CN207419206U - Kerbstone construction installation folder - Google Patents

Kerbstone construction installation folder Download PDF

Info

Publication number
CN207419206U
CN207419206U CN201721532354.6U CN201721532354U CN207419206U CN 207419206 U CN207419206 U CN 207419206U CN 201721532354 U CN201721532354 U CN 201721532354U CN 207419206 U CN207419206 U CN 207419206U
Authority
CN
China
Prior art keywords
connecting plate
kerbstone
grip handle
clamping piece
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721532354.6U
Other languages
Chinese (zh)
Inventor
葛玉宾
申海飞
王天政
甄佳鹏
冯云
陈靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Engineering Group ecological environment Co., Ltd
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Garden Engineering Co Ltd
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Garden Engineering Co Ltd, Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Garden Engineering Co Ltd
Priority to CN201721532354.6U priority Critical patent/CN207419206U/en
Application granted granted Critical
Publication of CN207419206U publication Critical patent/CN207419206U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model provides a kind of kerbstone construction installation folder, it is characterized in that, it is hingedly formed by two clamps, each clamp includes the grip handle grasped for operating personnel, the connecting plate for the clamping piece that clamps kerbstone and for connecting grip handle and clamping piece;The top of connecting plate is fixedly connected with corresponding grip handle, and the bottom of connecting plate is fixedly connected with corresponding clamping piece, and two connecting plates are hinged to realize being hinged between two monomers by shaft;Two clamping pieces are oppositely arranged, and clamping piece is fixedly connected with the bottom of connecting plate.The utility model easy implementation simple in structure, improves construction efficiency, solves the problems, such as that construction efficiency existing for traditional kerbstone construction method operating personnel's finger in the secondary adjustment inconvenience of kerbstone and installation process lowly, easily occurs and easily collided with.The utility model significantly improves installation speed and installation quality in actual use, and its using effect is more notable.

Description

Kerbstone construction installation folder
Technical field
The utility model is related to a kind of kerbstone construction tool, more particularly, to a kind of kerbstone construction installation folder.
Background technology
Kerbstone refers to being located at the boundary stone of pavement edge, and abbreviation kerb is commonly called as road serratd edge, it is as being arranged on road surface The rectangular slab of stone of edge and other structural belts boundary is that town road, park plaza Ji little Yuan roads form indispensable pith, In traditional kerbstone installation process, operating personnel are directly carried with hand, and a people is adjusted or moves by hand There is inconvenience when dynamic, therefore generally require other people in movement or adjustment and carry out coordinative construction, operating personnel's linking is not tight When easily there is work holdup phenomenon, and when putting, the finger of operating personnel is easily bumped to.
Utility model content
The purpose of this utility model is just to provide a kind of kerbstone construction installation folder, to solve existing to apply in kerbstone Installation effectiveness present in work is low and the vulnerable problem of construction personnel.
What the purpose of this utility model was realized in:
A kind of kerbstone construction installation folder is hingedly formed by two clamps, and each clamp includes operating Grip handle that personnel grasp, the company for the clamping piece that clamps kerbstone and for connecting the grip handle and the clamping piece Fishplate bar;
The top of the connecting plate is fixedly connected with the corresponding grip handle, the bottom of the connecting plate and corresponding folder Gripping member is fixedly connected, and two connecting plates are hinged to realize being hinged between two clamps by shaft;
The clamping piece is an angle steel by two orthogonal bar shaped side plate connections;Two clamping pieces are opposite It sets.
The top surface of the clamping piece is fixedly connected by welding with the bottom of the connecting plate.
The grip handle uses steel pipe.
The axial length of the grip handle is more than the length of the connecting plate long side.
Angle between the connecting plate and the grip handle is in obtuse angle.
The connecting plate long side and the plane setting at an acute angle where the clamping piece top surface.
The axial length of the grip handle is more than 4 times of the length of the connecting plate long side.
The utility model route two clamps and hingedly forms, and each clamp includes the grasping grasped for operating personnel Handle, the connecting plate for the clamping piece that clamps kerbstone and for connecting grip handle and clamping piece, grip handle, connecting plate and folder The connection structure of gripping member takes full advantage of lever principle, and the process for making installation folder gripping kerbstone is saves time and effort.Clamping piece Setting be then to have used the conversion of mechanics that will shear to be converted into vertical frictional force.In addition, the grasping in the utility model Handle, clamping piece and connecting plate are easily gathered materials on the spot at the construction field (site), and the remaining waste material in construction site can be carried out to secondary use, drop Low construction cost.
The utility model easy implementation simple in structure, improves construction efficiency, solves traditional kerbstone construction method and deposits Construction efficiency it is low, easily occur that the secondary adjustment of kerbstone is inconvenient and installation process in operating personnel's finger easily collided with Problem.The utility model significantly improves installation speed and installation quality in actual use, and its using effect is more aobvious It writes.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is the connecting plate of the utility model and the connection structure diagram of clamping piece.
Fig. 3 is the using state structure diagram of the utility model.
In figure:1st, clamp;2nd, grip handle;3rd, clamping piece;4 connecting plates;5th, kerbstone;6th, bar shaped side plate;7th, shaft.
Specific embodiment
As shown in Fig. 1 ~ Fig. 3, the utility model is hingedly formed by two clamps 1, and each clamp 1 is included for operator Grip handle 2 that member grasps, the connecting plate for the clamping piece 3 that clamps kerbstone 5 and for connecting grip handle 2 and clamping piece 3 4.Grip handle 2 uses steel pipe, and connecting plate 4 is made of band steel.
Two clamping pieces 3 are oppositely arranged, and clamping piece 3 is fixedly connected with the bottom of connecting plate 4.Clamping piece 3 is one by two The angle steel that a orthogonal bar shaped side plate 6 connects, the width of the bar shaped side plate 6 of clamping piece 3 are 40mm, the item of clamping piece 3 The thickness of shape side plate 6 is 5mm.The corner of two clamping pieces 3 is oppositely arranged.The axial length of grip handle 2 is grown more than connecting plate 4 The length on side, the axial length of grip handle 2 are more than 4 times of the length of 4 long side of connecting plate, the folder between connecting plate 4 and grip handle 2 In obtuse angle, 4 long side of connecting plate and the plane setting at an acute angle where 3 top surface of clamping piece are in X-shaped after two connecting plates 4 are hinged at angle Structure.Each connecting plate 4 is vertically arranged.The top of connecting plate 4 is fixedly connected with corresponding grip handle 2, the top of connecting plate 4 The bottom with grip handle 2 is fixedly connected by welding.The bottom of connecting plate 4 is fixedly connected with corresponding clamping piece 3, even Plane where the plate face of fishplate bar 4 is parallel with the end face at the axial both ends of clamping piece 3, in the present embodiment, the level of clamping piece 3 The top surface of the bar shaped side plate 6 in direction is fixedly connected by welding with the bottom of connecting plate 4.Two connecting plates 4 are by turning Axis 7 is hinged to realize being hinged between two clamps, and shaft 7 uses bolt.

Claims (7)

1. a kind of kerbstone construction installation folder, which is characterized in that hingedly formed by two clamps, each clamp includes The grip handle that is grasped for operating personnel, for the clamping piece that clamps kerbstone and for connecting the grip handle and the folder The connecting plate of gripping member;
The top of the connecting plate is fixedly connected with the corresponding grip handle, the bottom of the connecting plate and corresponding clamping piece It is fixedly connected, two connecting plates are hinged to realize being hinged between two clamps by shaft;
The clamping piece is an angle steel by two orthogonal bar shaped side plate connections;Two clamping pieces are opposite to be set It puts.
2. kerbstone construction installation folder according to claim 1, which is characterized in that the top surface of the clamping piece with it is described The bottom of connecting plate is fixedly connected by welding.
3. kerbstone construction installation folder according to claim 1, which is characterized in that the grip handle uses steel pipe.
4. kerbstone construction installation folder according to claim 1, which is characterized in that the axial length of the grip handle is big In the length of the connecting plate long side.
5. kerbstone construction installation folder according to claim 1, which is characterized in that the connecting plate and the grip handle Between angle in obtuse angle.
6. kerbstone construction installation folder according to claim 1, which is characterized in that the connecting plate long side and the folder Plane setting at an acute angle where gripping member top surface.
7. kerbstone construction installation folder according to claim 4, which is characterized in that the axial length of the grip handle is big In 4 times of the length of the connecting plate long side.
CN201721532354.6U 2017-11-16 2017-11-16 Kerbstone construction installation folder Active CN207419206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721532354.6U CN207419206U (en) 2017-11-16 2017-11-16 Kerbstone construction installation folder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721532354.6U CN207419206U (en) 2017-11-16 2017-11-16 Kerbstone construction installation folder

Publications (1)

Publication Number Publication Date
CN207419206U true CN207419206U (en) 2018-05-29

Family

ID=62305044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721532354.6U Active CN207419206U (en) 2017-11-16 2017-11-16 Kerbstone construction installation folder

Country Status (1)

Country Link
CN (1) CN207419206U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110001719A (en) * 2019-03-26 2019-07-12 中国五冶集团有限公司 A kind of rectangular slab of stone means of transport

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110001719A (en) * 2019-03-26 2019-07-12 中国五冶集团有限公司 A kind of rectangular slab of stone means of transport
CN110001719B (en) * 2019-03-26 2023-12-22 中国五冶集团有限公司 A kind of strip stone transport means

Similar Documents

Publication Publication Date Title
CN207419206U (en) Kerbstone construction installation folder
CN208945974U (en) One kind forging pipe vice
CN207058392U (en) A kind of quick grabbing device of bar
CN207823443U (en) Bind garbage cleaning device in the bar-mat reinforcement completed
CN2804263Y (en) Wall scraper
CN208775590U (en) A kind of scalable brick clamp
CN206859682U (en) A kind of building template quick-gripping device
CN201998075U (en) Tongs
CN205616057U (en) Adjustable clamping device is counted to fragment of brick
CN206811869U (en) A kind of T beam-ends template bolt fastening tool
CN207108412U (en) A kind of protection type cable cover starts device
CN206971775U (en) Masonry mortar pointer
CN206319555U (en) A kind of construction claying knife
CN217998997U (en) Concrete block carrying clamp
CN206844678U (en) A kind of adjustable brick-discharging device
CN204324157U (en) Cement plate holding device
CN211572654U (en) Concrete test block card
CN214089368U (en) Be applied to instrument of curbstone transport
CN202969929U (en) Corner clamp for building operations
CN102922599B (en) Tool for plastering cement mortar on concrete pipe joints
CN206550176U (en) A kind of building site spanner
CN212507252U (en) X-shaped support paving device for floor tiles
CN205147963U (en) Scraper grinding machine scraper stacks hoist and mount combination frock
CN204549470U (en) A kind of robot that stacks bricks not needing brick folding power
CN204036341U (en) A kind of pipe wrench with clashing into seat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 050051 No.146 Youyi North Street, Xinhua District, Shijiazhuang City, Hebei Province

Patentee after: HEBEI CONSTRUCTION GROUP Co.,Ltd.

Patentee after: Hebei Construction Engineering Group ecological environment Co., Ltd

Address before: 050051 No.146 Youyi North Street, Xinhua District, Shijiazhuang City, Hebei Province

Patentee before: HEBEI CONSTRUCTION GROUP Co.,Ltd.

Patentee before: Hebei Construction Engineering Group garden Engineering Co., Ltd