CN207406358U - A kind of operation tunnel inclined shaft water damage renovates structure - Google Patents

A kind of operation tunnel inclined shaft water damage renovates structure Download PDF

Info

Publication number
CN207406358U
CN207406358U CN201721334114.5U CN201721334114U CN207406358U CN 207406358 U CN207406358 U CN 207406358U CN 201721334114 U CN201721334114 U CN 201721334114U CN 207406358 U CN207406358 U CN 207406358U
Authority
CN
China
Prior art keywords
wall
tunnel
inclined shaft
guide
main tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721334114.5U
Other languages
Chinese (zh)
Inventor
杨晓军
吴牧
焦钢
白晓岭
曾捡春
怀平生
赵玮栋
邵东雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201721334114.5U priority Critical patent/CN207406358U/en
Application granted granted Critical
Publication of CN207406358U publication Critical patent/CN207406358U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to tunnel water damage training works technical field, is specifically a kind of operation tunnel inclined shaft water damage regulation structure.Solve the problems, such as the prevention and improvement of tunnel water damage, including main tunnel and inclined shaft arranged in a crossed manner, inclined shaft is arranged on main tunnel one side and is connected with main tunnel, the one side on inclined shaft top is equipped with lateral sulcus, lateral sulcus lower end is connected with the guide-wall being staggered, block wall is equipped on the inside of guide-wall, water storage space is equipped between block wall and guide-wall, block wall one side is equipped with observation hole, the connecting pin for observing hole and main tunnel is equipped with steel cat ladder, the connecting pin for observing hole and water storage space is equipped with step, and the rhone of pvc pipe, pvc pipe connection water storage space and main tunnel is equipped in block wall.The utility model not only has many advantages, such as that design is reasonable, simple in structure, safe and reliable, also effectively eliminates the hidden danger of operation tunnel inclined shaft water damage harm, substantially increases the security of operation tunnel.

Description

A kind of operation tunnel inclined shaft water damage renovates structure
Technical field
The utility model belongs to tunnel water damage training works technical field, is specifically a kind of operation tunnel inclined shaft water damage regulation Structure.
Background technology
Under the drive of economic development, the traffic transport industry in China is developed rapidly, the number of railway tunnel work Amount is also being continuously increased.Therefore, carry out tunnel operation state detection and effectively improvement tunnel defect is significant.Analyze current iron It is found after the reason for road tunnel defect, water damage can be described as in " sources of ten thousand evils ".If there is water burst in construction period, construction can be given Bring very big difficulty;If occurring leak or water burst during tunnel operation, lining cracking, tunnel bottom may be caused to hang Sky, and then influence the safe to use of tunnel.Therefore, it is an important and arduous times to carry out the prevention of tunnel water damage and improvement Business.
The content of the invention
The utility model provides a kind of operation tunnel inclined shaft water damage to solve the problems, such as the prevention of tunnel water damage and improvement Renovate structure.
The utility model takes following technical scheme:A kind of operation tunnel inclined shaft water damage renovates structure, including arranged in a crossed manner Main tunnel and inclined shaft, inclined shaft be arranged on main tunnel one side and connected with main tunnel, the one side on inclined shaft top is equipped with lateral sulcus, lateral sulcus lower end with The guide-wall connection being staggered, guide-wall inside are equipped with block wall, and water storage space, closure are equipped between block wall and guide-wall Wall one side is equipped with observation hole, and the connecting pin for observing hole and main tunnel is equipped with steel cat ladder, and the connecting pin for observing hole and water storage space is equipped with Step, the interior rhone for being equipped with pvc pipe, pvc pipe connection water storage space and main tunnel of block wall.
Further, guide-wall is equipped with four, and the thickness of first of guide-wall is twice of three water guide wall thickness below, The top surface absolute altitude of four guide-walls is identical.
Compared with prior art, the utility model forms block wall by mortar flag stone;Pass through lateral sulcus, guide-wall, pvc pipe Composition gear is dredged, the waterproof and water drainage system that row is integrated, it not only has many advantages, such as that design is reasonable, simple in structure, safe and reliable, also The hidden danger of operation tunnel inclined shaft water damage harm is effectively eliminated, substantially increases the security of operation tunnel.
Description of the drawings
Fig. 1 is the planar structure schematic diagram of the utility model;
Fig. 2 is II-II sectional view of the utility model;
Fig. 3 is I-I sectional view of the utility model;
In figure:1- mortar flag stones, 2- pvc pipes, 3- observations hole, 4- steps, 5- guide-walls, 6- lateral sulcus, 7- main tunnels, 8- are oblique Well, 9- water storage spaces.
Specific embodiment
In order to make the technical problems, technical solutions and advantages to be solved by the utility model clearer, below in conjunction with attached drawing And specific embodiment is described in detail.
As shown in Figure 1, 2, 3, a kind of operation tunnel inclined shaft water damage regulation structure, including main tunnel 7 arranged in a crossed manner and inclined shaft 8, inclined shaft 8 is arranged on 7 one side of main tunnel and is connected with main tunnel 7, and the one side on 8 top of inclined shaft is equipped with lateral sulcus 6, and 6 lower end of lateral sulcus is with interlocking The guide-wall 5 of setting connects, and 5 inside of guide-wall is equipped with block wall 1, and water storage space 9, envelope are equipped between block wall 1 and guide-wall 5 1 one side of wall is equipped with observation hole 3, and the connecting pin for observing hole 3 and main tunnel 7 is equipped with steel cat ladder, observation hole 3 and the company of water storage space 9 It connects end and is equipped with step 4, pvc pipe 2 is equipped in block wall 1, pvc pipe 2 connects water storage space 9 and the rhone of main tunnel 7.
Guide-wall 5 is equipped with four, and the thickness of first of guide-wall 5 is twice of three guide-walls, 5 thickness below, and four lead The top surface absolute altitude of waterwall 5 is identical.
Block wall 1 is made of mortar flag stone;It is integrated by lateral sulcus 6, guide-wall 5, the composition of pvc pipe 2 gear, thin, row anti- Drainage system;Four guide-wall 5, first thickness are below three twice, four guide-walls, 5 top surface absolute altitude one to. Observation hole main tunnel, which is surveyed, sets steel cat ladder to climb up observation panel convenient for personnel.It is surveyed away from main tunnel and M10 mortar flag stones step is set to inclined shaft Bottom.Observation 3 main tunnel of hole, which is surveyed, sets steel cat ladder to climb up observation panel convenient for personnel.It is surveyed away from main tunnel and M10 mortar flag stones step 4 is set To inclined shaft bottom.
The above is the preferred embodiment of the utility model, it is noted that for the ordinary skill of the art For personnel, on the premise of principle described in the utility model is not departed from, several improvements and modifications can also be made, these improvement The scope of protection of the utility model is also should be regarded as with retouching.

Claims (2)

1. a kind of operation tunnel inclined shaft water damage renovates structure, it is characterised in that:Including main tunnel arranged in a crossed manner(7)And inclined shaft(8), Inclined shaft(8)It is arranged on main tunnel(7)One side and and main tunnel(7)Connection, inclined shaft(8)The one side on top is equipped with lateral sulcus(6), lateral sulcus(6) Lower end and the guide-wall being staggered(5)Connection, guide-wall(5)Inside is equipped with block wall(1), block wall(1)With guide-wall(5) Between be equipped with water storage space(9), block wall(1)One side is equipped with observation hole(3), observe hole(3)With main tunnel(7)Connecting pin be equipped with Steel cat ladder observes hole(3)With water storage space(9)Connecting pin be equipped with step(4), block wall(1)It is interior to be equipped with pvc pipe(2), PVC Pipe(2)Connect water storage space(9)With main tunnel(7)Rhone.
2. operation tunnel inclined shaft water damage according to claim 1 renovates structure, it is characterised in that:The guide-wall(5) Equipped with four, first of guide-wall(5)Thickness be three guide-wall below(5)Twice of thickness, four guide-walls(5)Top Face absolute altitude is identical.
CN201721334114.5U 2017-10-17 2017-10-17 A kind of operation tunnel inclined shaft water damage renovates structure Expired - Fee Related CN207406358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721334114.5U CN207406358U (en) 2017-10-17 2017-10-17 A kind of operation tunnel inclined shaft water damage renovates structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721334114.5U CN207406358U (en) 2017-10-17 2017-10-17 A kind of operation tunnel inclined shaft water damage renovates structure

Publications (1)

Publication Number Publication Date
CN207406358U true CN207406358U (en) 2018-05-25

Family

ID=62319930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721334114.5U Expired - Fee Related CN207406358U (en) 2017-10-17 2017-10-17 A kind of operation tunnel inclined shaft water damage renovates structure

Country Status (1)

Country Link
CN (1) CN207406358U (en)

Similar Documents

Publication Publication Date Title
CN206386134U (en) A kind of Underground Subway Station guarded drainage construction
CN104481588B (en) A kind of encapsulating method of coal mine gob
CN102071961B (en) Downward gas drainage drill hole and pressure testing drill hole sealing method
CN107035401A (en) A kind of abandoned mine fire damp administers new technology
CN106195616A (en) A kind of liquid CO 2 bulking system
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
WO2021026961A1 (en) Self-adaptive gas release rod and shallow gas controlled gas release recovery system and method
CN205839822U (en) A kind of protection structure of building enclosure inclinometer pipe
CN106988308A (en) Grouting behind shaft or drift lining pile for prestressed pipe and its construction technology
CN107604903A (en) A kind of miniature steel pipe isolation pile reinforced construction method
CN205349414U (en) Quick escape device in tunnel construction accident
CN206801564U (en) The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance
CN207454024U (en) A kind of inclined shaft and the main tunnel intersection section anti-water damage structure of inclined shaft
CN207406358U (en) A kind of operation tunnel inclined shaft water damage renovates structure
CN206784327U (en) A kind of stone masonry dam poor quality dam grouting reinforcing structure
CN106968227A (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN208749398U (en) A kind of tapping equipment of coal mine overlying rock water
CN109519221B (en) Water injection method for coal seam floor fracture in rock burst dangerous area
CN201991548U (en) Drainage, slag discharge and gas extraction integrated device
CN106958240A (en) Air-cushion type batch vacuum pipe well and apply its soft foundation Yield rainfall relation method
CN206928255U (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN205532706U (en) A barricade device that is used for shutoff admission passage to fill
CN206360720U (en) A kind of novel flexible filling isolation barricade
CN209369865U (en) A kind of protected seam gas drainage structure
CN103711119A (en) Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180525

Termination date: 20211017

CF01 Termination of patent right due to non-payment of annual fee