CN109403672A - A kind of Gas-steam Combined Cycle power plant main power house arragement construction - Google Patents

A kind of Gas-steam Combined Cycle power plant main power house arragement construction Download PDF

Info

Publication number
CN109403672A
CN109403672A CN201811088226.6A CN201811088226A CN109403672A CN 109403672 A CN109403672 A CN 109403672A CN 201811088226 A CN201811088226 A CN 201811088226A CN 109403672 A CN109403672 A CN 109403672A
Authority
CN
China
Prior art keywords
gas
combined cycle
gas turbine
steam turbine
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811088226.6A
Other languages
Chinese (zh)
Inventor
赵志龙
宋映波
梁珊珊
杨小军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
DEC Dongfang Turbine Co Ltd
Original Assignee
DEC Dongfang Turbine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DEC Dongfang Turbine Co Ltd filed Critical DEC Dongfang Turbine Co Ltd
Priority to CN201811088226.6A priority Critical patent/CN109403672A/en
Publication of CN109403672A publication Critical patent/CN109403672A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention discloses a kind of Gas-steam Combined Cycle power plant main power house arragement constructions, it includes main building, and combined cycle generating unit is provided in the main building, and the combined cycle generating unit includes Gas Turbine Generating Units and steam turbine generator group;The Gas Turbine Generating Units include gas turbine, gas turbine powered generator and Gas Turbine Generating Units subsidiary engine equipment;The steam turbine generator group includes steam turbine, steam turbine generator and steam turbine generator group subsidiary engine equipment;Zero meter of layer and operating layer are provided in the main building;The gas turbine, gas turbine powered generator, steam turbine and steam turbine generator setting are on operating layer;The Gas Turbine Generating Units subsidiary engine equipment and steam turbine generator group subsidiary engine equipment are arranged on zero meter of layer.The arragement construction be able to solve existing workshop arrange it is unreasonable, take up a large area, safeguard problem inconvenient, that input cost is high, construction speed is slow.

Description

A kind of Gas-steam Combined Cycle power plant main power house arragement construction
Technical field
The present invention relates to workshops to arrange field, refers in particular to a kind of Gas-steam Combined Cycle power plant main power house arragement construction.
Background technique
The relationships such as the main building arrangement scheme of Gas-steam Combined Cycle power plant and host model, crew qiting mode are close It cuts.
Existing combined cycle generating unit includes Gas Turbine Generating Units and steam turbine generator group;Wherein combustion gas Turbine generator group includes gas turbine, gas turbine powered generator and Gas Turbine Generating Units subsidiary engine equipment;Steam turbine hair Motor group includes steam turbine, steam turbine generator and steam turbine generator group subsidiary engine equipment;Gas Turbine Generating Units Also it is correspondingly arranged on afterheat boiler system;Steam turbine generator group is also correspondingly arranged on condenser system.
Due to gas turbine and the arrangement of steam turbine shafting, operating layer height, gas turbine inlet air mode, combustion gas The difference of the relative position of turbine and steam turbine, there are more arrangement combinations modes for main building.
Typical high-order arrangement workshop is divided into three layers, i.e. zero meter of layer, middle layer and operating layer.Zero meter of layer and middle layer are main The ancillary equipment of arrangement Gas Turbine Generating Units and steam turbine generator group, electrical and fire fighting device and each system pipe Road.Operating layer is mainly used for arranging gas turbine, gas turbine powered generator, steam turbine, steam turbine generator and to these The repair and maintenance of host equipment.
The advantages of high position arrangement, divides three-layer stereo to arrange for main building, and main building occupied area is small;Unit auxiliaries, electricity Gas equipment and pipe arrangement space are abundant, and design difficulty is small;Each layer space for maintenance of main building and tour channel are spacious, are convenient for user Daily Round Check;Main building operates on layer other than the main equipments such as Gas Turbine Generating Units, steam turbine generator group, without other Ancillary equipment and pipeline, entire workshop is using joint large platform arrangement, the beautiful and tidy unification of pattern;Gas Turbine Generating Units, The maintenance of steam turbine generator group can carry out on operating layer, and unit maintenance is very convenient, can satisfy multiple host simultaneously The requirement of maintenance does not need that space for maintenance additionally is arranged;Workshop is arranged not by steam turbine discharge mode (i.e. condenser arrangement) Limitation, high-order arrangement all can be used in steam discharge, axial exhaust and side steam discharge under steam turbine;Combustion turbine exhaustion road height compared with Height, combustion turbine exhaustion from boiler horn mouth enter waste heat boiler after good dispersion degree be conducive to the heat exchange of waste heat boiler, while it is right In the unit of setting denitrification apparatus, denitration efficiency can be improved;Gas Turbine Generating Units generator and steam turbine power generation machine are adopted With the mode of lower part outlet, layer neat appearance is operated.
The disadvantage of high position arrangement is that main building height is higher, and workshop volume is big and cost is high, and the construction period is long;And Since high position arrangement gas turbine inlet air generallys use lower part air inlet, need to reserve the arrangement space of gas handling system, this will lead to Exhaust transition segment length between Gas Turbine Generating Units and waste heat boiler is longer, is vented crushing and low position is compared in radiation loss It is larger.
Typical low position main building does not have middle layer and operating layer.Entire Gas Turbine Generating Units and steam turbine Pipeline of generating set and its ancillary equipment, electrical equipment, fire-fighting equipment and each system etc. is all arranged in zero meter of workshop.
The advantages of low position is that main factory building height is low, and small in size, main building civil engineering and construction cost are low;Low position combustion Gas-turbine generallys use top air inlet or side air inlet, and combustion turbine exhaustion is directly connected with waste heat boiler horn mouth, is vented segment length Degree is shorter, is vented crushing and radiation loss is small.
The shortcomings that low position are as follows: main building takes up a large area;And due to host, subsidiary engine other all devices cloth all It sets in zero meter of layer of main building, design difficulty is very big;Main building interior conduit and equipment arrangement are intensive, and tour channel is narrow, maintenance dimension It protects very inconvenient;In addition, since without enough service areas, when unit maintenance, needs to move most of components in workshop To outside workshop, it is also necessary to individually build the interim workshop for unit maintenance in workshop;Low position is limited to steam turbine steam discharge side Formula, usual low position is suitable for the unit of steam turbine machine axial exhaust or side exhaust, for that can only use lower steam discharge Steam turbine then cannot achieve low position;Between hollowing out under low position steam turbine condenser part needs are biggish, power plant is increased Construction volume and cost;The position that low position combustion turbine exhaustion enters waste heat boiler is relatively low, into waste heat boiler after dispersion degree Without the good of high-order arrangement, there is certain influence to the heat exchange of waste heat boiler, simultaneously for the unit of setting denitrification apparatus, denitration effect Rate is good without high-order arrangement;The generator of low position must influence workshop beauty by the way of the outlet of top.
In recent years, it further saves construction investment and reduces project cost and have become the basic principle of power plant construction and become The expectation of gesture and most of owners.Reasonable in order to reach the layout of the electric power factory equipment after building up and space utilization, pipeline connection is short Prompt, neat, workshop inner facility characteristics of compact layout is appropriate, facilitates operation and maintenance to require, while meeting combined cycle generation again The target that the land occupation of unit main building is minimum, specific investment cost most saves, construction speed is most fast.The invention proposes a kind of fuel gas-steams Combined-cycle power plant's main building arrangement structure.
Summary of the invention
It is an object of the invention to: in view of the above problems, provide a kind of main factory, Gas-steam Combined Cycle power plant Room arragement construction;The arragement construction be able to solve existing workshop arrangement is unreasonable, take up a large area, safeguard it is inconvenient, put at The slow problem of this height, construction speed.
The technical solution adopted by the invention is as follows:
A kind of Gas-steam Combined Cycle power plant main power house arragement construction, it includes main building, and connection is provided in the main building Circulating generation unit is closed, the combined cycle generating unit includes Gas Turbine Generating Units and steam turbine generator group;Institute Stating Gas Turbine Generating Units includes gas turbine, gas turbine powered generator and Gas Turbine Generating Units subsidiary engine equipment;It is described Steam turbine generator group includes steam turbine, steam turbine generator and steam turbine generator group subsidiary engine equipment;The master Zero meter of layer and operating layer are provided in workshop;The gas turbine, gas turbine powered generator, steam turbine and steam turbine power generation Machine setting is on operating layer;The Gas Turbine Generating Units subsidiary engine equipment and the setting of steam turbine generator group subsidiary engine equipment exist On zero meter of layer.
In said structure, main building arrangement structure belongs to middle low position, and interior only two layers of platform is divided into zero meter of layer With operating layer, without middle layer, arrangement is between high position arrangement and low position.Make factory building height relative to a high position It is reduced for arrangement, reduces area of mill site for low position, and then reduce workshop Construction cost and space occupancy rate.Since Gas Turbine Generating Units and steam turbine generator group are arranged at same operating It on layer, avoids because operating layer absolute altitude is different, and frequent stair activity is needed to tie up respectively to gas turbine and steam turbine The case where shield, occurs.And Gas Turbine Generating Units and steam turbine generator group can be simultaneously using the same rows in workshop Vehicle is overhauled;And Gas Turbine Generating Units and steam turbine generator group share an operating layer large platform, facilitate equipment Installation maintenance, be convenient for staff's inspection back and forth.Middle low position, the height of the operating layer made is for high position arrangement It is reduced, then the exhaust transition segment length between Gas Turbine Generating Units and waste heat boiler shortens, and is vented crushing and heat dissipation Damage reduces.The main building arrangement structure keeps electric power factory equipment layout and space utilization more reasonable, and pipeline connection is more short prompt, whole Together;Workshop inner facility arrangement is more compact appropriate, while also meeting and operation and maintenance is facilitated to require.
Further, the main building includes host workshop and generator workshop;The gas turbine and steam turbine are set In in host workshop;The gas turbine powered generator and steam turbine generator are placed in generator workshop;The host workshop It is spaced from each other or is interconnected with generator workshop.
In above structure, host workshop and generator workshop can be spaced from each other or be interconnected, when host workshop and hair After motor workshop is interconnected, host workshop and generator workshop collectively form joint big workshop main body.It can make main building in this way Span reduces, and reduces driving span, reduces driving quantity, while being convenient for the repair and maintenance of equipment.Layer platform is operated through power generation Machine workshop and host workshop, the entire layer that operates is spacious and well-lighted, neat and artistic.Host maintenance can carry out on operating layer completely, And the task of multiple host while maintenance can be met simultaneously.
Further, at least a set of combined cycle generation along the arrangement of main building length direction in-line is provided in main building Unit;Every set combined cycle generating unit includes a Gas Turbine Generating Units and a steam turbine generator group;? The central axis of Gas Turbine Generating Units and steam turbine generator group is parallel to each other in every set combined cycle generating unit, and Their central axis is vertical with the length direction of main building.
Due to above structure, Gas Turbine Generating Units and steam turbine generator in every set combined cycle generating unit The central axis of group is parallel to each other, and can reduce the span of main building in the longitudinal direction in this way, so save construction cost and Workshop occupied space.
Further, at least one set of combined cycle generation along the arrangement of main building length direction in-line is provided in main building Unit, every group of combined cycle generating unit include two sets of combined cycle generating units;Two steam turbine generators in every group Group is clipped among two Gas Turbine Generating Units.
Since steam turbine generator group is clipped among two Gas Turbine Generating Units, then two steam turbine generator groups can Rotor space is taken out to share a part of steam turbine generator, utilizes the space in main building rationally.Reduce steam turbine hair Spacing between motor group central axis is further reduced the span of workshop length direction, reduces cost.Meanwhile steam turbine is sent out Motor group is clipped among two Gas Turbine Generating Units, and also for making outside workshop, there are enough skies between two afterheat boiler systems Between, convenient for construction installation other equipment, and then optimize workshop layout, rationally utilizes space.
Further, the two Gas Turbine Generating Units axial symmetry arrangement in every group of combined cycle generating unit, two steam Turbine generator group axial symmetry arrangement.Keep entire electric forming apparatus arrangement cleaner and tidier, convenient for the maintenance operation of equipment.
Further, each Gas Turbine Generating Units are corresponding with an afterheat boiler system, each steam turbine hair Motor group is corresponding with a condenser system;The afterheat boiler system and condenser system as main building outside.
Further, the afterheat boiler system and condenser system are located at the same side of main building, and every group is combined and follow It include two afterheat boiler systems and two condenser systems in ring generating set, wherein two condenser systems are clipped in two waste heats Among boiler system.
Since two condenser systems are clipped among two afterheat boiler systems, then it can share a part and take out tube space, make to lead Space outside workshop rationally utilizes.
Further, the two afterheat boiler system axial symmetry arrangement in every group of combined cycle generating unit, two condenser systems System also arrange by axial symmetry;Wherein, two afterheat boiler system axial symmetry arrangement makes the building the space to be preserved Chu Jikong cloth between boiler system Between emptying.
Further, the gas turbine uses upper air mode, and gas handling system is arranged in Generators roof or institute Gas turbine is stated using side intake method, gas handling system is arranged in gas turbine side;The steam turbine is using axial row Way of steam or side exhaust mode.
Further, driving, top or the master of the driving positioned at host workshop are provided in the host workshop Machine workshop and generator workshop set shared driving, and the driving is located at the top of host workshop and generator workshop.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1, Gas-steam Combined Cycle power plant main power house of the invention belongs to middle low position, interior only to operate layer and zero meter Layer;Factory building height is lower than the factory building height of existing high-order arrangement, and area of mill site takes up an area face than the workshop that existing status is arranged Product is small, and then reduces the construction cost and space occupancy rate of workshop.
2, Gas Turbine Generating Units and steam turbine generator group are arranged on same operating layer, are avoided because of operating Layer absolute altitude is different, and the case where need frequent stair activity to safeguard respectively to gas turbine and steam turbine.
3, Gas Turbine Generating Units and steam turbine generator group share an operating layer large platform, facilitate the peace of equipment Dress maintenance, is convenient for staff's inspection back and forth.
4, Gas Turbine Generating Units and steam turbine generator group can simultaneously using same in workshop drive a vehicle into Row maintenance.
5, Gas Turbine Generating Units and steam turbine generator group centerline axis parallel arrangement, can reduce main factory across Away from, and then reduce construction cost and space occupancy rate.
6, due to middle low position, in main building internal-combustion gas turbine engine generating set central axis and steam turbine generator group The unit centre axis absolute altitude that heart absolute altitude compares traditional low position is higher by 2 ~ 3 meters, so that gas turbine powered generator and steaming There are the sufficient outlet of space layout gas turbine powered generator and turbine generator outlet below turbine generator;Using lower part The mode of outlet, so that operating layer is neat and artistic generous, maintenance convenience.
7, no matter middle low position mode can be used in split axle unit or uniaxial unit, the arrangement adaptation range Extensively, and middle low position mode take high-order arrangement chief's benefit low position shortage.
Detailed description of the invention
Fig. 1 is zero meter of layer arrangement figure of Gas-steam Combined Cycle power plant main power house in the embodiment of the present invention.
Fig. 2 is Gas-steam Combined Cycle power plant main power house middle layer layout drawing in the embodiment of the present invention.
Fig. 3 is Gas-steam Combined Cycle power plant main power house Gas Turbine Generating Units cross-section diagram in the embodiment of the present invention.
Fig. 4 is Gas-steam Combined Cycle power plant main power house steam turbine generator group cross-section diagram in the embodiment of the present invention.
Marked in the figure: 10- main building, 11- host workshop, 12- generator workshop, 20- steam turbine condenser housing, The building 30- Ji Kong, 100- Gas Turbine Generating Units, 110- gas turbine, 111- gas turbine inlet air system, 120- gas turbine Generator, 121- gas turbine powered generator take out rotor space, 122- gas turbine powered generator outlet, 123- gas turbine powered generator Transformer, 130- waste heat boiler, 131- waste heat boiler supplementary module, the preposition module of 132- gas turbine natural gas;200- steam Turbine generator group, 210- steam turbine, 220- steam turbine generator, 221- steam turbine generator take out rotor space, 222- steam turbine generator outlet, 223- steam turbine generator transformer, 230- condenser, 231- condenser circulating water connect Mouthful, 232- condenser water supply pump group.
Specific embodiment
With reference to the accompanying drawing, the present invention is described in detail.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figs 1-4, the invention discloses a kind of 10 arragement construction of Gas-steam Combined Cycle power plant main power house, it Including main building 10, combined cycle generating unit is provided in the main building 10, the combined cycle generating unit includes combustion Gas-turbine generating set 100 and steam turbine generator group 200;The Gas Turbine Generating Units 100 include gas turbine 110,100 subsidiary engine equipment of gas turbine powered generator 120 and Gas Turbine Generating Units;The steam turbine generator group 200 is wrapped Include 200 subsidiary engine equipment of steam turbine 210, steam turbine generator 220 and steam turbine generator group;It is set in the main building 10 It is equipped with zero meter of layer and operating layer;The gas turbine 110, gas turbine powered generator 120, steam turbine 210 and steam turbine hair The setting of motor 220 is on operating layer;The 100 subsidiary engine equipment of Gas Turbine Generating Units and steam turbine generator group 200 are auxiliary Machine equipment is arranged on zero meter of layer.
Since main building 10 only has two layers, it is divided into zero meter of layer and operating layer, without middle layer, and host equipment is located at operating Cheng Shang, therefore factory building height is reduced for existing high-order arrangement, area of mill site is relative to existing status Reduced for arrangement, and then is reducingd the construction costs.In the workshop, the arrangement of each electric power factory equipment is arranged between a high position Between low position.Therefore the arrangement belongs to middle low position.
In middle low position mode, the absolute altitude operated is 6 ~ 7 meters;Gas Turbine Generating Units 100 and steam turbine About 7 ~ 8 meters of 200 central axis absolute altitude of generating set;Due to middle low position, in 10 internal-combustion gas turbine engine generating set 100 of main building The unit centre axis absolute altitude that mandrel line compares traditional low position with 200 center absolute altitude of steam turbine generator group is higher by 2 ~ 3 Rice, so that have sufficient space layout gas turbine hair below gas turbine powered generator 120 and steam turbine generator 220 Motor outlet wire 122 and steam turbine generator outlet 222.Since gas turbine powered generator 120 and steam turbine generator 220 are adopted With the mode of lower part outlet, so that operating layer is neat and artistic generous, maintenance is facilitated.
Gas turbine 110, gas turbine powered generator 120, steam turbine 210 and steam turbine generator 220 are arranged simultaneously It is convenient for the maintenance and maintenance of equipment on operating layer.
The main building 10 includes host workshop 11 and generator workshop 12;The gas turbine 110 and steam turbine 210 It is placed in host workshop 11;The gas turbine powered generator 120 and steam turbine generator 220 are placed in generator workshop 12; The host workshop 11 and generator workshop 12 are spaced from each other or are interconnected.In present embodiment, host workshop 11 and power generation Machine workshop 12, which is interconnected, constitutes joint big workshop.
At least a set of combined cycle generating unit along the arrangement of 10 length direction in-line of main building is provided in main building 10; Every set combined cycle generating unit includes a Gas Turbine Generating Units 100 and a steam turbine generator group 200;? The central axis of Gas Turbine Generating Units 100 and steam turbine generator group 200 is mutual in every set combined cycle generating unit In parallel, and their central axis is vertical with the length direction of main building 10.At least one set is provided in main building 10 along main factory The combined cycle generating unit of 10 length direction in-line of room arrangement, every group of combined cycle generating unit includes two sets of combined cycles Generating set;Two steam turbine generator groups 200 in every group are clipped among two Gas Turbine Generating Units 100.Every group of joint Two Gas Turbine Generating Units 100 in circulating generation unit axial symmetry arrangement, two steam turbine generator groups on delivery layer 200 delivery layer on axial symmetry arrangement;Two Gas Turbine Generating Units, 100 subsidiary engine equipment axial symmetry arrangement on zero meter of layer, two 200 subsidiary engine equipment of steam turbine generator group axial symmetry on zero meter of layer is arranged.
As illustrated in fig. 1 and 2, in present embodiment, two sets of combined cycle generating units, two sets of connection are provided in main building 10 It closes circulating generation unit and constitutes one group of combined cycle generating unit;Two steam turbine generator groups 200 and two combustion gas in every group Turbine generator group 100 comes in same row, and two steam turbine generator groups 200 are clipped in two Gas Turbine Generating Units Among 100, two Gas Turbine Generating Units, 100 axial symmetry arrangement, two steam turbine generator groups, 200 axial symmetry arrangement.
Each Gas Turbine Generating Units 100 are corresponding with an afterheat boiler system, each steam turbine generator group 200 are corresponding with a condenser system;The afterheat boiler system and condenser system as main building 10 outside.
The afterheat boiler system and condenser system are located at the same side of main building 10, and every group of combined cycle generation machine It include two afterheat boiler systems and two condenser systems in group, wherein two condenser systems are clipped in two afterheat boiler systems It is intermediate.Two afterheat boiler system axial symmetry arrangement in every group of combined cycle generating unit, two condenser systems also axial symmetry cloth It sets;Wherein, two afterheat boiler system axial symmetry arrangement makes 30 arrangement space of the building space to be preserved Chu Jikong between boiler system.
As described in Fig. 1 and 2;Two afterheat boiler systems and two condenser systems are provided with outside main building 10;Wherein two A condenser system is clipped between two afterheat boiler systems;Each afterheat boiler system and gas turbine power generation corresponding in manufacturer Unit 100 is connected, and is overlapped with the central axis of Gas Turbine Generating Units 100;Each condenser system is corresponding in manufacturer Steam turbine generator group 200 is connected, and is overlapped with the central axis of steam turbine generator group 200;Two afterheat boiler systems Axial symmetry arrangement, two condenser systems also arrange by axial symmetry;Wherein, two afterheat boiler system axial symmetry arrangement makes between boiler system 30 arrangement space of the building space to be preserved Chu Jikong.
The afterheat boiler system includes waste heat boiler 130 and the waste heat boiler being arranged on waste heat boiler 130 auxiliary mould Block 131, the preposition module 132 of gas turbine natural gas;131 axial symmetry of waste heat boiler supplementary module on two waste heat boilers 130 Setting, preposition 132 axial symmetry of the module setting of gas turbine natural gas.The condenser system includes being arranged in steam turbine 210 Condenser 230 in 230 housing 2 of condenser and the condenser circulating water interface 231 being arranged on condenser 230 and condenser to Water pump group 232,231 axial symmetry of the condenser circulating water interface setting on two of them condenser 230, two condenser feed pumps Group 232 axial symmetry setting.
As shown in Figure 1, the gas turbine powered generator for being additionally provided with 100 pairs of same Gas Turbine Generating Units outside main building 10 becomes Depressor 123, with steam turbine generator transformer 223;Gas turbine powered generator takes out rotor space 121 and steam turbine power generation simultaneously Machine is taken out rotor space and is arranged in main building 10.
The gas turbine 110 uses upper air mode, and gas handling system is arranged in Generators roof or the combustion gas Turbine 110 uses side intake method, and gas handling system is arranged in 110 side of gas turbine;The steam turbine 210 is using axial Exhaust mode or side exhaust mode.
As shown in Figures 3 and 4, in present embodiment, generator workshop 12 is than 11 low, the gas turbine inlet air of height of host workshop System 111 is placed in 12 top of generator workshop using the arrangement of upper air;It can make workshop volume reducing in this way, greatly Width reduces workshop civil engineering construction cost.
Driving, top or the host workshop of the driving positioned at host workshop 11 are provided in the host workshop 11 Shared driving is set with generator workshop, the driving is located at the top of host workshop and generator workshop.
Existing typical high-order arrangement workshop is divided into three layers of layer of zero meter of layer, middle layer and operating.Zero meter of layer is facility floor, About 6 ~ 7 meters of middle layer absolute altitude, about 12 ~ 13 meters of layer absolute altitude are operated, Gas Turbine Generating Units or steam turbine power generation unit centre line It about 13 ~ 14 meters of absolute altitude, about 35 meters of factory building height, drives a vehicle about 30 meters of absolute altitude.
Existing typical low position main building does not have middle layer and operating layer.Entire Gas Turbine Generating Units generator Pipeline of group and steam turbine power generation unit and its ancillary equipment, electrical equipment, fire-fighting equipment and each system etc. is all arranged in factory Zero meter of room layer, 4 ~ 6 meters of unit centre line absolute altitude.
In this real mode, 21 meters of 11 span of host workshop, 11 24 meters of height of host workshop is driven a vehicle 20 meters of absolute altitude;Power generation 24 meters of 12 span of machine workshop, 13 meters of height.About 7 ~ 8 meters of 100 center line absolute altitude of Gas Turbine Generating Units, operating layer absolute altitude about 6 ~ 7 meters, operating layer platform runs through entire workshop.Gas turbine 110 uses upper air arrangement, and gas handling system is arranged in generator House top.Big driving, and 110 He of gas turbine are only arranged above 210 host workshop 11 of gas turbine 110 and steam turbine Steam turbine 210 public can drive a vehicle, and generator workshop 12 only configures the small driving of maintenance repair, in this way can be significantly Save driving cost.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of Gas-steam Combined Cycle power plant main power house arragement construction, it is characterised in that: it includes main building (10), institute It states in main building (10) and is provided with combined cycle generating unit, the combined cycle generating unit includes Gas Turbine Generating Units (100) and steam turbine generator group (200);The Gas Turbine Generating Units (100) include gas turbine (110), combustion gas Turbine generator (120) and Gas Turbine Generating Units (100) subsidiary engine equipment;The steam turbine generator group (200) includes Steam turbine (210), steam turbine generator (220) and steam turbine generator group (200) subsidiary engine equipment;The main building (10) zero meter of layer and operating layer are provided in;The gas turbine (110), gas turbine powered generator (120), steam turbine (210) and steam turbine generator (220) setting is on operating layer;Gas Turbine Generating Units (100) the subsidiary engine equipment and Steam turbine generator group (200) subsidiary engine equipment is arranged on zero meter of layer.
2. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 1, it is characterised in that: The main building (10) includes host workshop (11) and generator workshop (12);The gas turbine (110) and steam turbine (210) it is placed in host workshop (11);The gas turbine powered generator (120) and steam turbine generator (220) are placed in power generation In machine workshop (12);The host workshop (11) and generator workshop (12) are spaced from each other or are interconnected.
3. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 1 or 2, feature exist In: at least a set of combined cycle generating unit along the arrangement of main building (10) length direction in-line is provided in main building (10); Every set combined cycle generating unit includes a Gas Turbine Generating Units (100) and a steam turbine generator group (200);Gas Turbine Generating Units (100) and steam turbine generator group (200) in every set combined cycle generating unit Central axis is parallel to each other, and their central axis is vertical with the length direction of main building (10).
4. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 3, it is characterised in that: The interior combined cycle generating unit for being provided at least one set and arranging along main building (10) length direction in-line of main building (10), every group Combined cycle generating unit includes two sets of combined cycle generating units;Two steam turbine generator groups (200) folder in every group It is intermediate in two Gas Turbine Generating Units (100).
5. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 4, it is characterised in that: Two Gas Turbine Generating Units (100) axial symmetry arrangement in every group of combined cycle generating unit, two steam turbine generator groups (200) axial symmetry is arranged.
6. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 5, it is characterised in that: Each Gas Turbine Generating Units (100) are corresponding with an afterheat boiler system, and each steam turbine generator group (200) is equal It is corresponding with a condenser system;The afterheat boiler system and condenser system as main building (10) outside.
7. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 6, it is characterised in that: The afterheat boiler system and condenser system are located at the same side of main building (10), and in every group of combined cycle generating unit Comprising two afterheat boiler systems and two condenser systems, wherein two condenser systems are clipped among two afterheat boiler systems.
8. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 7, it is characterised in that: Two afterheat boiler system axial symmetry arrangement in every group of combined cycle generating unit, two condenser systems also arrange by axial symmetry;Its In, two afterheat boiler system axial symmetry arrangement makes the building space to be preserved Chu Jikong (30) arrangement space between boiler system.
9. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 1 or 2, feature exist In: the gas turbine (110) uses upper air mode, and gas handling system is arranged in Generators roof or the combustion gas wheel Machine (110) uses side intake method, and gas handling system is arranged in gas turbine (110) side;The steam turbine (210) uses Axial exhaust mode or side exhaust mode.
10. a kind of Gas-steam Combined Cycle power plant main power house arragement construction according to claim 1 or 2, feature exist In: driving, top or the host workshop of the driving positioned at host workshop (11) are provided in the host workshop (11) (11) and generator workshop (12) sets shared driving, and the driving is located at the top of host workshop (11) and generator workshop (12) Portion.
CN201811088226.6A 2018-09-18 2018-09-18 A kind of Gas-steam Combined Cycle power plant main power house arragement construction Pending CN109403672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811088226.6A CN109403672A (en) 2018-09-18 2018-09-18 A kind of Gas-steam Combined Cycle power plant main power house arragement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811088226.6A CN109403672A (en) 2018-09-18 2018-09-18 A kind of Gas-steam Combined Cycle power plant main power house arragement construction

Publications (1)

Publication Number Publication Date
CN109403672A true CN109403672A (en) 2019-03-01

Family

ID=65465597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811088226.6A Pending CN109403672A (en) 2018-09-18 2018-09-18 A kind of Gas-steam Combined Cycle power plant main power house arragement construction

Country Status (1)

Country Link
CN (1) CN109403672A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206802A (en) * 2020-02-24 2020-05-29 中国能源建设集团广东省电力设计研究院有限公司 Gas and steam combined cycle unit structure and arrangement method
CN111412032A (en) * 2019-12-23 2020-07-14 东方电气集团东方汽轮机有限公司 Combined cycle unit
CN112922403A (en) * 2021-01-12 2021-06-08 中国能源建设集团广东省电力设计研究院有限公司 Main plant structure of gas and steam combined cycle power plant

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103019A (en) * 1996-09-30 1998-04-21 Toshiba Corp Installing method for power train apparatus and power plant being installed by this method
CN106523048A (en) * 2016-12-30 2017-03-22 中国能源建设集团广东省电力设计研究院有限公司 Main building arrangement structure of gas-steam combined cycle power generation plant
CN106677564A (en) * 2016-12-09 2017-05-17 中国能源建设集团广东省电力设计研究院有限公司 Combined main factory building of cycle power plant
CN206600027U (en) * 2017-02-16 2017-10-31 中国能源建设集团广东省电力设计研究院有限公司 Split axle Combined cycle gas-steam turbine unit low level combines main building arrangement structure
CN207485050U (en) * 2017-10-30 2018-06-12 中国电力工程顾问集团西北电力设计院有限公司 A kind of large-size thermal power plant main building arrangement structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103019A (en) * 1996-09-30 1998-04-21 Toshiba Corp Installing method for power train apparatus and power plant being installed by this method
CN106677564A (en) * 2016-12-09 2017-05-17 中国能源建设集团广东省电力设计研究院有限公司 Combined main factory building of cycle power plant
CN106523048A (en) * 2016-12-30 2017-03-22 中国能源建设集团广东省电力设计研究院有限公司 Main building arrangement structure of gas-steam combined cycle power generation plant
CN206600027U (en) * 2017-02-16 2017-10-31 中国能源建设集团广东省电力设计研究院有限公司 Split axle Combined cycle gas-steam turbine unit low level combines main building arrangement structure
CN207485050U (en) * 2017-10-30 2018-06-12 中国电力工程顾问集团西北电力设计院有限公司 A kind of large-size thermal power plant main building arrangement structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
广东省电力设计研究院: "《电力设计技术优秀论文集(上)》", 31 May 2008 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111412032A (en) * 2019-12-23 2020-07-14 东方电气集团东方汽轮机有限公司 Combined cycle unit
CN111206802A (en) * 2020-02-24 2020-05-29 中国能源建设集团广东省电力设计研究院有限公司 Gas and steam combined cycle unit structure and arrangement method
CN112922403A (en) * 2021-01-12 2021-06-08 中国能源建设集团广东省电力设计研究院有限公司 Main plant structure of gas and steam combined cycle power plant

Similar Documents

Publication Publication Date Title
CN109403672A (en) A kind of Gas-steam Combined Cycle power plant main power house arragement construction
CN103643986B (en) Self-backheating type coal mine low-concentration gas and ventilation gas cooperative oxidation integrated device
CN205260334U (en) Water pump system is given to 100% capacity steam -operating in large unit of power plant boiler
CN105464852B (en) Gas handling system for engine
CN106742075A (en) A kind of distributed propulsion system
CN105604357A (en) Main power house layout structure of single-shaft gas-steam combined cycle units
CN206636652U (en) A kind of portable cold, heat and electricity triple supply distributed busbar protection
CN105019695A (en) High-position arrangement method and structure of combined main power house of split-shaft gas-steam combined-cycle power plant
CN106014519B (en) Steam turbine and Organic Rankine Cycle working medium turbine dual drive system
CN207485050U (en) A kind of large-size thermal power plant main building arrangement structure
CN102353196B (en) Cooling water supply system of bulb tubular turbine generator set
CN215633185U (en) Gas and steam combined cycle power plant
CN203347858U (en) Gas-steam combined cycle system
CN206812865U (en) A kind of dual power supply mobile power vehicle
CN205077914U (en) Split axle gas - steam combined -cycle power plant unites high -order arrangement structure of main building
CN208816256U (en) Water cooling air intake-exhaust pipe
CN209605447U (en) Intensive rebuilding system applied to fume afterheat deep exploitation
CN211474246U (en) Mute box type generator set
CN209588142U (en) A kind of Waste Heat Recovery System of back pressure type thermal power plant unit
CN104806390B (en) The internal combustion engine power generating system of fuel is used as by the use of mine air-lack
CN205400158U (en) Main plant building arrangement structure of single shaft gas -steam combined cycle unit
CN202970804U (en) Single layer layout turbine system
CN107269411A (en) Distributed energy resource system and the method for solving the fluctuation of jacket water system pressure
CN106677564A (en) Combined main factory building of cycle power plant
CN219344189U (en) Arrangement structure of combined cycle main workshop of internal combustion engine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Song Wengui

Inventor after: Lei Baoming

Inventor after: Zhang Shuang

Inventor after: Yang Xiaojun

Inventor after: Lv Xiaolan

Inventor after: Zhao Zhilong

Inventor after: Zhu Deyong

Inventor after: Zheng Bin

Inventor after: Song Yingbo

Inventor after: Wu Bo

Inventor after: Cai Chunrong

Inventor after: Liang Shanshan

Inventor before: Zhao Zhilong

Inventor before: Song Yingbo

Inventor before: Liang Shanshan

Inventor before: Yang Xiaojun

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201216

Address after: 618000 Jinsha Jiangxi Road, high tech Industrial Park, Deyang, Sichuan, 666

Applicant after: De Yang Dong Fang Steam Turbine Works Surface Engineering Co.,Ltd.

Applicant after: Huaneng Dongguan gas turbine thermal power Co.,Ltd.

Applicant after: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA ENERGY ENGINEERING Group

Address before: 618000 Jinsha Jiangxi Road, high tech Industrial Park, Deyang, Sichuan, 666

Applicant before: De Yang Dong Fang Steam Turbine Works Surface Engineering Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190301