CN207495779U - It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool - Google Patents

It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool Download PDF

Info

Publication number
CN207495779U
CN207495779U CN201720983748.7U CN201720983748U CN207495779U CN 207495779 U CN207495779 U CN 207495779U CN 201720983748 U CN201720983748 U CN 201720983748U CN 207495779 U CN207495779 U CN 207495779U
Authority
CN
China
Prior art keywords
fixed
tensioning
pile
plate
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720983748.7U
Other languages
Chinese (zh)
Inventor
王鲲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dalishen Pipe Tube Co Ltd
Original Assignee
Jiangsu Dalishen Pipe Tube Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Dalishen Pipe Tube Co Ltd filed Critical Jiangsu Dalishen Pipe Tube Co Ltd
Priority to CN201720983748.7U priority Critical patent/CN207495779U/en
Application granted granted Critical
Publication of CN207495779U publication Critical patent/CN207495779U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool, including pile end board, sealing plate, fixing end component, stretching end component, pipe die and tensioning screw rod component:It is characterized in that:The both ends open of the pipe die is respectively fixed end opening and tensioning end opening, the fixed plate is connected on fixed end opening, and fixed end opening is covered, the sealing plate is located on tensioning end opening, and the fixing end component and stretching end component are arranged at the inside of pipe die.Apply the pretension of equal size to every reinforcing bar by puller system in reinforced bar stretching process, drawn reinforcing bar is fixed on the clamp system after often pulling a reinforcing bar in advance, this causes the tensional state of every reinforcing bar to be consistent, after pretreatment, two times tensioning is carried out to all reinforcing bars, reinforcing steel bar bear in stretching process is consistent, and greatly improves pile pile quality.

Description

It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool
Technical field
The utility model is related to pile pile manufacturing fields, and in particular to a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning Tool.
Background technology
Prestressed concrete member, such as pile pile and square pile etc. are important pile foundation material, especially pile pile, extensively should For
In the foundation engineering of all kinds of buildings and construction, as skyscraper, public building, general industry are built with civilian Build, harbour, harbour, highway, the fields such as bridge, the traditional structure of pile pile includes concrete, steel reinforcement cage, end plate, anchor ear plate (Also referred to as " anchor ear circle " or " skirtboard ")Components are waited, pile pile is generally hollow.Wherein, concrete and steel reinforcement cage form pile pile Pile body, and steel reinforcement cage is then by main reinforcement or PC rod irons(Namely " deformed bar ")The hoop being continuously welded in the shape of a spiral in main reinforcement Muscle forms, and steel reinforcement cage can generally be made by mechanized equipments such as seam welders.The both ends of pile pile pile body are pile crown, traditional Tubular pile head is made of end plate and anchor ear plate, and end plate is arranged on the both ends of pile body, and anchor ear plate passes through welding or riveting with end plate It the modes such as connects to be fixed together, so as to further by end plate anchor ear on pile body, in the prior art, carry out prestressing force main reinforcement During tensioning, end plate plays extremely important effect:The side of end plate needs and stretch board is fixedly connected by nut etc., The opposite side of end plate needs to carry out snapping by dowel hole and main reinforcement, and the power of the generation of stretching machine is eventually transferred to main reinforcement. That is, in the prior art, end plate to pile pile and for be an indispensable part, prestressed stretch-draw especially is being carried out to main reinforcement When, end plate is even more essential, but due to when having end pipe stake manufacture pile end board and the cost of anchor ear plate account for pile pile production cost Major part, cost dearly, and end-plate material is thick in production process, quality is big;And anchor ear plate material is thin, light weight, because This easily leads to the deformation of anchor ear plate, manufacturing process complexity is numerous after end plate and anchor ear plate are riveted or welded in transportational process Trivial, people have invented tubular pile without end plate thus, the quality of pile pile not only with the manufacture level of steel reinforcement cage and manufacture needed for material Expect it is related, it is also related with every main reinforcement stressing conditions during prestressed stretch-draw, due to actual conditions in manufacturing process, can make Length into main reinforcement is different, and for existing end-plate-free tensioning tool often in stretching process, tensioning component applies main pulling force It is added on longer reinforcing bar, and pulling force suffered by shorter reinforcing bar is smaller, causes reinforcing steel bar bear uneven, influences pile pile quality.
Invention content
To solve the deficiencies in the prior art, one end board prestress for no reason is prepared the purpose of this utility model is to provide a kind of Tubular piles stretching has.
In order to realize above-mentioned target, the utility model adopts the following technical scheme:
It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool, including pile end board, sealing plate, fixing end component, tensioning Hold component, pipe die and tensioning screw rod component:The both ends open of the pipe die is respectively to fix end opening and tensioning end opening, described Fixed plate is connected on fixed end opening, and covers fixed end opening, and the sealing plate is located on tensioning end opening, the fixing end Component and stretching end component are arranged at the inside of pipe die;
The fixing end component includes pile end board and fixed endplate, and the fixed endplate is in a manner of dismountable It is connect with fixed plate, the pile end board is removably connect with fixed endplate, and the pile end board is equipped with end Plate draws hole, and the fixed endplate draws hole equipped with partition board, and the end plate draws hole sky and partition board drawing hole site is corresponding;
The stretching end component include cystosepiment, baffle, clamp system, stretch board, tensioning endplate, the cystosepiment with Dismountable mode links together with baffle, and the tensioning endplate is removably connect with clamp system, described Clamp system is equipped with holes for clamping, and the tensioning endplate draws hole, the holes for clamping and partition board drawing hole site phase equipped with partition board It is corresponding;
The tensioning screw rod component is removably connect with stretching end component, and tensioning screw rod is outside inside pipe die Portion stretches.
As the further preferred of the utility model, the fixed endplate draws hole and pile end board draws hole and inserted including reinforcing bar Hole and reinforcing bar counterbore, the reinforcing bar jack are connected with reinforcing bar counterbore.
As the further preferred of the utility model, the fixed plate is equipped with corresponding equipped with position with fixed endplate Screw hole, screw bolt passes fixed plate and fixed endplate connect fixed plate and fixed endplate, the pile end board is cut Face is equipped with bayonet lock, and the pile end board section and pipe die are equipped with the corresponding pin hole in position.
