CN206376906U - Gas combustion-gas vapor combined cycle factory owner's plant layout structure - Google Patents

Gas combustion-gas vapor combined cycle factory owner's plant layout structure Download PDF

Info

Publication number
CN206376906U
CN206376906U CN201621488457.2U CN201621488457U CN206376906U CN 206376906 U CN206376906 U CN 206376906U CN 201621488457 U CN201621488457 U CN 201621488457U CN 206376906 U CN206376906 U CN 206376906U
Authority
CN
China
Prior art keywords
gas
vapor
combined cycle
wheel
gas turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621488457.2U
Other languages
Chinese (zh)
Inventor
郑赟
章正传
李懿靓
吴家凯
马雪松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201621488457.2U priority Critical patent/CN206376906U/en
Application granted granted Critical
Publication of CN206376906U publication Critical patent/CN206376906U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses a kind of gas combustion-gas vapor combined cycle factory owner plant layout structure, including factory building main body, in-line combines at least two sets combined cycle generating units being arranged in the factory building main body;Often cover gas turbine generator group and vapor wheel generating set that the combined cycle generating unit includes being mutually perpendicular to arrangement, and waste heat boiler corresponding with the gas turbine generator group.The utility model proposes gas combustion-gas vapor combined cycle factory owner's plant layout structure, reduce investment construction cost, make each equipment connection and reasonable arrangement in power plant, improve economy of power plant.

Description

Gas combustion-gas vapor combined cycle factory owner's plant layout structure
Technical field
The utility model is related to gas combustion-gas vapor combined cycle factory technical field, more particularly to a kind of combustion and steam joint Cycle power plant main building arrangement structure.
Background technology
For gas combustion-gas vapor combined cycle factory, main building is one of most crucial building, most of host device With main therrmodynamic system process pipelines, the equal centralized arrangement of cable in main building.The conjunction of main building and its process equipment arrangement Rationality, affect building volume, process pipelines cable kilometer, construction organization order, power plant construction cycle length and The operation safety and convenience of electric power factory equipment.
Combined cycle power plant's main building arrangement structure includes combined cycle generating unit, often covers combined cycle generating unit It is divided into gas turbine generator group, vapor wheel generating set and the part of waste heat boiler three.Gas turbine generator group include gas turbine, Gas turbine generator and its auxiliary equipment.Vapor wheel generating set includes steam turbine, steam turbine generator and its auxiliary equipment. Waste heat boiler includes boiler body and its auxiliary equipment, and its arrangement form depends primarily on the exhaust mode of gas turbine, with combustion Relation between gas-turbine is relatively fixed.
In gas combustion-gas vapor combined cycle factory, most important equipment is exactly gas turbine, and its structure type decides master The arrangement general layout of factory building.Gas turbine can use side air inlet, three kinds of frame modes of upper air and lower air inlet.When gas turbine is used During the intake method of side, the air induction system of side air inlet can only be mounted in gas turbine side, and not allow mirror-image arrangement.If hair When there are many set Combined Cycle Units in power plant, in order to avoid adjacent Combined Cycle Unit and its factory building are entered to the air of gas turbine The air of gas system produces disturbance destruction, often cover Combined Cycle Unit position must assure that certain safe operation away from From, therefore main building is typically using the plant layout structure that often set Combined Cycle Unit is independently arranged.When under gas turbine use During intake method, the air induction system of lower air inlet is arranged in below gas turbine, and air inlet is towards waste heat boiler, in order to ensure Air inlet amount and relatively low flow passage resistance force of waterproof, gas turbine are necessary for high-order operating layer arrangement, the steam turbine with high position arrangement It can be arranged with layer.When gas turbine uses upper air mode, taken up too much space by the air induction system of upper air and Air inlet is needed in outdoor, therefore gas turbine is low position, can be arranged with the steam turbine of high-order or low level with layer.
It is general both at home and abroad that upper air low position is used to gas turbine in order to reduce main building cost.Moreover, combustion gas is steamed Vapour combined cycle power plant main building arrangement structure is diversified, is mainly reflected in gas turbine generator group and vapor wheel generates electricity Relation between unit.For example, in the technical scheme having, a set of steam turbine and a set of combustion turbine combined formation are single Combined Cycle Unit, and form self plant layout structure;In the technical scheme having, cover united steam turbine and many more Cover united gas turbine and form many set Combined Cycle Units, and form united main building arrangement structure respectively;In the skill having In art scheme, all combined steamed gas turbines together, form joint main building arrangement structure.
Further, since gas combustion-gas vapor combined cycle factory cost of equipment maintenance in life cycle management accounts for the ratio of totle drilling cost Weight is larger, therefore the repair and maintenance of domestic split axle combined cycle power plant major-minor machine equipment for convenience at present, reduces high Gas turbine generator group and vapor wheel generator set device safeguard running cost, while also to shorten equipment construction installation period, Main building arrangement generally uses remaining knot of therrmodynamic system equipment combined layout in same factory building in addition to waste heat boiler Configuration formula.In conventional art, gas turbine generator group and its auxiliary equipment in a kind of many set combined cycle split axle units are proposed, is steamed The main building arrangement scheme of Turbo-generator Set and its auxiliary equipment combined layout in same factory building.Its detailed technical side Case includes herein below:Gas turbine is using lower air inlet high position arrangement, and steam turbine is using lower steam discharge high position arrangement, two sets of generatings The operating layer platform absolute altitude of unit is 13m;Gas turbine generator group center line and vapor wheel generating set centerline parallel are more The equipment in-line arrangement of Combined Cycle Unit is covered in same main building, and vapor wheel generating set is arranged in gas turbine generator The left side or right side of group;Joint main building sets three layers of inspection platform altogether, respectively zero meter layer, intermediate layer and operating layer, fortune Turn layer platform arrangement steam turbine generator group and gas turbine generator group, the auxiliary equipment belonging to them is corresponded under it respectively Each layer inspection platform arrangement in side;Often set Combined Cycle Unit sets a maintenance driving, and the institute of unit is often covered to overhaul lifting There is major-minor machine equipment;Turbine generator and gas turbine powered generator are taken out rotor and realized by same travelling crane inspection lifting;Often Combined Cycle Unit setting one is covered across maintenance across its access path A before main building is discharged into out;Main building roof absolute altitude is in 30m More than, main building and driving span are about 45m.The technical scheme has following several shortcomings:Host device is high-order arrangement, if The civil engineering costs such as standby basis, pile foundation are higher;Main building takes out dress to consider that generator amature is overhauled indoors, thus main building and Span of driving a vehicle is very huge, about 45m, so factory building volume is larger, while civil engineering cost is high, driving cost is also higher;It is main The total floor space of factory building is larger, it is desirable to which power plant place is well-to-do, and expropriation of land cost is higher;For the vapor wheel of low position axle steam discharge Machine, is not suitable for this combustion turbine combined arrangement main building scheme with air inlet under high-order arrangement;The large scale equipments such as condenser It because being arranged in factory building center, it is impossible to assemble and promoted comprehensively in factory building outside factory, can only assemble, install in factory building narrow space Construction period is longer.
Utility model content
Based on this, in view of the above-mentioned problems, the utility model proposes a kind of gas combustion-gas vapor combined cycle factory owner factory building cloth Structure is put, investment construction cost is reduced, makes each equipment connection and reasonable arrangement in power plant, improves economy of power plant.
Its technical scheme is as follows:
A kind of gas combustion-gas vapor combined cycle factory owner plant layout structure, including factory building main body, in-line, which is combined, to be arranged at At least two sets combined cycle generating units in the factory building main body;Often covering the combined cycle generating unit includes mutually hanging down The gas turbine generator group and vapor wheel generating set directly arranged, and waste heat corresponding with gas turbine generator group pot Stove;
The gas turbine generator group includes the gas turbine of upper air low position, and is arranged at the gas turbine The gas turbine generator of side, the waste heat boiler is arranged at the gas turbine opposite side, and the gas turbine, combustion gas wheel Generator and waste heat boiler coaxial line;
The vapor wheel generating set includes the steam turbine of low position axle steam discharge or the lower steam discharge of high-order arrangement, the steaming The axis of the axis of steam turbine and the gas turbine is mutually perpendicular to, and the vapor wheel set with the steam turbine coaxial line Generator;
In two sets of adjacent combined cycle generating units, the axis of a gas turbine with another described in The diameter parallel of gas turbine, the axis collinear of the axis of a steam turbine and another steam turbine.
Its further technical scheme is illustrated below:
Further, gas turbine region is provided with the main building, the gas turbine region is provided with combustion gas wheel Zero meter of maintenance layer and combustion gas wheel operating maintenance layer;
The gas turbine includes combustion gas wheel main frame, and the gas turbine accessory system being connected with the combustion gas wheel main frame is set Standby, gas turbine engine lubricant system equipment and gas turbine cooling system equipment;Combustion gas wheel main frame and the gas turbine auxiliary System equipment is arranged at the combustion gas wheel operating maintenance layer, the gas turbine engine lubricant system equipment and gas turbine cooling system System equipment is arranged at described zero meter of maintenance layer of combustion gas wheel.
Further, the gas turbine generator is using indoor low position, and the gas turbine includes and the combustion gas The airintake wind-tunnel of main frame connection is taken turns, the airintake wind-tunnel is arranged above the gas turbine generator.
Further, steam turbine region is provided with the main building, the steam turbine is arranged using low position axle During vapour, the steam turbine region is provided with zero meter of maintenance layer of vapor wheel and vapor wheel operating maintenance layer, and the vapor wheel zero Rice maintenance layer is connected with described zero meter of maintenance layer of combustion gas wheel, the vapor wheel operating maintenance layer and combustion gas wheel operating maintenance layer It is connected;
Steam turbine and the steam turbine generator is arranged at the vapor wheel operating maintenance layer;The steam turbine generator Group also closes chilled water system equipment, condensate system equipment, lubrication including what is be connected with the steam turbine and steam turbine generator Oil system equipment and gland seal system equipment, and it is described close chilled water system equipment, condensate system equipment, lubricating oil system equipment and Gland seal system equipment is arranged at described zero meter of maintenance layer of vapor wheel.
Further, steam turbine region is provided with the main building, the steam turbine is arranged using high-order arrangement is lower During vapour, the steam turbine region is provided with zero meter of maintenance layer of vapor wheel, vapor wheel centre maintenance layer and vapor wheel operating maintenance Layer;
Steam turbine and the steam turbine generator is arranged at the vapor wheel operating maintenance layer;The steam turbine generator Group also closes chilled water system equipment, condensate system equipment, lubrication including what is be connected with the steam turbine and steam turbine generator Oil system equipment and gland seal system equipment, and it is described close chilled water system equipment, condensate system equipment, lubricating oil system equipment and Gland seal system equipment is arranged at maintenance layer in the middle of described zero meter of maintenance layer of vapor wheel and vapor wheel.
Further, in two sets of adjacent combined cycle generating units, a set of combined cycle generating unit Gas turbine generator group it is adjacent with the vapor wheel generating set of the another set of combined cycle generating unit, a set of steam Turbine generator group is located between two sets of gas turbine generator groups.
Further, in two sets of adjacent combined cycle generating units, a set of combined cycle generating unit Two set adjacent and adjacent with the vapor wheel generating set of the another set of combined cycle generating unit of vapor wheel generating set The vapor wheel generating set is positioned opposite.
Further, in two sets of adjacent combined cycle generating units, a set of combined cycle generating unit Two set adjacent and adjacent with the vapor wheel generating set of the another set of combined cycle generating unit of vapor wheel generating set The vapor wheel generating set in-line arrangement.
Further, in addition to the main maintenance that is arranged between adjacent one gas turbine and steam turbine across, The main maintenance is across the centerline parallel with the gas turbine;
Also include being arranged in factory building main body and above the gas turbine generator group and vapor wheel generating set Maintenance driving, the maintenance driving is with the main maintenance across parallel.
Further, the waste heat boiler includes boiler body with the gas turbine coaxial line, and with the pot The boiler auxiliaries that furnace main body is connected side by side, the main maintenance is across adjoining the boiler auxiliaries.
The utility model has beneficial effect prominent as follows:It is to ensure that major-minor machine equipment combines cloth in main building room On the basis of putting, make the initial costs such as power plant's civil engineering cost, auxiliary equipment cost, main building driving cost and power plant's expropriation of land cost Smaller, each capital equipment is arranged to more rationally, improve economy of power plant.
Brief description of the drawings
Fig. 1 is the structure of gas combustion-gas vapor combined cycle factory owner plant layout structure described in the utility model embodiment Schematic block diagram one;
Fig. 2 is the structure of gas combustion-gas vapor combined cycle factory owner plant layout structure described in the utility model embodiment Schematic block diagram two;
Fig. 3 is the structure of gas combustion-gas vapor combined cycle factory owner plant layout structure described in the utility model embodiment Schematic block diagram three;
Fig. 4 is the combustion gas of gas combustion-gas vapor combined cycle factory owner plant layout structure described in the utility model embodiment Cross section structure schematic diagram at turbine.
Description of reference numerals:
10- factory building main bodys, 12- maintenance drivings, 100- gas turbine generator groups, 110- gas turbines, 112- airintake wind-tunnels, 120- gas turbine generators, 200- waste heat boilers, 300- vapor wheel generating sets, 310- steam turbines, 320- vapor wheels generate electricity Machine, 400- it is main maintenance across.
Embodiment
Embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, a kind of gas combustion-gas vapor combined cycle factory owner plant layout structure, including factory building main body 10, in-line combines at least two sets combined cycle generating units being arranged in the factory building main body 10, can make all combined cycles The centerline collineation of generating set.Moreover, often covering the combustion gas wheel that the combined cycle generating unit includes being mutually perpendicular to arrangement Generating set 100 and vapor wheel generating set 300, and waste heat boiler 200 corresponding with the gas turbine generator group 100. Specifically, the vapor wheel generating set 300 can lateral arrangement, gas turbine generator group 100 can be longitudinally arranged, i.e., vapor wheel is sent out The center line of group of motors 300 and the central axis of gas turbine generator group 100.It can then make all to need setting for repair and maintenance It is standby to be all disposed within same driving across interior, compact conformation, reduce and take up an area, also allow for repair and maintenance.Moreover, also sending out vapor wheel simultaneously Group of motors and gas turbine generator group are separate, can keep the system independence of combustion gas circulation and steam circulation.
Moreover, set combined cycle generating unit sets the big factory building of joint, these combined cycle generating unit in-line arrangements more On the same line, all major-minor machine equipments and steam-water pipe, cable etc. use straight line in-line arrangement form, are adapted to modularization Design and construction, are also convenient for installing maintenance operation.Moreover, so may be such that main building main span away from smaller (only about with driving span 25m).Main building span is smaller, reduces main building volume, factory building civil engineering construction cost is greatly reduced.Span of driving a vehicle is smaller, driving Cost is greatly reduced.It is thus possible to greatly save main building and travelling facility cost, it is possible to reduce main building takes up an area, and subtracts Few power plant construction land used, reduction expropriation of land cost.In addition, combined cycle generating unit in-line combined layout will be covered in straight line more On, also allow for construction and installation and maintenance.
In addition, as shown in figure 4, the factory building main body 10 includes the side wall that surrounding is set, and being arranged at top side wall Roof.Four the week side of boss walls and roof, which are enclosed, is set as a receiving space, will cover gas turbine generator group 100 and vapor wheel generating set more 300 accommodate wherein.In addition, the gas turbine generator group 100 includes the gas turbine 110, Yi Jishe of upper air low position The gas turbine generator 120 of the side of gas turbine 110 is placed in, the waste heat boiler 200 is arranged at the gas turbine 110 Opposite side, and the gas turbine 110, gas turbine generator 120 and the coaxial line of waste heat boiler 200.The gas turbine 110 is led To include combustion gas wheel body and its accessory system, air induction system and flue gas exhaust system etc..Flue gas exhaust systematic influence The position of waste heat boiler 200, heavy duty gas turbine is generally axial exhaust, therefore waste heat boiler 200 is coaxial therewith arrangement. Air induction system determines gas turbine using low level or the arrangement form of a high position.In the present embodiment, gas turbine 110 is adopted Upper air low position is used, host device uses low position form, Equipment Foundations and pile foundation cost can be greatly reduced, can drop Low main building cost.In addition, by the way that the steam turbine 110, gas turbine generator 120 and the coaxial line of waste heat boiler 200 are set Put, three's compact conformation can be caused, reduce factory building space-consuming, reduce factory building span.
In addition, the vapor wheel generating set 300 includes the vapor wheel of low position axle steam discharge or the lower steam discharge of high-order arrangement Machine 310, the axis of the axis of the steam turbine 310 and the gas turbine 110 is mutually perpendicular to, and with the steam turbine The steam turbine generator 320 that 310 coaxial lines are set.Moreover, in two sets of adjacent combined cycle generating units, an institute State the diameter parallel of the axis and another gas turbine 110 of gas turbine 110, the axle of a steam turbine 310 The axis collinear of line and another steam turbine 310.Vapor wheel generating set 300 that will be used is arranged at same axle On line (center line that may also be main building), and gas turbine generator group 100 used is set to be parallel to each other, so can be easily Installation and repairing is carried out to gas turbine generator group 100 and vapor wheel generating set 300, the joint of adjacent two sets is also may be such that Circulating generation unit sets compacter.
In addition, being provided with gas turbine region in the main building (factory building main body 10), the gas turbine region is set There are zero meter of maintenance layer of combustion gas wheel and combustion gas wheel operating maintenance layer.The gas turbine 110 includes combustion gas wheel main frame, with the combustion gas Gas turbine auxiliary system equipment, gas turbine engine lubricant system equipment and the gas turbine cooling system of wheel main frame connection are set It is standby.The combustion gas wheel main frame and gas turbine auxiliary system equipment are arranged at the combustion gas wheel operating maintenance layer, the combustion gas wheel Machine lubricating oil system equipment and gas turbine cooling system equipment are arranged at described zero meter of maintenance layer of combustion gas wheel.Moreover, the combustion Turbo-generator 120 is using indoor low position, and the gas turbine 110 includes the air inlet wind being connected with the combustion gas wheel main frame Road 112, the airintake wind-tunnel 112 is arranged at the top of gas turbine generator 120.So, the airintake direction of gas turbine 110 is Upper air mode, i.e. airintake wind-tunnel 112 are arranged on gas turbine generator 120, without taking out rotor using driving, then this region factory Only accomplish that airintake wind-tunnel support frame elevation of bottom can (height about 13 meters) in house face.In the present embodiment, gas electricity generator is adopted Cartridge rotor is taken out with the small-sized fixed lifting tool that overhauls.In addition, the airintake wind-tunnel 112 of gas turbine 10 is arranged in outdoor, positioned at it The top of supporting gas turbine generator 1120, and the gas turbine generator 120 is arranged in travelling crane inspection across outer, its repair and maintenance leads to The small-sized apparatus for examination and repair (such as electric block) crossed in airintake wind-tunnel supporting construction is completed.
In addition, in one embodiment, steam turbine region, the steam turbine are provided with the factory building main body 10 During 310 use low position axle steam discharge, the steam turbine region is provided with zero meter of maintenance layer of vapor wheel and vapor wheel operating inspection Repair layer, and zero meter of maintenance layer of the vapor wheel is connected with described zero meter of maintenance layer of combustion gas wheel, the vapor wheel operating overhaul layer and The combustion gas wheel operating maintenance layer is connected.The steam turbine 310 and steam turbine generator 320 are arranged at the vapor wheel operating Overhaul layer.The vapor wheel generating set 300 also includes and the steam turbine and steam turbine generator are connected closes cold water system Unite equipment, condensate system equipment, lubricating oil system equipment and gland seal system equipment, and described close chilled water system equipment, condensation Water system equipment, lubricating oil system equipment and gland seal system equipment are arranged at described zero meter of maintenance layer of vapor wheel.So, for low Vapor wheel generating set region inspection platform and gas turbine generator group in the steam turbine 310 of position disposed axle steam discharge, main building Region inspection platform is identical, and the operating layer of the two is connected, and is combined into the low of gas turbine generator group and vapor wheel generating set Position large platform arrangement form.In addition, in the present embodiment, for the joint main building of steam turbine low position, roof absolute altitude About 23.5m.Moreover, gas turbine axle center absolute altitude and steam turbine shaft center absolute altitude are 5.5m, operating maintenance layer platform absolute altitude For 4.5m.
In another embodiment, steam turbine region is provided with the factory building main body 10, the steam turbine is used Under a high position arrangement during steam discharge, the steam turbine region is provided with zero meter of maintenance layer of vapor wheel, vapor wheel centre maintenance layer and steaming Steamer operating maintenance layer.The steam turbine 310 and steam turbine generator 320 are arranged at the vapor wheel operating maintenance layer.Institute The chilled water system that closes that stating vapor wheel generating set 300 also includes being connected with the steam turbine 310 and steam turbine generator 320 is set Standby, condensate system equipment, lubricating oil system equipment and gland seal system equipment, and it is described close chilled water system equipment, condense water system System equipment, lubricating oil system equipment and gland seal system equipment are arranged in the middle of described zero meter of maintenance layer of vapor wheel and vapor wheel and overhauled Layer.In the present embodiment, steam turbine region and gas turbine region separate can be set, i.e., the maintenance layer of the two can not be right It should set.In addition, in the present embodiment, for the joint main building of steam turbine high position arrangement, roof absolute altitude is about 28.5m. Moreover, vapor wheel generating set operating layer absolute altitude is about 11m.
Therefore, the vapor wheel generating set 300 that the Combined Cycle Unit is covered more can be using dispersed placement or concentration cloth Put two kinds of arrangements.In one embodiment, as shown in figure 1, when vapor wheel generating set 300 using dispersed placement when, often The vapor wheel generating set 330 of set Combined Cycle Unit is separated by gas turbine generator group 100, and all major-minor machine equipments are kept In-line arrangement.Specifically, i.e., in two sets of adjacent combined cycle generating units, a set of combined cycle generating unit Gas turbine generator group 100 it is adjacent with the vapor wheel generating set 300 of the another set of combined cycle generating unit, Yi Taosuo Vapor wheel generating set 300 is stated between two sets of gas turbine generator groups 100.When the steam turbine is using high-order cloth When putting lower steam discharge, this dispersed placement form can be set to the above-mentioned steam turbine region zero meter of vapor wheel maintenance layer, The situation that maintenance layer is operated with vapor wheel when overhauling layer in the middle of vapor wheel is corresponding.Now, the steaming of combined cycle generating unit is often covered Turbo-generator Set and gas turbine generator group are separate, and the two sets different maintenance layers.When the steam turbine 310 is adopted During with low position axle steam discharge, this dispersed placement form can be set to zero meter of maintenance layer of vapor wheel with the steam turbine region Situation when maintenance layer is operated with vapor wheel is corresponding.Now, the often vapor wheel generating set of set combined cycle generating unit and combustion Turbo-generator group sets identical to overhaul layer, forms general overhaul platform.
In another embodiment, as shown in Fig. 2 being for setting when vapor wheel generating set 300 is using centralized arrangement Count (at least) two sets Combined Cycle Units extra selection, will two sets of vapor wheel generating set centralized arrangements together so that Each layer inspection platform of steam turbine generator group 300 is connected shared, and major-minor machine equipment can be mirror-image arrangement.I.e. adjacent In two sets of combined cycle generating units, the vapor wheel generating set 300 of a set of combined cycle generating unit with it is another Cover two sets of adjacent and adjacent vapor wheel generating sets of the vapor wheel generating set 300 of the combined cycle generating unit 300 is positioned opposite.When steam turbine steam discharge lower using high-order arrangement, this centralized arrangement form can with it is above-mentioned described in Steam turbine region is set to situation when zero meter of maintenance layer of vapor wheel, vapor wheel centre maintenance layer and vapor wheel operating maintenance layer Correspondence.Now, often the vapor wheel generating set and gas turbine generator group of set combined cycle generating unit are separate, and the two sets Put different maintenance layers.But, identical maintenance layer can be set in adjacent vapor wheel generating set.When the steam turbine 310 During using low position axle steam discharge, this centralized arrangement form can be set to zero meter of maintenance of vapor wheel with the steam turbine region The situation that layer is operated with vapor wheel when overhauling layer is corresponding.Now, often set combined cycle generating unit vapor wheel generating set with Gas turbine generator group sets identical to overhaul layer, and adjacent vapor wheel generating set can also be arranged on identical maintenance Layer, forms general overhaul platform.
In another embodiment, as shown in figure 3, being for setting when vapor wheel generating set 300 is using centralized arrangement Count (at least) two sets Combined Cycle Units extra selection, will two sets of centralized arrangements of vapor wheel generating set 300 together, make Each layer inspection platform for obtaining steam turbine generator group 300 is connected shared, and major-minor machine equipment can be in-line arrangement.I.e. adjacent Two sets of combined cycle generating units in, the vapor wheel generating set 300 of a set of combined cycle generating unit with it is another Two sets of adjacent and adjacent steam turbine generators of the vapor wheel generating set 300 of a set of combined cycle generating unit 300 in-line arrangements of group.This centralized arrangement form is identical with a upper embodiment, and (steam turbine is using the lower steam discharge of high-order arrangement When and the steam turbine 310 using low position axle steam discharge when).
In addition, the gas combustion-gas vapor combined cycle factory owner plant layout structure also includes being arranged at an adjacent institute The main maintenance between gas turbine 110 and steam turbine 310 is stated across 400, the main maintenance is across 400 and the gas turbine 110 Centerline parallel.Often covering the combined cycle generating unit sets a set of main maintenance across 400, is convenient for installation and repairing. Structure of main power house also includes being arranged in factory building main body 10 and positioned at the gas turbine generator group 100 and vapor wheel generating set One maintenance driving 12 of 300 tops, the maintenance driving 12 is parallel across 400 with the main maintenance.The maintenance driving 12 The equipment hung can be transported to main maintenance and be dispatched from the factory outside by vehicle transport in 400.It is additionally, since main maintenance and is arranged in master across 400 Between subsidiary engine equipment, therefore it will not be crossed over mutually during the lifting of major-minor machine equipment, repair and maintenance is safe and reliable.In the present embodiment, Often set combined cycle generating unit sets a maintenance driving 12, and the unit of set more than full factory can share all maintenance drivings 12 and carry out Install, overhaul and safeguard, especially during unit installation is installed, many maintenance drivings 12 can be while make simultaneously to a set of unit Industry, greatly increases the convenience of installation and operation maintenance.
In addition, the waste heat boiler 200 includes boiler body 210 with the coaxial line of gas turbine 110, and with institute The boiler auxiliaries 220 that boiler body 210 is connected side by side is stated, the main maintenance adjoins the boiler auxiliaries across 400 220.Moreover, waste heat boiler 200 uses semi-outdoor in-line arrangement, i.e., the boiler body 210 of waste heat boiler is arranged on factory building master Outside body 10, reduce the space-consuming of factory building main body.In addition, the supporting condenser of steam turbine 310 is arranged in factory building inward flange side, Directly promoted after being assembled outside factory building after waste heat boiler stove outside factory building in factory building, so that condenser integral installation It is more convenient.The overall operation performance of equipment is so not only ensure that, the installation time is also significantly shortened, installation fee is reduced With.
The utility model proposes gas combustion-gas vapor combined cycle factory owner's plant layout structure, be to ensure that main auxiliary machine is set On the basis of the standby combined layout in main building room, make power plant's civil engineering cost, auxiliary equipment cost, main building driving cost and The initial costs such as power plant's expropriation of land cost are smaller, and each capital equipment is arranged to more rationally, improve economy of power plant.Moreover, using this Gas turbine generator group and vapor wheel generating set joint main building low position scheme, can both keep gas turbine and its auxiliary The gas recirculating system independence of equipment is helped, steam turbine and its steam circulation of auxiliary equipment can also be kept independent Property, and the advantages of power plant's disposable initial cost is greatly lowered.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and it describes more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of gas combustion-gas vapor combined cycle factory owner plant layout structure, it is characterised in that including factory building main body, in-line connection Close at least two sets combined cycle generating units being arranged in the factory building main body;The combined cycle generating unit is often covered to wrap The gas turbine generator group and vapor wheel generating set for being mutually perpendicular to arrangement are included, and it is corresponding with the gas turbine generator group Waste heat boiler;
The gas turbine generator group includes the gas turbine of upper air low position, and is arranged at the gas turbine side Gas turbine generator, the waste heat boiler is arranged at the gas turbine opposite side, and the gas turbine, combustion gas wheel generate electricity Machine and waste heat boiler coaxial line;
The vapor wheel generating set includes the steam turbine of low position axle steam discharge or the lower steam discharge of high-order arrangement, the vapor wheel The axis of the axis of machine and the gas turbine is mutually perpendicular to, and the vapor wheel set with the steam turbine coaxial line generates electricity Machine;
In two sets of adjacent combined cycle generating units, the axis of a gas turbine and another combustion gas The diameter parallel of turbine, the axis collinear of the axis of a steam turbine and another steam turbine.
2. gas combustion-gas vapor combined cycle factory owner plant layout structure according to claim 1, it is characterised in that described Gas turbine region is provided with main building, the gas turbine region is provided with zero meter of maintenance layer of combustion gas wheel and the operating of combustion gas wheel Overhaul layer;
The gas turbine includes combustion gas wheel main frame, the gas turbine auxiliary system equipment being connected with the combustion gas wheel main frame, combustion Gas-turbine lubricating oil system equipment and gas turbine cooling system equipment;The combustion gas wheel main frame and gas turbine accessory system are set It is standby to be arranged at the combustion gas wheel operating maintenance layer, the gas turbine engine lubricant system equipment and gas turbine cooling system equipment It is arranged at described zero meter of maintenance layer of combustion gas wheel.
3. gas combustion-gas vapor combined cycle factory owner plant layout structure according to claim 2, it is characterised in that described Gas turbine generator is using indoor low position, and the gas turbine includes the airintake wind-tunnel being connected with the combustion gas wheel main frame, The airintake wind-tunnel is arranged above the gas turbine generator.
4. gas combustion-gas vapor combined cycle factory owner plant layout structure according to claim 2, it is characterised in that described Steam turbine region is provided with main building, when the steam turbine uses low position axle steam discharge, the steam turbine region It is provided with zero meter of maintenance layer of vapor wheel and vapor wheel operating maintenance layer, and zero meter of maintenance layer of the vapor wheel and the combustion gas wheel zero Rice maintenance layer is connected, and the vapor wheel operating maintenance layer is connected with combustion gas wheel operating maintenance layer;
Steam turbine and the steam turbine generator is arranged at the vapor wheel operating maintenance layer;The vapor wheel generating set is also Chilled water system equipment, condensate system equipment, lubricating oil system are closed including what is be connected with the steam turbine and steam turbine generator Unite equipment and gland seal system equipment, and described close chilled water system equipment, condensate system equipment, lubricating oil system equipment and axle envelope System equipment is arranged at described zero meter of maintenance layer of vapor wheel.
5. gas combustion-gas vapor combined cycle factory owner plant layout structure according to claim 2, it is characterised in that described Steam turbine region is provided with main building, when the steam turbine arranges lower steam discharge using a high position, the steam turbine region It is provided with zero meter of maintenance layer of vapor wheel, vapor wheel centre maintenance layer and vapor wheel operating maintenance layer;
Steam turbine and the steam turbine generator is arranged at the vapor wheel operating maintenance layer;The vapor wheel generating set is also Chilled water system equipment, condensate system equipment, lubricating oil system are closed including what is be connected with the steam turbine and steam turbine generator Unite equipment and gland seal system equipment, and described close chilled water system equipment, condensate system equipment, lubricating oil system equipment and axle envelope System equipment is arranged at maintenance layer in the middle of described zero meter of maintenance layer of vapor wheel and vapor wheel.
6. gas combustion-gas vapor combined cycle factory owner's plant layout structure according to claim 4 or 5, it is characterised in that In two sets of adjacent combined cycle generating units, the gas turbine generator group of a set of combined cycle generating unit with The vapor wheel generating set of the another set of combined cycle generating unit is adjacent, and a set of vapor wheel generating set is located at two sets Between the gas turbine generator group.
7. gas combustion-gas vapor combined cycle factory owner's plant layout structure according to claim 4 or 5, it is characterised in that In two sets of adjacent combined cycle generating units, the vapor wheel generating set of a set of combined cycle generating unit with Two sets of adjacent and adjacent vapor wheel generating sets of the vapor wheel generating set of the another set of combined cycle generating unit It is positioned opposite.
8. gas combustion-gas vapor combined cycle factory owner's plant layout structure according to claim 4 or 5, it is characterised in that In two sets of adjacent combined cycle generating units, the vapor wheel generating set of a set of combined cycle generating unit with Two sets of adjacent and adjacent vapor wheel generating sets of the vapor wheel generating set of the another set of combined cycle generating unit In-line arrangement.
9. gas combustion-gas vapor combined cycle factory owner plant layout structure according to claim 1, it is characterised in that also wrap Include the main maintenance that is arranged between adjacent one gas turbine and steam turbine across, the main maintenance across with the combustion gas The centerline parallel of turbine;
Also include being arranged at the maintenance in factory building main body and above the gas turbine generator group and vapor wheel generating set Driving, the maintenance driving is with the main maintenance across parallel.
10. gas combustion-gas vapor combined cycle factory owner plant layout structure according to claim 9, it is characterised in that institute Stating waste heat boiler includes the boiler body with the gas turbine coaxial line, and the boiler being connected side by side with the boiler body Auxiliary equipment, the main maintenance is across adjoining the boiler auxiliaries.
CN201621488457.2U 2016-12-30 2016-12-30 Gas combustion-gas vapor combined cycle factory owner's plant layout structure Active CN206376906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621488457.2U CN206376906U (en) 2016-12-30 2016-12-30 Gas combustion-gas vapor combined cycle factory owner's plant layout structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621488457.2U CN206376906U (en) 2016-12-30 2016-12-30 Gas combustion-gas vapor combined cycle factory owner's plant layout structure

Publications (1)

Publication Number Publication Date
CN206376906U true CN206376906U (en) 2017-08-04

Family

ID=59404696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621488457.2U Active CN206376906U (en) 2016-12-30 2016-12-30 Gas combustion-gas vapor combined cycle factory owner's plant layout structure

Country Status (1)

Country Link
CN (1) CN206376906U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111141158A (en) * 2020-01-07 2020-05-12 中国电建集团河北工程有限公司 Method for modularly assembling condenser outside A row of steam turbine room

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111141158A (en) * 2020-01-07 2020-05-12 中国电建集团河北工程有限公司 Method for modularly assembling condenser outside A row of steam turbine room

Similar Documents

Publication Publication Date Title
CN102352696B (en) Lateral structure and arranging method of steam turbine generator unit of 1000MW-grade set in thermal power plant
CN106523048A (en) Main building arrangement structure of gas-steam combined cycle power generation plant
CN206376906U (en) Gas combustion-gas vapor combined cycle factory owner's plant layout structure
CN105155880B (en) A kind of complex factories low position structure of one-to-one multiaxis combined cycle thermal power generation unit
CN210032787U (en) Main power house layout structure of gas and steam combined cycle generator set
CN206753668U (en) A kind of single shaft arrangement of Combined cycle gas-steam turbine unit
CN209524776U (en) A kind of cooling tower of energy-saving circulating cooling water
CN105019695A (en) High-position arrangement method and structure of combined main power house of split-shaft gas-steam combined-cycle power plant
CN104652863B (en) Method for open-air arrangement of main plant of fuel gas-steam combined-cycle power plant
CN203613834U (en) Compact four-column type arrangement structure of ultra supercritical air cooling unit main power house
CN105604357A (en) Main power house layout structure of single-shaft gas-steam combined cycle units
CN109403672A (en) A kind of Gas-steam Combined Cycle power plant main power house arragement construction
CN207485050U (en) A kind of large-size thermal power plant main building arrangement structure
CN205077914U (en) Split axle gas - steam combined -cycle power plant unites high -order arrangement structure of main building
CN110409878A (en) A kind of arragement construction of nuclear power station oil or gas boiler room
CN206600027U (en) Split axle Combined cycle gas-steam turbine unit low level combines main building arrangement structure
CN203347858U (en) Gas-steam combined cycle system
CN106677564A (en) Combined main factory building of cycle power plant
JPH1113416A (en) Package type power plant
CN103956964A (en) Tower type surrounding distributed wind-solar complementary power generation device
CN205400158U (en) Main plant building arrangement structure of single shaft gas -steam combined cycle unit
CN202970804U (en) Single layer layout turbine system
CN209483444U (en) A kind of steam turbine building based on coal base distributing-supplying-energy system
CN209605447U (en) Intensive rebuilding system applied to fume afterheat deep exploitation
CN102116215A (en) Self-electricity consumption reduction combined cooling heat and power system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant