CN207452913U - A kind of light-weight foamed concrete backfill bridge pier structure - Google Patents

A kind of light-weight foamed concrete backfill bridge pier structure Download PDF

Info

Publication number
CN207452913U
CN207452913U CN201721464334.XU CN201721464334U CN207452913U CN 207452913 U CN207452913 U CN 207452913U CN 201721464334 U CN201721464334 U CN 201721464334U CN 207452913 U CN207452913 U CN 207452913U
Authority
CN
China
Prior art keywords
bridge pier
light
foamed concrete
weight foamed
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721464334.XU
Other languages
Chinese (zh)
Inventor
苏谦
赵文辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guyuan Chentong Technology Development Co Ltd
Original Assignee
Guyuan Chentong Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guyuan Chentong Technology Development Co Ltd filed Critical Guyuan Chentong Technology Development Co Ltd
Priority to CN201721464334.XU priority Critical patent/CN207452913U/en
Application granted granted Critical
Publication of CN207452913U publication Critical patent/CN207452913U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of light-weight foamed concrete backfill bridge pier structures, are related to pier location backfill field, including the former pier cap for being arranged on underground and the bridge pier component being arranged at the top of former pier cap;The bridge pier component includes ground bridge pier and underground bridge pier, and ground bridge pier is integrally formed with underground bridge pier;Bridge pier component is more than the cylindrical hollow structure of top diameter for base diameter, light-weight foamed concrete layer B is filled with inside the bridge pier of underground, auxiliary support mechanism is provided with outside the bridge pier of underground, auxiliary support mechanism includes the superstructure set gradually from top to bottom, light-weight foamed concrete layer A and metalling, the metalling is laid at the top of cushion cap, the inner wall of underground bridge pier is equipped with waterproof layer with outer wall painting, the utility model can reduce the vertical deformation caused by bridge pier, vertical relative settlement, the influences such as transversely deforming, bridge pier code requirement is also complied with while the security for ensureing existing bridge pier.

Description

A kind of light-weight foamed concrete backfill bridge pier structure
Technical field
The utility model is related to bridge fields, and in particular to a kind of pier location backfills field.
Background technology
With the continuous development construction in city, building site area will gradually decrease, to save building site, fully profit With space, future will widely run into the problem of existing pier location backfills.Light-weight foamed concrete is a kind of new coagulation Foaming agent by the foamed system of foaming machine is mechanically fully foamed, and foam is uniformly mixed with cement mortar by soil material It closes, then carries out cast-in-place construction by the pumping system of foaming machine or mould molding, the one kind formed through natural curing contain The novel light insulation material of a large amount of sealed porositys.Its density is small, and density rating is generally 300-1800kg/m3, in building The building structure such as external and internal wall, level, flooring, column in using this kind of material, building dead weight can generally be made to reduce by 25% Left and right such as replaces normal concrete using light-weight foamed concrete, can improve the bearing capacity of component.
In the prior art, bridge pier being backfilled, generally use conventional fillers are filled, but the dead weight of filler is larger, The vertical load of pile foundation can be increased considerably;It, will be along certain from cushion cap coboundary position when the compaction deformation of filler is larger Angle there is shear fracture angle, can further increase the vertical load of pile foundation, therefore generally existing Pile Bearing Capacity surpasses The problem of limit or each parameter-beyond-limit of pier top.In addition mechanical ramming is needed using conventional native hardcore, there are potential damages to existing bridge pier Cold danger, influences its durability.And when bridge pier is hollow pier, common fillers can not carry out filling in pier.
Therefore, it is necessary to a kind of new in existing bridge pier backfill construction method.
Utility model content
The purpose of this utility model is that:In order to solve the vertical load pressure of existing highway bridge earthing layer weight and pile foundation Caused by excessive the technical issues of bridge pier vertical deformation, vertical relative settlement, transversely deforming, a kind of light-weight foamed coagulation is provided Earthen backfill bridge pier structure.
The utility model specifically uses following technical scheme to achieve these goals:
A kind of light-weight foamed concrete backfill bridge pier structure, including being arranged on the former pier cap of underground and being arranged on former bridge Bridge pier component at the top of pier cushion cap;The bridge pier component includes ground bridge pier and underground bridge pier, ground bridge pier and underground bridge pier one It is body formed;Bridge pier component is more than the cylindrical hollow structure of top diameter for base diameter, and it is light to be filled with foam inside the bridge pier of underground Matter concrete layer B, circle auxiliary support mechanism is provided with outside the bridge pier of underground, and auxiliary support mechanism includes setting successively from top to bottom Superstructure, light-weight foamed concrete layer A and the metalling put, the metalling are laid at the top of cushion cap, underground bridge pier it is interior Wall is equipped with waterproof layer with outer wall painting.
Specifically, the light-weight foamed concrete layer A of light-weight foamed concrete layer and light-weight foamed concrete layer B density are carrying The minimum design dry density of power safety coefficient calculates optimal light-weight foamed concrete dense according to specific bridge, bridge pier structure and uses Density.
Specifically, the bridge deck structure is vertical setting with ground structure, under original bridge pier is arranged on, in original bridge pier On the basis of bridge pier is set, realize that people travels with automobile shunting, the use of the soil bigger of realization.
Specifically, light-weight foamed concrete layer pours to be divided into.Its density of Conventional filler material and conduct oneself with dignity it is larger, as filling out Hollow pier structure can be damaged by filling material, and then increase the vertical load pressure of pile foundation, and light-weight foamed concrete can mitigate stake Base vertical load ability increases using duration, while the alkalescent and water proofing property that light-weight foamed concrete has, can increase bridge pier Durability.
Specifically, light-weight foamed concrete layer passes through formwork erection placement layer by layer, light-weight foamed concrete layer and dimension of platform phase Together.
Specifically, bridge pier outer wall in underground is coated with two layers of heated bitumen.