As the further preferred of the utility model, the cystosepiment and the baffle are clamped by U-shaped fastener and connected, The cystosepiment and the baffle are equipped with the corresponding reinforcing bar jack in position, and fixed set several has metal on the clamp system Bar, one end far from baffle is equipped with screw thread in the metallic rod, and the stretch board is equipped with metallic rod, and the metallic rod is separate Stretch board is equipped with screw thread close to one end of clamp system, the metallic rod on the clamp system by it is two-way to connected nut with Metallic rod on pulling plate is docking together.
As the further preferred of the utility model, the pipe die inner wall is equipped with several limited blocks, the limited block position In on same circumference, the stretch board is close to the limited block, and limited block side is equipped with pin hole, and bayonet lock is inserted into after passing through pipe die In pin hole.
As the further preferred of the utility model, the tensioning screw rod component include tensioning screw rod and nut, described One end of screw rod is drawn to be fixed on stretch board, the other end of tensioning screw rod extends, and pass through from the interior of pipe die Sealing plate, locking nut make sealing plate be fixed on tensioning port.
As the further preferred of the utility model, the clamp system includes clamp system main body and clamping element, described It is bolted between clamping main body and clamping element, the clamping element takes the shape of the letter U pipe clamp shape, and the clamp system main body is with clamping The active region of part is equipped with the antiskid thread for preventing slip of bar.
The beneficial effects of the utility model:It is equal big to every reinforcing bar application by puller system in reinforced bar stretching process Small pretension, per drawn reinforcing bar being fixed on the clamp system after pulling a reinforcing bar in advance, this causes every reinforcing bar Tensional state is consistent, and after pretreatment, to all reinforcing bars progress two times tensioning, the reinforcing steel bar bear in stretching process is consistent , greatly improve pile pile quality.
Description of the drawings
Fig. 1 has overall structure diagram for the utility model tensioning;
Fig. 2 positions tensioning tool fixing end partial enlarged view;
Fig. 3 has stretching end partial enlarged view for tensioning;
Fig. 4 is clamp system agent structure schematic diagram;
Fig. 5 is clamping element structure diagram;
Fig. 6 is foam panel structure schematic diagram;
Fig. 7 is baffle arrangement schematic diagram;
Fig. 8 is pile end board structure diagram;
Fig. 9 is fixing end tip plate configurations schematic diagram;
Figure 10 is U-shaped fastener constructions schematic diagram;
Figure 11 is clamp system overall structure diagram;
Figure 12 is clamp system partial enlarged view;
The meaning of reference numeral in figure:1- pipe dies, 2- fixed plates, 3- fix endplate, 4- tubular pile end versions, 5- reinforcing bar upsettings Head, 6- bayonet locks, 7- sealing plates, 8- cystosepiments, 9- baffles, 10- stretch boards, 11- clamp systems, 111- clamp system main bodys, 112- Clamping element, 12- main reinforcements, 13- metallic rods, 14- is two-way to connected nut, 15- limited blocks, 16- tensioning screw rods, 17- locking nuts, 18-U shape fasteners.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is further introduced.
Refering to shown in Fig. 1 to Figure 12, a kind of of the present embodiment prepares one end end-plate-free pile for prestressed pipe tensioning tool, including solid Fixed board 2, sealing plate 7, fixing end component, stretching end component, pipe die 1 and tensioning screw rod component:The both ends open of pipe die 1 is respectively solid Fixed end is open and tensioning end opening, and fixed plate 2 is connected on fixed end opening, and covers fixed end opening, and sealing plate 7 is located at tensioning On end opening, fixing end component and stretching end component are arranged at the inside of pipe die 1;
Fixing end component includes pile end board 4 and fixed endplate 3, and fixed endplate 3 is in a manner of dismountable and solid Fixed board 2 connects, and the pile end board 4 is removably connect with fixed endplate 3, and pile end board 4 draws equipped with end plate Hole, fixed endplate 3 draw hole equipped with partition board, and end plate draws hole sky and partition board drawing hole site is corresponding;
Stretching end component includes cystosepiment 8, baffle 9, clamp system 11, stretch board 10, and particularly, cystosepiment 8 is with removable The mode unloaded links together with baffle 9, and stretch board 10 is removably connect with clamp system 11;
Tensioning screw rod component is removably connect with stretching end component, and tensioning screw rod 16 is outside from 1 inside of pipe die Portion stretches.
The hole of drawing drawn on hole and pile end board 4 on fixed endplate 3 includes reinforcing bar jack and reinforcing bar counterbore, the reinforcing bar Jack is connected with reinforcing bar counterbore.
As shown in Figure 3, it is preferred that the fixed plate 2 of the present embodiment and fixed endplate 3 are corresponding equipped with position is equipped with Screw hole, screw bolt passes fixed plate 2 and fixed endplate 3, fixed plate 2 and fixed endplate 3 are connected, pile end board 4 is cut Face is equipped with bayonet lock 6, and 4 section of pile end board and pipe die 1 are equipped with the corresponding pin hole in position, generally, the quantity of bayonet lock 6 is set It is set to 3.
It is shown such as Fig. 3, Figure 10, it is preferred that cystosepiment 8 and baffle 9 are clamped by U-shaped fastener 18 and connected, cystosepiment 8 Be equipped with the corresponding reinforcing bar jack in position with baffle 9, on clamp system 11 it is fixed set it is several have a metallic rod 13, in metallic rod 13 One end far from clamp system 11 is equipped with screw thread, and stretch board 10 is equipped with similary metallic rod, far from stretch board 10 in metallic rod Screw thread is equipped with close to one end of clamp system 11, the metallic rod 13 on clamp system 11 is by two-way to connected nut 14 and tensioning Metallic rod on plate 10 is docking together;1 inner wall of pipe die is equipped with several limited blocks 15, and limited block 15 is located on same circumference, Stretch board 10 is close to the limited block 15 and is placed, and stretch board side is equipped with pin hole, and bayonet lock is inserted into stretch board 10 after passing through pipe die In the pin hole of side, stretch board 10 is made firmly to be attached onto with limited block 15.
As shown in Figure 1, tensioning screw rod component includes tensioning screw rod 16 and locking nut 17, one end of tensioning screw rod 16 is fixed It is arranged on stretch board 10, the other end of tensioning screw rod 16 extends, and pass through sealing plate 7, locking screw from the interior of pipe die 1 Mother 17 makes sealing plate 7 be fixed on tensioning port.
As shown in Fig. 4, Fig. 5, Figure 11 and Figure 12, clamp system 11 includes clamp system main body 111 and clamping element 112, machine Be bolted between structure main body 111 and clamping element 112, clamping element 11 takes the shape of the letter U pipe clamp shape, in clamp system main body 111 with The active region of clamping element 112 is equipped with the antiskid thread for preventing slip of bar.
With reference to the utility model prestressing force for no reason sheet pile method for stretching to the course of work of the utility model into Row further instruction.
As shown in Figure 1, the method for stretching of one end end-plate-free pile for prestressed pipe of the utility model mainly includes the following steps that:
(a)Steel reinforcement cage after machining is put into mold, wherein above-mentioned steel reinforcement cage is by prestressing force main reinforcement 12 and in spiral shell Rotation shape is welded on the stirrup composition in main reinforcement 12, and prestressing force main reinforcement 12 is set, and prestressing force main reinforcement along the longitudinal direction of pile body 12 one of end is handled by heading;
(b)The fixed endplate 3 of rotation and pile end board 4, make the partition board on fixed endplate 3 draw on hole and pile end board 4 End plate draw hole alignment and merge, hole across partition board is drawn in the end that prestressing force main reinforcement 12 is handled through heading and end plate draws hole, it is complete Into after this process, Swiveling Rebar cage makes the pier nose 5 of main reinforcement drop into partition board and draws in the reinforcing bar counterbore in hole, then, uses bolt respectively Fixed plate 2 and pipe die 1 are linked together, fixed plate 2 and fixed endplate 3 are linked together, bayonet lock 6 passes through pipe die pin hole It is inserted in place afterwards in pile end board 4 in the pin hole of 4 side of pile end board, is made to be close together with fixed endplate 3;
(c)Cystosepiment 8, baffle 9 and clamp system 11 are rotated, makes the reinforcing bar jack on cystosepiment 8, the reinforcing bar on baffle 9 Draw hole alignment, and cystosepiment 8 and baffle 9 are close together, and are clamped with U-shaped fastener 18 on jack and clamp system 11, The U-shaped fastener 18 of the present embodiment is made of elastic metallic, and the distance between 18 liang of pinching ends of fastener are slightly smaller than cystosepiment 8 Then the distance merged with baffle 9, the one end not handled in main reinforcement by heading is sequentially passed through on cystosepiment 8 Reinforcing bar jack, draw hole on reinforcing bar jack and clamp system 11 on baffle 9;At this point, mechanism body 111 on clamp system 11 It is bolted with clamping element 112, but bolt is not tightened, main reinforcement 5 can be slided between clamp system draws hole;
(d)Apply the identical pretension of size to every main reinforcement using puller system, every main reinforcement after prestretching process is completed, Main ribs are fixedly clamped using clamp system 11, after all main reinforcements complete prestretching process, stretch board 10 is rotated, makes tensioning Fixed metallic rod is aligned with metallic rod fixed on clamp system 11 on plate 10, at this point, stretch board 10 is close in limited block 15 On, clamp system 11 and stretch board 10 are linked together to connected nut 14 using two-way, and fixed stretch board 10 with bayonet lock, Locking nut 17 is screwed on after tensioning screw rod 16 fixed on stretch board 10 is passed through sealing plate 7, completes the dress of steel reinforcement cage and tensioning tool Mould, and then prestressed stretch-draw is carried out to prestressing force main reinforcement 5.
After the completion of tensioning step, above-mentioned tensioning component does not take out, but as a part of component of pile pile, continue Other steps of pile pile production are carried out, until producing pile pile finished product, in above-mentioned tensioning component, clamp system 11 and baffle 9 Between there are certain gaps, after pile pile is obtained, the extra reinforcing bar of end-plate-free one end is cut, formed 6cm long it is pre- Stay end.
By understanding that this practicality is new to the introduction of the utility model structure that sheet pile tensioning has for no reason and method for stretching above Type applies every reinforcing bar by puller system in reinforced bar stretching process the pretension of equal size, every to pull a reinforcing bar in advance Drawn reinforcing bar is fixed on the clamp system afterwards, this causes the tensional state of every reinforcing bar to be consistent, right after pretreatment All reinforcing bars carry out two times tensionings, and the reinforcing steel bar bear in stretching process is consistent, and greatly improves pile pile quality.
The above is only the preferred embodiment of the utility model patent, it is noted that for the general of the art For logical technical staff, under the premise of the utility model patent principle is not departed from, several improvements and modifications can also be made, this A little improvements and modifications also should be regarded as the protection domain of the utility model patent.

Claims (7)

1. a kind of prepare one end end-plate-free pile for prestressed pipe tensioning tool, including pile end board, sealing plate, fixing end component, stretching end Component, pipe die and tensioning screw rod component:It is characterized in that:The both ends open of the pipe die is respectively fixed end opening and stretching end Opening, the fixed plate is connected on fixed end opening, and covers fixed end opening, and the sealing plate is located on tensioning end opening, The fixing end component and stretching end component are arranged at the inside of pipe die;
The fixing end component includes pile end board and fixed endplate, the fixed endplate removably with fixation Plate connects, and the pile end board is removably connect with fixed endplate, and the pile end board draws hole equipped with end plate, The fixed endplate draws hole equipped with partition board, and the end plate draws hole sky and partition board drawing hole site is corresponding;
The stretching end component includes cystosepiment, baffle, clamp system, stretch board, tensioning endplate, and the cystosepiment is with removable The mode unloaded links together with baffle, and the tensioning endplate is removably connect with clamp system, the clamping Mechanism is equipped with holes for clamping, and the tensioning endplate draws hole equipped with partition board, and the holes for clamping is corresponding with partition board drawing hole site;
The tensioning screw rod component is removably connect with stretching end component, and tensioning screw rod is drawn from pipe die interior It stretches.
2. a kind of tubular piles stretching tool according to claim 1, which is characterized in that the fixed endplate draws hole and tubular pile end Plate draws hole and includes reinforcing bar jack and reinforcing bar counterbore, and the reinforcing bar jack is connected with reinforcing bar counterbore.
3. a kind of tubular piles stretching tool according to claim 1, which is characterized in that set on the fixed plate and fixed endplate Have equipped with the corresponding screw hole in position, screw bolt passes fixed plate and fixed endplate, fixed plate and fixed endplate are connected It connects, the pile end board section is equipped with bayonet lock, and the pile end board section and pipe die are equipped with the corresponding pin hole in position.
4. a kind of tubular piles stretching tool according to claim 1, which is characterized in that the cystosepiment and the baffle pass through U Shape fastener clamps connection, and the cystosepiment and the baffle are equipped with the corresponding reinforcing bar jack in position, the clamp system Upper fixation set it is several have a metallic rod, one end far from baffle is equipped with screw thread in the metallic rod, and the stretch board is equipped with gold Belong to bar, the metallic rod is equipped with screw thread far from stretch board close to one end of clamp system, the metallic rod on the clamp system It is docking together by two-way to connected nut and the metallic rod on stretch board.
5. a kind of tubular piles stretching tool according to claim 1, which is characterized in that the pipe die inner wall is equipped with several limitings Block, the limited block are located on same circumference, and the stretch board is close to the limited block, and limited block side is equipped with pin hole, bayonet lock It is inserted into pin hole after across pipe die.
6. a kind of tubular piles stretching tool according to claim 1, which is characterized in that the tensioning screw rod component includes tensioning spiral shell Bar and nut, one end of the tensioning screw rod are fixed on stretch board, the other end of tensioning screw rod from the inside of pipe die to Outside extension, and across sealing plate, locking nut makes sealing plate be fixed on tensioning port.
7. a kind of tubular piles stretching tool according to claim 1, which is characterized in that the clamp system includes clamp system master Body and clamping element are bolted between the clamp system main body and clamping element, and the clamping element takes the shape of the letter U pipe clamp shape, institute State the antiskid thread for being equipped in clamp system main body with the active region of clamping element and preventing slip of bar.
CN201720983748.7U 2017-08-08 2017-08-08 It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool Active CN207495779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720983748.7U CN207495779U (en) 2017-08-08 2017-08-08 It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720983748.7U CN207495779U (en) 2017-08-08 2017-08-08 It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool

Publications (1)

Publication Number Publication Date
CN207495779U true CN207495779U (en) 2018-06-15

Family

ID=62497608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720983748.7U Active CN207495779U (en) 2017-08-08 2017-08-08 It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool

Country Status (1)

Country Link
CN (1) CN207495779U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113183313A (en) * 2021-05-07 2021-07-30 青岛昊河建筑建材科技有限公司 Prefabricated square pile reinforcing bar tensioning equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113183313A (en) * 2021-05-07 2021-07-30 青岛昊河建筑建材科技有限公司 Prefabricated square pile reinforcing bar tensioning equipment

Similar Documents

Publication Publication Date Title
CN101538939B (en) Construction method for preset nut type steel-reinforced concrete compound pier template fixing device
CN211007659U (en) Device for controlling forming of embedded steel plate in concrete column on column surface
CN110630011A (en) Template reinforcing system for double shear walls at deformation joint and construction method thereof
CN107366353B (en) A kind of assembled steel reinforced concrete frame column with variable cross-sections and its construction method
CN207495779U (en) It is a kind of to prepare one end end-plate-free pile for prestressed pipe tensioning tool
CN206245471U (en) A kind of dismountable assembled steel reinforced concrete column splices node with post
CN111851987B (en) Construction method of attached short-limb I-shaped steel basket pull rod pull-knot type cantilever frame
CN211114842U (en) Repeatedly usable's split bolt
JPH09125317A (en) Reinforced construction of reinforced concrete column base and reinforcing method thereof
CN208280453U (en) Girder with rolled steel section en cased in concrete lacing wire constructing device
CN218375201U (en) Frame post and wall body crossing department constructional column unilateral template reinforcing apparatus
CN203937017U (en) Stretch-draw assembly for the production of end-plate-free prestressed-concrete pile
CN207608814U (en) Bridge circular-sectioned pier is socketed the fixing device of rectangular bent cap anchor bar skeleton
CN216108090U (en) Be used for reinforced (rfd) appurtenance of bridge concrete anticollision barrier inner formword
CN212317478U (en) A anchor clamps for assembled steel bar truss floor bearing plate
CN215105454U (en) Prefabricated and cast-in-place piled raft foundation that combines together
CN219255980U (en) Fixing device for prefabricated box girder inner mold
KR100695491B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
CN211114417U (en) Novel steel-concrete composite beam structure of tensile shear
CN212002269U (en) Concrete beam side form reinforcing apparatus
CN207757815U (en) The dies plate tap structure of Precast T-Beam
CN109162371A (en) A kind of fixed structure and its construction method of outer patch rubber fastening band
KR101468037B1 (en) The filler injection coupler for an iron reinforcing rod
CN111270846A (en) Fixing structure of I-steel of overhanging scaffold
CN218479548U (en) Assembled side form reinforcing fastener

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant