CN207488289U - For simulating the experimental provision of opencast coal mine dump soil erosion of side slope - Google Patents

For simulating the experimental provision of opencast coal mine dump soil erosion of side slope Download PDF

Info

Publication number
CN207488289U
CN207488289U CN201721677620.4U CN201721677620U CN207488289U CN 207488289 U CN207488289 U CN 207488289U CN 201721677620 U CN201721677620 U CN 201721677620U CN 207488289 U CN207488289 U CN 207488289U
Authority
CN
China
Prior art keywords
side slope
soil
coal mine
simulation
opencast coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721677620.4U
Other languages
Chinese (zh)
Inventor
张萌
刘莹雪
赵露
陆兆华
覃昕
宋淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201721677620.4U priority Critical patent/CN207488289U/en
Application granted granted Critical
Publication of CN207488289U publication Critical patent/CN207488289U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model belongs to analog machine technical field, and in particular to a kind of experimental provision for being used to simulate opencast coal mine dump soil erosion of side slope.The experimental provision described in the utility model for being used to simulate opencast coal mine dump soil erosion of side slope, including pedestal, simulation side slope and water and soil collector, the soil for simulating opencast coal mine dump side slope water and soil can be laid in the simulation side slope, the simulation side slope is set on the top of the pedestal and is connected with one end of the pedestal, the simulation side slope can be rotated around described one end of the pedestal, the water and soil collector is set on the first end of the simulation side slope, for collecting the soil being lost in the simulation side slope.By using described in the utility model for simulating the experimental provision of opencast coal mine dump soil erosion of side slope, opencast coal mine dump soil erosion of side slope can be effectively simulated on experimental provision, the expansion for correlative study work provides technical support.

Description

For simulating the experimental provision of opencast coal mine dump soil erosion of side slope
Technical field
The utility model belongs to analog machine technical field, and in particular to one kind is used to simulate opencast coal mine dump side slope The experimental provision of soil erosion.
Background technology
During coal mining, ground, spoil, tailing the like waste that stripping is banked up in the inside and outside layering in exploiting field form refuse dump, The ecosystem of extreme degradation is formed under human interference.China coal industry is over more than 50 years, add up discharge waste 5 × 1010T forms more than 2800 seat of refuse dump, takes up an area 6.5 × 104hm2.Refuse dump destroy natural landscape, cause soil, underground water and The serious pollution of air, particularly soil erosion of side slope is serious, and geological disaster easily occurs.In recent years, it is answered about refuse dump soil It cultivates, the research in terms of ecological recovery and environmental improvement is increasingly taken seriously, and the announcement of refuse dump soil erosion of side slope rule It is basis and the premise for carrying out refuse dump ecological recovery.
Utility model content
The purpose of this utility model is above-mentioned at least one in order to solve the problems, such as, which is by following technology What scheme was realized.
It is special the utility model proposes a kind of for simulating the experimental provision of opencast coal mine dump soil erosion of side slope Sign is, including pedestal, simulation side slope and water and soil collector, can be laid with to simulate open coal mine row in the simulation side slope The soil of native field side slope water and soil, the simulation side slope are set on the top of the pedestal and are connected with one end of the pedestal, institute Stating simulation side slope can be rotated around described one end of the pedestal, and the water and soil collector is set on the of the simulation side slope One end, for collecting the soil being lost in from the simulation side slope when being tested.
Further, the bottom of the simulation side slope is equipped with marble slab and/or cement plate.
Further, it is described to be layed in the marble for simulating the soil of opencast coal mine dump side slope water and soil On plate and/or the cement plate.
Further, it is described to include refuse dump original soil, bastard coal for simulating the soil of opencast coal mine dump side slope water and soil Stone and dregs.
Further, the first end of the simulation side slope is connected to described the one of the pedestal by hinged mode It holds, fixed baffle is respectively equipped on the second end of the simulation side slope and two sides.
Further, the pedestal and it is described simulation side slope between be equipped with supporting rod, the top of the supporting rod with it is described The bottom of simulation side slope is hinged, and the bottom end of the supporting rod and the piston rod of the hydraulic cylinder in the pedestal are hinged.
Further, the square of the water and soil collector, the simulation side slope and the pedestal to be welded by angle steel Shape babinet.
Further, the water and soil collector is connected to the first end of the simulation side slope by welding.
Further, the surface of the water and soil collector is equipped with filter paper.
By using described in the utility model for simulating the experimental provision of opencast coal mine dump soil erosion of side slope, Opencast coal mine dump soil erosion of side slope can be effectively simulated on experimental provision, the expansion for correlative study work provides Technical support.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field Technical staff will become clear.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to this practicality Novel limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the overall structure diagram of the utility model embodiment.
Respectively label represents as follows in attached drawing:
10:Pedestal, 11:Hydraulic cylinder, 12:Supporting rod;
20:Simulate side slope, 21:Refuse dump original soil, 22:Gangue, 23:Dregs;24th, fixed baffle;
30:Water and soil collector.
Specific embodiment
The illustrative embodiments of the disclosure are more fully described below with reference to accompanying drawings.Although this public affairs is shown in attached drawing The illustrative embodiments opened, it being understood, however, that may be realized in various forms the disclosure without the reality that should be illustrated here The mode of applying is limited.It is to be able to be best understood from the disclosure, and can be by this public affairs on the contrary, providing these embodiments The range opened completely is communicated to those skilled in the art.
Fig. 1 is the overall structure diagram of the utility model embodiment.As shown in Figure 1, it is used to simulate in the present embodiment The experimental provision of opencast coal mine dump soil erosion of side slope, including pedestal 10, simulation side slope 20 and water and soil collector 30.Simulation The soil for simulating opencast coal mine dump side slope water and soil can be laid in side slope 20, simulation side slope 20 is set on the upper of pedestal 10 It is connected just and with one end of pedestal 10, simulation side slope 20 can be rotated around one end of pedestal 10, and water and soil collector 30 is set In the first end of simulation side slope 20, for collecting the soil being lost in from simulation side slope 20 when being tested.
In the present embodiment, the rectangular box of water and soil collector 30, simulation side slope 20 and pedestal 10 to be welded by angle steel Body.Water and soil collector 30 is connected to the first end of simulation side slope 20 by welding.
Position as shown in Figure 1, the first end of simulation side slope 20 are to simulate one end that side slope 20 is connected with pedestal 10, In order to make the simulation of the slope surface of the realization different angle of simulation side slope 20, the first end of simulation side slope 20 passes through hinged mode It is connected to the left end of pedestal 10.Since simulation side slope 20 is equipped with the soil for simulating opencast coal mine dump side slope water and soil, Soil is scattering into the outside of simulation side slope 20 in order to prevent, and fixed gear is respectively equipped on the right end of simulation side slope 20 and two sides Plate 24.
Further, the bottom of simulation side slope 20 is equipped with artificial flags, and artificial flags can select marble slab and/or water Any one of mud plate is set on people since simulation side slope 20 is equipped with for simulating the soil of opencast coal mine dump side slope water and soil On work slabstone, in order to preferably simulate the loss of opencast coal mine dump side slope water and soil, wherein for simulating open coal mine casting The soil of field side slope water and soil includes refuse dump original soil 21, gangue 22 and dregs 23.
It, can be effective by using the simulation of artificial flags realization different soils, the soil erosion of side slope of different angle Simulate the wastage of opencast coal mine dump side slope water and soil.
Further, in order to effectively control the gradient angle for simulating side slope 20, various outdoor coals are realized The accurate simulation of ore deposit refuse dump soil erosion of side slope is equipped with supporting rod 12 between pedestal 10 and simulation side slope 20.Supporting rod 12 Top and simulate the bottom of side slope 20 and be hinged, the bottom end of supporting rod 12 and the piston rod of the hydraulic cylinder 11 in the pedestal 10 are cut with scissors It connects.By stretching motion of the piston rod in hydraulic cylinder 11, supporting rod 12 is driven to be rotated, so as to complete simulation side slope 20 The positioning of different angle, the accurate turnover rate for simulating opencast coal mine dump side slope water and soil.
Further, in order to accurately measure soil erosion rate, the surface of water and soil collector 30 is equipped with filter paper.Pass through weighing The weight change of filter paper calculates soil erosion amount.
By using described in the utility model for simulating the experimental provision of opencast coal mine dump soil erosion of side slope, Opencast coal mine dump soil erosion of side slope can be effectively simulated on experimental provision, the expansion for correlative study work provides Technical support.
The preferable specific embodiment of the above, only the utility model, but the scope of protection of the utility model is not This is confined to, in the technical scope that any one skilled in the art discloses in the utility model, can be readily occurred in Change or replacement, should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with Subject to the scope of the claims.

Claims (9)

1. a kind of experimental provision for being used to simulate opencast coal mine dump soil erosion of side slope, which is characterized in that including pedestal, mould Intend side slope and water and soil collector, the soil for simulating opencast coal mine dump side slope water and soil can be laid in the simulation side slope Earth, the simulation side slope are set on the top of the pedestal and are connected with one end of the pedestal, and the simulation side slope can be around Described one end of the pedestal is rotated, and the water and soil collector is set on the first end of the simulation side slope, for collecting The soil being lost in from the simulation side slope when being tested.
2. the experimental provision according to claim 1 for being used to simulate opencast coal mine dump soil erosion of side slope, feature It is, the bottom of the simulation side slope is equipped with marble slab and/or cement plate.
3. the experimental provision according to claim 2 for being used to simulate opencast coal mine dump soil erosion of side slope, feature It is, it is described to be layed in the marble slab and/or described for the soil of simulating opencast coal mine dump side slope water and soil On cement plate.
4. the experimental provision according to claim 3 for being used to simulate opencast coal mine dump soil erosion of side slope, feature It is, it is described to include refuse dump original soil, gangue and dregs for simulating the soil of opencast coal mine dump side slope water and soil.
5. being filled for simulating the experiment of opencast coal mine dump soil erosion of side slope according to any one of claim 1-4 It puts, which is characterized in that the first end of the simulation side slope is connected to described one end of the pedestal by hinged mode, Fixed baffle is respectively equipped on the second end of the simulation side slope and two sides.
6. being filled for simulating the experiment of opencast coal mine dump soil erosion of side slope according to any one of claim 1-4 It puts, which is characterized in that be equipped with supporting rod, the top of the supporting rod and the simulation between the pedestal and the simulation side slope The bottom of side slope is hinged, and the bottom end of the supporting rod and the piston rod of the hydraulic cylinder in the pedestal are hinged.
7. being filled for simulating the experiment of opencast coal mine dump soil erosion of side slope according to any one of claim 1-4 It puts, which is characterized in that the rectangular box of the water and soil collector, the simulation side slope and the pedestal to be welded by angle steel Body.
8. the experimental provision according to claim 7 for being used to simulate opencast coal mine dump soil erosion of side slope, feature It is, the water and soil collector is connected to the first end of the simulation side slope by welding.
9. the experimental provision according to claim 7 for being used to simulate opencast coal mine dump soil erosion of side slope, feature It is, the surface of the water and soil collector is equipped with filter paper.
CN201721677620.4U 2017-12-05 2017-12-05 For simulating the experimental provision of opencast coal mine dump soil erosion of side slope Active CN207488289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721677620.4U CN207488289U (en) 2017-12-05 2017-12-05 For simulating the experimental provision of opencast coal mine dump soil erosion of side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721677620.4U CN207488289U (en) 2017-12-05 2017-12-05 For simulating the experimental provision of opencast coal mine dump soil erosion of side slope

Publications (1)

Publication Number Publication Date
CN207488289U true CN207488289U (en) 2018-06-12

Family

ID=62458706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721677620.4U Active CN207488289U (en) 2017-12-05 2017-12-05 For simulating the experimental provision of opencast coal mine dump soil erosion of side slope

Country Status (1)

Country Link
CN (1) CN207488289U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110967469A (en) * 2019-12-25 2020-04-07 河南理工大学 Simulation test system suitable for ecological restoration of mine
CN114720660A (en) * 2022-03-31 2022-07-08 神华北电胜利能源有限公司 Method for researching soil structure and function recovery rule in open coal mine refuse dump

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110967469A (en) * 2019-12-25 2020-04-07 河南理工大学 Simulation test system suitable for ecological restoration of mine
CN114720660A (en) * 2022-03-31 2022-07-08 神华北电胜利能源有限公司 Method for researching soil structure and function recovery rule in open coal mine refuse dump

Similar Documents

Publication Publication Date Title
CN204731234U (en) Close-in seams water protection mining solid-liquid coupling analog simulation device
CN109024467A (en) A kind of mud-rock flow dam break imitative experimental appliance under difference ditch bed form
CN103837360B (en) Tunnel pipe shed construction method simulated excavation device and implementation method thereof
CN207488289U (en) For simulating the experimental provision of opencast coal mine dump soil erosion of side slope
CN207730761U (en) A kind of experimental rig of simulation shield tunnel construction
CN106092868B (en) A kind of experimental provision for simulating salinized soil environment road structure layer Mechanism of Deformation And Failure
CN205120386U (en) A analog system for simulating coal seam exploitation
CN209486096U (en) A kind of simulation Earth cave model test box
CN106900196A (en) Discarded rare-earth mining area Soil Slope is three-dimensional to repair ecological net and its maintenance process
CN108828184B (en) Similar experimental model device of coal mining area exploitation subsidence
CN206115855U (en) Tunnel is supporting construction experimental model case in advance
CN207215815U (en) A kind of analog simulation experiment shelf of unconsolidated formation traveling angle
CN214011233U (en) Simulation modeling experiment device for simulating migration of coal seam mining roof water-bearing stratum
CN111627279B (en) Test system for simulating landslide and debris flow disaster chain overall process
CN208860847U (en) A kind of novel native fish experimental rig
CN202584550U (en) Loading machine teaching demonstrating model
CN203668967U (en) Device used for installing and connecting support and pipe pile of current transformer in transformer substation
Römer Differential weathering and erosion in an inselberg landscape in southern Zimbabwe: A morphometric study and some notes on factors influencing the long-term development of inselbergs
CN203164174U (en) Slope mining model test device under action of surface water and underground water
CN206208708U (en) A kind of analogue means of " binary " structure hole clearance flow
Htun Sustainable mining in Myanmar
CN104834830A (en) Liquefiable ground inclined straight alternating pile group-soil-structural numerical calculation model
CN102663953B (en) Simulation experiment table and method for open-pit mine
CN205958407U (en) Remove tripod and adjust device of bulky heap of soil box slope angle
Jiayin et al. Concept and Practice of Open-pit Mining Area Restoration and Reuse---Taking an Open-pit Coal Mining Area in Datong, Shanxi as an Example

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant