CN205407131U - Cable laying device - Google Patents
Cable laying device Download PDFInfo
- Publication number
- CN205407131U CN205407131U CN201620141046.XU CN201620141046U CN205407131U CN 205407131 U CN205407131 U CN 205407131U CN 201620141046 U CN201620141046 U CN 201620141046U CN 205407131 U CN205407131 U CN 205407131U
- Authority
- CN
- China
- Prior art keywords
- wheel carrier
- cable
- connecting rod
- wheel
- auxiliary guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model relates to a cable laying device, including bracing piece and wheel carrier, bracing piece and wheel carrier fixed connection, wheel carrier upper end sets up the upper block, and the wheel carrier middle part sets up well guide pulley, and the wheel carrier lower extreme sets up the lower tumbler, the upper and lower both ends of wheel carrier set up a supplementary guiding mechanism who is used for the direction respectively, can make cable laying more smooth and easy. The utility model has the advantages of 1, simple structure, easily installation, when the electric power overhead line, small friction not only, moreover cable laying device to the cable play support with directed effect, prevent that electric cable frame from establishing the in -process and jumping the pendulum, the improvement progress of erectting is favorable to the remote of cable to be erect. 2, the upper and lower both ends of wheel carrier set up a supplementary guiding mechanism who is used for the direction respectively, can make cable laying more smooth and easy. 3, the wheel inslot of upper block, well guide pulley and lower tumbler is provided with smoothing layer, and the translation rate of cable accelerates. (B /)
Description
Technical field
This utility model relates to engineering construction field, particularly relates to a kind of cable-laying gear.
Background technology
Current skyscraper cable lifting, conventional method has two kinds: one to be along laying the numerous personnel of path profile lift with joint efforts;Two is that the steel cable adopting electrical hoist is pulled up.The former had both been difficult to ensure card construction safety, spent again too many strength;The latter, except safety factors problem, there is also the work progress problem to cable product quality protection.Wire rope traction cable, along with cable rises and weight increase, stress point and top cable body stress increase, and can cause construction of cable deformation damage.
Utility model content
Technical problem to be solved in the utility model is: for solving above-mentioned technical problem, it is provided that a kind of simple in construction, safe and reliable cable-laying gear.
This utility model be the technical scheme is that by the problem that solution is set forth above
A kind of cable-laying gear, including support bar 1 and wheel carrier 2, support bar 1 is fixing with wheel carrier 2 to be connected, described wheel carrier 2 upper end arranges upper block 3, middle guide wheel 4 is set in the middle part of wheel carrier 2, wheel carrier 2 lower end arranges lower tumbler 5, and the two ends up and down of described wheel carrier 2 are respectively provided with an auxiliary guide mechanism 6 for leading, it is possible to make cable laying more smooth and easy.
Described auxiliary guide mechanism 6 includes connecting rod 7, clamp device 8 and auxiliary guide wheels 9, the upper end of connecting rod 7 is fixed with auxiliary guide wheels 9, described connecting rod 7 is fixed on wheel carrier 2 by clamp device 8 by the bottom of connecting rod 7, cable is played and supports and directed effect, prevent from erecting cable process is jumped pendulum, it is possible to make cable laying more smooth and easy.
Described auxiliary guide mechanism 6 includes connecting rod 7, clamp device 8 and annulus 10, the upper end of connecting rod 7 is fixed with annulus 10, described connecting rod 7 is fixed on wheel carrier 2 by clamp device 8 by the bottom of connecting rod 7, annulus 10 is set on cable, cable is played and supports and directed effect, prevent from erecting cable process is jumped pendulum, it is possible to make cable laying more smooth and easy.
Described connecting rod 7 is Bolted angle connection bar.
Described connecting rod 7 is respectively provided with ribs.
Described clamp device 8 includes bolt 11 and nut 12, and bolt 11 is threadeded through connecting rod 7 with nut 12.
Described support bar 1 is spliced by channel-section steel.
It is provided with smooth layer in the race of described upper block 3, middle guide wheel 4 and lower tumbler 5.
Described smooth layer is chromium coating, graphite linings or ceramic layer.
Operation principle of the present utility model: be first fixed on skyscraper by this device during use, cable walks around this device upper block, middle guide wheel and lower tumbler successively, it is ensured that cable lowering velocity is steady;The two ends up and down of described wheel carrier are respectively provided with an auxiliary guide mechanism for leading, it is possible to make cable laying more smooth and easy.
The beneficial effects of the utility model are in that: 1, simple in construction, be easily installed, when electric stringing, not only frictional force is little, and cable is played and supports and directed effect by cable-laying gear, prevent from erecting cable process is jumped pendulum, improve erection progress, be conducive to the remote erection of cable.2, the two ends up and down of wheel carrier are respectively provided with an auxiliary guide mechanism for leading, it is possible to make cable laying more smooth and easy.3, being provided with smooth layer in the race of upper block, middle guide wheel and lower tumbler, the translational speed of cable is accelerated.
Accompanying drawing explanation
Fig. 1 is the structural representation of the first embodiment of this utility model;
Fig. 2 is the structural representation of this utility model the second embodiment.
Wherein, 1-support bar, 2-wheel carrier, 3-upper block, guide wheel in 4-, 5-lower tumbler, 6-auxiliary guide mechanism, 7-connecting rod, 8-clamp device, 9-auxiliary guide wheels, 10-annulus, 11-bolt, 12-nut.
Detailed description of the invention
Embodiment of the present utility model is further illustrated below in conjunction with accompanying drawing.
Embodiment 1, with reference to Fig. 1, a kind of cable-laying gear described in this detailed description of the invention, including support bar 1 and wheel carrier 2, support bar 1 is fixing with wheel carrier 2 to be connected, and described wheel carrier 2 upper end arranges upper block 3, middle guide wheel 4 is set in the middle part of wheel carrier 2, wheel carrier 2 lower end arranges lower tumbler 5, and the two ends up and down of described wheel carrier 2 are respectively provided with an auxiliary guide mechanism 6 for leading, it is possible to make cable laying more smooth and easy.
Described auxiliary guide mechanism 6 includes connecting rod 7, clamp device 8 and auxiliary guide wheels 9, and the upper end of connecting rod 7 is fixed with auxiliary guide wheels 9, and described connecting rod 7 is fixed on wheel carrier 2 by the bottom of connecting rod 7 by clamp device 8.
Described connecting rod 7 is Bolted angle connection bar.
Described connecting rod 7 is respectively provided with ribs.
Described clamp device 8 includes bolt 11 and nut 12, and bolt 11 is threadeded through connecting rod 7 with nut 12.
Described support bar 1 is spliced by channel-section steel.
It is provided with smooth layer in the race of described upper block 3, middle guide wheel 4 and lower tumbler 5.
Described smooth layer is graphite linings.
Embodiment 2, with reference to Fig. 2, a kind of cable-laying gear described in this detailed description of the invention, including support bar 1 and wheel carrier 2, support bar 1 is fixing with wheel carrier 2 to be connected, and described wheel carrier 2 upper end arranges upper block 3, middle guide wheel 4 is set in the middle part of wheel carrier 2, wheel carrier 2 lower end arranges lower tumbler 5, and the two ends up and down of described wheel carrier 2 are respectively provided with an auxiliary guide mechanism 6 for leading, it is possible to make cable laying more smooth and easy.
Described auxiliary guide mechanism 6 includes connecting rod 7, clamp device 8 and annulus 10, and the upper end of connecting rod 7 is fixed with annulus 10, and described connecting rod 7 is fixed on wheel carrier 2 by the bottom of connecting rod 7 by clamp device 8.
Described connecting rod 7 is Bolted angle connection bar.
Described connecting rod 7 is respectively provided with ribs.
Described clamp device 8 includes bolt 11 and nut 12, and bolt 11 is threadeded through connecting rod 7 with nut 12.
Described support bar 1 is spliced by channel-section steel.
It is provided with smooth layer in the race of described upper block 3, middle guide wheel 4 and lower tumbler 5.
Described smooth layer is ceramic layer.
The operation principle of this detailed description of the invention: be first fixed on skyscraper by this device during use, cable walks around this device upper block, middle guide wheel and lower tumbler successively, it is ensured that cable lowering velocity is steady;The two ends up and down of described wheel carrier are respectively provided with an auxiliary guide mechanism for leading, it is possible to make cable laying more smooth and easy.
Having the beneficial effects that of this detailed description of the invention: 1, simple in construction, be easily installed, when electric stringing, not only frictional force is little, and cable is played and supports and directed effect by cable-laying gear, prevent from erecting cable process is jumped pendulum, improve erection progress, be conducive to the remote erection of cable.2, the two ends up and down of wheel carrier are respectively provided with an auxiliary guide mechanism for leading, it is possible to make cable laying more smooth and easy.3, being provided with smooth layer in the race of upper block, middle guide wheel and lower tumbler, the translational speed of cable is accelerated.
Specific embodiment of the utility model does not constitute restriction of the present utility model, every employing analog structure of the present utility model and change, all in protection domain of the present utility model.
Claims (5)
1. a cable-laying gear, including support bar (1) and wheel carrier (2), support bar (1) is fixing with wheel carrier (2) to be connected, described wheel carrier (2) upper end arranges upper block (3), wheel carrier (2) middle part arranges middle guide wheel (4), wheel carrier (2) lower end arranges lower tumbler (5), it is characterised in that: the two ends up and down of described wheel carrier (2) are respectively provided with an auxiliary guide mechanism (6) for leading.
2. a kind of cable-laying gear as claimed in claim 1, it is characterized in that: described auxiliary guide mechanism (6) includes connecting rod (7), clamp device (8) and auxiliary guide wheels (9), the upper end of connecting rod (7) is fixed with auxiliary guide wheels (9), and described connecting rod (7) is fixed on wheel carrier (2) by the bottom of connecting rod (7) by clamp device (8).
3. a kind of cable-laying gear as claimed in claim 1, it is characterized in that: described auxiliary guide mechanism (6) includes connecting rod (7), clamp device (8) and annulus (10), the upper end of connecting rod (7) is fixed with annulus (10), and described connecting rod (7) is fixed on wheel carrier 2 by the bottom of connecting rod (7) by clamp device (8).
4. a kind of cable-laying gear as claimed in claim 2 or claim 3, it is characterised in that: described connecting rod (7) is Bolted angle connection bar.
5. a kind of cable-laying gear as claimed in claim 4, it is characterised in that: described clamp device (8) includes bolt (11) and nut (12), and bolt (11) is threadeded through connecting rod (7) with nut (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620141046.XU CN205407131U (en) | 2016-02-25 | 2016-02-25 | Cable laying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620141046.XU CN205407131U (en) | 2016-02-25 | 2016-02-25 | Cable laying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205407131U true CN205407131U (en) | 2016-07-27 |
Family
ID=56447127
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620141046.XU Expired - Fee Related CN205407131U (en) | 2016-02-25 | 2016-02-25 | Cable laying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205407131U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107104394A (en) * | 2017-04-30 | 2017-08-29 | 陶霞霞 | A kind of method that blow-off line is crossed in extra-high-tension cable process of deployment |
CN107154600A (en) * | 2017-04-30 | 2017-09-12 | 陶霞霞 | The method whether cable stretches is judged in a kind of extra-high-tension cable process of deployment |
-
2016
- 2016-02-25 CN CN201620141046.XU patent/CN205407131U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107104394A (en) * | 2017-04-30 | 2017-08-29 | 陶霞霞 | A kind of method that blow-off line is crossed in extra-high-tension cable process of deployment |
CN107154600A (en) * | 2017-04-30 | 2017-09-12 | 陶霞霞 | The method whether cable stretches is judged in a kind of extra-high-tension cable process of deployment |
CN107104394B (en) * | 2017-04-30 | 2019-01-04 | 芜湖泰庆电子科技有限公司 | The method of blow-off line is crossed in a kind of extra-high-tension cable process of deployment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102444086A (en) | Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge | |
CN112072560B (en) | Method for vertically laying super high-rise shaft cable in air through relay lifting | |
CN205855858U (en) | A kind of derrick crane hoist rope passes around system | |
CN103274315B (en) | Installing and hoisting device for side plate and upright of gas chamber | |
CN205407131U (en) | Cable laying device | |
CN106088609A (en) | A kind of integral lifting method of large span steel structure vestibule | |
CN205932929U (en) | Large power supply equipment fixing is with hoist and mount framework | |
CN202414929U (en) | Cable pulley with flexible guide tracks | |
CN204173715U (en) | Iron tower of power transmission line jacking system | |
CN206109992U (en) | Bridge bottom surface construction platform | |
CN203334186U (en) | A wheel type device for cable-stayed bridge floor press anchoring | |
CN202518943U (en) | Creeper-traveler for coating bridge location | |
CN206705446U (en) | A kind of super high speed elevator compensation rope tensioning apparatus and its tensioning wheel group | |
CN202578562U (en) | Lifting device of drilling machine | |
CN202465078U (en) | Hoisting mechanism of crane | |
CN204530513U (en) | The manned maintenance Hanging Basket of suspension cable | |
CN203734215U (en) | Overhead cable-laying tractor and special lifting tool thereof | |
CN202414930U (en) | Flexible guide rail cable sliding trolley | |
CN205023653U (en) | Be applied to equipment of natural draft hyperbola cooling tower inner wall construction | |
CN201857225U (en) | Hoisting device for bridge crane frame | |
CN204727496U (en) | Arm-rest walkway drive motor lifting appliance | |
CN201074150Y (en) | Pulley type traveling cable guiding apparatus for construction elevator | |
CN200954969Y (en) | Electric lifting sleeve-frame for construction lifter | |
CN205312884U (en) | Towed arch bridge crane of trolley | |
CN203392694U (en) | Elevator hoisting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160727 Termination date: 20170225 |
|