CN205894260U - Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more - Google Patents

Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more Download PDF

Info

Publication number
CN205894260U
CN205894260U CN201620839692.3U CN201620839692U CN205894260U CN 205894260 U CN205894260 U CN 205894260U CN 201620839692 U CN201620839692 U CN 201620839692U CN 205894260 U CN205894260 U CN 205894260U
Authority
CN
China
Prior art keywords
bar
straight
pumping plant
well
distribution well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620839692.3U
Other languages
Chinese (zh)
Inventor
郭亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haicheng Environmental Protection Technology (shanghai) Co Ltd
Original Assignee
Haicheng Environmental Protection Technology (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haicheng Environmental Protection Technology (shanghai) Co Ltd filed Critical Haicheng Environmental Protection Technology (shanghai) Co Ltd
Priority to CN201620839692.3U priority Critical patent/CN205894260U/en
Application granted granted Critical
Publication of CN205894260U publication Critical patent/CN205894260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model provides an it is more convenient to overhaul with the debugging, safety, and the cost is lower, take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more that efficiency is higher. It includes distributing well and prefabricated pump station, and the distributing well is connected through the connector between the pump station with prefabricating, the entry of every distributing well and export all set up the gate that can close business turn over water, remain basically stable at the bottom of the inner bottom of distributing well and the water outlet pipe. The concrete base of cooperation improved generation distributing well is raised with five concrete pillars, the middle spill that is to there is protruding reinforcing bar, distributing well bottom mid portion sets up the evagination reinforcing bar. Still there is simultaneously one set of supplementary device that examines and repair, include by straight -bar, aboveground viewing aperture, viewing aperture, first leaded light lens and second leaded light lens in the pit, first leaded light lens is installed in the upper portion of straight -bar, second leaded light lens is installed in the lower part of straight -bar, aboveground viewing aperture docks with first leaded light lens mutually, the viewing aperture docks with second leaded light lens mutually in the pit.

Description

With bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant
Technical field
This utility model is related to a kind of drainage equipment, specifically refers to a kind of band bulkhead gate and improves distribution well deposition and pacify The multi-joint cylinder pumping plant of dress mode.
Background technology
With industrial expansion, the amount of trade effluent gets more and more, and therefore occurs in that various sewage disposal devices, Pumping plant is one of them.Traditional pumping plant is to be built at the scene with concrete etc. to form, and construction period is long, usually 2- 3 months, take a substantial amount of time, material resources, financial resources.In order to increase sewage treatment capacity, the big pump of Area comparison can be built Stand.For example, the Chinese patent application of Publication No. cn102797371 discloses a kind of multiple water-pouring functions pump with high-order well Room, including two be arranged symmetrically go out pump house, middle exhalant region is connected by installing the through hole of valve additional and turning on.Each water outlet Pump house is the structures carrying hollow cavity, and hollow cavity is divided into lifting zone, exhalant region and high-order wellblock, installs in lifting zone Multiple stage water pump, lifting zone connects water inlet pipe, and exhalant region connects outlet pipe.Due to needing the area of structure built big, therefore, build Make that the cycle is long, expend the big defect of time, material resources, financial resources more prominent.Meanwhile, in this patent application, two go out pump house and divide Not do not supplied water by two water inlet pipes, and by two outlet pipe water outlets, two go out pump house each independent operating, therefore this multi-functional go out Pump house does not have water distribution function.The Chinese utility model patent application of Publication No. cn202809825u, discloses a kind of pre- Buried integrated sewage pumping plant processed, including pumping plant main body, pumping plant main body includes sump, pumping plant tank body and pumping plant control room, The side of sump is connected with the first water inlet pipe, and opposite side is connected with the import of grid adapter by the second water inlet pipe, grid Adapter is arranged in pumping plant tank body.The outlet of grid adapter is connected with pulverizing grid, is provided with water pump, water pump in pumping plant tank body It is connected with the outlet pipe of pumping plant tank body side.Described pumping plant tank body is provided with pumping plant control room, and pumping plant controls interior to be provided with control Cabinet, switch board is connected with pulverizing grid and water pump respectively.Wherein, water pump prioritizing selection is three, and dual-purpose one is standby;Pumping plant tank body is Grp high strength glass fiber reinforced plastic material, the diameter of pumping plant tank body and height determine according to flow and lift.The diameter of pumping plant tank body is optional Scope is 2~4m, and the optional scope of height of pumping plant tank body is 4~12m.However, at sewage pumping station disclosed in this utility model Reason is limited in one's ability.When demand of processing quantity increases, single sump can not meet need with combining of single prefabricated pumping plant Ask.The diameter of pps is mostly 2 meters, even if the pps of enlarged-diameter twice is also difficult to meet the demand of current treating capacity at present.And And merely expand size, difficulty can be brought to manufacture, large-sized pps also can there is a problem of limited by highway transportation.Jp is special Open flat 11061971 and disclose a kind of technical scheme being carried out water process by outlet pipeline two pumping plants of connection.It has arc Shape dress is put for distributing current.But the arrangement of its pumping plant is limited, can only be along pipeline bearing of trend, and disposal ability is limited, water distribution Nor accurately meet different demands.
For above-mentioned background, number of patent application is 2013102797589, and patent name is: the China of prefabricated pumping station system Patent proposes a kind of prefabricated pumping station system, including the prefabricated water dispensing unit and at least two being provided with least one the first water inlet Prefabricated pumping plant.Water dispensing unit is provided with least two first outlets.Two prefabricated pumping plants are respectively provided with intakes of pumping station, pumping plant Outlet and the water pump connecting with gargoyle of pumping station, the intakes of pumping station of two prefabricated pumping plants is connected to water distribution by pipeline respectively At least two first outlets of unit, the liquid pump that at least two water pumps will be flowed into by the intakes of pumping station of two prefabricated pumping plants Deliver to the gargoyle of pumping station of two prefabricated pumping plants.Water dispensing unit is configured with the water yield for adjusting at least two first outlets At least one Water outlet adjusting device.This patent application is by free group between multiple water dispensing unit and multiple prefabricated pumping plant Close, effectively solve the weak point of aforementioned various pumping station system.But the applicant of present patent application is in actual use During the prefabricated pumping station system stated, find each and every one new problems several, how the base of high water level well and prefabricated pump house is installed and do not related to again And arrive;When pumping plant needs maintenance, how to close and do not mention into water, examine after in addition i.e. water dispensing unit and prefabricated pumping plant are more than two Repair very inconvenient, once whole system goes wrong it is often necessary to arrive each pumping plant or water distribution list under staff Investigated one by one in unit.Problem is stuff in pumping plant and water dispensing unit, dark, and space is little, one on maintainer one Under shuttle between multiple units, efficiency is very low.
In sum, it is badly in need of a kind of maintenance at present and debugs convenient, safety, and cost is lower, in hgher efficiency is pre- Pumping station system processed.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of maintenance and debugs convenient, safety, and cost is more Low, in hgher efficiency with bulkhead gate and improve the multi-joint cylinder pumping plant of distribution well deposition and mounting means.
For solving above-mentioned technical problem, the technical scheme that this utility model provides is: a kind of band bulkhead gate improving is joined Well deposition and the multi-joint cylinder pumping plant of mounting means, it includes at least one distribution well and at least one prefabricated pumping plant, described Interconnected by union joint between distribution well and described prefabricated pumping plant;It is provided with the entrance and exit of each distribution well The gate of turnover aquaporin can be closed;The concrete bed of each distribution well passes through 4~6 concrete pillars supports and raises;Often It is mounted on a set of auxiliary repair device in individual distribution well and prefabricated pumping plant;Described auxiliary repair device is included by straight-bar, well The latent prestige maintenance mechanism of upper observation panel, down-hole observation panel, the first guide-lighting eyeglass and the second guide-lighting eyeglass composition;Described first is led Light eyeglass is installed on the top of straight-bar;The guide-lighting eyeglass of described second is installed on the bottom of straight-bar;On described well observation panel with First guide-lighting eyeglass connects relatively;Described down-hole observation panel is guide-lighting with second, and eyeglass is relative connects;User's sight line is by observation panel on well Enter, after sequentially passing through the first guide-lighting eyeglass, straight-bar, the second guide-lighting eyeglass and down-hole observation panel, be directed to distribution well and prefabricated Inside pumping plant;Described straight-bar is arranged on distribution well or the side wall of prefabricated pumping plant by mounting seat.
As improvement, it is rotatably connected between described straight-bar and mounting seat;Described straight-bar simultaneously can also be along installation Seat slides up and down.
As improvement, the periphery of described down-hole observation panel is provided with observation lamp;It is connected with switch on described observation lamp, Described switch is arranged on observation panel on well.
As improvement, described straight-bar is expansion link.
As improvement, described straight-bar is also equipped with rotating handles;Described rotating handles is spacing with straight-bar circumference to join Close, described rotating handles is located at the top of straight-bar.
After said structure, this utility model have the advantages that this patent creative will be based on periscope The auxiliary repair device of principle is installed in each distribution well and each prefabricated pumping plant.So user is using the maintenance of this band Gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant when, daily maintenance need not be crawled into downwards at all every time Observe it is only necessary on each prefabricated pumping plant and distribution well by observation panel on well be one by one in each prefabricated pumping plant and distribution well Following situation can easily be seen, wait discovery to need just now to go into the well to be overhauled problematicly, debugged in equipment simultaneously When, without the people that stands in each well, directly observe on well;As improvement, rotatable between straight-bar and mounting seat Connect;Described straight-bar can also slide up and down along mounting seat simultaneously.The periphery of down-hole observation panel is provided with observation lamp;Described Switch is connected with observation lamp, described switch is arranged on observation panel on well.Straight-bar is expansion link.Also pacify on described straight-bar Equipped with rotating handles;The spacing cooperation with straight-bar circumference of described rotating handles, described rotating handles is located at the top of straight-bar.This A little improve when items make to use more efficiently with convenient, the setting of light, substantially increase visibility, even prefabricated pump or join Hydrops are had also not interfere with the observation of user in well.
In sum, this utility model provides a kind of maintenance and debugs convenient, safety, and cost is lower, efficiency Higher with bulkhead gate and improve the multi-joint cylinder pumping plant of distribution well deposition and mounting means.
Brief description
Fig. 1 is with bulkhead gate and improve distribution well deposition and the multi-joint cylinder pumping plant of mounting means is being bowed in this utility model Depending on the structural representation under state.
Fig. 2 be this utility model with bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant auxiliary The structural representation of apparatus for examination and repair.
As shown in the figure: 1, distribution well, 2, prefabricated pumping plant, 3, auxiliary repair device, 4, straight-bar, 5, union joint, 6, see on well Cha Kou, 7, outlet, 8, down-hole observation panel, 9, water pump, 10, observation lamp, 11, mounting seat, the 12, first guide-lighting eyeglass, 13, second Guide-lighting eyeglass, 14, rotating handles, 15, switch, 16, gate, 17, concrete pillar.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further detail.
In conjunction with accompanying drawing 1 and accompanying drawing 2, a kind of with bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pump Stand, it includes at least one distribution well 1 and at least one prefabricated pumping plant 2, described distribution well 1 and described prefabricated pumping plant 2 it Between interconnected by union joint 5;It is provided with the gate that can close turnover aquaporin at the entrance and exit of each distribution well 1 16;The concrete bed of each distribution well 1 passes through 4~6 concrete pillars 17 supports and raises;Each distribution well 1 and prefabricated pump Stand and be mounted on a set of auxiliary repair device 3 in 2;Described auxiliary repair device 3 is included by observation panel 6, well on straight-bar 4, well Lower observation panel the 8, first leaded light eyeglass 12 and the latent prestige maintenance mechanism of the second guide-lighting eyeglass 13 composition;The guide-lighting eyeglass of described first 12 tops being installed on straight-bar 4;The guide-lighting eyeglass 13 of described second is installed on the bottom of straight-bar 4;On described well observation panel 6 with First guide-lighting eyeglass 12 connects relatively;Described down-hole observation panel 8 is guide-lighting with second, and eyeglass 13 is relative connects;User's sight line is seen by well Examine mouth 6 to enter, sequentially pass through the first guide-lighting eyeglass 12, be directed to after the guide-lighting eyeglass 13 of straight-bar 4, second and down-hole observation panel 8 Inside distribution well 1 and prefabricated pumping plant 2;Described straight-bar 4 is arranged on the side wall of distribution well 1 or prefabricated pumping plant 2 by mounting seat 11 On.
As improvement, it is rotatably connected between described straight-bar 4 and mounting seat 11;Described straight-bar 4 simultaneously can also edge Mounting seat 11 slides up and down.
As improvement, the periphery of described down-hole observation panel 8 is provided with observation lamp 10;It is connected with described observation lamp 10 Switch 15, described switch 15 is arranged on observation panel 6 on well.
As improvement, described straight-bar 4 is expansion link.
As improvement, described straight-bar 4 is also equipped with rotating handles 14;Described rotating handles 14 and straight-bar 4 circumference Spacing cooperation, described rotating handles 14 is located at the top of straight-bar 4.
After said structure, this utility model have the advantages that this patent creative will be based on periscope The auxiliary repair device of principle is installed in each distribution well 1 and each prefabricated pumping plant 2.So user is using the inspection of this band Repair gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant when, daily maintenance need not be climbed downwards at all every time Enter and observe one by one in each prefabricated pumping plant and distribution well it is only necessary to observation panel on well is passed through on each prefabricated pumping plant and distribution well 6 can easily see following situation, wait discovery to need just now to go into the well to be overhauled problematicly, are adjusted in equipment simultaneously During examination, without the people that stands in each well, directly observe on well;As improvement, can between straight-bar 4 and mounting seat 11 Rotate and connect;Described straight-bar 4 can also slide up and down along mounting seat 11 simultaneously.The periphery of down-hole observation panel 8 is provided with observation Lamp 10;Switch 15 is connected with described observation lamp 10, described switch 15 is arranged on observation panel 6 on well.Straight-bar 4 is flexible Bar.It is also equipped with rotating handles 14 on described straight-bar 4;Described rotating handles 14 and the circumferential spacing cooperation of straight-bar 4, described Rotating handles 14 is located at the top of straight-bar 4.These improve more efficiently and convenient, the setting of light when item makes to use, significantly Improve visibility, in even prefabricated pump or distribution well, have the observation that hydrops do not interfere with user yet.
In sum, this utility model provides a kind of maintenance and debugs convenient, safety, and cost is lower, efficiency Higher with bulkhead gate and improve the multi-joint cylinder pumping plant of distribution well deposition and mounting means.
It should be noted that this utility model is when actually used, the concrete number of described distribution well 1 and prefabricated pumping plant 2 Amount is not restricted, and is also all using three water pumps 9 in each prefabricated pumping plant 2;It is connected with outlet 7 on each water pump 9; Three described water pumps 9 are used cooperatively by dual-purpose one standby scheme.When being embodied as, the entrance and exit of each distribution well is all provided with Put the gate 16 that can close Inlet and outlet water, remain basically stable in the inner bottom of distribution well and water outlet pipe bottom, reduce water distribution deposition.Cooperation improves The concrete bed of type distribution well is raised with five concrete pillars 17, is spill, and has raised steel in the middle of concrete pillar 17 Muscle;Distribution well bottom center portion arranges evagination reinforcing bar, and distribution well is reliably fixedly mounted with base and is by later-stage secondary grouting Integrally.Described gate 16 passes through drive link and transmission handwheel controls folding, and described transmission handwheel is located at the top of distribution well.
Above this utility model and embodiments thereof are described, this description does not have restricted, shown in accompanying drawing Also it is one of embodiment of the present utility model, actual structure is not limited thereto.If generally speaking this area is general Logical technical staff is enlightened by it, in the case of creating objective without departing from this utility model, designing and being somebody's turn to do without creative The similar frame mode of technical scheme and embodiment, all should belong to protection domain of the present utility model.

Claims (5)

1. a kind of with bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant, it includes at least one water distribution Well (1) and at least one prefabricated pumping plant (2), pass through union joint between described distribution well (1) and described prefabricated pumping plant (2) (5) interconnect;It is characterized in that: it is provided with the entrance and exit of each distribution well (1) and turnover aquaporin can be closed Gate (16);The concrete bed of each distribution well (1) passes through 4~6 concrete pillars (17) supports and raises;Each distribution well (1) and it is mounted on a set of auxiliary repair device (3) in prefabricated pumping plant (2);Described auxiliary repair device (3) is included by straight-bar (4), the latent prestige that on well, observation panel (6), down-hole observation panel (8), the first guide-lighting eyeglass (12) and the second guide-lighting eyeglass (13) form Maintenance mechanism;The guide-lighting eyeglass (12) of described first is installed on the top of straight-bar (4);The guide-lighting eyeglass (13) of described second is installed Bottom in straight-bar (4);On described well, observation panel (6) is relative with the first guide-lighting eyeglass (12) connects;Described down-hole observation panel (8) relative with the second guide-lighting eyeglass (13) connect;User's sight line is entered by observation panel on well (6), sequentially passes through the first guide-lighting eyeglass (12), it is directed to distribution well (1) and prefabricated pumping plant (2) after straight-bar (4), the second guide-lighting eyeglass (13) and down-hole observation panel (8) Internal;Described straight-bar (4) is arranged on distribution well (1) or the side wall of prefabricated pumping plant (2) by mounting seat (11).
2. according to claim 1 with bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant, its It is characterised by: be rotatably connected between described straight-bar (4) and mounting seat (11);Described straight-bar (4) simultaneously can also be along peace Dress seat (11) slides up and down.
3. according to claim 1 with bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant, its It is characterised by: the periphery of described down-hole observation panel (8) is provided with observation lamp (10);It is connected with out on described observation lamp (10) Close (15), described switch (15) is arranged on observation panel on well (6).
4. according to claim 1 with bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant, its It is characterised by: described straight-bar (4) is expansion link.
5. according to claim 1 with bulkhead gate and improve distribution well deposition and mounting means multi-joint cylinder pumping plant, its It is characterised by: on described straight-bar (4), be also equipped with rotating handles (14);Described rotating handles (14) and straight-bar (4) circumference Spacing cooperation, described rotating handles (14) is located at the top of straight-bar (4).
CN201620839692.3U 2016-08-04 2016-08-04 Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more Active CN205894260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620839692.3U CN205894260U (en) 2016-08-04 2016-08-04 Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620839692.3U CN205894260U (en) 2016-08-04 2016-08-04 Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more

Publications (1)

Publication Number Publication Date
CN205894260U true CN205894260U (en) 2017-01-18

Family

ID=57783690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620839692.3U Active CN205894260U (en) 2016-08-04 2016-08-04 Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more

Country Status (1)

Country Link
CN (1) CN205894260U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882153A (en) * 2017-11-10 2018-04-06 广东华南泵业有限公司 It is a kind of that there are separation of solid and liquid, energy dissipating, water distribution, more pit shaft pumping plants of diversion function
CN114277886A (en) * 2021-12-08 2022-04-05 上海通一水泵(集团)有限公司 Integrated pump room without negative pressure equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882153A (en) * 2017-11-10 2018-04-06 广东华南泵业有限公司 It is a kind of that there are separation of solid and liquid, energy dissipating, water distribution, more pit shaft pumping plants of diversion function
CN107882153B (en) * 2017-11-10 2024-03-12 华南泵业有限公司 Multi-shaft pump station with solid-liquid separation, energy dissipation, water distribution and diversion functions
CN114277886A (en) * 2021-12-08 2022-04-05 上海通一水泵(集团)有限公司 Integrated pump room without negative pressure equipment

Similar Documents

Publication Publication Date Title
CN205894260U (en) Take bulkhead gate and improve section of thick bamboo pump stations that ally oneself with of distributing well deposit and mounting means more
CN106638681A (en) Integrated pipe gallery
CN104532907B (en) pump station structure
CN108086968B (en) Coal bed gas cluster well skid-mounted device
CN207001339U (en) A kind of assembled welded type external reinforcement self-cleaning water tank
CN109371891A (en) A kind of spray system
CN201760426U (en) Pipe-line system of ultrasonic cleaning machine
CN107999495A (en) A kind of intelligent automatic cask washing equipment
CN109812637A (en) A kind of concrete pump pipe connection and the concrete pump pipe structure based on the device
CN102814078B (en) Cast-in-situ terrazzo grade level polishing waste slurry recovery device
CN206785108U (en) The job site enclosing frame of multipurpose water tank watering is installed
CN207660088U (en) A kind of armored concrete water pipe cut-off equipment
CN215635132U (en) Three-purpose mixing valve
CN107083863A (en) The job site enclosing frame of multipurpose water tank watering is installed
CN214940898U (en) Landscape pool
CN206778447U (en) One kind is used for the positive backwashing system of ionic adsorption device
CN206143847U (en) Sewage selectivity recovery system and clarification plant
CN206143844U (en) Can overhaul incessant confession drainage system
CN205259317U (en) Rain sewage shunts discharge system
CN207959366U (en) Square combination formula fire water box
CN208516984U (en) Integrated elevator pump
CN208379688U (en) A kind of novel pre-treatment cistern device
CN207138388U (en) A kind of agricultural greenhouse cleaning device
CN208023644U (en) A kind of multistage absorption system absorption station inspection control device
CN209035116U (en) Finishing mill baffle device for water and finishing mill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant