CN101476294A - Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower - Google Patents

Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower Download PDF

Info

Publication number
CN101476294A
CN101476294A CNA2009100582336A CN200910058233A CN101476294A CN 101476294 A CN101476294 A CN 101476294A CN A2009100582336 A CNA2009100582336 A CN A2009100582336A CN 200910058233 A CN200910058233 A CN 200910058233A CN 101476294 A CN101476294 A CN 101476294A
Authority
CN
China
Prior art keywords
tower
lifting
cable
box girder
wheel machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100582336A
Other languages
Chinese (zh)
Other versions
CN101476294B (en
Inventor
于志兵
聂东
张佐安
裴宾嘉
甘洪
罗明勇
姚德波
申传贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Road and Bridge (Group) Co Ltd
Original Assignee
Sichuan Shengda Comm Science Res And Design Co ltd
Sichuan Road and Bridge (Group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Shengda Comm Science Res And Design Co ltd, Sichuan Road and Bridge (Group) Co Ltd filed Critical Sichuan Shengda Comm Science Res And Design Co ltd
Priority to CN2009100582336A priority Critical patent/CN101476294B/en
Publication of CN101476294A publication Critical patent/CN101476294A/en
Application granted granted Critical
Publication of CN101476294B publication Critical patent/CN101476294B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the technical field of bridge construction steel box girder construction, and particularly relates to a method for mounting a lower beam section of a large-span steel box girder cable-stayed bridge tower. The construction method of the lower tower beam section installation method of the large-span steel box girder cable-stayed bridge comprises the following steps: (1) erecting a mast crane to hoist a steel box girder in a tower area by means of a construction wind structure used during construction of a cable tower upper cross beam and the cable tower, (2) installing a bridge floor crane on the steel box girder in the tower area to hoist a first section of standard girder section adjacent to the steel box girder in the tower area, and (3) symmetrically installing the bridge floor crane on the installed first section of standard girder section to start symmetrical hoisting of the standard girder sections on the center side and the bank side of the river. The method for installing the lower tower beam section of the large-span steel box girder cable-stayed bridge is simple, practical, safe, reliable, economical, convenient and small in limitation of site construction conditions. The difficult problem in the construction process of the existing large-span steel box girder cable-stayed bridge is solved.

Description

Large-span steel box girder stayed-cable bridge tower lower beam segment mounting method
Technical field:
The invention belongs to bridge and build the steel box girder construction technical field, particularly be a kind of large-span steel box girder stayed-cable bridge tower lower beam segment mounting method.
Background technology:
Along with the continuous development of bridge design and building technology, the large-span steel box girder stayed-cable bridge is built more and more.But, in the process of construction of large-span steel box girder stayed-cable bridge, still exist many difficult problems of not capturing as yet.For example: how safety, economical, finish this problem of construction of large-span steel box girder stayed-cable bridge tower underbeam section apace, just never be well solved.Large-span steel box girder stayed-cable bridge tower lower beam segment mounting method in the past has: support loop wheel machine method and support crane barge method, but all there is tangible problem in these two kinds of methods.Support loop wheel machine method be king-post basis end face set up with the contour support of lower transverse beam after, amplitude variation type bridge floor loop wheel machine is placed in the top of support, the beam section that rises under the tower crane with amplitude variation type bridge floor loop wheel machine is positioned on the support, again by pulling the installation of finishing tower underbeam section in place.This method is installed extremely complexity of tower underbeam section process, needs design and makes the very big bridge floor loop wheel machine of luffing, and need the support of repeated disassembled and assembled bridge floor loop wheel machine in the process of this method of enforcement, and this makes that undoubtedly the construction period is longer, and construction cost is higher.Support crane barge method be king-post basis end face set up with the contour support of lower transverse beam after, the beam section that rises under the tower crane with large-scale floating crane is positioned on the support, again by pulling the installation of finishing tower underbeam section in place.Tower underbeam section is installed in this way, not only construction cost is very high, but also will be subjected to the restriction of job site condition: because large-scale floating crane is capable deeply generally bigger, this just requires near the waters the king-post basis that the enough depth of water must be arranged, otherwise this method just can't be implemented fully.
Summary of the invention:
The objective of the invention is for overcoming the problem of above-mentioned existence, a kind of large-span steel box girder stayed-cable bridge tower lower beam segment mounting method is provided.
The construction sequence of large-span steel box girder stayed-cable bridge tower lower beam segment mounting method of the present invention is:
The construction wind structure of using during (1) by Sarasota top rail and Sarasota construction is set up the masts type loop wheel machine and is played tower crane district steel case beam,
(2) the bridge floor loop wheel machine is installed on tower district steel case beam, the first segment standard beam section of lifting next-door neighbour tower district steel case beam,
(3) on mounted first segment standard beam section, install the bridge floor loop wheel machine symmetrically, the symmetry lifting of beginning middle of the river side and bank side standard beam section.
The construction sequence of above-mentioned large-span steel box girder stayed-cable bridge tower lower beam segment mounting method is:
A, on the Sarasota lower transverse beam, set up small-sized falsework and steel case beam movement track be installed thereon,
B, the masts type loop wheel machine of tower district steel case beam lifting is installed on Sarasota top rail and above construction wind structure thereof, between king-post,
C, with the masts type loop wheel machine rise on the steel case beam movement track of tower crane district steel case beam to the small-sized falsework successively and movement in place,
D, the bridge floor loop wheel machine is installed on the tower district of installation steel case beam,
E, usefulness is the bridge floor loop wheel machine lifting middle of the river side first segment standard beam section of installation in position, and installation in position is also finished the extension rope,
F, dismounting bridge floor loop wheel machine and commutation are installed on the tower district steel case beam,
G, lifting bank side first segment standard beam section is in place and finish the extension rope,
H, the bridge floor loop wheel machine is run on the bank side first segment standard beam section,
I, in the middle of a river bridge floor loop wheel machine, the symmetry lifting construction of beginning middle of the river side and bank side standard beam section be installed on the side first segment standard beam section.
The Sarasota top rail of the mast of above-mentioned installation masts type loop wheel machine is the top rail of cable stayed bridge king-tower.
Above-mentioned construction wind structure is a Steel Space Truss, on construction wind structure the dorsal funciculus tackle pulley is arranged.Construction wind structure not only can increase the stability of the above body of the tower of Sarasota top rail in construction, and it can also be used to install the dorsal funciculus tackle pulley that tower district steel case beam lifts by crane the masts type loop wheel machine of usefulness.
Above-mentioned masts type loop wheel machine is by mast, bearing, the dorsal funciculus tackle pulley, the dorsal funciculus hoist engine, the dorsal funciculus steel cable, the lifting tackle pulley, play sling, lifting hoist engine and lifting steel cable are formed, bearing is embedded on the Sarasota top rail, be hinged with the lower end pin of mast, the upper end of mast is connected with the lifting tackle pulley with the dorsal funciculus tackle pulley respectively, dorsal funciculus hoist engine and lifting hoist engine are separately fixed on the operation platform, the dorsal funciculus tackle pulley is connected with the dorsal funciculus hoist engine by the dorsal funciculus steel cable, the lifting tackle pulley is connected with the lifting hoist engine by the lifting steel cable, plays the lower end that sling is installed in the lifting tackle pulley.
Above-mentioned mast is the mast of bridge floor loop wheel machine or is installed in steel mast on the Sarasota top rail.
The tower underbeam section mounting method of large-span steel box girder stayed-cable bridge of the present invention is simple and practical, safe and reliable, economical convenient and be subjected to the construction condition restriction little.Solved the difficult problem in the present large-span steel box girder stayed-cable bridge process of construction.
Description of drawings:
Fig. 1 is one of the construction lateral view that plays the tower crane beam section of the tower underbeam section mounting method of a kind of large-span steel box girder stayed-cable bridge of the present invention.
Fig. 2 is one of the construction front view that plays the tower crane beam section of the tower underbeam section mounting method of a kind of large-span steel box girder stayed-cable bridge of the present invention.
Fig. 3 be a kind of large-span steel box girder stayed-cable bridge of the present invention tower underbeam section mounting method the construction lateral view that plays the tower crane beam section two.
Fig. 4 be a kind of large-span steel box girder stayed-cable bridge of the present invention tower underbeam section mounting method the construction front view that plays the tower crane beam section two.
Fig. 5 be a kind of large-span steel box girder stayed-cable bridge of the present invention tower underbeam section mounting method the construction lateral view that plays the tower crane beam section three.
Fig. 6 be a kind of large-span steel box girder stayed-cable bridge of the present invention tower underbeam section mounting method the construction front view that plays the tower crane beam section three.
Fig. 7 is one of the construction lateral view of installation code beam section of the tower underbeam section mounting method of a kind of large-span steel box girder stayed-cable bridge of the present invention.
Fig. 8 is one of the construction front view of installation code beam section of the tower underbeam section mounting method of a kind of large-span steel box girder stayed-cable bridge of the present invention.
Fig. 9 be a kind of large-span steel box girder stayed-cable bridge of the present invention tower underbeam section mounting method installation code beam section the construction lateral view two.
Figure 10 be a kind of large-span steel box girder stayed-cable bridge of the present invention tower underbeam section mounting method installation code beam section the construction front view two.
Figure 11 is the symmetry lifting construction lateral view of case beam of the tower underbeam section mounting method of a kind of large-span steel box girder stayed-cable bridge of the present invention.
Figure 12 is the symmetry lifting construction front view of case beam of the tower underbeam section mounting method of a kind of large-span steel box girder stayed-cable bridge of the present invention.
The specific embodiment:
The Jing Yue Changjiang River Highway Bridge is the controlled engineering that Suizhou to Yueyang speedway is crossed over the Changjiang river in Hubei Province's " six vertical five horizontal rings " skeleton highway network planning.Main bridge is the two asymmetric hybrid beam cable stayed bridges of rope face of main span 816m double tower.Bridge north main bridge (100m+298m)+816m/2 be in light weight, wind resistance good, Plate of Flat Steel Box Girder handsome in appearance, stride longitudinal section in the main bridge and be positioned at radius R=34650m, length of tangent line T=408.18m, vow circular curve that northern main bridge deck profile grade is 0.356% apart from E=2.4m.Bridge master bridge bridge floor is two-way six-lane, bridge floor effective width 33.5m.
Bridge floor steel case beam is the bilateral box structure of separate type, and the centre connects with gooseneck.Steel case beam is made up of bridge floor top board, base plate, endosternum, outer web, diaphragm, tuyere, anchoring structure etc.The high 3.8m of profile in the steel case beam centerline, overall with is that (contain Bu Suo district and tuyere 2 * 2.5m), be 36.5m in Sarasota place deck-siding constriction to 38.5m, and bridge deck are established 2% two-way horizontal wall inscription, standard beam segment length 15m, maximum lifting weight 317.5t.North tower side is totally 57 girder steel sections, 3 sections in tower district, 26 companies of end bay side socket section, 1 termination sections, 1 end bay closure sections, 26 companies of main span side socket section.
Be subjected to the condition restriction of construction area, large-scale floating crane can't arrive, the main bridge in Jing Yue Changjiang River Highway Bridge north is with the tower underbeam section mounting method of a kind of large-span steel box girder stayed-cable bridge of the present invention, with masts type loop wheel machine and amplitude variation type bridge floor loop wheel machine and small-sized falsework, finish the construction of steel case beam beam section under the northern main bridge tower.
Embodiment 1:
Shown in Fig. 1~12, the construction sequence of the tower underbeam section mounting method of large-span steel box girder stayed-cable bridge of the present invention is:
The construction wind structure of using during (1) by Sarasota top rail 1 and Sarasota construction 2 is set up 3 tower crane districts of masts type loop wheel machine steel case beam 4,9,24,
(2) bridge floor loop wheel machine 5,19 is installed on tower district steel case beam 4,9,24, the first segment standard beam section 6,20 of lifting next-door neighbour tower district steel case beam 4,24,
(3) on mounted first segment standard beam section 6,20, install bridge floor loop wheel machine 5,19 symmetrically, the symmetry lifting of beginning middle of the river side and bank side standard beam section 21,22.
The construction sequence of above-mentioned large-span steel box girder stayed-cable bridge tower lower beam segment mounting method is:
A, on Sarasota lower transverse beam 7, set up small-sized falsework 23 and steel case beam movement track 8 be installed thereon,
B, the masts type loop wheel machine 3 of tower district steel case beam 4,9,24, lifting is installed on Sarasota top rail 1 and above construction wind structure 2 thereof, between king-post,
C, with masts type loop wheel machine 3 rise on the steel case beam movement track 8 of tower crane district steel case beam 4,9,24 to the small-sized falsework 23 successively and movement in place,
D, bridge floor loop wheel machine 5 is installed on the tower district of installation steel case beam 4,9,24,
E, usefulness is the bridge floor loop wheel machine 5 lifting middle of the river side first segment standard beam sections 6 of installation in position, and installation in position is also finished the extension rope,
F, dismounting bridge floor loop wheel machine 5 and commutation are installed on the tower district steel case beam 4,9,24,
G, lifting bank side first segment standard beam section 20 are in place and finish the extension rope,
H, bridge floor loop wheel machine 5 is run on the bank side first segment standard beam section 20,
I, in the middle of a river bridge floor loop wheel machine 19, the symmetry lifting construction of beginning middle of the river side and bank side standard beam section 21,22 be installed on the side first segment standard beam section 6.
The Sarasota top rail 1 of the mast of above-mentioned installation masts type loop wheel machine 3 is top rails of cable stayed bridge king-tower.
Above-mentioned construction wind structure 2 is Steel Space Truss, on construction wind structure 2 dorsal funciculus tackle pulley 12 is arranged.Construction wind structure 2 not only can increase the stability of Sarasota top rail 1 above body of the tower in construction, and it can also be used to install the dorsal funciculus tackle pulley 12 that tower district steel case beam 4,9,24 lifts by crane the masts type loop wheel machine 3 of usefulness.
Above-mentioned masts type loop wheel machine 3 is by mast 14, bearing 15, dorsal funciculus tackle pulley 12, dorsal funciculus hoist engine 16, dorsal funciculus steel cable 13, lifting tackle pulley 17, play sling 25, lifting hoist engine 18 and lifting steel cable 10 are formed, bearing 15 is embedded on the Sarasota top rail 1, be hinged with the lower end pin of mast 14, the upper end of mast 14 is connected with lifting tackle pulley 17 with dorsal funciculus tackle pulley 12 respectively, dorsal funciculus hoist engine 16 and lifting hoist engine 18 are separately fixed on the operation platform 11, dorsal funciculus tackle pulley 12 is connected with dorsal funciculus hoist engine 16 by dorsal funciculus steel cable 13, lifting tackle pulley 17 is connected with lifting hoist engine 18 by lifting steel cable 10, plays the lower end that sling 25 is installed in lifting tackle pulley 17.
Above-mentioned mast 14 is masts of bridge floor loop wheel machine 5,19.
Embodiment 2:
Remove: E, usefulness is the bridge floor loop wheel machine 5 lifting bank side first segment standard beam sections 20 of installation in position, installation in position is also finished the extension rope, G, lifting middle of the river side first segment standard beam section 20 are in place and finish the extension rope, H, bridge floor loop wheel machine 5 is run on the middle of the river side first segment standard beam section 6, I, bridge floor loop wheel machine 19 is installed on bank side first segment standard beam section 20, outside the symmetry lifting construction of beginning middle of the river side and bank side standard beam section 21,22, all the other are all identical with embodiment 1.
Embodiment 3:
Except that: mast 14 was mounted in steel mast on the Sarasota top rail 1, all the other were all identical with embodiment 1.
Embodiment 4:
Remove: D, at the tower district of installation steel case beam 4,9, bridge floor loop wheel machine 19 is installed on 24, E, bridge floor loop wheel machine 19 lifting middle of the river side first segment standard beam sections 6 with installation in position, installation in position is also finished the extension rope, F, remove bridge floor loop wheel machine 19 and commutate and be installed on tower district steel case beam 4,9, on 24, G, lifting bank side first segment standard beam section 20 is in place and finish the extension rope, H, bridge floor loop wheel machine 19 is run on the bank side first segment standard beam section 20, I, bridge floor loop wheel machine 5 is installed on the side first segment standard beam section 6 in the middle of a river, beginning middle of the river side and bank side standard beam section 21, outside 22 the symmetry lifting construction, all the other are all identical with embodiment 1.
Embodiment 5:
Remove: E, usefulness is the bridge floor loop wheel machine 19 lifting bank side first segment standard beam sections 20 of installation in position, installation in position is also finished the extension rope, G, lifting middle of the river side first segment standard beam section 20 are in place and finish the extension rope, H, bridge floor loop wheel machine 19 is run on the middle of the river side first segment standard beam section 6, I, bridge floor loop wheel machine 5 is installed on bank side first segment standard beam section 20, outside the symmetry lifting construction of beginning middle of the river side and bank side standard beam section 21,22, all the other are all identical with embodiment 1.

Claims (6)

1, a kind of large-span steel box girder stayed-cable bridge tower lower beam segment mounting method is characterized in that construction sequence is:
The construction wind structure of using during (1) by Sarasota top rail (1) and Sarasota construction (2) is set up masts type loop wheel machine (3) and is played tower crane district steel case beam (4,9,24),
(2) go up installation bridge floor loop wheel machine (5,19) at tower district steel case beam (4,9,24), the first segment standard beam section (6,20) of lifting next-door neighbour's tower district's steel case beam (4,24),
(3) on mounted first segment standard beam section (6,20), install bridge floor loop wheel machine (5,19) symmetrically, the symmetry lifting of beginning middle of the river side and bank side standard beam section (21,22).
2, large-span steel box girder stayed-cable bridge tower lower beam segment mounting method according to claim 1 is characterized in that construction sequence is:
A, on Sarasota lower transverse beam (7), set up small-sized falsework (23) and steel case beam movement track (8) be installed thereon,
B, go up, install between king-post the masts type loop wheel machine (3) of tower district's steel case beam (4,9,24) lifting at Sarasota top rail (1) and above construction wind structure (2) thereof,
C, play successively with masts type loop wheel machine (3) that the steel case beam movement track (8) of tower crane district steel case beam (4,9,24) to the small-sized falsework (23) gone up and movement is in place,
D, bridge floor loop wheel machine (5) go up to be installed at the tower district of installation steel case beam (4,9,24),
E, usefulness is bridge floor loop wheel machine (5) the lifting middle of the river side first segment standard beam section (6) of installation in position, and installation in position is also finished the extension rope,
F, dismounting bridge floor loop wheel machine (5) and commutation are installed on the tower district steel case beam (4,9,24),
G, lifting bank side first segment standard beam section (20) is in place and finish the extension rope,
H, bridge floor loop wheel machine (5) is run on the bank side first segment standard beam section (20),
I, side first segment standard beam section (6) go up to be installed bridge floor loop wheel machine (19) in the middle of a river, the symmetry lifting construction of beginning middle of the river side and bank side standard beam section (21,22).
3, large-span steel box girder stayed-cable bridge tower lower beam segment mounting method according to claim 1 and 2, the Sarasota top rail (1) that it is characterized in that installing the mast of masts type loop wheel machine (3) is the top rail of cable stayed bridge king-tower.
4, large-span steel box girder stayed-cable bridge tower lower beam segment mounting method according to claim 1 and 2, the wind structure (2) that it is characterized in that constructing is a Steel Space Truss, on construction wind structure (2) dorsal funciculus tackle pulley (12) is arranged.
5, according to claim 1 or 2 or 3 described large-span steel box girder stayed-cable bridge tower lower beam segment mounting method, it is characterized in that masts type loop wheel machine (3) is by mast (14), bearing (15), dorsal funciculus tackle pulley (12), dorsal funciculus hoist engine (16), dorsal funciculus steel cable (13), lifting tackle pulley (17), play sling (25), lifting hoist engine (18) and lifting steel cable (10) are formed, bearing (15) is embedded on the Sarasota top rail (1), be hinged with the lower end pin of mast (14), the upper end of mast (14) is connected with lifting tackle pulley (17) with dorsal funciculus tackle pulley (12) respectively, dorsal funciculus hoist engine (16) and lifting hoist engine (18) are separately fixed on the operation platform (11), dorsal funciculus tackle pulley (12) is connected with dorsal funciculus hoist engine (16) by dorsal funciculus steel cable (13), lifting tackle pulley (17) is connected with lifting hoist engine (18) by lifting steel cable (10), plays the lower end that sling (25) is installed in lifting tackle pulley (17).
6, large-span steel box girder stayed-cable bridge tower lower beam segment mounting method according to claim 5 is characterized in that mast (14) is the mast of bridge floor loop wheel machine (5,19) or is installed in steel mast on the Sarasota top rail (1).
CN2009100582336A 2009-01-22 2009-01-22 Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower Active CN101476294B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100582336A CN101476294B (en) 2009-01-22 2009-01-22 Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100582336A CN101476294B (en) 2009-01-22 2009-01-22 Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower

Publications (2)

Publication Number Publication Date
CN101476294A true CN101476294A (en) 2009-07-08
CN101476294B CN101476294B (en) 2010-10-27

Family

ID=40837068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100582336A Active CN101476294B (en) 2009-01-22 2009-01-22 Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower

Country Status (1)

Country Link
CN (1) CN101476294B (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101966967A (en) * 2010-10-21 2011-02-09 中国化学工程第三建设有限公司 Twin-tower low-pylon self-balancing lifting device
CN101973491A (en) * 2010-10-21 2011-02-16 中国化学工程第三建设有限公司 Construction method for hoisting by using double-tower low-pylon self-balanced elevating device
CN102121234A (en) * 2011-04-23 2011-07-13 中铁三局集团有限公司 Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
CN102154988A (en) * 2011-04-22 2011-08-17 中交隧道工程局有限公司 Arch-after-girder construction method of large-span steel box tacked arch bridge
CN102168405A (en) * 2011-03-18 2011-08-31 重庆城建控股(集团)有限责任公司 Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge
CN102296525A (en) * 2011-05-31 2011-12-28 中铁大桥勘测设计院有限公司 Support system mixed combined beam cable-stayed bridge and construction method thereof
CN102535343A (en) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge
CN101788357B (en) * 2009-12-16 2012-09-05 中铁大桥局股份有限公司 Cable force monitoring method in stayed cable construction of polycarbonate (PC) steel strands
CN102839608A (en) * 2012-09-25 2012-12-26 中铁大桥局集团第四工程有限公司 Composite-section construction method for reinforced concrete composite tower
CN102926329A (en) * 2012-11-23 2013-02-13 江苏省交通工程集团有限公司 Device dedicated for lifting steel box beam of small and medium-sized long-span suspension bridge and lifting method
CN103147404A (en) * 2013-04-02 2013-06-12 中铁大桥局股份有限公司 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN103243654A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN104562944A (en) * 2015-01-29 2015-04-29 山东省交通规划设计院 Large span composite beam cable-stayed bridge side steel box temporary anchorage system
CN105200923A (en) * 2015-09-08 2015-12-30 贵州省公路工程集团有限公司 Hoisting device for steel truss sections of steel truss cable-stayed bridge and hoisting method of hoisting device
CN105317008A (en) * 2015-09-08 2016-02-10 贵州省公路工程集团有限公司 An overall lifting transport method of steel truss girder sections of a steel truss girder cable-stayed bridge
CN105568859A (en) * 2015-12-24 2016-05-11 中铁大桥局集团第二工程有限公司 Dike-striding transfer method for large-tonnage steel beam
CN105839536A (en) * 2016-04-01 2016-08-10 中铁大桥局集团第五工程有限公司 Construction method of cable-stayed bridge pylon
CN106012841A (en) * 2016-05-16 2016-10-12 中交路桥华南工程有限公司 Cable crane and installation method thereof
CN106522101A (en) * 2016-11-17 2017-03-22 中交路桥华东工程有限公司 Construction method of superlong cable beam-free sections of cable-stayed bridge
CN106939553A (en) * 2016-01-05 2017-07-11 宏润建设集团股份有限公司 A kind of Steel Bridge Deck and steel box arch rib installation method
CN109252444A (en) * 2018-01-23 2019-01-22 四川公路桥梁建设集团有限公司 Special construction method for lower cross beam under low lower tower column condition
CN111039206A (en) * 2019-11-26 2020-04-21 中交第二公路工程局有限公司 Method for hoisting steel box girder of cable-stayed bridge
CN113718654A (en) * 2021-09-01 2021-11-30 中电建路桥集团有限公司 Installation structure for ropeless beam section of bridge tower area
CN114657879A (en) * 2022-03-06 2022-06-24 中交第四公路工程局有限公司 Method for hoisting and lifting main beam in suspender area of tied arch bridge with steel truss girder by using cable
CN116853963A (en) * 2023-05-31 2023-10-10 中铁二局集团有限公司 A hoisting device and hoisting method for the main beam of a cable-stayed bridge

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2938029A1 (en) * 1979-09-20 1981-04-02 Polensky & Zöllner, 6000 Frankfurt METHOD FOR PRODUCING A CABLE ROPE OR TOW BELT BRIDGE
CN101210415A (en) * 2007-12-20 2008-07-02 中铁大桥局股份有限公司 Method for mounting bridge main tower cross beam top steel box girder segment

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788357B (en) * 2009-12-16 2012-09-05 中铁大桥局股份有限公司 Cable force monitoring method in stayed cable construction of polycarbonate (PC) steel strands
CN101973491B (en) * 2010-10-21 2012-04-18 中国化学工程第三建设有限公司 Construction method for hoisting by using double-tower low-pylon self-balanced elevating device
CN101973491A (en) * 2010-10-21 2011-02-16 中国化学工程第三建设有限公司 Construction method for hoisting by using double-tower low-pylon self-balanced elevating device
CN101966967A (en) * 2010-10-21 2011-02-09 中国化学工程第三建设有限公司 Twin-tower low-pylon self-balancing lifting device
CN102168405B (en) * 2011-03-18 2013-06-05 重庆城建控股(集团)有限责任公司 Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge
CN102168405A (en) * 2011-03-18 2011-08-31 重庆城建控股(集团)有限责任公司 Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge
CN102154988A (en) * 2011-04-22 2011-08-17 中交隧道工程局有限公司 Arch-after-girder construction method of large-span steel box tacked arch bridge
CN102121234B (en) * 2011-04-23 2012-04-04 中铁三局集团有限公司 Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
CN102121234A (en) * 2011-04-23 2011-07-13 中铁三局集团有限公司 Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
CN102296525A (en) * 2011-05-31 2011-12-28 中铁大桥勘测设计院有限公司 Support system mixed combined beam cable-stayed bridge and construction method thereof
CN102535343A (en) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge
CN102839608B (en) * 2012-09-25 2014-09-24 中铁大桥局集团第四工程有限公司 Composite-section construction method for reinforced concrete composite tower
CN102839608A (en) * 2012-09-25 2012-12-26 中铁大桥局集团第四工程有限公司 Composite-section construction method for reinforced concrete composite tower
CN102926329A (en) * 2012-11-23 2013-02-13 江苏省交通工程集团有限公司 Device dedicated for lifting steel box beam of small and medium-sized long-span suspension bridge and lifting method
CN102926329B (en) * 2012-11-23 2015-01-21 江苏省交通工程集团有限公司 Device dedicated for lifting steel box beam of small and medium-sized long-span suspension bridge and lifting method
CN103147404A (en) * 2013-04-02 2013-06-12 中铁大桥局股份有限公司 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN103243654A (en) * 2013-05-16 2013-08-14 中交路桥华南工程有限公司 Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN104562944A (en) * 2015-01-29 2015-04-29 山东省交通规划设计院 Large span composite beam cable-stayed bridge side steel box temporary anchorage system
CN105200923A (en) * 2015-09-08 2015-12-30 贵州省公路工程集团有限公司 Hoisting device for steel truss sections of steel truss cable-stayed bridge and hoisting method of hoisting device
CN105200923B (en) * 2015-09-08 2018-07-13 贵州省公路工程集团有限公司 A kind of steel truss girder cable-stayed bridge steel truss girder segment handling apparatus and its handling method
CN105317008A (en) * 2015-09-08 2016-02-10 贵州省公路工程集团有限公司 An overall lifting transport method of steel truss girder sections of a steel truss girder cable-stayed bridge
CN105317008B (en) * 2015-09-08 2018-06-29 贵州省公路工程集团有限公司 A kind of Integral lifting method of steel truss girder cable-stayed bridge steel truss girder segment
CN105568859A (en) * 2015-12-24 2016-05-11 中铁大桥局集团第二工程有限公司 Dike-striding transfer method for large-tonnage steel beam
CN105568859B (en) * 2015-12-24 2017-07-21 中铁大桥局集团第二工程有限公司 A kind of large-tonnage steel girder span dike conveyer method
CN106939553A (en) * 2016-01-05 2017-07-11 宏润建设集团股份有限公司 A kind of Steel Bridge Deck and steel box arch rib installation method
CN105839536A (en) * 2016-04-01 2016-08-10 中铁大桥局集团第五工程有限公司 Construction method of cable-stayed bridge pylon
CN105839536B (en) * 2016-04-01 2017-10-27 中铁大桥局集团第五工程有限公司 A kind of construction method of Cable-stayed Bridge Pylon
CN106012841A (en) * 2016-05-16 2016-10-12 中交路桥华南工程有限公司 Cable crane and installation method thereof
CN106522101A (en) * 2016-11-17 2017-03-22 中交路桥华东工程有限公司 Construction method of superlong cable beam-free sections of cable-stayed bridge
CN109252444A (en) * 2018-01-23 2019-01-22 四川公路桥梁建设集团有限公司 Special construction method for lower cross beam under low lower tower column condition
CN111039206A (en) * 2019-11-26 2020-04-21 中交第二公路工程局有限公司 Method for hoisting steel box girder of cable-stayed bridge
CN111039206B (en) * 2019-11-26 2021-09-17 中交第二公路工程局有限公司 Method for hoisting steel box girder of cable-stayed bridge
CN113718654A (en) * 2021-09-01 2021-11-30 中电建路桥集团有限公司 Installation structure for ropeless beam section of bridge tower area
CN113718654B (en) * 2021-09-01 2022-11-22 中电建路桥集团有限公司 Installation structure for ropeless beam section of bridge tower area
CN114657879A (en) * 2022-03-06 2022-06-24 中交第四公路工程局有限公司 Method for hoisting and lifting main beam in suspender area of tied arch bridge with steel truss girder by using cable
CN116853963A (en) * 2023-05-31 2023-10-10 中铁二局集团有限公司 A hoisting device and hoisting method for the main beam of a cable-stayed bridge
CN116853963B (en) * 2023-05-31 2025-02-18 中铁二局集团有限公司 A hoisting device and hoisting method for main beam of cable-stayed bridge

Also Published As

Publication number Publication date
CN101476294B (en) 2010-10-27

Similar Documents

Publication Publication Date Title
CN101476294B (en) Method for mounting lower beam section of large-span steel box girder cable-stayed bridge tower
CN100572673C (en) Span continuous beam bridge fabrication machine in a kind of
CN100476076C (en) Mobile integral construction platform, construction method and special spreader
CN101509229B (en) Method for constructing side span beam section without joist bracket of large-span steel box girder cable-stayed bridge
CN205387439U (en) Mast hoisting accessory
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN101487233B (en) Method for mounting temporary pier top beam section of large-span steel box girder cable-stayed bridge
CN101559905A (en) Deck unit erection gantry
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN105019357B (en) Installation method of special-shaped prefabricated bridge deck on open lattice steel girder of arch bridge
CN205369055U (en) Rotatory lifting device of suspension bridge stiffening beam
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN208167497U (en) A kind of elevated steel suspension bridge navigable
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN101487234B (en) Construction method for transverse beam hoisting in-position of arch first and beam late tied-arch bridge
CN101481903B (en) The method of erecting the main truss of the suspension bridge in mountainous area by reversing the cable-span crane
CN111749140A (en) A truss integral lift bridge high pier climbing formwork device and construction method
CN105484168B (en) Rotary hoisting equipment for stiffening beam of suspension bridge and erecting method of stiffening beam
CN206052568U (en) The long hoist cable of suspension bridge bank slope beam section swings shifting erecting device
CN201473221U (en) Light cable crane for suspension bridge
CN208088097U (en) A kind of three-tower suspension bridge erection of main beam constructing structure
CN203682931U (en) Wharf building crane
CN101591890A (en) Hanging device of large-scale over-long box girder
CN205329550U (en) Suspension bridge catwalk system
CN104495653A (en) Multifunctional large-tonnage beam erecting crane and beam erecting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: SICHUAN SHENGDA TRANSPORTATION RESEARCH + DESIGN CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110808

Address after: 610041 nine Xing Xing Road 12, hi tech Zone, Sichuan, Chengdu

Patentee after: Sichuan Road and Bridge (Group) Co., Ltd.

Address before: 610041 nine Xing Xing Road 12, hi tech Zone, Sichuan, Chengdu

Co-patentee before: SICHUAN SHENGDA COMM SCIENCE RES AND DESIGN Co.,Ltd.

Patentee before: Sichuan Road and Bridge (Group) Co., Ltd.