Specifically, bridge pier inner wall in underground is two layers of waterproof coating.
Specifically, light-weight foamed concrete layer A is less than 2m with light-weight foamed concrete layer B vertical-horizontals gap.
Specifically, rubble thickness 30-40cm, metalling can help light-weight foamed concrete layer A drainings.
Specifically, the material of superstructure is consistent with earth material, more convenient in construction.
The beneficial effects of the utility model are as follows:
1. use light-weight foamed concrete material that can effectively reduce the dead weight of bridge object as packing material, and then reduce The vertical load pressure of earthing layer weight and pile foundation, can not only meet the requirement for bearing capacity of pier footing, but also can reduce pair The influences such as vertical deformation, vertical relative settlement, transversely deforming caused by bridge pier, had both ensured the security of existing bridge pier and had met Design specification.
2. light-weight foamed concrete is a kind of by foam and the mixed uniformly heat insulating material of cement mortar, not only density Small, lightweight is light and durability is strong, low bullet damping property is good, has function of heat insulation, while without benzene, formaldehyde in its raw material Etc. harmful substances, not can cause environmental pollution, and cheap.
3. containing moisture in foam concrete, waterproof material can effectively prevent corrosiveness of the moisture to bridge pier structure, Increase bridge pier usage time.
4. metalling can help light-weight foamed concrete draining, reduce ponding and the burn into of bridge pier is destroyed.
Description of the drawings
Fig. 1 is the plane of structure schematic diagram of the present invention;
Fig. 2 is underground bridge pier top view;
Reference numeral:1- bridge deck structures;2- bridge pier components;2-1 undergrounds bridge pier;2-2 grounds bridge pier;3- ground lines;On 4- Portion's structure;The light-weight foamed concrete layer A of 5-;The light-weight foamed concrete layer B of 6-;7- metallings;8- cushion caps;9- original places upper thread.
Specific embodiment
In order to which those skilled in the art are better understood from the utility model, below in conjunction with the accompanying drawings with following embodiment to this Utility model is described in further detail.
Embodiment 1
Referring to shown in Fig. 1, a kind of light-weight foamed concrete backfill bridge pier structure includes the former pier cap 8 for being arranged on underground With the bridge pier component 2 for being arranged on former 8 top of pier cap;The bridge pier component 2 includes ground bridge pier 2-2 and underground bridge pier 2-1, Ground bridge pier 2-2 and underground bridge pier 2-1 is integrally formed;Bridge pier component 2 is more than the cylindrical hollow knot of top diameter for base diameter Structure, underground bridge pier 2-1 inside are filled with light-weight foamed concrete layer B6, and circle auxiliary load-bearing is provided with outside the bridge pier 2-1 of underground Mechanism, auxiliary support mechanism include the superstructure 4, light-weight foamed concrete layer A5 and the metalling 7 that set gradually from top to bottom, The metalling 7 is laid on 8 top of cushion cap, and inner wall and the outer wall painting of underground bridge pier 2-1 are equipped with waterproof layer.
S1. by 9 foundation excavation of original place upper thread to 8 top of cushion cap;
S2. waterproof layer:The inner wall of underground bridge pier 2-1 and outer wall brushing waterproof layer;
S3. metalling:It is laid with the metalling 7 of thickness 35cm;
S4. light-weight foamed concreting:Light-weight foamed concrete layer A 5 and light-weight foamed concrete layer B 6 simultaneously into Row pours;
S5. 4 layers of construction of superstructure are finally carried out.
Light-weight foamed concrete layer B 6 is set with light-weight foamed 5 density of concrete layer A for the minimum of bearing capacity safety coefficient Count dry density.
The bridge deck structure 1 is vertical setting with ground structure 3.
Light-weight foamed concrete layer B 6 is poured by being divided into.
Light-weight foamed concrete layer A 5 passes through formwork erection placement layer by layer, light-weight foamed concrete layer A 5 and 8 size phase of cushion cap Together.
Underground bridge pier 2-1 outer walls are coated with two layers of heated bitumen.
Underground bridge pier 2-1 inner walls are two layers of waterproof coating.
Light-weight foamed concrete layer B 6 and light-weight foamed 5 vertical-horizontal gap 1m of concrete layer A.
The material of superstructure 4 is consistent with earth material.
The above is only the preferred embodiment of the utility model, is not intended to limit the utility model, the utility model Scope of patent protection be subject to claims, what every specification and accompanying drawing content with the utility model was made is equal Structure change similarly should be included in the scope of protection of the utility model.

Claims (8)

  1. A kind of 1. light-weight foamed concrete backfill bridge pier structure, which is characterized in that the former pier cap (8) including being arranged on underground With the bridge pier component (2) being arranged at the top of former pier cap (8);The bridge pier component (2) includes ground bridge pier (2-2) and underground Bridge pier (2-1), ground bridge pier (2-2) are integrally formed with underground bridge pier (2-1);Bridge pier component (2) is more than top for base diameter The cylindrical hollow structure of diameter, underground bridge pier (2-1) are internal filled with light-weight foamed concrete layer B (6), underground bridge pier (2-1) Outside is provided with circle auxiliary support mechanism, and auxiliary support mechanism includes the superstructure (4) set gradually from top to bottom, foam Lightweight concrete layer A (5) and metalling (7), the metalling (7) are laid at the top of cushion cap (8), underground bridge pier (2-1) it is interior Wall is equipped with waterproof layer with outer wall painting.
  2. 2. a kind of light-weight foamed concrete backfill bridge pier structure according to claim 1, which is characterized in that the foam is light Matter concrete layer B (6) is to be divided into pouring structure.
  3. A kind of 3. light-weight foamed concrete backfill bridge pier structure according to claim 1 or 2, which is characterized in that the bubble Foam lightweight concrete layer A (5) is formwork erection placement layer by layer structure, and light-weight foamed concrete layer A (5) is identical with cushion cap (8) size.
  4. 4. a kind of light-weight foamed concrete backfill bridge pier structure according to claim 1 or 2, which is characterized in that describedly Lower bridge pier (2-1) outer wall is coated with two layers of heated bitumen.
  5. 5. a kind of light-weight foamed concrete backfill bridge pier structure according to claim 1 or 2, which is characterized in that describedly Lower bridge pier (2-1) inner wall is two layers of waterproof coating.
  6. A kind of 6. light-weight foamed concrete backfill bridge pier structure according to claim 1 or 2, which is characterized in that the bubble Foam lightweight concrete layer B (6) is less than 2m with light-weight foamed concrete layer A (5) difference in height.
  7. A kind of 7. light-weight foamed concrete backfill bridge pier structure according to claim 1, which is characterized in that the metalling (7) thickness is 30-40cm.
  8. A kind of 8. light-weight foamed concrete backfill bridge pier structure according to claim 1, which is characterized in that the top knot Structure (4) paver is consistent with earth material.
CN201721464334.XU 2017-11-06 2017-11-06 A kind of light-weight foamed concrete backfill bridge pier structure Active CN207452913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721464334.XU CN207452913U (en) 2017-11-06 2017-11-06 A kind of light-weight foamed concrete backfill bridge pier structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721464334.XU CN207452913U (en) 2017-11-06 2017-11-06 A kind of light-weight foamed concrete backfill bridge pier structure

Publications (1)

Publication Number Publication Date
CN207452913U true CN207452913U (en) 2018-06-05

Family

ID=62254110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721464334.XU Active CN207452913U (en) 2017-11-06 2017-11-06 A kind of light-weight foamed concrete backfill bridge pier structure

Country Status (1)

Country Link
CN (1) CN207452913U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794932A (en) * 2017-11-06 2018-03-13 固远晨通科技发展有限公司 A kind of light-weight foamed concrete backfill bridge pier structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794932A (en) * 2017-11-06 2018-03-13 固远晨通科技发展有限公司 A kind of light-weight foamed concrete backfill bridge pier structure
CN107794932B (en) * 2017-11-06 2023-10-03 固远晨通科技发展有限公司 Pier structure is backfilled to foam lightweight concrete

Similar Documents

Publication Publication Date Title
CN203807904U (en) Lightweight bridgehead roadbed of bubble-mixed lightweight soil and expandable polystyrene (EPS) combined block
CN104060631B (en) A kind of manhole mouth elevation Dynamic controlling structure
CN110205921A (en) The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar
US20100325819A1 (en) Bridge approach and abutment construction and method
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN110359957B (en) Dam body connecting structure and construction method thereof
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN107165177A (en) A kind of side slope supporting construction method
CN107794932A (en) A kind of light-weight foamed concrete backfill bridge pier structure
CN207452913U (en) A kind of light-weight foamed concrete backfill bridge pier structure
CN113073680B (en) Slag disposal site retaining wall structure of plateau high-cold area and construction method thereof
CN112813757B (en) Foam light soil composite roadbed construction method for bridge head transition treatment
CN110042723A (en) The construction method of the permeable road of full precast splice type
CN109577307A (en) Combination of rigidity and flexibility stake and its construction method
RU2367743C2 (en) Basement
CN205369320U (en) Basement post -cast strip leakage protective system
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
US5189855A (en) Foundation raft for supporting a structure
CN209636780U (en) Composite pile
CN211523243U (en) Reinforcement type highway bank protection
CN209636573U (en) A kind of assembled self-balancing channel design system
CN106760577A (en) Frame module formula Polymer Geogrids Reinforced Earth safeguard structure and its construction method
CN206986904U (en) A kind of depth hole composite supporting construction with water-proof function
CN206418505U (en) A kind of architectural engineering pit damp-proof layer

Legal Events

Date Code Title Description
GR01 Patent grant