CN207485050U - A kind of large-size thermal power plant main building arrangement structure - Google Patents

A kind of large-size thermal power plant main building arrangement structure Download PDF

Info

Publication number
CN207485050U
CN207485050U CN201721417390.8U CN201721417390U CN207485050U CN 207485050 U CN207485050 U CN 207485050U CN 201721417390 U CN201721417390 U CN 201721417390U CN 207485050 U CN207485050 U CN 207485050U
Authority
CN
China
Prior art keywords
turbine
main building
building
rotors
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721417390.8U
Other languages
Chinese (zh)
Inventor
程政
李毅
史亚乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201721417390.8U priority Critical patent/CN207485050U/en
Application granted granted Critical
Publication of CN207485050U publication Critical patent/CN207485050U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses a kind of large-size thermal power plant main building arrangement structure, two groups of turbine LP rotors tails arrange tail in main building, framework corresponding to the switchgear house of two groups of turbine LP rotors is provided with central station of floating dock, setting twin columns pillar in the steam turbine building of two groups of turbine LP rotors, compared with traditional 600MW grades of main building, independent She Jikong buildings are not needed to, the advantages of program is the cost for reducing Ji Kong buildings;Turbo-generator Set tail is arranged symmetrically tail, two set generators are close to Overhaul Yard arrangement, turbine body installation can be made not influenced by generator unit stator lifting, be conducive to the installation tissue of entire Turbo-generator Set, shorten the engineering construction duration, each region space for maintenance general overhaul of main building is convenient, and pipe portion is artistically decorated smooth, cable arrangements compact and reasonable runs, is easy to maintain quick.

Description

A kind of large-size thermal power plant main building arrangement structure
【Technical field】
The utility model belongs to thermal power plant main building design field, is related to a kind of main factory of large-size thermal power plant Room arrangement.
【Background technology】
In traditional thermal power plant, due to being limited by traditional design thinking, main building is set respectively with Ji Kong buildings, main Ji Kong buildings are separately provided outside workshop, cost is higher, and space is not abundant in the corresponding framework of main building distribution chamber region It utilizes, existing arrangement is unfavorable for maintenance for generation companies and installation.
【Utility model content】
The utility model aim is to overcome the shortcomings of prior art, provides a kind of large-size thermal power plant main building Arrangement optimizes main building arrangement, and double-span frame structure pattern is conducive to civil engineering structure antidetonation, and Turbo-generator Set tail is to tail pair Claim to be disposed with the installation tissue conducive to entire Turbo-generator Set, shorten the engineering construction duration.
To achieve the above object, the utility model adopts the following technical solution:
A kind of large-size thermal power plant main building arrangement structure, main building are coal bunker formula structure before double frames, in main building Two groups of turbine LP rotors tails arrange tail two groups of turbine LP rotors are close to Overhaul Yard arrangement, two groups of steam turbine hairs Framework corresponding to the switchgear house of motor group is provided with central station of floating dock, and setting is double in the steam turbine building of two groups of turbine LP rotors Column, two groups of turbine LP rotors conjunctions set a central station of floating dock, and not independent She Jikong buildings, coal bunker is arranged on central station of floating dock both sides.
Further, the steam turbine building of turbine LP rotors uses concrete structure, two twin columns is set to support in steam turbine building Structure.
Further, the steam turbine building of turbine LP rotors uses steelframe structure, and a twin columns support construction is set in steam turbine building.
Further, three layer arrangement of steam turbine building of turbine LP rotors, respectively in the bottom of 0.00m, 6.9~7.8m Interbed, 13.7~15.50m operating layer and 25~34m remove oxygen layer.
Further, operating layer arrangement has high-pressure heater.
Further, deoxygenation layer arrangement has externally arranged steam cooler, oxygen-eliminating device, closed type water tank.
The large-size thermal power plant main building arrangement structure of the utility model, two groups of turbine LP rotors tails in main building Tail is arranged, the framework corresponding to the switchgear house of two groups of turbine LP rotors is provided with central station of floating dock, two groups of steam turbine hairs Setting twin columns pillar, compared with traditional 600MW grades of main building, does not need to independent She Jikong buildings, the party in the steam turbine building of motor group The advantages of case is the cost for reducing Ji Kong buildings;Turbo-generator Set tail is arranged symmetrically tail, and two set generators are close to examine Field arrangement is repaiied, turbine body installation can be made not influenced by generator unit stator lifting, be conducive to entire Turbo-generator Set Tissue is installed, shortens the engineering construction duration, generator unit stator is not needed to rotate in the air, not carried when being lifted to operating layer While high cost, problem is lifted by crane when solving generator unit stator installation, makes safety more secure, each region maintenance of main building Space general overhaul is convenient, and pipe portion is artistically decorated smooth, cable arrangements compact and reasonable, operation, easy to maintain quick.
Setting twin columns pillar in the steam turbine building of two groups of turbine LP rotors, double-span frame structure pattern are conducive to civil engineering structure Antidetonation.
【Description of the drawings】
Fig. 1:Main building plan view
【Specific embodiment】
Below in conjunction with attached drawing and example, the utility model is described in further detail.
As shown in Figure 1, using main building using double frame-preceding coal bunkers, turbine LP rotors tail arranges tail, No. 1 machine Head extends ends towards fixing end, No. 2 machine heads directions.Steam turbine building length 154.8m after optimization, steam turbine building span 30m, deoxygenation 9 meters of frame span, two stove spacing 94.8m.Central station of floating dock arrangement is planned to two-unit-control room scheme, i.e. two machine combinations set a collection control Room is arranged in main building frame, not independent She Jikong buildings.
Three layers of steam turbine building point:Bottom (0.00 meter), middle layer (6.9~7.8 meters), operating layer (13.7~15.50 meters).
Zero meter of layer arrangement has condenser, and condenser takes out pipe direction towards A organ timberings.Two knapsack type hydrophobic development units are respectively arranged On the outside of condenser.Condenser sets -5.40 meters of cycle puddle, arranges recirculated water water-in and water-out pipeline.Condenser circulating water pipe Import and export electric butterfly valve is arranged in steam turbine building cycle puddle;2 condensate pumps are arranged in the condensate pump hole of generator side It is interior;Steam turbine head side is disposed with reconditioner, fire resistant oil device, oil transfer pump;Small turbine is disposed with by B organ timberings to supply Oily device;Stator water collection assembling device, generator Seal Oil collection assembling device are disposed in generator side engine base.Generator side is arranged by A Place's arrangement vacuum pump;Generate electricity drive end unit arrangement 400V switchgear houses;8th, No. 9 intercolumniations are zero meter of Overhaul Yard.
Middle layer is mainly pipe layers, is disposed with one small machine blow-off line, main fuel tank, enclosed bus of generator, excitation Transformer, 6kV power distribution equipments, shaft sealing cooler and axial sealing blower fan, gland seal system valving station, main steam, reheated steam and other Steam-water pipe and its valving station etc., 7, No. 8 low-pressure heaters are arranged in condenser throat.8th, maintenance lifting is equipped between No. 9 columns Hole.
Operating layer is platform structure, and the steam feed pump of every crew qiting is disposed adjacent to 3/A organ timberings.Small steam turbine row Steam ports is downward, steam discharge to host condenser.Two low voltage bypass devices are disposed with by steam turbine A rows side.To overhaul condensate pump With main oil pump on steam turbine main fuel tank, it is equipped with the manhole with movable rack for 7.8 meters and 15.5 meters above it.It operates on layer also There are installation and repairing space and channel, ensure putting for component and repair apparatus during installation and maintenance.Between 8, No. 9 columns extremely Zero meter of maintenance lifting eye can meet steam turbine and turn over cylinder and Over-size transport lifting requirement.
Deoxygenation frame is divided into:Bottom (0.00m), middle layer (6.9~7.8 meters), operating layer (13.7~15.50m), deoxygenation Layer (25.0~34m), specific arrangement are as follows:
Bottom arranges drain cooler, and heat pump fore pump, staircase, two machines centre third gear are Ji Kong buildings position, close to B There are operation and maintenance channels for organ timbering side.
Intermediate No. 5 low-pressure heaters of layer arrangement, No. 6 low-pressure heaters.
Operate No. 1 high-pressure heater of layer arrangement, No. 2 high-pressure heaters, No. 3 high-pressure heaters.
No. 3 externally arranged steam coolers, oxygen-eliminating device, closed type water tanks are placed on except oxygen layer.
Steam turbine building channel
Space for maintenance is equipped in steam turbine building between two units.
Zero meter of steam turbine building has clear span two units of not less than 2.5 meters perforations there are 1.5 meters of access path by B organ timberings side Channel, convenient for making an inspection tour and overhauling, transport.
The channel not less than 2.5 meters is being equipped with by B rows side layer by layer among steam turbine building, convenient for making an inspection tour and overhauling, transport.
Steam turbine building operating layer is large platform, and equipment is relatively fewer, and channel is rather spacious, unobstructed.
Every unit is being equipped with the platform staircase towards each layer by A organ timberings.
Central station of floating dock is arranged
Central station of floating dock arrangement is planned to two-unit-control room scheme, i.e. two machine combinations set a central station of floating dock, are arranged in main building frame In frame.
The above content is combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that specific embodiment of the present utility model is only limitted to this, for the utility model person of an ordinary skill in the technical field For, without departing from the concept of the premise utility, several simple deduction or replace can also be made, should be all considered as Belong to the utility model and determine scope of patent protection by the claims submitted.

Claims (6)

1. a kind of large-size thermal power plant main building arrangement structure, it is characterised in that:Main building is coal bunker formula structure before double frames, Two groups of turbine LP rotors tails arrange tail in main building, and two groups of turbine LP rotors are close to Overhaul Yard and arrange, two groups Framework corresponding to the switchgear house of turbine LP rotors is provided with central station of floating dock, the steam turbine building of two groups of turbine LP rotors Interior setting twin columns pillar, two groups of turbine LP rotors conjunctions set a central station of floating dock, and not independent She Jikong buildings, coal bunker is arranged on collection control Room both sides.
2. large-size thermal power plant main building arrangement structure according to claim 1, it is characterised in that:Turbine generator The steam turbine building of group is using concrete structure, steam turbine building two twin columns support constructions of interior setting.
3. large-size thermal power plant main building arrangement structure according to claim 1, it is characterised in that:Turbine generator The steam turbine building of group is using steelframe structure, steam turbine building one twin columns support construction of interior setting.
4. large-size thermal power plant main building arrangement structure according to claim 1, it is characterised in that:Turbine generator Three layer arrangement of steam turbine building of group, the respectively bottom of 0.00m, the middle layer of 6.9~7.8m, 13.7~15.50m operating layers and 25 ~34m's removes oxygen layer.
5. a kind of large-size thermal power plant main building arrangement structure as described in claim 1, it is characterised in that:Operating layer arrangement has High-pressure heater.
6. a kind of large-size thermal power plant main building arrangement structure as described in claim 1, it is characterised in that:Deoxygenation layer arrangement has Externally arranged steam cooler, oxygen-eliminating device, closed type water tank.
CN201721417390.8U 2017-10-30 2017-10-30 A kind of large-size thermal power plant main building arrangement structure Active CN207485050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721417390.8U CN207485050U (en) 2017-10-30 2017-10-30 A kind of large-size thermal power plant main building arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721417390.8U CN207485050U (en) 2017-10-30 2017-10-30 A kind of large-size thermal power plant main building arrangement structure

Publications (1)

Publication Number Publication Date
CN207485050U true CN207485050U (en) 2018-06-12

Family

ID=62478336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721417390.8U Active CN207485050U (en) 2017-10-30 2017-10-30 A kind of large-size thermal power plant main building arrangement structure

Country Status (1)

Country Link
CN (1) CN207485050U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590255A (en) * 2018-07-10 2018-09-28 中国华电科工集团有限公司 A kind of integrated Power island of energy saving optimizing
CN109403672A (en) * 2018-09-18 2019-03-01 东方电气集团东方汽轮机有限公司 A kind of Gas-steam Combined Cycle power plant main power house arragement construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590255A (en) * 2018-07-10 2018-09-28 中国华电科工集团有限公司 A kind of integrated Power island of energy saving optimizing
CN109403672A (en) * 2018-09-18 2019-03-01 东方电气集团东方汽轮机有限公司 A kind of Gas-steam Combined Cycle power plant main power house arragement construction

Similar Documents

Publication Publication Date Title
CN102352696B (en) Lateral structure and arranging method of steam turbine generator unit of 1000MW-grade set in thermal power plant
CN207485050U (en) A kind of large-size thermal power plant main building arrangement structure
CN204435946U (en) A kind of coal-fired 1,000,000 unit turbine house structures
CN204663057U (en) Steam power station main building arrangement structure
CN105155880B (en) A kind of complex factories low position structure of one-to-one multiaxis combined cycle thermal power generation unit
CN202139876U (en) Transverse structure of 1000MW stage set turbo generator set of thermal power plant
CN105019695A (en) High-position arrangement method and structure of combined main power house of split-shaft gas-steam combined-cycle power plant
CN106338170A (en) Circulating cooling water supply system for multiple hypersonic speed testing devices
Hallgrímsdóttir et al. The geothermal power plant at Hellisheiði, Iceland
CN203924787U (en) The main building arrangement of single shaft gas-steam combined-cycle unit
CN205077914U (en) Split axle gas - steam combined -cycle power plant unites high -order arrangement structure of main building
CN104763178A (en) Main power building of thermal power plant
CN109403672A (en) A kind of Gas-steam Combined Cycle power plant main power house arragement construction
CN211647500U (en) Compact three-row steam turbine room structure of 660MW coal-fired generator set
CN106677564A (en) Combined main factory building of cycle power plant
CN106523048A (en) Main building arrangement structure of gas-steam combined cycle power generation plant
CN110630056A (en) Compact three-row steam turbine room structure of 660MW coal-fired generator set
CN206600027U (en) Split axle Combined cycle gas-steam turbine unit low level combines main building arrangement structure
CN206376906U (en) Gas combustion-gas vapor combined cycle factory owner's plant layout structure
CN104251062B (en) The optimum organization structure of thermal power plant's steam turbine building, cooling tower and power distribution equipment
CN203642723U (en) Thermal-power co-generation system for cement plant
CN203769983U (en) Auxiliary fuel oil system for emergency diesel oil generator set in nuclear power station
CN215909708U (en) Power plant's air cooling island increase-volume switched systems
CN202056858U (en) Boiler steam-driven water supply system
CN219344189U (en) Arrangement structure of combined cycle main workshop of internal combustion engine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant