Prior art keywords
cable
bridge
tower
suspension
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101130760A
Other languages
Chinese (zh)
Other versions
CN103147404B (en
Inventor
马涛
李军堂
张克
万成钢
张瑞霞
姚法海
许佳平
涂满明
刘灿
姚森
黄剑锋
方小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN201310113076.0A priority Critical patent/CN103147404B/en
Publication of CN103147404A publication Critical patent/CN103147404A/en
Application granted granted Critical
Publication of CN103147404B publication Critical patent/CN103147404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a system and a method for hanging a stay cable at a tower end of a height limiting cable-stayed bridge. The hanging system comprises a cable hanging cradle, a travelling device and a lifting device, wherein the cable hanging cradle is sleeved on a bridge tower; the travelling device comprises a track beam and an electric hoist; the track beam is fixedly arranged on the bottom surface of the cable hanging cradle; the electric hoist is hung on the track beam; parts of the cable hanging cradle, which are positioned on the two sides of the bridge tower, are inconsistent in length, so as to form an unsymmetrical truss structure; the lifting device comprises a winch and a pulley block; the winch is arranged on a bridge floor; the pulley block is fixedly arranged at the top end of the bridge tower; and the winch is connected with the cable hanging cradle through a steel wire rope wound on the pulley block and can control the lifting of the cable hanging cradle. The hanging system has the advantages of simplicity and convenience in operation, complete function, safety, reliability and good construction effect.

Description

Limit for height Tower Column of A Cable Stayed Bridge end suspension cable hang system and method
Technical field
The present invention relates to bridge Construction Technology, be specifically related to the system and method that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable.
Background technology
In the construction of cable stayed bridge, the conventional hanging cable job practices of suspension cable is: adopt bridge tower tower top suspension bracket and beam face automobile loop wheel machine to coordinate installation, tower top suspension bracket operated by rotary motion is above king-tower pushes up, utilize the tap of automobile loop wheel machine, beam face hoist engine is put rope, the tower top suspension bracket is sling cable, by guide chain inside and outside tower and the acting in conjunction of tower top suspension bracket, completes the installation of tower end suspension cable.And for some construction operation limit for height height only higher than the special operation condition of tower top 2m, conventional tower top suspension bracket and automobile loop wheel machine job practices can't realize.
Summary of the invention
Technical problem to be solved by this invention is the conventional tower top suspension bracket of solution and automobile loop wheel machine job practices can't be completed the hanging cable of stay cable construction in the limit for height situation problem.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is to provide a kind of system that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable, comprises hanging cable suspension bracket, running gear and jack up unit, and described hanging cable suspension bracket is set on bridge tower; Described running gear comprises rail beam and electric block, described rail beam is fixed on the bottom surface of described hanging cable suspension bracket, described electric block is suspended on described rail beam, and described hanging cable suspension bracket to be positioned at the partial-length of bridge tower both sides inconsistent, form asymmetric trussed construction; Described jack up unit comprises hoist engine and tackle pulley, and described hoist engine is arranged on bridge floor, and described tackle pulley is fixed on the top of bridge tower, and described hoist engine is connected with described hanging cable suspension bracket by the wire rope on described tackle pulley and controls its lifting.
Hang system above-mentioned, described hanging cable suspension bracket comprises main bearing beam, described main bearing beam is the trussed construction that is comprised of forward and backward two main couples, upper horizontal connection system and described rail beam, described hanging cable suspension bracket is provided with the longitudinal hole suitable with bridge tower, by described longitudinal hole, described hanging cable suspension bracket is arranged with on bridge tower and can vertically moves along bridge tower.
Hang system above-mentioned, described hanging cable suspension bracket is provided with for the support bracket that the hanging cable suspension bracket is fixed on bridge tower.
Hang system above-mentioned, also comprise the Simple slide way that is arranged on bridge floor.
The present invention also provides a kind of method that the above-mentioned system that hangs hangs limit for height Tower Column of A Cable Stayed Bridge end suspension cable of using, and comprises the following steps:
A10, at the bridge floor place around bridge tower integral assembling hanging cable suspension bracket, and running gear and jack up unit are installed;
A20, utilize jack up unit that the hanging cable suspension bracket is promoted to the corresponding height position of bridge tower and is fixed on bridge tower;
A30, utilize running gear that suspension cable is sling to the installation site, complete the hanging cable of suspension cable at the bridge tower end;
A40, complete the hanging cable of stay cable of beam-ends on bridge floor;
A50, at bridge tower end tractive suspension cable, it is put in place;
A60, the tractive suspension cable makes its stretch-draw to builder's tonnage on bridge floor.
In said method, the concrete steps of steps A 30 are as follows:
A301, suspension cable is put into the rope frame and at its end pass line bucket tool, be provided for the Simple slide way that reduces friction simultaneously on bridge floor;
A302, with cord clip suspender clamping on electric block, suspension cable is placed on Simple slide way, utilize electric block that one end of suspension cable is sling to the corresponding height position of bridge tower;
The anchor cup of A303, extraction bridge tower end is installed drawing head and cord clip successively on the anchor cup;
A304, cord clip is connected with the cord clip suspender, completes the hanging cable of suspension cable bridge tower end.
The method that hangs limit for height Tower Column of A Cable Stayed Bridge end suspension cable provided by the invention, easy and simple to handle, multiple functional, safe and reliable, construction effect is good.
Description of drawings
Fig. 1 is the system schematic that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable provided by the invention;
Fig. 2 is the top view of hanging cable suspension bracket in the present invention;
Fig. 3 is the central structure schematic diagram of hanging cable suspension bracket in the present invention;
Fig. 4 is the lateral view of hanging cable suspension bracket in the present invention.
The specific embodiment
The object of the present invention is to provide a kind of easy to operate, safe and reliable stay cable of cable-stayed bridge hanging cable construction system and method, when highly not enough for operation directly over bridge tower pushes up, complete construction.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, at first the invention provides a kind of system that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable, comprise hanging cable suspension bracket, running gear and jack up unit.
The hanging cable suspension bracket is trussed construction, strengthens the resistance to overturning of hanging cable suspension bracket.The hanging cable suspension bracket comprises by forward and backward two main bearing beam that main couple forms, every main couple is welded by upper chord 21, lower chord 22, montant 23 and brace 24, being welded with horizontal connection on the end face of main bearing beam is 11, be welded with on the bottom surface for the fixing crossbeam 12 of running gear, the lower horizontal connection that crossbeam 12 both can be used as trussed construction is, can be used as again load bearing cross beam, both unite two into one, the suspension cable 2 of main bearing beam and bridge tower 1 both sides is positioned at same perpendicular.
Have the through hole suitable with bridge tower 1 on the hanging cable suspension bracket, be arranged with on bridge tower 1 and can vertically move along bridge tower by longitudinal hole hanging cable suspension bracket, it is inconsistent that the hanging cable suspension bracket is positioned at the partial-length of longitudinal hole both sides in the longitudinal direction, form asymmetric trussed construction, to adapt to the suspension cable 2 of the differing heights position installation that enters cable guide pipe 20 from top to bottom of bridge tower 1 both sides.
Be fixed with on the hanging cable suspension bracket be used to the support bracket 13 that is fixed on bridge tower 1, support bracket 13 and be four and be arranged on tetragonal four summits, support four bights that bracket 13 is weldingly fixed on bridge tower 1.
Running gear comprises rail beam 31 and electric block 32, and rail beam 31 is welded on main bearing beam, and electric block 32 is suspended on rail beam 31.
Jack up unit comprises hoist engine 3 and tackle pulley 4, and hoist engine 3 is arranged on bridge floor, and tackle pulley 4 is fixed on the top of bridge tower 1, and hoist engine 3 is connected with the hanging cable suspension bracket by the wire rope on tackle pulley 4 and controls its lifting.
Also be provided be used to the Simple slide way that reduces to rub on bridge floor.
The present invention also provides a kind of method that the above-mentioned system that hangs hangs limit for height Tower Column of A Cable Stayed Bridge end suspension cable of using, and comprises the following steps:
A10, at the bridge floor place around bridge tower integral assembling hanging cable suspension bracket, and running gear and jack up unit are installed;
A20, utilize jack up unit that the hanging cable suspension bracket is promoted to the corresponding height position of bridge tower 1 and is fixed on bridge tower 1;
A30, utilize running gear that suspension cable is sling to the installation site, complete the hanging cable of suspension cable 2 at the bridge tower end;
The concrete steps of steps A 30 are as follows:
A301, suspension cable 2 is put into rope frame 5 and at its end pass line bucket tool, be provided for the Simple slide way that reduces friction simultaneously on bridge floor;
A302, with cord clip suspender clamping on electric block 32, suspension cable 2 is placed on Simple slide way, utilize electric block 32 that an end of suspension cable 2 is sling to the corresponding height position of bridge tower 1;
A303, the anchor cup (not shown) of extracting the bridge tower end out, assurance anchor cup is installed drawing head and cord clip (not shown) successively on the anchor cup outside conduit;
A304, cord clip is connected with the cord clip suspender, completes the hanging cable of suspension cable bridge tower end.
A40, complete the hanging cable of stay cable of beam-ends on bridge floor;
A50, at bridge tower end tractive suspension cable, it is put in place;
A60, the tractive suspension cable makes its stretch-draw to builder's tonnage on bridge floor.
Due to the aviation limit for height, conventional tower crane or tower top suspension bracket can't be constructed, and the present invention adopts the hanging cable suspension bracket is arranged in bridge tower 1 both sides, and the hanging cable suspension bracket adopts asymmetric trussed construction, the installation that enters cable guide pipe 20 to adapt to bridge tower 1 diverse location place, both sides suspension cable 2.Hanging cable Hang frame structure in the present invention is simple, stressed clear and definite, and the method that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable is a kind of easy and simple to handle, multiple functional, safe and reliable hanging cable job practices, and construction effect is good.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structural change of making under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, within all falling into protection scope of the present invention.

Claims (6)

1. the system that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable, is characterized in that, comprising:
The hanging cable suspension bracket is set on bridge tower;
Running gear, comprise rail beam and electric block, described rail beam is fixed on the bottom surface of described hanging cable suspension bracket, and described electric block is suspended on described rail beam, and it is inconsistent that described hanging cable suspension bracket is positioned at the partial-length of bridge tower both sides, forms asymmetric trussed construction;
Jack up unit comprises hoist engine and tackle pulley, and described hoist engine is arranged on bridge floor, and described tackle pulley is fixed on the top of bridge tower, and described hoist engine is connected with described hanging cable suspension bracket by the wire rope on described tackle pulley and controls its lifting.
2. the system that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable as claimed in claim 1, it is characterized in that, described hanging cable suspension bracket comprises main bearing beam, described main bearing beam is the trussed construction that is comprised of forward and backward two main couples, upper horizontal connection system and described rail beam, described hanging cable suspension bracket is provided with the longitudinal hole suitable with bridge tower, by described longitudinal hole, described hanging cable suspension bracket is arranged with on bridge tower and can vertically moves along bridge tower.
3. the system that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable as claimed in claim 1, is characterized in that, described hanging cable suspension bracket is provided with for the support bracket that the hanging cable suspension bracket is fixed on bridge tower.
4. the system that hangs of limit for height Tower Column of A Cable Stayed Bridge end suspension cable as claimed in claim 1, is characterized in that, also comprises the Simple slide way that is arranged on bridge floor.
5. use the method that system hangs limit for height Tower Column of A Cable Stayed Bridge end suspension cable that hangs as claimed in claim 1, it is characterized in that, comprise the following steps:
A10, at the bridge floor place around bridge tower integral assembling hanging cable suspension bracket, and running gear and jack up unit are installed;
A20, utilize jack up unit that the hanging cable suspension bracket is promoted to the corresponding height position of bridge tower and is fixed on bridge tower;
A30, utilize running gear that suspension cable is sling to the installation site, complete the hanging cable of suspension cable at the bridge tower end;
A40, complete the hanging cable of stay cable of beam-ends on bridge floor;
A50, at bridge tower end tractive suspension cable, it is put in place;
A60, the tractive suspension cable makes its stretch-draw to builder's tonnage on bridge floor.
6. method as claimed in claim 5, is characterized in that, the concrete steps of steps A 30 are as follows:
A301, suspension cable is put into the rope frame and at its end pass line bucket tool, be provided for the Simple slide way that reduces friction simultaneously on bridge floor;
A302, with cord clip suspender clamping on electric block, suspension cable is placed on Simple slide way, utilize electric block that one end of suspension cable is sling to the corresponding height position of bridge tower;
The anchor cup of A303, extraction bridge tower end is installed drawing head and cord clip successively on the anchor cup;
A304, cord clip is connected with the cord clip suspender, completes the hanging cable of suspension cable bridge tower end.
CN201310113076.0A 2013-04-02 2013-04-02 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge Active CN103147404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310113076.0A CN103147404B (en) 2013-04-02 2013-04-02 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310113076.0A CN103147404B (en) 2013-04-02 2013-04-02 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge

Publications (2)

Publication Number Publication Date
CN103147404A true CN103147404A (en) 2013-06-12
CN103147404B CN103147404B (en) 2015-02-11

Family

ID=48545697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310113076.0A Active CN103147404B (en) 2013-04-02 2013-04-02 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN103147404B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762880A (en) * 2015-05-03 2015-07-08 李孟平 Improved bridge inhaul cable structure and hanging method thereof
CN105019364A (en) * 2015-08-04 2015-11-04 武船重型工程股份有限公司 Method for slipping and vertically swinging steel tower
CN105442458A (en) * 2016-01-29 2016-03-30 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN109853393A (en) * 2019-03-19 2019-06-07 湖南联智智能科技有限公司 A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN111979916A (en) * 2019-12-31 2020-11-24 中铁十一局集团第一工程有限公司 Cable-stayed bridge tower part suspension construction method and suspension operation platform device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820910A (en) * 1994-07-05 1996-01-23 Kajima Corp Construction method of pc cable stayed bridge
CN1253197A (en) * 1998-11-09 2000-05-17 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
JP2005200867A (en) * 2004-01-14 2005-07-28 Obihiro Development & Construction Department Hokkaido Regional Development Bureau Diagonal cable snow removing device for cable stayed bridge
CN101476294A (en) * 2009-01-22 2009-07-08 四川公路桥梁建设集团有限公司 Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower
CN201272942Y (en) * 2008-12-22 2009-07-15 湖南路桥建设集团公司 Mounting angle regulation apparatus for stay cable column end of stayed-cable bridge
CN101725114A (en) * 2009-12-08 2010-06-09 中铁大桥(郑州)缆索有限公司 Method for hoisting hawser of long-span cable-stayed bridge and equipment thereof
CN102444086A (en) * 2011-10-14 2012-05-09 中铁大桥局股份有限公司 Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820910A (en) * 1994-07-05 1996-01-23 Kajima Corp Construction method of pc cable stayed bridge
CN1253197A (en) * 1998-11-09 2000-05-17 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
JP2005200867A (en) * 2004-01-14 2005-07-28 Obihiro Development & Construction Department Hokkaido Regional Development Bureau Diagonal cable snow removing device for cable stayed bridge
CN201272942Y (en) * 2008-12-22 2009-07-15 湖南路桥建设集团公司 Mounting angle regulation apparatus for stay cable column end of stayed-cable bridge
CN101476294A (en) * 2009-01-22 2009-07-08 四川公路桥梁建设集团有限公司 Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower
CN101725114A (en) * 2009-12-08 2010-06-09 中铁大桥(郑州)缆索有限公司 Method for hoisting hawser of long-span cable-stayed bridge and equipment thereof
CN102444086A (en) * 2011-10-14 2012-05-09 中铁大桥局股份有限公司 Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李中民,姜中祖,刘涛: ""番禺大桥斜拉索安装"", 《广东公路交通》 *
李伟: ""成都市火车南站斜拉桥斜拉索安装工艺"", 《施工技术》 *
陈雪华: ""双塔双索面斜拉索安装工艺"", 《施工技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762880A (en) * 2015-05-03 2015-07-08 李孟平 Improved bridge inhaul cable structure and hanging method thereof
CN105019364A (en) * 2015-08-04 2015-11-04 武船重型工程股份有限公司 Method for slipping and vertically swinging steel tower
CN105442458A (en) * 2016-01-29 2016-03-30 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN105442458B (en) * 2016-01-29 2017-01-11 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN109853393A (en) * 2019-03-19 2019-06-07 湖南联智智能科技有限公司 A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN111979916A (en) * 2019-12-31 2020-11-24 中铁十一局集团第一工程有限公司 Cable-stayed bridge tower part suspension construction method and suspension operation platform device

Also Published As

Publication number Publication date
CN103147404B (en) 2015-02-11

Similar Documents

Publication Publication Date Title
CN103147404B (en) System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN201351084Y (en) Dual-machine load walking type hydraulic numerical control cross cable crane
CN103790114A (en) Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN205133081U (en) Novel hanging flower basket system
CN101761031B (en) Continuous and perpendicular lifting apparatus for large segmental bridge floor beam
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN205653086U (en) Tower crane who possesses climbing ladder and lift
CN201367556Y (en) Hanging arch bridge inspection vehicle climbing by steel tube track
CN201284191Y (en) Rope bracketing trolley of tower crane
CN201634333U (en) Super-altitude gantry crane
CN203729212U (en) Cable loading crane with hydraulic traction and idler wheel walking combined
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN202390116U (en) High-intensity small-tonnage hoist
CN205764526U (en) For welding the dolly of clamping-rail trolley conductor bracket
CN202416171U (en) Stay cable single cable suspension platform
CN107235422A (en) It is exclusively used in the crane device of lifting steel pipes and welding
CN201817208U (en) Simple lifting machine
CN206955487U (en) It is exclusively used in lifting steel pipes and the crane device of welding
CN202729645U (en) Tower crane with elevator
CN204643664U (en) A kind of building tower crane
CN205590168U (en) Overturning lifting device
CN204138213U (en) Track gun carriage is used in a kind of cell cube curtain wall lifting
CN203998745U (en) The tower machine suspension hook disconnected rope anti-drop device of rushing to summit
CN105540440A (en) Monitoring device for hoisting of steel wire rope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150113

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150113

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Applicant after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Applicant before: China Zhongtie Major Bridge Engineering Co., Ltd.

C14 Grant of patent or utility model