CN207498840U - The bridge hanging basket that can be broken the barriers - Google Patents

The bridge hanging basket that can be broken the barriers Download PDF

Info

Publication number
CN207498840U
CN207498840U CN201721566731.8U CN201721566731U CN207498840U CN 207498840 U CN207498840 U CN 207498840U CN 201721566731 U CN201721566731 U CN 201721566731U CN 207498840 U CN207498840 U CN 207498840U
Authority
CN
China
Prior art keywords
bridge
barriers
wire rope
steel wire
intermediate arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721566731.8U
Other languages
Chinese (zh)
Inventor
徐琨
殷文杰
王坤
马永胜
张灿柱
韩冰
李连军
张元明
刘晓东
杨进勇
左建伟
刘国栋
安智敏
李国儒
杨万桥
孟庆宇
马霞
孔祥璐
李虎
梁纪钢
张传峰
王强
王海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Communications Planning and Design Institute Co Ltd
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Provincial Communications Planning and Design Institute Co Ltd
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Communications Planning and Design Institute Co Ltd, Shandong Luqiao Group Co Ltd filed Critical Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority to CN201721566731.8U priority Critical patent/CN207498840U/en
Application granted granted Critical
Publication of CN207498840U publication Critical patent/CN207498840U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is mainly used in road and bridge service technique field, more particularly to a kind of bridge hanging basket to break the barriers, overhanging running gear including being arranged on bridge both sides, overhang running gear and include pedestal, base bottom sets idler wheel, top sets supporting rack, cantilever is distributed at the top of supporting rack, cantilever includes side arm and the intermediate arm between side arm, side arm and intermediate arm end are all connected with steel wire rope, the end of steel wire rope is all connected with job platform, guide groove is set on intermediate arm, guide groove outer end is installed by directive wheel, the steel cord ends being connect with intermediate arm pass through directive wheel successively, guide groove connects hoist engine.The utility model is simple in structure, reduces difficulty of construction, and do not influenced by barriers such as suspension cables, the job platform of bridge bottom setting can facilitate worker's bridge bottom to construct, running gear is run in maintaining roadway simultaneously, is not influenced to drive a vehicle, is substantially increased safety coefficient.

Description

The bridge hanging basket that can be broken the barriers
Technical field
The utility model is related to a kind of bridge hanging baskets to break the barriers, are mainly used in road and bridge service technique field.
Background technology
Since suspension cable bridge is relatively common in Large Span Bridges, and in existing equipment during repair bridge bottom plate, Bridge hanging basket is main mechanical equipment in bridge maintaining engineering.The hanging basket majority of 30 meters current of bridge hanging basket across footpath or more is adopted With truss, limitation is big, inconvenient for operation and when barrier is encountered in moving process can not normal use.
Utility model content
The technical problems to be solved in the utility model is:It is simple in structure to provide one kind, reduces difficulty of construction, and not by outstanding The barriers such as rope influence, can be with the bridge hanging basket to break the barriers of normal construction.
The bridge hanging basket described in the utility model to break the barriers, the overhanging including being arranged on bridge both sides, which is walked, to be filled It puts, overhanging running gear includes pedestal, base bottom setting idler wheel, and top sets supporting rack, cantilever is distributed at the top of supporting rack, Cantilever includes side arm and the intermediate arm between side arm, and side arm and intermediate arm end are all connected with steel wire rope, the end of steel wire rope Job platform is all connected with, guide groove, guide groove outer end installation directive wheel, the steel wire rope being connect with intermediate arm are set on intermediate arm End is successively by directive wheel, guide groove connection hoist engine.
Overhanging running gear can be moved by the setting of idler wheel along the length direction of bridge, complete the maintenance of whole section of bridge Work, hoist engine, the steel wire rope of setting can realize the lifting of job platform, and effective avoiding obstacles improve working efficiency, side The steel wire rope of arm plays the role of job platform suspension, and the steel wire rope of intermediate arm can realize job platform by the work of hoist engine Lifting, guide groove, directive wheel play guiding role to the steel wire rope on intermediate arm.
The position setting locating slot of corresponding steel wire rope in the middle part of the directive wheel.
The idler wheel positioned at base bottom is set as six.Resistance can be reduced in moving process, and ensures to set It is standby to stablize.
The supporting rack is obliquely installed, and the height of supporting rack outer end is higher than the height of inner end.
Job platform is connect by steel wire rope with being arranged on the overhanging running gear of bridge both sides, and overhanging running gear is placed It on the maintaining roadway of bridge both sides, is slided by steel bobbin, the power of slip can be the electric block band of direction of advance It is dynamic, suspension cable is met in moving process when barriers, can be risen job platform by hoist engine, steel wire rope, Ke Yishun Profit breaks the barriers.
The beneficial effects of the utility model are:
The utility model is simple in structure, reduces difficulty of construction, and do not influenced by barriers such as suspension cables, bridge bottom is set The job platform put can facilitate worker's bridge bottom to construct, while running gear is run in maintaining roadway, does not influence to drive a vehicle, significantly Improve safety coefficient.
Description of the drawings
Fig. 1 is structure diagram of the utility model on bridge cross section.
Fig. 2 is the overlooking the structure diagram that running gear is overhang in Fig. 1.
In figure:1st, side arm;2nd, supporting rack;3rd, hoist engine;4th, pedestal;5th, bridge;6th, idler wheel;7th, steel wire rope;8th, operation horizontal Platform;9th, intermediate arm;10th, directive wheel.
Specific embodiment
The utility model is described further below in conjunction with the accompanying drawings:
As shown in Fig. 1~Fig. 2, the bridge hanging basket described in the utility model to break the barriers, including being arranged on bridge 5 The overhanging running gear of both sides, overhanging running gear include pedestal 4,4 bottom of pedestal setting idler wheel 6, and top sets supporting rack 2, Cantilever is distributed in 2 top of supporting rack, and cantilever includes side arm 1 and the intermediate arm 9 between side arm 1,9 end of side arm 1 and intermediate arm End is all connected with steel wire rope 7, and the end of steel wire rope 7 is all connected with job platform 8, guide groove, guide groove outer end are set on intermediate arm 9 Directive wheel 10 is installed, 7 end of steel wire rope being connect with intermediate arm 9 is successively by directive wheel 10, guide groove connection hoist engine 3.It leads To the position of the corresponding steel wire rope 7 in 10 middle part of wheel, locating slot is set.Idler wheel 6 positioned at 4 bottom of pedestal is set as six.Supporting rack 2 It is obliquely installed, the height of 2 outer end of supporting rack is higher than the height of inner end.
Job platform 8 is connect by steel wire rope 7 with being arranged on the overhanging running gear of 5 both sides of bridge, overhangs running gear It is placed on the maintaining roadway of 5 both sides of bridge, is slided by steel bobbin 6, the barriers such as suspension cable are met in moving process When, job platform 8 can be risen by hoist engine 3, steel wire rope 7, barrier can be passed through.

Claims (4)

1. a kind of bridge hanging basket to break the barriers, it is characterised in that:Overhanging including being arranged on bridge (5) both sides, which is walked, to be filled It puts, overhanging running gear includes pedestal (4), pedestal (4) bottom setting idler wheel (6), top setting supporting rack (2), supporting rack (2) Cantilever is distributed in top, and cantilever includes side arm (1) and the intermediate arm (9) between side arm (1), side arm (1) and intermediate arm (9) End is all connected with steel wire rope (7), and the end of steel wire rope (7) is all connected with job platform (8), and intermediate arm sets guide groove on (9), leads To slot outer end installation directive wheel (10), steel wire rope (7) end being connect with intermediate arm (9) is passed through directive wheel (10), is led successively To slot connection hoist engine (3).
2. the bridge hanging basket according to claim 1 to break the barriers, it is characterised in that:It is corresponding in the middle part of directive wheel (10) The position setting locating slot of steel wire rope (7).
3. the bridge hanging basket according to claim 1 to break the barriers, it is characterised in that:Positioned at pedestal (4) bottom Idler wheel (6) is set as six.
4. the bridge hanging basket according to claim 1 to break the barriers, it is characterised in that:Supporting rack (2) is obliquely installed, The height of supporting rack (2) outer end is higher than the height of inner end.
CN201721566731.8U 2017-11-21 2017-11-21 The bridge hanging basket that can be broken the barriers Expired - Fee Related CN207498840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721566731.8U CN207498840U (en) 2017-11-21 2017-11-21 The bridge hanging basket that can be broken the barriers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721566731.8U CN207498840U (en) 2017-11-21 2017-11-21 The bridge hanging basket that can be broken the barriers

Publications (1)

Publication Number Publication Date
CN207498840U true CN207498840U (en) 2018-06-15

Family

ID=62505263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721566731.8U Expired - Fee Related CN207498840U (en) 2017-11-21 2017-11-21 The bridge hanging basket that can be broken the barriers

Country Status (1)

Country Link
CN (1) CN207498840U (en)

Similar Documents

Publication Publication Date Title
CN104088449B (en) Safe and fast double-track construction platform of super high-rise curtain wall
CN203668775U (en) Hydraulic sleeper replacing machine
CN107651573A (en) A kind of track is laid a railway track special purpose crane tool
CN103669133A (en) Hydraulic sleeper replacement machine and hydraulic sleeper replacement method
CN107298388A (en) Bridge crane with suspender maintenance rig
CN102556854A (en) Mine hydraulic hoisting traveling crane
CN109653481A (en) A kind of hanging rail formula high-altitude operation platform and production method
CN202298476U (en) Bridge variable cross-section box girder surface operation trolley
CN2923635Y (en) Single-column towing type elevator
CN220245368U (en) Electric hoist gantry crane
CN207498840U (en) The bridge hanging basket that can be broken the barriers
CN201250058Y (en) Improved lifting trolley
CN202864734U (en) Novel double-beam bridge crane
CN103147404A (en) System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN201817208U (en) Simple lifting machine
CN204873574U (en) Hoist girder construction of stretching out and drawing back
CN2693735Y (en) In and out kettle crane
CN207175276U (en) A kind of track is laid a railway track special purpose crane tool
CN202390106U (en) Lifting hook portal crane easy to maintain
CN202465078U (en) Hoisting mechanism of crane
CN202465109U (en) Motor-driven double-beam grab bucket gantry crane
CN205346676U (en) High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism
CN205407131U (en) Cable laying device
CN201292509Y (en) Suspension bridge main girder construction segment conveying facilities
CN209603469U (en) A kind of hanging rail formula high-altitude operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xu Kun

Inventor after: Yang Jinyong

Inventor after: Zuo Jianwei

Inventor after: Liu Guodong

Inventor after: An Zhimin

Inventor after: Li Guoru

Inventor after: Yang Wanqiao

Inventor after: Meng Qingyu

Inventor after: Ma Xia

Inventor after: Kong Xianglu

Inventor after: Li Hu

Inventor after: Yin Wenjie

Inventor after: Liang Jigang

Inventor after: Zhang Chuanfeng

Inventor after: Wang Qiang

Inventor after: Wang Haitao

Inventor after: Wang Kun

Inventor after: Ma Yongsheng

Inventor after: Zhang Canzhu

Inventor after: Han Bing

Inventor after: Li Lianjun

Inventor after: Zhang Yuanming

Inventor after: Liu Xiaodong

Inventor before: Xu Kun

Inventor before: Yang Jinyong

Inventor before: Zuo Jianwei

Inventor before: Liu Guodong

Inventor before: An Zhimin

Inventor before: Li Guoru

Inventor before: Yang Wanqiao

Inventor before: Meng Qingyu

Inventor before: Ma Xia

Inventor before: Kong Xianglu

Inventor before: Li Hu

Inventor before: Yin Wenjie

Inventor before: Liang Jigang

Inventor before: Zhang Chuanfeng

Inventor before: Wang Qiang

Inventor before: Wang Haitao

Inventor before: Wang Kun

Inventor before: Ma Yongsheng

Inventor before: Zhang Canzhu

Inventor before: Han Bing

Inventor before: Li Lianjun

Inventor before: Zhang Yuanming

Inventor before: Liu Xiaodong

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615

Termination date: 20181121