CN207419206U - Kerbstone construction installation folder - Google Patents
Kerbstone construction installation folder Download PDFInfo
- Publication number
- CN207419206U CN207419206U CN201721532354.6U CN201721532354U CN207419206U CN 207419206 U CN207419206 U CN 207419206U CN 201721532354 U CN201721532354 U CN 201721532354U CN 207419206 U CN207419206 U CN 207419206U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- kerbstone
- grip handle
- clamping piece
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
The utility model provides a kind of kerbstone construction installation folder, it is characterized in that, it is hingedly formed by two clamps, each clamp includes the grip handle grasped for operating personnel, the connecting plate for the clamping piece that clamps kerbstone and for connecting grip handle and clamping piece;The top of connecting plate is fixedly connected with corresponding grip handle, and the bottom of connecting plate is fixedly connected with corresponding clamping piece, and two connecting plates are hinged to realize being hinged between two monomers by shaft;Two clamping pieces are oppositely arranged, and clamping piece is fixedly connected with the bottom of connecting plate.The utility model easy implementation simple in structure, improves construction efficiency, solves the problems, such as that construction efficiency existing for traditional kerbstone construction method operating personnel's finger in the secondary adjustment inconvenience of kerbstone and installation process lowly, easily occurs and easily collided with.The utility model significantly improves installation speed and installation quality in actual use, and its using effect is more notable.
Description
Technical field
The utility model is related to a kind of kerbstone construction tool, more particularly, to a kind of kerbstone construction installation folder.
Background technology
Kerbstone refers to being located at the boundary stone of pavement edge, and abbreviation kerb is commonly called as road serratd edge, it is as being arranged on road surface
The rectangular slab of stone of edge and other structural belts boundary is that town road, park plaza Ji little Yuan roads form indispensable pith,
In traditional kerbstone installation process, operating personnel are directly carried with hand, and a people is adjusted or moves by hand
There is inconvenience when dynamic, therefore generally require other people in movement or adjustment and carry out coordinative construction, operating personnel's linking is not tight
When easily there is work holdup phenomenon, and when putting, the finger of operating personnel is easily bumped to.
Utility model content
The purpose of this utility model is just to provide a kind of kerbstone construction installation folder, to solve existing to apply in kerbstone
Installation effectiveness present in work is low and the vulnerable problem of construction personnel.
What the purpose of this utility model was realized in:
A kind of kerbstone construction installation folder is hingedly formed by two clamps, and each clamp includes operating
Grip handle that personnel grasp, the company for the clamping piece that clamps kerbstone and for connecting the grip handle and the clamping piece
Fishplate bar;
The top of the connecting plate is fixedly connected with the corresponding grip handle, the bottom of the connecting plate and corresponding folder
Gripping member is fixedly connected, and two connecting plates are hinged to realize being hinged between two clamps by shaft;
The clamping piece is an angle steel by two orthogonal bar shaped side plate connections;Two clamping pieces are opposite
It sets.
The top surface of the clamping piece is fixedly connected by welding with the bottom of the connecting plate.
The grip handle uses steel pipe.
The axial length of the grip handle is more than the length of the connecting plate long side.
Angle between the connecting plate and the grip handle is in obtuse angle.
The connecting plate long side and the plane setting at an acute angle where the clamping piece top surface.
The axial length of the grip handle is more than 4 times of the length of the connecting plate long side.
The utility model route two clamps and hingedly forms, and each clamp includes the grasping grasped for operating personnel
Handle, the connecting plate for the clamping piece that clamps kerbstone and for connecting grip handle and clamping piece, grip handle, connecting plate and folder
The connection structure of gripping member takes full advantage of lever principle, and the process for making installation folder gripping kerbstone is saves time and effort.Clamping piece
Setting be then to have used the conversion of mechanics that will shear to be converted into vertical frictional force.In addition, the grasping in the utility model
Handle, clamping piece and connecting plate are easily gathered materials on the spot at the construction field (site), and the remaining waste material in construction site can be carried out to secondary use, drop
Low construction cost.
The utility model easy implementation simple in structure, improves construction efficiency, solves traditional kerbstone construction method and deposits
Construction efficiency it is low, easily occur that the secondary adjustment of kerbstone is inconvenient and installation process in operating personnel's finger easily collided with
Problem.The utility model significantly improves installation speed and installation quality in actual use, and its using effect is more aobvious
It writes.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is the connecting plate of the utility model and the connection structure diagram of clamping piece.
Fig. 3 is the using state structure diagram of the utility model.
In figure:1st, clamp;2nd, grip handle;3rd, clamping piece;4 connecting plates;5th, kerbstone;6th, bar shaped side plate;7th, shaft.
Specific embodiment
As shown in Fig. 1 ~ Fig. 3, the utility model is hingedly formed by two clamps 1, and each clamp 1 is included for operator
Grip handle 2 that member grasps, the connecting plate for the clamping piece 3 that clamps kerbstone 5 and for connecting grip handle 2 and clamping piece 3
4.Grip handle 2 uses steel pipe, and connecting plate 4 is made of band steel.
Two clamping pieces 3 are oppositely arranged, and clamping piece 3 is fixedly connected with the bottom of connecting plate 4.Clamping piece 3 is one by two
The angle steel that a orthogonal bar shaped side plate 6 connects, the width of the bar shaped side plate 6 of clamping piece 3 are 40mm, the item of clamping piece 3
The thickness of shape side plate 6 is 5mm.The corner of two clamping pieces 3 is oppositely arranged.The axial length of grip handle 2 is grown more than connecting plate 4
The length on side, the axial length of grip handle 2 are more than 4 times of the length of 4 long side of connecting plate, the folder between connecting plate 4 and grip handle 2
In obtuse angle, 4 long side of connecting plate and the plane setting at an acute angle where 3 top surface of clamping piece are in X-shaped after two connecting plates 4 are hinged at angle
Structure.Each connecting plate 4 is vertically arranged.The top of connecting plate 4 is fixedly connected with corresponding grip handle 2, the top of connecting plate 4
The bottom with grip handle 2 is fixedly connected by welding.The bottom of connecting plate 4 is fixedly connected with corresponding clamping piece 3, even
Plane where the plate face of fishplate bar 4 is parallel with the end face at the axial both ends of clamping piece 3, in the present embodiment, the level of clamping piece 3
The top surface of the bar shaped side plate 6 in direction is fixedly connected by welding with the bottom of connecting plate 4.Two connecting plates 4 are by turning
Axis 7 is hinged to realize being hinged between two clamps, and shaft 7 uses bolt.
Claims (7)
1. a kind of kerbstone construction installation folder, which is characterized in that hingedly formed by two clamps, each clamp includes
The grip handle that is grasped for operating personnel, for the clamping piece that clamps kerbstone and for connecting the grip handle and the folder
The connecting plate of gripping member;
The top of the connecting plate is fixedly connected with the corresponding grip handle, the bottom of the connecting plate and corresponding clamping piece
It is fixedly connected, two connecting plates are hinged to realize being hinged between two clamps by shaft;
The clamping piece is an angle steel by two orthogonal bar shaped side plate connections;Two clamping pieces are opposite to be set
It puts.
2. kerbstone construction installation folder according to claim 1, which is characterized in that the top surface of the clamping piece with it is described
The bottom of connecting plate is fixedly connected by welding.
3. kerbstone construction installation folder according to claim 1, which is characterized in that the grip handle uses steel pipe.
4. kerbstone construction installation folder according to claim 1, which is characterized in that the axial length of the grip handle is big
In the length of the connecting plate long side.
5. kerbstone construction installation folder according to claim 1, which is characterized in that the connecting plate and the grip handle
Between angle in obtuse angle.
6. kerbstone construction installation folder according to claim 1, which is characterized in that the connecting plate long side and the folder
Plane setting at an acute angle where gripping member top surface.
7. kerbstone construction installation folder according to claim 4, which is characterized in that the axial length of the grip handle is big
In 4 times of the length of the connecting plate long side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721532354.6U CN207419206U (en) | 2017-11-16 | 2017-11-16 | Kerbstone construction installation folder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721532354.6U CN207419206U (en) | 2017-11-16 | 2017-11-16 | Kerbstone construction installation folder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207419206U true CN207419206U (en) | 2018-05-29 |
Family
ID=62305044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721532354.6U Active CN207419206U (en) | 2017-11-16 | 2017-11-16 | Kerbstone construction installation folder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207419206U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110001719A (en) * | 2019-03-26 | 2019-07-12 | 中国五冶集团有限公司 | A kind of rectangular slab of stone means of transport |
-
2017
- 2017-11-16 CN CN201721532354.6U patent/CN207419206U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110001719A (en) * | 2019-03-26 | 2019-07-12 | 中国五冶集团有限公司 | A kind of rectangular slab of stone means of transport |
CN110001719B (en) * | 2019-03-26 | 2023-12-22 | 中国五冶集团有限公司 | A kind of strip stone transport means |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207419206U (en) | Kerbstone construction installation folder | |
CN208945974U (en) | One kind forging pipe vice | |
CN207058392U (en) | A kind of quick grabbing device of bar | |
CN207823443U (en) | Bind garbage cleaning device in the bar-mat reinforcement completed | |
CN2804263Y (en) | Wall scraper | |
CN208775590U (en) | A kind of scalable brick clamp | |
CN206859682U (en) | A kind of building template quick-gripping device | |
CN201998075U (en) | Tongs | |
CN205616057U (en) | Adjustable clamping device is counted to fragment of brick | |
CN206811869U (en) | A kind of T beam-ends template bolt fastening tool | |
CN207108412U (en) | A kind of protection type cable cover starts device | |
CN206971775U (en) | Masonry mortar pointer | |
CN206319555U (en) | A kind of construction claying knife | |
CN217998997U (en) | Concrete block carrying clamp | |
CN206844678U (en) | A kind of adjustable brick-discharging device | |
CN204324157U (en) | Cement plate holding device | |
CN211572654U (en) | Concrete test block card | |
CN214089368U (en) | Be applied to instrument of curbstone transport | |
CN202969929U (en) | Corner clamp for building operations | |
CN102922599B (en) | Tool for plastering cement mortar on concrete pipe joints | |
CN206550176U (en) | A kind of building site spanner | |
CN212507252U (en) | X-shaped support paving device for floor tiles | |
CN205147963U (en) | Scraper grinding machine scraper stacks hoist and mount combination frock | |
CN204549470U (en) | A kind of robot that stacks bricks not needing brick folding power | |
CN204036341U (en) | A kind of pipe wrench with clashing into seat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 050051 No.146 Youyi North Street, Xinhua District, Shijiazhuang City, Hebei Province Patentee after: HEBEI CONSTRUCTION GROUP Co.,Ltd. Patentee after: Hebei Construction Engineering Group ecological environment Co., Ltd Address before: 050051 No.146 Youyi North Street, Xinhua District, Shijiazhuang City, Hebei Province Patentee before: HEBEI CONSTRUCTION GROUP Co.,Ltd. Patentee before: Hebei Construction Engineering Group garden Engineering Co., Ltd |