CN207491691U - A kind of tree crown fixed structure of ornamental plant plantation - Google Patents
A kind of tree crown fixed structure of ornamental plant plantation Download PDFInfo
- Publication number
- CN207491691U CN207491691U CN201721529639.4U CN201721529639U CN207491691U CN 207491691 U CN207491691 U CN 207491691U CN 201721529639 U CN201721529639 U CN 201721529639U CN 207491691 U CN207491691 U CN 207491691U
- Authority
- CN
- China
- Prior art keywords
- sliding sleeve
- tree crown
- column
- wall
- ring portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of tree crown fixed structures of ornamental plant plantation, include the column of four rectangular arrangements, and it is connected to the side link between two adjacent columns, a sliding sleeve is provided at the close top position of the column, an annular groove is provided at the outer wall of the sliding sleeve, binding rope is combined with by the annular groove, annular is provided with more than two ring portions at the outer wall of the sliding sleeve, limb traction rope is combined with by the ring portion, the lower end of the column is provided with the grounding rod for being inserted into ground, the first sliding sleeve is provided on the shaft of the side link, welding is provided with the first ring portion at the outer wall of first sliding sleeve, first ring portion is combined with haul line, that one end fits of the haul line far from first ring portion have an anchor pole, the haul line is wrapped on the shaft of the anchor pole;The present apparatus can effectively fix the tree crown part of plant, avoid or reduce tree crown generation and significantly shake.
Description
Technical field
The utility model is related to a kind of tree crown fixed structures of ornamental plant plantation.
Background technology
Ornamental plant is frequently encountered strong wind weather in planting process, higher for Partial Height, and vertical tube is more
Luxuriant plant, the probability to fracture is higher, the reason is that the front face area of tree crown is larger, tree crown generates during shaking
Larger torque so that the trunk of plant fractures.
Based on the above problem, it is desirable to provide a kind of tree crown part that can effectively fix plant avoids or reduces tree crown hair
The raw tree crown fixed structure of ornamental plant plantation significantly shaken.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of tree crown parts that can effectively fix plant, avoid
Or reduce the tree crown fixed structure of ornamental plant plantation that tree crown generation is significantly shaken.
The utility model is achieved through the following technical solutions:
A kind of tree crown fixed structure of ornamental plant plantation, column including four rectangular arrangements and is connected to two
Side link between the adjacent column of root, is connected with iron wire, in leaning on for the column between the side link and the column
A sliding sleeve is provided at nearly top position, there is the screw for connecting the column at the outer wall of the sliding sleeve, the sliding sleeve
An annular groove is provided at outer wall, binding rope is combined with by the annular groove, annular is provided at the outer wall of the sliding sleeve
More than two ring portions are combined with limb traction rope by the ring portion, and the lower end of the column, which is provided with, is inserted into ground
Grounding rod is provided with the first sliding sleeve on the shaft of the side link, is welded at the outer wall of first sliding sleeve and be provided with first
Ring portion is combined with the second screw between first sliding sleeve and the side link, first ring portion is combined with haul line, described
That one end fits of haul line far from first ring portion have an anchor pole, and limited block is provided at the top of the anchor pole, described to hang
Drawstring is wrapped on the shaft of the anchor pole.
Preferably, the column includes the more rod pieces stacked gradually, and the upper end of the rod piece is provided with inserted link, the bar
The lower end of part is provided with the jack for assigning the inserted link, has the first spiral shell of the fixed inserted link at the outer wall of the rod piece
Thread, the first inserted link is provided at the top of the grounding rod, first inserted link coordinates the jack, and the length of column can pass through
The stacking of rod piece is adjusted, and meets the fixation needs of the plant of different height, and is stored after being also easily removable.
Preferably, the side link is hollow steel rod piece.
Preferably, the length of the single rod piece is 60cm-80cm, and the rod piece is hollow steel rod piece.
Preferably, the grounding rod be pyramidal structure, the grounding rod be solid steel stem, the grounding rod top position
The place of putting is provided with baffle.
The present apparatus holistic conformation time in 30min-45min, therefore when large area is needed to fix, needs be connected to typhoon
Start to arrange after early warning.
The beneficial effects of the utility model are:The present apparatus when in use, is not fixed trunk, and column is fixed on by grounding rod
On ground, by being fixed to each other between side link realization column, a firm frame structure is formed, passes through and binds rope binding
Tree crown limb nearby connects longer tree crown strut by limb traction rope, and pass through limb traction rope by tree crown strut to
Drop-down, reduces height, and the present apparatus can effectively fix the tree crown part of plant, avoid or reduce the shaking of tree crown, avoid leading
Dry to fracture, the structure of the present apparatus is relatively simple, and cost is more cheap, is suitble to promote the use of.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the front view of the utility model;
Fig. 2 is the front view of rod piece;
Fig. 3 is the front view of grounding rod.
Specific embodiment
All features or disclosed all methods disclosed in this specification or in the process the step of, in addition to mutually exclusive
Feature and/or step other than, can combine in any way.
This specification(Including any accessory claim, abstract and attached drawing)Disclosed in any feature, except non-specifically chatting
It states, can be replaced by other alternative features that are equivalent or have similar purpose.That is, unless specifically stated, each feature is only
It is an example in a series of equivalent or similar characteristics.
The tree crown fixed structure of a kind of ornamental plant plantation as shown in Figure 1, Figure 2 and Figure 3, including four rectangular rows
The column 1 of cloth and the side link 2 being connected between two adjacent columns 1, connect between the side link 2 and the column 1
Iron wire 3 is connected to, a sliding sleeve 4 is provided at the close top position of the column 1, there is connection at the outer wall of the sliding sleeve 4
The screw 401 of the column 1 is provided with an annular groove 402 at the outer wall of the sliding sleeve 4, is coordinated by the annular groove 402
There is binding rope 403, annular is provided with more than two ring portions 404 at the outer wall of the sliding sleeve 4, matches by the ring portion 404
Conjunction has limb traction rope 405, and the lower end of the column 1 is provided with the grounding rod 5 for being inserted into ground, in the bar of the side link 2
It is provided with the first sliding sleeve 6 with it, is welded at the outer wall of first sliding sleeve 6 and is provided with the first ring portion 601, first sliding sleeve 6
The second screw 611 is combined between the side link 2, first ring portion 601 is combined with haul line 602, the haul line
602 that one end fits far from first ring portion 601 have an anchor pole 7, and the top of the anchor pole 7 is provided with limited block 701, institute
Haul line 602 is stated to be wrapped on the shaft of the anchor pole 7.
A preferred embodiment in the utility model, the column 1 includes the more rod pieces 111 stacked gradually, described
The upper end of rod piece 111 is provided with inserted link 112, and the lower end of the rod piece 111 is provided with the jack for assigning the inserted link 112(Not
Diagram), there is at the outer wall of the rod piece 111 first screw 113 of the fixed inserted link 112, the top of the grounding rod 5
Be provided with the first inserted link 511, first inserted link 511 coordinates the jack, the length of column can by the stacking of rod piece into
Row is adjusted, and meets the fixation needs of the plant of different height, and stored after being also easily removable.
A preferred embodiment in the utility model, the side link 2 are hollow steel rod piece.
A preferred embodiment in the utility model, the length of the single rod piece 111 are 80cm, the rod piece 111
For hollow steel rod piece.
A preferred embodiment in the utility model, the grounding rod 5 are pyramidal structure, and the grounding rod 5 is solid
Steel stem is provided with baffle 555 at the top position of the grounding rod 5.
The present apparatus holistic conformation time in 30min-45min, therefore when large area is needed to fix, needs be connected to typhoon
Start to arrange after early warning.
The beneficial effects of the utility model are:The present apparatus when in use, is not fixed trunk, and column is fixed on by grounding rod
On ground, by being fixed to each other between side link realization column, a firm frame structure is formed, passes through and binds rope binding
Tree crown limb nearby connects longer tree crown strut by limb traction rope, and pass through limb traction rope by tree crown strut to
Drop-down, reduces height, and the present apparatus can effectively fix the tree crown part of plant, avoid or reduce the shaking of tree crown, avoid leading
Dry to fracture, the structure of the present apparatus is relatively simple, and cost is more cheap, is suitble to promote the use of.
The above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to
In this, any change or replacement expected without creative work should be covered within the scope of the utility model.
Therefore, the scope of protection of the utility model should be determined by the scope of protection defined in the claims.
Claims (5)
1. a kind of tree crown fixed structure of ornamental plant plantation, it is characterised in that:Column including four rectangular arrangements and
The side link being connected between two adjacent columns, is connected with iron wire, described between the side link and the column
A sliding sleeve is provided at the close top position of column, there is the screw for connecting the column, institute at the outer wall of the sliding sleeve
It states and an annular groove is provided at the outer wall of sliding sleeve, binding rope, the ring at the outer wall of the sliding sleeve are combined with by the annular groove
Shape is provided with more than two ring portions, is combined with limb traction rope by the ring portion, the lower end of the column is provided with insertion
The grounding rod on ground is provided with the first sliding sleeve on the shaft of the side link, welds and set at the outer wall of first sliding sleeve
The first ring portion is equipped with, the second screw is combined between first sliding sleeve and the side link, first ring portion, which is combined with, hangs
Drawstring, that one end fits of the haul line far from first ring portion have an anchor pole, limiting are provided at the top of the anchor pole
Block, the haul line are wrapped on the shaft of the anchor pole.
2. the tree crown fixed structure of ornamental plant plantation according to claim 1, it is characterised in that:The column includes
The more rod pieces stacked gradually, the upper end of the rod piece are provided with inserted link, and the lower end of the rod piece, which is provided with, assigns the inserted link
Jack has the first screw of the fixed inserted link at the outer wall of the rod piece, is provided at the top of the grounding rod
First inserted link, first inserted link coordinate the jack.
3. the tree crown fixed structure of ornamental plant plantation according to claim 1, it is characterised in that:The side link is
Hollow steel rod piece.
4. the tree crown fixed structure of ornamental plant plantation according to claim 2, it is characterised in that:The single rod piece
Length for 60cm-80cm, the rod piece is hollow steel rod piece.
5. the tree crown fixed structure of ornamental plant plantation according to claim 2, it is characterised in that:The grounding rod is
Pyramidal structure, the grounding rod are solid steel stem, and baffle is provided at the top position of the grounding rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721529639.4U CN207491691U (en) | 2017-11-16 | 2017-11-16 | A kind of tree crown fixed structure of ornamental plant plantation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721529639.4U CN207491691U (en) | 2017-11-16 | 2017-11-16 | A kind of tree crown fixed structure of ornamental plant plantation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207491691U true CN207491691U (en) | 2018-06-15 |
Family
ID=62504315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721529639.4U Expired - Fee Related CN207491691U (en) | 2017-11-16 | 2017-11-16 | A kind of tree crown fixed structure of ornamental plant plantation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207491691U (en) |
-
2017
- 2017-11-16 CN CN201721529639.4U patent/CN207491691U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205902538U (en) | Novel ornamental trees and shrubs support fixedly device | |
CN206506969U (en) | One kind is used for viticultural column hack lever | |
CN207491691U (en) | A kind of tree crown fixed structure of ornamental plant plantation | |
CN206879618U (en) | Fruit tree branch pulling wind-proof device | |
CN208597439U (en) | Pear tree composite frame | |
CN207443646U (en) | A kind of tomato climbs climing frame | |
CN106804321B (en) | A kind of waste tire flowerpot and its manufacture method | |
CN206681482U (en) | A kind of colored pond guardrail | |
CN206078362U (en) | Network structure vine shoot pergola | |
CN207995747U (en) | A kind of low branch point tree support | |
CN107006333A (en) | A kind of convenient trees supporting device | |
CN207854650U (en) | A kind of wine-growing frame | |
CN207099876U (en) | A kind of potted plant liana rack of contraction type | |
CN206744073U (en) | A kind of anti-hail net cap | |
CN207491686U (en) | A kind of ornamental plant multifunctional sun-shielding frame | |
CN206413629U (en) | A kind of rice field insect-killing lamp | |
CN206294578U (en) | One planting fruit-trees climbing frame | |
CN105545078A (en) | Fast-built tent | |
CN205284365U (en) | Pillar with connecting piece zonulae occludens | |
CN205320759U (en) | Vinegrowing frame | |
CN204929848U (en) | Booth frame for yangtao | |
CN104266562B (en) | The tree crown pruning gauge of pyramid litchi | |
CN207854787U (en) | A kind of novel poultry device for feeding | |
CN203827766U (en) | Pruning mode support system for fruit tree trunk shapes | |
CN215912686U (en) | Frame is planted to hot pepper |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180615 Termination date: 20181116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |