CN207484507U - A kind of bridge pier foundation pile precast construction - Google Patents

A kind of bridge pier foundation pile precast construction Download PDF

Info

Publication number
CN207484507U
CN207484507U CN201721598749.6U CN201721598749U CN207484507U CN 207484507 U CN207484507 U CN 207484507U CN 201721598749 U CN201721598749 U CN 201721598749U CN 207484507 U CN207484507 U CN 207484507U
Authority
CN
China
Prior art keywords
foundation pile
pier
hole
foundation
ontology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721598749.6U
Other languages
Chinese (zh)
Inventor
罗向晖
鲜永忠
许传峰
沙焱东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN JIAOYUN ENGINEERING GROUP Co Ltd
Original Assignee
SHENZHEN JIAOYUN ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN JIAOYUN ENGINEERING GROUP Co Ltd filed Critical SHENZHEN JIAOYUN ENGINEERING GROUP Co Ltd
Priority to CN201721598749.6U priority Critical patent/CN207484507U/en
Application granted granted Critical
Publication of CN207484507U publication Critical patent/CN207484507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to the bridge pier foundation pile fields of bridge construction, it is intended to provide a kind of bridge pier foundation pile precast construction of generation that can reduce security risk, its key points of the technical solution are that including foundation pile ontology, foundation pile ontology is arranged in foundation pit, supporting table is equipped in foundation pit, foundation pile ontology is equipped with several fixed steel bars close to foundation pit side, fixed steel bars are equipped with " V " shape reinforcing bar away from one end of foundation pile ontology, fixed steel bars pass through supporting table, and foundation pile ontology contradicts supporting table, cement has been poured in gap between supporting table table top and bottom of foundation ditch, cement has been poured in gap between foundation pile ontology and foundation pit side-wall.By using above-mentioned technical proposal, cement between supporting table and foundation pit limits fixed steel bars and " V " shape reinforcing bar, the gap around foundation pile ontology is filled by cement again, and it is filled out below supporting table and is filled with cement, so as to improve the stability of fixed foundation pile, and then the stability of precast pier is improved, reduce the generation of security risk.

Description

A kind of bridge pier foundation pile precast construction
Technical field
The utility model is related to the bridge pier foundation pile field of bridge construction, more particularly to a kind of bridge pier foundation pile precast construction.
Background technology
Bridge pier be in bridge more than holes and holes in addition to the abutment that both ends are connected with embankment remaining intermediate supports Structure is usually arranged at the solid ground of subsurface by bridge pier foundation pile below bridge pier.
At present, the Chinese patent of Publication No. CN205224078U discloses a kind of bridge pier foundation pile structure, it includes support Arch, support stake, foundation pile, the supporting arch are made of two arch bridge intersections, and there are four be respectively provided at two for the support stake Four bridge pier lower parts of arch bridge, the foundation pile are located at supporting arch top, and bridge pier is located on foundation pile.
Although this bridge pier foundation pile structure can carry and fixed abutment, since the supporting arch of foundation pile lower part connection is Arch, and the middle section of supporting arch does not support, if foundation pile carries bridge pier for a long time, easily generates the supporting arch in foundation pit Deformation, foundation pile, which easily sinks, either to be tilted so as to cause pier sinking or inclination, brings security risk.
Utility model content
The purpose of this utility model is to provide a kind of bridge pier foundation pile precast construction, can make the stability of foundation pile enhance, and carries High stability between bridge pier and foundation pile, reduces the generation of security risk.
A kind of bridge pier foundation pile precast construction, including foundation pile ontology, in the foundation pit of the foundation pile ontology setting on the ground, institute Foundation pile ontology is stated equipped with pier hole, the pier hole is equipped with supporting table, and the support for placing precast pier in the foundation pit The table top of platform is equipped with gap, and the foundation pile ontology is equipped with several fixed steel bars close to foundation pit side, and the fixed steel bars deviate from One end of foundation pile ontology is equipped with " V " shape reinforcing bar, and the point of the " V " shape reinforcing bar is away from foundation pile ontology, the fixed steel bars Across supporting table, and foundation pile ontology contradicts supporting table, and the footprint of the supporting table is more than the floor space of foundation pile ontology, described Cement is poured in gap between supporting table table top and bottom of foundation ditch, in the gap between the foundation pile ontology and foundation pit side-wall Cement is poured.
By using above-mentioned technical proposal, first foundation pile ontology is mounted in supporting table, makes the fixation with " V " shape reinforcing bar Reinforcing bar passes through supporting table, supporting table and foundation pit is fixed together by cement, the cement between supporting table and foundation pit is to fixation Reinforcing bar and " V " shape reinforcing bar are limited, so as to fulfill the limiting to foundation pile ontology in the vertical direction, then by cement by foundation pile Gap filling around ontology, limits foundation pile ontology by cement, in the horizontal direction since foundation pile ontology is in level Direction and vertical direction are limited, and are filled out below supporting table and be filled with cement, so as to improve the stability of fixed foundation pile, into And the stability of precast pier is improved, reduce the generation of security risk.
Further setting:The first reinforced hole to match with the first reinforcing bar of precast pier end is set in the pier hole.
By using above-mentioned technical proposal, the first reinforcing bar is plugged in the first reinforced hole, realize to precast pier into One step limits, and so as to improve the stability between foundation pile ontology and precast pier, reduces the generation of security risk.
Further setting:The marginal portion in the pier hole is equipped with slope.
By using above-mentioned technical proposal, the convenient gap between foundation pile ontology and precast pier of setting on slope pours Cement makes cement uniformly be filled in gap, improves the stability between foundation pile ontology and precast pier, so as to make foundation pile It is more stable between ontology and precast pier, reduce the generation of security risk.
Further setting:Gusset is additionally provided on the foundation pile ontology, the gusset is arranged on the surrounding in pier hole.
By using above-mentioned technical proposal, the setting of gusset further limits the precast pier being mounted in pier hole Position, makes the stability between precast pier and foundation pile ontology more secure, further reduces the generation of security risk.
Further setting:The profile and the outer profile of precast pier that the gusset of pier hole surrounding surrounds match.
By using above-mentioned technical proposal, profile and the outer profile of precast pier that gusset surrounds match, and can make muscle Plate contradicts precast pier, improves limit effect of the gusset to precast pier, so as to improve precast pier and foundation pile ontology it Between stability, make security risk occur probability reduce.
Further setting:Screwed pipe is equipped in the gusset, is equipped with and the screw thread phase in screwed pipe in the screwed pipe The threaded rod matched, the threaded rod are equipped with push plate close to pier hole direction.
By using above-mentioned technical proposal, threaded rod rotates in screwed pipe, can change between push plate and precast pier Distance, after precast pier is mounted on foundation pile ontology, by rotating threaded rod, push plate is made to contradict precast pier, to pre- Bridge pier processed is limited in the horizontal direction, is improved the stability between precast pier and foundation pile ontology, is reduced security risk Occur.
Further setting:The threaded rod is equipped with nut, and the nut is placed in the both sides of gusset.
By using above-mentioned technical proposal, by rotation of the nut on threaded rod, threaded rod can be limited, kept away Exempt from push plate causes threaded rod to be subjected to displacement when by external force.
Further setting:The edge in the pier bottom hole portion is equipped with the second reinforcing bar, and the precast pier is equipped with the second steel Muscle hole, and the internal diameter of second reinforced hole is more than the diameter of the second reinforcing bar, and the L-shaped setting of the second reinforced hole, the Two reinforced holes run through precast pier perpendicular to the part of the second reinforcing bar.
By using above-mentioned technical proposal, after the second reinforcing bar is inserted into the second reinforced hole, hung down by the second reinforced hole of " L " shape Directly cement is injected in the second reinforced hole in the part of the second reinforcing bar, makes the gap in the second reinforced hole around the second reinforcing bar by water Mud is filled, and by realizing the limiting between foundation pile ontology and precast pier to the limiting of the second reinforcing bar, improves foundation pile ontology Stability between precast pier reduces the generation of security risk.
In conclusion the utility model has the advantages that:
1st, be equipped with supporting table below foundation pile ontology, and filled with cement between supporting table and foundation pit, around foundation pile ontology with Gap between foundation pit is also filled by cement, so as to improve the stability of foundation pile ontology, since the stability of foundation pile ontology carries Height so as to which the stability between precast pier and foundation pile ontology be caused to improve, reduces the generation of security risk;
2nd, the setting of gusset further limits the precast pier being mounted in pier hole, and precast pier inclination is avoided to lead Cause the generation of security risk;
3rd, the cooperation of the cooperation of the first reinforcing bar and the first reinforced hole, the second reinforcing bar and the second reinforced hole can make foundation pile ontology It is mutually limited between precast pier, improves the stability between precast pier and foundation pile ontology, reduce security risk Occur.
Description of the drawings
Fig. 1 is the structure diagram for being used to embody the utility model in embodiment 1;
Fig. 2 is the A portions schematic enlarged-scale view for being used to embody position relationship between slope and pier hole in Fig. 1;
Fig. 3 is the structure diagram for being used to embody position relationship between supporting table and foundation pile ontology in embodiment 1;
Fig. 4 is the structure diagram for being used to embody position relationship between precast pier and push plate in embodiment 2;
Fig. 5 is the B portions schematic enlarged-scale view for being used to embody position relationship between gusset and screwed pipe in Fig. 4.
In figure, 1, foundation pile ontology;2nd, foundation pit;3rd, pier hole;4th, supporting table;5th, fixed steel bars;6th, " V " shape reinforcing bar;7th, first Reinforced hole;8th, the first reinforcing bar;9th, gusset;10th, screwed pipe;11st, threaded rod;12nd, push plate;13rd, nut;14th, the second reinforcing bar;15、 Second reinforced hole;16th, slope;17th, precast pier.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:A kind of bridge pier foundation pile precast construction, as shown in Figure 1, the foundation pile ontology 1 including carrying pier hole 3, pier hole 3 For placing precast pier 17, foundation pile ontology 1 is set in foundation pit 2 on the ground, and the edge of 3 bottom of pier hole is equipped with the second reinforcing bar 14, precast pier 17 is equipped with the second reinforced hole of " L " shape 15, and the internal diameter of the second reinforced hole 15 is more than the diameter of the second reinforcing bar 14, For second reinforced hole 15 perpendicular to the part of the second reinforcing bar 14 through precast pier 17, the end of precast pier 17 is equipped with the first reinforcing bar 8, pier hole 3 is interior to be equipped with the first reinforced hole 7 to match with the first reinforcing bar 8.
As depicted in figs. 1 and 2, the marginal portion in pier hole 3 is equipped with slope 16, and gusset 9, gusset 9 are additionally provided on foundation pile ontology 1 The surrounding in pier hole 3 is arranged on, the outer profile of profile and precast pier 17 that the gusset 9 of 3 surrounding of pier hole surrounds matches.
As shown in figure 3, foundation pile ontology 1 is equipped with several fixed steel bars 5, and each fixed steel bars 5 close to 2 bottom side of foundation pit " V " shape reinforcing bar 6 is equipped with away from one end of foundation pile ontology 1, the setting of " V " shape reinforcing bar 6 enhances the stability of fixed steel bars 5, When fixed steel bars 5 loosen, " V " shape reinforcing bar 6 limits fixed steel bars 5, and fixed steel bars 5 is avoided to face away from 6 side of " V " shape reinforcing bar To movement, it is free to be additionally provided with band away from foundation pile ontology 1 between 2 bottom of foundation pile ontology 1 and foundation pit for the point of " V " shape reinforcing bar 6 The supporting table 4 of gap, the area of 4 table top of supporting table are more than the floor space of foundation pile ontology 1, and the fixed steel bars 5 on foundation pile ontology 1 pass through Supporting table 4, foundation pile ontology 1 contact at supporting table 4, and water has been poured in the gap between 2 bottom of 4 table top of supporting table and foundation pit Mud has poured cement in the gap between 2 side wall of foundation pile ontology 1 and foundation pit.
Implementation process:Supporting table 4 is mounted in foundation pit 2, then foundation pile ontology 1 is placed in supporting table 4, makes foundation pile sheet Fixed steel bars 5 and " V " shape reinforcing bar 6 on body 1 pass through the gap in supporting table 4, since the area of 4 table top of supporting table is more than foundation pile Cement is injected into 4 table top of supporting table in the following, by pouring water by the floor space of ontology 1 by the gap around 4 table top of supporting table Mud connects supporting table 4 and foundation pit 2, meanwhile, cement in foundation pit 2 is by the fixed steel bars 5 and " V " shape on foundation pile ontology 1 Reinforcing bar 6 is fixed, and by being fixed to fixed steel bars 5 and " V " shape reinforcing bar 6, realizes the limiting in the vertical direction to foundation pile ontology 1.
After joints cement below 4 table top of supporting table, by the gap between 2 side wall of foundation pile ontology 1 and foundation pit, by water Mud is cast in gap, and by the joints cement in gap, foundation pile ontology 1 and foundation pit 2 are connected, foundation pile ontology 1 is made to exist It is limited in horizontal direction.
After foundation pile ontology 1 is limited in the horizontal direction with vertical direction, precast pier 17 is placed on foundation pile ontology 1 In pier hole 3, when installing precast pier 17, the first reinforcing bar 8 is made to be inserted into the first reinforced hole 7, the second reinforcing bar 14 is inserted into second In reinforced hole 15, precast pier 17 is limited, cement is cast between precast pier 17 and pier hole 3 by slope 16 In gap, then by the second reinforced hole 15 cement is cast in the second reinforced hole 15 through one end of precast pier 17, so as to Second reinforced hole 15 is tightened together with the second reinforcing bar 14, due to the outer profile of the profile that gusset 9 forms and precast pier 17 Match, gusset 9 is put into one end limiting to precast pier 17 close to foundation pile ontology 1, avoids its inclination.
Embodiment 2:A kind of bridge pier foundation pile precast construction, with embodiment 1 the difference lies in, as shown in Figure 4 and Figure 5, The screwed pipe 10 for being parallel to foundation pile ontology 1 is equipped in gusset 9, threaded rod 11, threaded rod 11 and screwed pipe are equipped in screwed pipe 10 10 matchings, threaded rod 11 are equipped with nut 13, and nut 13 is placed in the both sides of gusset 9, and the one end in threaded rod 11 towards pier hole 3 is set There is push plate 12.
Implementation process:After precast pier 17 is mounted in pier hole 3, rotating nuts 13 make nut 13 to away from gusset 9 Direction is transported, and threaded rod 11 is enable to have the range of activity, threaded rod 11 is rotated further by, threaded rod 11 is made to pass through 10 direction of screwed pipe 17 direction of precast pier moves, until the push plate 12 on threaded rod 11 contradicts precast pier 17, rotating nuts 13, make nut again 13 move towards 9 direction of gusset, until nut 13 contradicts gusset 9, stop rotating nut 13, and nut 13 limits threaded rod 11 Position, avoids push plate 12 that threaded rod 11 is caused to be subjected to displacement in the case where being acted on by external force.
The above embodiments are only explanation to the utility model, are not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as it is all protected in the right of the utility model by Patent Law.

Claims (8)

1. a kind of bridge pier foundation pile precast construction, including foundation pile ontology (1), the foundation pit of foundation pile ontology (1) setting on the ground (2) in, the foundation pile ontology (1) is equipped with pier hole (3), and for placing precast pier (17), feature exists the pier hole (3) In:Supporting table (4) is equipped in the foundation pit (2), and the table top of the supporting table (4) is equipped with gap, the foundation pile ontology (1) Several fixed steel bars (5) are equipped with close to foundation pit (2) side, the fixed steel bars (5) are equipped with away from one end of foundation pile ontology (1) " V " shape reinforcing bar (6), and the point of the " V " shape reinforcing bar (6) is away from foundation pile ontology (1), the fixed steel bars (5) are across branch Platform (4) is supportted, and foundation pile ontology (1) contradicts supporting table (4), the footprint of the supporting table (4) is more than the bottom of foundation pile ontology (1) Area has poured cement, the foundation pile ontology (1) and base in the gap between supporting table (4) table top and foundation pit (2) bottom Cement has been poured in gap between (2) side wall of hole.
2. a kind of bridge pier foundation pile precast construction according to claim 1, it is characterised in that:Set in the pier hole (3) in advance The first reinforced hole (7) that the first reinforcing bar (8) of bridge pier (17) end processed matches.
3. a kind of bridge pier foundation pile precast construction according to claim 2, it is characterised in that:The edge part of the pier hole (3) It is arranged with slope (16).
4. a kind of bridge pier foundation pile precast construction according to claim 3, it is characterised in that:On the foundation pile ontology (1) also Equipped with gusset (9), the gusset (9) is arranged on the surrounding of pier hole (3).
5. a kind of bridge pier foundation pile precast construction according to claim 4, it is characterised in that:The muscle of pier hole (3) surrounding The outer profile of the profile that plate (9) surrounds and precast pier (17) matches.
6. a kind of bridge pier foundation pile precast construction according to claim 4, it is characterised in that:Spiral shell is equipped in the gusset (9) Line pipe (10), the screwed pipe (10) is interior to be equipped with the threaded rod (11) to match with the screw thread in screwed pipe (10), the screw thread Bar (11) is equipped with push plate (12) close to pier hole (3) direction.
7. a kind of bridge pier foundation pile precast construction according to claim 6, it is characterised in that:The threaded rod (11) is equipped with Nut (13), and the nut (13) is placed in the both sides of gusset (9).
8. a kind of bridge pier foundation pile precast construction according to claim 5 or 7, it is characterised in that:Pier hole (3) bottom Edge is equipped with the second reinforcing bar (14), and the precast pier (17) is equipped with the second reinforced hole (15), and second reinforced hole (15) internal diameter is more than the diameter of the second reinforcing bar (14), and second reinforced hole (15) L-shaped setting, the second reinforced hole (15) run through precast pier (17) perpendicular to the part of the second reinforcing bar (14).
CN201721598749.6U 2017-11-24 2017-11-24 A kind of bridge pier foundation pile precast construction Active CN207484507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721598749.6U CN207484507U (en) 2017-11-24 2017-11-24 A kind of bridge pier foundation pile precast construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721598749.6U CN207484507U (en) 2017-11-24 2017-11-24 A kind of bridge pier foundation pile precast construction

Publications (1)

Publication Number Publication Date
CN207484507U true CN207484507U (en) 2018-06-12

Family

ID=62471547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721598749.6U Active CN207484507U (en) 2017-11-24 2017-11-24 A kind of bridge pier foundation pile precast construction

Country Status (1)

Country Link
CN (1) CN207484507U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535310A (en) * 2020-05-11 2020-08-14 安徽建大交通科技有限公司 Combined foundation pile for civil engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535310A (en) * 2020-05-11 2020-08-14 安徽建大交通科技有限公司 Combined foundation pile for civil engineering

Similar Documents

Publication Publication Date Title
CN106836463A (en) The constructing device and construction method of cushion cap and ground girder construction
CN107429496A (en) Wind energy plant ground and wind energy plant
CN207776485U (en) A kind of novel work people construction wall bracing means
CN207063522U (en) A kind of frame column high-supported formwork
CN207484507U (en) A kind of bridge pier foundation pile precast construction
CN205676882U (en) A kind of novel supporting construction
JP5635048B2 (en) Basics for installing solar panels
CN104060585B (en) Floating-plug bulkhead gate
JP2005090116A (en) Method for erecting steel frame column and positioning frame body used for it
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN106968241A (en) Continuous underground wall structure and retaining design construction method
CN102425188B (en) Method for adjusting height-adjustable tower foundation
US4232491A (en) Swimming pool deck
CN103669976A (en) Ancient pagoda correction
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN206800371U (en) Continuous underground wall structure and retaining design
CN206752675U (en) A kind of concrete frame node
CN206887980U (en) A kind of integrated bracket basis of antifreeze pile
CN201809974U (en) Glass steel cylindrical formwork device
CN206829786U (en) Construction, which is enclosed, covers
CN209555866U (en) A kind of unrestrained device of gear
CN202273243U (en) Adjustable height type pole and tower foundation
CN203222808U (en) Foundation processing structure for floating sluice
CN207062981U (en) A kind of Retaining Wall
CN207277848U (en) Metro Station Structure side wall punching block ruggedized construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant