groups, and adjacent two U-tubes (A) are with work
Dynamic connection mode is arranged in series, and the axis of adjacent two U-tubes (A) is located in different planes;Described in every group
Elbow group includes at least two elbows connected with movable connection method (B), and the elbow group is respectively with flexible connection side
Formula is arranged on the U-tube (A);
The port of export axis of the swing pipe group (3) is in 45 ° -135 ° with fixing pipe group (2) axis.
5. the piping installation of multi-joint foldable form according to claim 4, which is characterized in that the U-tube (A) with
On the outer wall of junction on the outer wall of junction between the elbow (B), between adjacent two U-tubes (A), it is adjacent
Junction on the outer wall of junction between two straight tubes (C), between the straight tube (C) and the elbow (B) it is outer
Seal assembly (6) is equipped on the outer wall of junction on wall and between the two neighboring elbow (B).
6. the piping installation of multi-joint foldable form according to claim 5, which is characterized in that the seal assembly
(6) it is made of pipe clamp and seal washer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720454076.0U CN207513188U (en) | 2017-04-27 | 2017-04-27 | A kind of piping installation of multi-joint foldable form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720454076.0U CN207513188U (en) | 2017-04-27 | 2017-04-27 | A kind of piping installation of multi-joint foldable form |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207513188U true CN207513188U (en) | 2018-06-19 |
Family
ID=62531647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720454076.0U Active CN207513188U (en) | 2017-04-27 | 2017-04-27 | A kind of piping installation of multi-joint foldable form |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207513188U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798023A (en) * | 2017-04-27 | 2018-11-13 | 湖南五新隧道智能装备股份有限公司 | A kind of piping installation of multi-joint foldable form |
CN110565961A (en) * | 2019-09-17 | 2019-12-13 | 陈忠海 | Concrete pouring device |
-
2017
- 2017-04-27 CN CN201720454076.0U patent/CN207513188U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798023A (en) * | 2017-04-27 | 2018-11-13 | 湖南五新隧道智能装备股份有限公司 | A kind of piping installation of multi-joint foldable form |
CN110565961A (en) * | 2019-09-17 | 2019-12-13 | 陈忠海 | Concrete pouring device |
CN110565961B (en) * | 2019-09-17 | 2021-03-16 | 陈忠海 | Concrete pouring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207063993U (en) | Placement layer by layer material distributing machine and the lining trolley comprising this material distributing machine | |
CN108798709A (en) | Placement layer by layer material distributing machine and lining trolley comprising this material distributing machine | |
CN207513188U (en) | A kind of piping installation of multi-joint foldable form | |
CN206928950U (en) | A kind of cleaning device and the lining trolley comprising this cleaning device | |
CN209385149U (en) | Pour the automatic pouring system of mouth mechanism and lining trolley | |
CN208831012U (en) | Two lining concrete placing installations | |
CN104131818B (en) | Center rotary joint of earth pressure balance shield machine | |
CN104532845B (en) | Deep basal pit super thick concrete floor casting system and construction method | |
CN205875743U (en) | Rotatable formula concrete pump pipe device | |
CN107377548A (en) | A kind of draining piping lane is with pipeline cleaning machine people | |
CN206928952U (en) | A kind of concrete spreader | |
CN206928953U (en) | A kind of concrete spreader | |
US3519206A (en) | Traveling water supply for field irrigation system | |
CN207177929U (en) | Arc adhesion type two serves as a contrast concrete and pours elephant trunk by window | |
CN108798023A (en) | A kind of piping installation of multi-joint foldable form | |
CN207405593U (en) | A kind of integration pump lock of rotatable 90 ° of the unlatching of gate | |
CN108709019A (en) | The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components | |
CN208853390U (en) | A kind of cyclone-type oil pipeline flusher | |
CN205894260U (en) | Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more | |
CN205859607U (en) | A kind of novel public work hose station | |
CN209686551U (en) | A kind of engineering drainage pipe underground mounting structure | |
CN111379568B (en) | Automatic pouring system and pouring method of lining trolley | |
CN206888134U (en) | Sewage pipe picks out the underground pipe gallery structure outside corridor in corridor | |
CN207172419U (en) | A kind of building mixes equipment with concrete mortar | |
CN207892649U (en) | Tailings sand warehouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |