monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720389325.2U
Other languages
Chinese (zh)
Inventor
冯明生
罗伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN NUOTE TECHNOLOGY Co Ltd
Original Assignee
SICHUAN NUOTE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN NUOTE TECHNOLOGY Co Ltd filed Critical SICHUAN NUOTE TECHNOLOGY Co Ltd
Priority to CN201720389325.2U priority Critical patent/CN207504640U/en
Application granted granted Critical
Publication of CN207504640U publication Critical patent/CN207504640U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses the monitoring and protecting system used in power supply unit from far-off regions, including real-time monitoring device and mobile base station;Wherein, the real-time monitoring device:Including strain transducer, GPRS module and GPS module;The GPS module obtains shaft tower position and monitoring time information, and shaft tower is carried detection data, shaft tower position and monitoring time information, is sent to signal condition and acquisition module by controller by the GPRS module;The strain transducer acquisition shaft tower temperature and strain information, are sent to signal condition and acquisition module, and the signal condition receives the information that strain transducer and controller are sent with acquisition module, communication module is sent to after processing;Further include the point-to-point devices of NFC and relay module;The point-to-point devices of NFC include being mounted on NFC submodules on the key and the NFC primary modules on batch meter lock core;Wherein, NFC main moulds number of blocks is more than or equal to 2 for 1, NFC submodule quantities.

Description

Use the monitoring and protecting system in power supply unit from far-off regions
Technical field
The utility model is related to a kind of power protection systems, and in particular to be protected using the monitoring in power supply unit from far-off regions Protecting system.
Background technology
In recent years, as ammeter is registered one's residence and the development of step price, each Utilities Electric Co. is in the base of original manually meter reading Electric power remote intelligent meter data recording is widely used on plinth.While this brings great convenience to electric-power metering charging with income, Have also discovered this pattern there are the problem of:First, the management of electric metering box is not substantially by the long-range prison of power department at present Control, can not obtain operation information of the maintenance personnel to batch meter, including operator and number of operations etc. in time;Second, illegal When person is implemented to electric metering box violence damage or power stealing illegal activities, automatic alarm can not be realized to abnormal conditions, this It just further reduced safety and the anti-theft of electric metering box.Particularly Qinghai Province is scarcely populated, along with being safeguarded power The influence of the deficiency, staff's sense of responsibility of amount, it is impossible to find that batch meter is destroyed or even some places find bird unexpectedly in time Class does the situation of nest in destroyed batch meter, this brings great security risk to the normal operation of electric metering box.
Current power transmission circuit mainly manually carrys out inspection, can only understand shaft tower and tilt and collapse, can not grasp wind load, cover It ice load and waves on the influence of the dynamic characteristics of tower structure;And conducting wire is concentrated mainly on to the on-line monitoring of transmission line of electricity at present Monitoring, monitoring means mainly include video surveillance, line oscillation and dynamic characteristics monitoring, sky are lain substantially in the monitoring of shaft tower White state, therefore, effective monitoring in real time is carried out to shaft tower just seems particularly necessary, the real time on-line monitoring of exploratory development shaft tower System contributes to the improvement of the design of shaft tower, construction, and provides warning function, is being effectively ensured for transmission line safety operation.
We need to open new tool, more objective and accurate maintenance foundation, acquire and grasp wind load, ice coating load and dance The dynamic dynamic characteristics on tower structure influences, and finds metering chamber door abnormal conditions in time, to deal carefully with as early as possible, is set for electric power Standby safe and stable operation provides a strong guarantee.
Utility model content
Technical problem to be solved in the utility model is to acquire and grasp wind load, ice coating load and wave to shaft tower knot The dynamic characteristics of structure influences, and finds metering chamber door abnormal conditions, and it is an object of the present invention to provide using in power supply unit from far-off regions in time Monitoring and protecting system, solve to acquire and grasp wind load, ice coating load and wave the dynamic characteristics of tower structure is influenced and Shi Faxian measures the problem of chamber door abnormal conditions.
The utility model is achieved through the following technical solutions:
Using the monitoring and protecting system in power supply unit from far-off regions, including real-time monitoring device and mobile base station;Wherein, The real-time monitoring device:Including strain transducer, GPRS module and GPS module;The GPS module obtains shaft tower position and prison Temporal information is surveyed, shaft tower is carried detection data, shaft tower position and monitoring time information, passes through controller by the GPRS module It is sent to signal condition and acquisition module;The strain transducer acquisition shaft tower temperature and strain information, are sent to signal condition With acquisition module, the signal condition receives the information that strain transducer and controller are sent with acquisition module, is sent after processing To communication module;Further include the point-to-point devices of NFC and relay module;The point-to-point devices of NFC include being mounted on the key NFC submodules and the NFC primary modules on batch meter lock core;Wherein, NFC main moulds number of blocks is 1, NFC submodules Quantity is more than or equal to 2;The NFC submodules:NFC presupposed informations are sent to NFC primary modules;The NFC primary modules receive information And it matches, and record NFC submodules block message and the communication module being installed on shaft tower is sent to by RS485 or the communication of remote signalling point; The relay module collects signal and is sent to communication module after handling;The communication module:Receive NFC primary modules, relay The information that device module and signal condition are sent with acquisition module;It is sent to remote server resume module and storage server mould Block;The storage server modules:Receive the information that communication module is sent;The remote server module:Receive storage service The information that device module is sent, is handled by data processing module, if beyond safety value, sends warning message to alarm module;Institute State alarm module:Timing module is connected, receives the warning message that remote server module is sent, starts SMS module and video screen module Block works, and after 20 minutes, starts voice module and LED lamp module work;Further include timer, the timer and alarm mould Block connects, and is alarm module timing.We need to open new tool, more objective and accurate maintenance foundation, acquire and grasp wind load It lotus, ice coating load and waves on the influence of the dynamic characteristics of tower structure, metering chamber door abnormal conditions is found in time, so as to appropriate as early as possible Reason is conducted oneself well, the safe and stable operation for power equipment provides a strong guarantee, and technical problem to be solved in the utility model is to adopt Collect and grasp wind load, ice coating load and wave on the influence of the dynamic characteristics of tower structure, find metering chamber door exception feelings in time Condition is, and it is an object of the present invention to provide using the monitoring and protecting system in power supply unit from far-off regions, and first, data processing module analysis is transferred The monitoring data of server are analyzed and processed, such as are more than because wind load and line oscillation, icing factor cause tower structure Bearing capacity is designed, provides early-warning and predicting;Secondly, batch meter status monitoring software is divided into two parts, and first part is to case The management and control of door lock is authorized by soft ware authorization to relevant personnel, and authorized content includes:Uncaging time section can unlock ID, unlocking person, and relevant information can be read on lockset by managing key, including:Uncaging time is unlocked ID, unlocking person, Effectively the maintenance condition of maintenance personnel can be managed in this way, while stealing row caused by also avoiding skilled unlocking For.Whether second part is the monitoring illegally opened to chamber door, by chamber door state collecting device in opening, if being in Opening, software automatic alarm simultaneously passes through before sending short messages in groups function notifies maintenance personnel and goes to handle, if related personnel does not go Processing, by accumulated time, alert levels increase, until being disposed.Also related data is arranged, is stored simultaneously And analysis, as the foundation of administrative staff's maintenance measures, NFC keys are divided into operation key and two kinds of key of management, operate key Interior battery is mating to give lock core power supply, and will open permission, temporal information with key is transmitted to lock, and key uses double verification code, Condition code and general code, have 64 ID identification codes of unique identification, and the encryption of the rank is respectively adopted in mandate and unlocking process Algorithm has the characteristics that safe, highly reliable;Management key collects unlocking information and storage is opened the door and recorded, and system is held Amount can record 3000 information, and the core that management key is applied as system can set related key by software to corollary equipment The permission and function of spoon, can be managed and tie up to specified personnel, the time specified, the door lock correlation job information specified It is fixed.
The strain information includes wind load information and icing information.Transmission line of electricity and shaft tower turn to dynamic from static measurement It measures, that is, considers tower structure load-bearing monitor and the analyzing and processing of bar wind load, ice coating load, early-warning and predicting is provided.
Further include cancellation alarm module, the remote server module can remote opening cancel alarm module, cancel alarm After module is opened, alarm module is stopped.Preferred embodiment as the utility model.
The relay module uses contact-relay or honeywell switch sensor.Preferred side as the utility model Case, using contact-relay.
The presupposed information of the NFC submodules is including uncaging time section, can unlock ID, unlocking person, as the utility model Preferred embodiment, preset these types information.
The utility model compared with prior art, has the following advantages and advantages:
1st, the utility model uses the monitoring and protecting system in power supply unit from far-off regions, and data processing module analysis is transferred The monitoring data of server are analyzed and processed, such as are more than because wind load and line oscillation, icing factor cause tower structure Bearing capacity is designed, provides early-warning and predicting;
2nd, the utility model uses the monitoring and protecting system in power supply unit from far-off regions, and first part is to lock for box door Management and control, authorized by soft ware authorization to relevant personnel, authorized content includes:Uncaging time section, is unlocked at the ID that can unlock People, and relevant information can be read on lockset by managing key, including:Uncaging time is unlocked ID, unlocking person, in this way may be used Effectively the maintenance condition of maintenance personnel is managed, while also avoids electricity stealing caused by skilled unlocking;
3rd, the utility model uses the monitoring and protecting system in power supply unit from far-off regions, and second part is illegal to chamber door The monitoring of unlatching, whether by chamber door state collecting device in opening, if in opening, software automatic alarm is simultaneously It goes to handle before notifying maintenance personnel by sending short messages in groups function, if related personnel does not go to handle, by accumulated time, grade of alarming Do not increase, until being disposed.
Description of the drawings
Attached drawing described herein is used for providing further understanding the utility model embodiment, forms the one of the application Part does not form the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is the utility model clone system structure schematic diagram.
Specific embodiment
For the purpose of this utility model, technical solution and advantage is more clearly understood, with reference to embodiment and attached drawing, The utility model is described in further detail, and the exemplary embodiment and its explanation of the utility model are only used for explaining this Utility model is not intended to limit the scope of the present invention.
Embodiment
As shown in Figure 1, the utility model uses the monitoring and protecting system in power supply unit from far-off regions, including monitoring in real time Device and mobile base station;Wherein, the real-time monitoring device:Including strain transducer, GPRS module and GPS module;The GPS Module obtains shaft tower position and monitoring time information, and shaft tower is carried detection data, shaft tower position and monitoring by the GPRS module Temporal information is sent to signal condition and acquisition module by controller;The strain transducer acquires shaft tower temperature and should Become information, be sent to signal condition and acquisition module, the signal condition receives strain transducer and controller with acquisition module The information of transmission is sent to communication module after processing;Further include the point-to-point devices of NFC and relay module;The NFC is point-to-point Device includes being mounted on NFC submodules on the key and the NFC primary modules on batch meter lock core;Wherein, NFC master Module number is that 1, NFC submodule quantities are more than or equal to 2;The NFC submodules:NFC presupposed informations are sent to NFC primary modules; The NFC primary modules receive information and match, and record NFC submodules block message and be sent to peace by RS485 or the communication of remote signalling point Loaded on the communication module on shaft tower;The relay module collects signal and is sent to communication module after handling;The communication mould Block:Receive the information that NFC primary modules, relay module and signal condition are sent with acquisition module;It is sent to remote server mould Block processing and storage server modules;The storage server modules:Receive the information that communication module is sent;The remote service Device module:The information that storage server modules are sent is received, is handled by data processing module, if beyond safety value, sends report Information is warned to alarm module;The alarm module:Timing module is connected, receives the warning message that remote server module is sent, Start SMS module and video module work, after 20 minutes, start voice module and LED lamp module work;Further include timing Device, the timer are connected with alarm module, are alarm module timing.The strain information includes wind load information and icing is believed Breath.Further include cancellation alarm module, the remote server module can remote opening cancel alarm module, cancel alarm module and open Qi Hou, alarm module are stopped.The relay module uses contact-relay;The presupposed information packet of the NFC submodules Include uncaging time section, can unlock ID, unlocking person.During work:According to the connection of the structure of shaft tower and conducting wire, crucial forced section is found out Position;Residual Loading Capacity judgement is carried out according to the detection data of strain transducer, sends out and is supervised when beyond design bearing capacity The early warning of the shaft tower of survey.
Above-described specific embodiment, the purpose of this utility model, technical solution and advantageous effect have been carried out into One step is described in detail, it should be understood that the foregoing is merely specific embodiment of the present utility model, is not used to limit Determine the scope of protection of the utility model, within the spirit and principle of the utility model, any modification for being made equally is replaced It changes, improve, should be included within the scope of protection of this utility model.

Claims (5)

1. use the monitoring and protecting system in power supply unit from far-off regions, it is characterised in that:Including real-time monitoring device and movement Base station;Wherein, the real-time monitoring device:Including strain transducer, GPRS module and GPS module;The GPS module obtains bar Shaft tower is carried detection data, shaft tower position and monitoring time information by tower position and monitoring time information, the GPRS module, Signal condition and acquisition module are sent to by controller;The strain transducer acquisition shaft tower temperature and strain information, send To signal condition and acquisition module, the signal condition receives the information that strain transducer and controller are sent with acquisition module, Communication module is sent to after processing;
Further include the point-to-point devices of NFC and relay module;The point-to-point devices of NFC include being mounted on NFC on the key Module and the NFC primary modules on batch meter lock core;Wherein, NFC main moulds number of blocks is more than for 1, NFC submodule quantities Equal to 2;The NFC submodules:NFC presupposed informations are sent to NFC primary modules;The NFC primary modules receive information and match, and Record NFC submodules block message is sent to the communication module being installed on shaft tower by RS485 or the communication of remote signalling point;The relay Communication module is sent to after module collection signal and processing;
The communication module:Receive the information that NFC primary modules, relay module and signal condition are sent with acquisition module;It sends To remote server resume module and storage server modules;
The storage server modules:Receive the information that communication module is sent;
The remote server module:The information that storage server modules are sent is received, is handled by data processing module, if super Go out safety value, send warning message to alarm module;
The alarm module:Connect timing module, receive the warning message that remote server module is sent, start SMS module and Video module works, and after 20 minutes, starts voice module and LED lamp module work;
Timer is further included, the timer is connected with alarm module, is alarm module timing.
2. use according to claim 1 is in the monitoring and protecting system of power supply unit from far-off regions, it is characterised in that:It is described Strain information includes wind load information and icing information.
3. use according to claim 1 is in the monitoring and protecting system of power supply unit from far-off regions, it is characterised in that:Also wrap Include cancellation alarm module, the remote server module can remote opening cancel alarm module, cancel after alarm module opens, report Alert module from service.
4. use according to claim 1 is in the monitoring and protecting system of power supply unit from far-off regions, it is characterised in that:It is described Relay module uses contact-relay or honeywell switch sensor.
5. use according to claim 1 is in the monitoring and protecting system of power supply unit from far-off regions, it is characterised in that:It is described The presupposed information of NFC submodules is including uncaging time section, can unlock ID, unlocking person.
CN201720389325.2U 2017-04-14 2017-04-14 Use the monitoring and protecting system in power supply unit from far-off regions Expired - Fee Related CN207504640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720389325.2U CN207504640U (en) 2017-04-14 2017-04-14 Use the monitoring and protecting system in power supply unit from far-off regions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720389325.2U CN207504640U (en) 2017-04-14 2017-04-14 Use the monitoring and protecting system in power supply unit from far-off regions

Publications (1)

Publication Number Publication Date
CN207504640U true CN207504640U (en) 2018-06-15

Family

ID=62496534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720389325.2U Expired - Fee Related CN207504640U (en) 2017-04-14 2017-04-14 Use the monitoring and protecting system in power supply unit from far-off regions

Country Status (1)

Country Link
CN (1) CN207504640U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107121580A (en) * 2017-04-14 2017-09-01 四川诺特科技有限公司 It is a kind of can omnibearing protection power equipment warning system
CN112365186A (en) * 2020-11-27 2021-02-12 中国电建集团海外投资有限公司 Health degree evaluation method and system for electric power information system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107121580A (en) * 2017-04-14 2017-09-01 四川诺特科技有限公司 It is a kind of can omnibearing protection power equipment warning system
CN112365186A (en) * 2020-11-27 2021-02-12 中国电建集团海外投资有限公司 Health degree evaluation method and system for electric power information system

Similar Documents

Publication Publication Date Title
CN105182032B (en) Electricity meter box intelligent management system
CN108107801A (en) A kind of system and method for being used to carry out batch meter intelligent protection
CN105389873A (en) Monitoring system for electric energy metering device
CN107093238B (en) A kind of intelligent door lock system
CN207504640U (en) Use the monitoring and protecting system in power supply unit from far-off regions
CN109577376A (en) A kind of smart well cover lock
GB2533964A (en) Padlock
CN111142465A (en) Intelligent manhole cover lock monitoring management system and method
CN101673425B (en) State real-time monitoring system aiming at carrier device
CN105807680A (en) GPS based mechanical lock, vehicle compartment specified location unlocking system and method
JP2011188474A (en) Communicating apparatus and equipment logging method
CN208126141U (en) A kind of system for carrying out intelligent protection to batch meter
CN201377223Y (en) Intelligent electronic lock monitoring system applied to outdoor telecommunication rooms and cabinets
CN205375612U (en) Terminal and corresponding electric energy metering device monitored control system
CN109765834A (en) A kind of workshop comprehensive monitoring system and method
CN208207842U (en) Power distribution room safety management system
KR20190003607A (en) Sealing system and method of installing sealing system
CN107054297A (en) A kind of theft preventing method
CN110189458A (en) A kind of prison access way gate inhibition remote-control system
CN109035535A (en) A kind of novel intelligent face recognition door control system
CN209657134U (en) A kind of workshop comprehensive monitoring system
CN102493720B (en) Safety anti-theft system for outdoor distribution network cabinet door
CN202522901U (en) Electric power metering equipment distribution and monitoring device and metering equipment distribution vehicle
CN109360313A (en) NB-IoT electronic lock system and management method for room entry/exit management between grain depot storehouse for grain, etc.
CN110185336A (en) Electronic type Intelligent lock device and control method applied to electric power bin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615

Termination date: 20210414