CN207405843U - A kind of precast splice type floor - Google Patents

A kind of precast splice type floor Download PDF

Info

Publication number
CN207405843U
CN207405843U CN201721365056.2U CN201721365056U CN207405843U CN 207405843 U CN207405843 U CN 207405843U CN 201721365056 U CN201721365056 U CN 201721365056U CN 207405843 U CN207405843 U CN 207405843U
Authority
CN
China
Prior art keywords
floor
concrete layer
steel frame
splice type
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721365056.2U
Other languages
Chinese (zh)
Inventor
王小平
黄鹏飞
陆波
程春英
黄涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of science and technology design and Research Institute Co.,Ltd.
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201721365056.2U priority Critical patent/CN207405843U/en
Application granted granted Critical
Publication of CN207405843U publication Critical patent/CN207405843U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of precast splice type floor, floor are whole by side(Square)The blocking criteria plate of shape is continuously spliced in same plane, and on-gauge plate lower floor is steel frame, and the top surface of steel frame is equipped with concrete layer, and the lateral edge of concrete layer inside contracts 25 ~ 150mm with respect to the side of steel frame;Concrete layer is connected with the upper surface of steel frame using shearing-resistant member, and steel frame surrounds hollow entirety for four sides channel steel.Onesize blocking criteria plate by adjacent steel frame with bolt is fixedly connected, splices integral composite floor, composite floor can be connected fixation with building girder or column from side or bottom surface, then be smoothed out with concrete.The utility model can realize the installation spliced at the scene by prefabricated modular on-gauge plate to the floor of different shape size and complete floor, and floor is light-weight, and installation is quick, and easy for construction, holistic resistant behavior is good.

Description

A kind of precast splice type floor
Technical field
The utility model is related to the precast splice type floors of architectural engineering technology, specifically a kind of building construction.
Background technology
Prefabricated concrete structure refers to the knot formed using the precast concrete component and fitting of plant produced in assemble in site Structure, have installation speed it is fast, to construction site pollution less, construction quality be easy to get the advantages such as guarantee, have in China extensive Application prospect.Floor is a part for prefabricated component and fitting in prefabricated concrete structure, and way includes prefabricated(Prestressing force) Concrete slab, reinforced concrete laminated floor slab etc..But this two kinds of ways are defective:The former is whole by assembled floor Body is poor, and is only capable of unidirectional power transmission;And the latter's standardization level is not high, and there are a large amount of wet constructions at scene.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of precast splice type floors, and this composite floor is by work The prefabricated blocking criteria plate of factory is spliced, and good integrity can realize two-way power transmission.
The utility model provides a kind of precast splice type floor, it is characterised in that:The whole mark by rectangular module of floor Quasi- plate is continuously spliced in same plane, and the length of side of on-gauge plate is 0.3 ~ 2.4m;
The on-gauge plate lower floor is steel frame, and the top surface of steel frame is equipped with concrete layer, the lateral edge of concrete layer Side with respect to steel frame inside contracts 25 ~ 150mm;
The steel frame surrounds hollow entirety for four sides channel steel, and the web of channel steel is vertical with concrete layer, and notch is inside, The wing plate of channel steel top surface is fixedly connected with concrete layer;
Parallelly be embedded with bar-mat reinforcement with concrete layer in concrete layer, bar-mat reinforcement stretch out the side 50 of concrete layer ~ 250mm。
Preferably, the lateral location of concrete layer is stretched out in bar-mat reinforcement, concrete layer is equipped with multiple 40 ~ 125mm that concave Link slot.
Preferably, the peg being fixedly connected with steel frame is equipped in the range of concrete layer covering.
The web of channel steel is equipped with bolt hole, and installation or modularization mark are connected with building girder or column from side for floor to be whole Splicing between quasi- plate.
Wing plate in channel steel bottom surface is equipped with bolt hole, and integrally installation is connected with building girder or column from bottom surface for floor.
The prefabricated and live bolt of batch production that the utility model realizes floor quickly splices, and floor is made to realize that standardization is pre- System, modular structure are hardly limited by live true form size, can live Fast Installation as the case may be.
The utility model is by side(Square)The blocking criteria prefabricated board of shape is spliced.On-gauge plate lower floor be steel frame, steel The top surface of frame is equipped with concrete layer, is connected between concrete layer and steel frame by shearing-resistant member, the corner of each steel frame Between be connected by screw bolts, the preset slot between every piece of on-gauge plate pours reality using coagulation soil scene.
The utility model realizes the laying of blocking criteria plate for the floor of Different Plane size, and assembly is completed at scene, There is standardization level height, floor good integrity, high capacity and two-way power transmission, situ wet operation is few, installation is quick, Application prospect is good.
Description of the drawings
Fig. 1 is the structure diagram of precast splice type floor,
Fig. 2 is the B-B sectional views in Fig. 1,
Fig. 3 is A-A sectional views in Fig. 2,
Fig. 4 is floor side and steel building girder or column side connection diagram,
Fig. 5 is soffit and steel building girder or column connection diagram.
In figure:1-concrete layer, 2-bar-mat reinforcement, slot between 3-plate, 4-peg, 5-steel frame, 6-web, 7-spiral shell Bolt, 8-wing plate, 9-link slot, 10-bolt hole.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples:The floor of the prior art needs as needed Shape is pointedly prefabricated or only single structure size is integrally connected across on the beam of both sides, cannot completely match somebody with somebody in building structure During conjunction, installation and construction are all relatively complicated.The utility model tries hard to solve the problems, such as this.
The precast splice type floor as shown in Fig. 1,2, the whole on-gauge plate by rectangular module of floor connect in same plane Continuous to be spliced, the length of side of on-gauge plate is 0.3 ~ 2.4m, can set the on-gauge plate of different size, select as needed.
The on-gauge plate lower floor is steel frame 5, and the top surface of steel frame is equipped with concrete layer 1, the side face edge of concrete layer Edge inside contracts 25 ~ 150mm with respect to the side of steel frame.Bar-mat reinforcement 2, reinforcing bar are parallelly embedded with concrete layer in concrete layer Net 2 stretches out 50 ~ 250mm of side of concrete layer.In order to the bar connecting between adjacent modular on-gauge plate.
The lateral location of concrete layer is stretched out in bar-mat reinforcement, concrete layer is equipped with the link slot of multiple 40 ~ 125mm that concave 9.It is equally easy for the bar connecting between adjacent modular plate and larger connection space is provided.
The steel frame 5 surrounds hollow entirety for four sides channel steel, and the web 6 of channel steel is vertical with concrete layer 1, notch to Interior, the wing plate 8 of channel steel top surface is fixedly connected with concrete layer;It is equipped with to fix with steel frame in the range of concrete layer covering and connect The peg 4 connect.To enhance the attachment force between steel frame and concrete layer.
The web 6 of channel steel is equipped with bolt hole 10, and installation or standard are connected with building girder or column from side for floor to be whole Splicing between plate.When being connected between adjacent modular plate, the web 6 of channel steel contacts directly, and bolt hole aligned in position can be direct It is connected through bolt 7.When on-gauge plate is connected with building girder or column from side, by building girder or column pre-buried sleeve or connector Alignment, is connected by bolt 7.
Wing plate 8 in channel steel bottom surface is equipped with bolt hole 10, and integrally installation is connected with building girder or column from bottom surface for floor. When on-gauge plate builds the reconnection above building girder or column, the pre-buried sleeve of building girder or column or connector are alignd, passed through It is bolted.
A kind of above-mentioned precast splice type floor construction method, as steps described below order progress:
The first step, the on-gauge plate in the prefabricated dimension of factory's batch;
It is in the process of the prefabricated on-gauge plate of factory's batch:Steel frame 5 prefabricated first, then covers in the concrete layer of steel frame Peg 4 is welded and fixed in the range of lid, the template of correspondingly-shaped is installed, pours into a mould concrete, the pre-buried direction in length and breadth in concrete layer Bar-mat reinforcement 2;Etc. to be solidified.
Second step, transport on-gauge plate to construction site, at the construction field (site) ground or in the air according to floor design shape with Size is spliced into whole floor, in splicing:
First by adjacent on-gauge plate horizontal alignment, after the alignment of web 6 of steel frame 5, alignment is passed through to connect bolt 7 The bolt hole 10 of adjacent web simultaneously fastens, and the bar-mat reinforcement 2 of adjacent position secondly is tightened connection, forms floor semi-finished product;
Floor semi-finished product are lifted into design floor location by the 3rd step, are fixed and are connected with building girder or column from side or bottom surface Connect, the then fill concrete slurry in the groove of slab surfaces, and concordant with concrete layer, by the stipulated time maintenance simultaneously Cure.
When floor is connected from side with building girder or column, first, from the steel frame web of edge on-gauge plate to connecting building Beam or column side are fastened with screw or bolt, then recessed with connecting building beam or column on the outside of the concrete layer of edge on-gauge plate Fill concrete slurry in slot, and smoothing out, it is curing by the stipulated time.
When floor is connected from bottom surface with building girder or column, first, connecting building beam or column steel in contact on-gauge plate bottom Locations of structures, lateral connecting building beam or column are fastened with screw or bolt out of steel frame bottom flap, connecting building beam or column It can be with built-in bolt sleeve or connector, so that bolt or screw connect.Then on the outside of the concrete layer of edge on-gauge plate with Fill concrete slurry in the groove of wall, and smoothing out, it is curing by the stipulated time.
For the floor semi-finished product when installation on ground forms, the floor semi-finished product are the whole floor that the position need to install A part, after floor semi-finished product are connected from side or bottom surface with connecting building beam or column, new in vacant locations extension splicing On-gauge plate aligns side by side from side by new on-gauge plate steel frame with the on-gauge plate steel frame of floor semi-finished product, to be bolted Fastening, connects building connecting building beam or column steel construction that on-gauge plate is overlapped to floor one by one, and with connecting building beam or column spiral shell It tethers and connects, fill concrete slurry and smoothed out in the groove finally occurred in top surface, it is curing by the stipulated time.

Claims (5)

1. a kind of precast splice type floor, it is characterised in that:The whole on-gauge plate by rectangular module of floor connects in same plane Continuous to be spliced, the length of side of on-gauge plate is 0.3~2.4m;
The on-gauge plate lower floor is steel frame (5), and the top surface of steel frame is equipped with concrete layer (1), the side face edge of concrete layer Edge inside contracts 25~150mm with respect to the side of steel frame;
The steel frame (5) surrounds hollow entirety for four sides channel steel, and the web (6) of channel steel is vertical with concrete layer (1), notch Inwardly, the wing plate (8) of channel steel top surface is fixedly connected with concrete layer;
Bar-mat reinforcement (2) is parallelly embedded with concrete layer in concrete layer, bar-mat reinforcement (2) stretches out the side 50 of concrete layer ~250mm.
2. precast splice type floor according to claim 1, it is characterised in that:The side of concrete layer is stretched out in bar-mat reinforcement Position, concrete layer are equipped with the link slot (9) of multiple 40~125mm that concave.
3. precast splice type floor according to claim 1, it is characterised in that:It is equipped in the range of concrete layer covering The peg (4) being fixedly connected with steel frame.
4. precast splice type floor according to claim 1, it is characterised in that:The web (6) of channel steel is equipped with bolt hole (10), for the whole splicing between side and building girder or column connection installation or blocking criteria plate of floor.
5. precast splice type floor according to claim 1, it is characterised in that:Wing plate (8) in channel steel bottom surface is equipped with spiral shell Keyhole (10) is integrally connected installation from bottom surface for floor with building girder or column.
CN201721365056.2U 2017-10-19 2017-10-19 A kind of precast splice type floor Active CN207405843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721365056.2U CN207405843U (en) 2017-10-19 2017-10-19 A kind of precast splice type floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721365056.2U CN207405843U (en) 2017-10-19 2017-10-19 A kind of precast splice type floor

Publications (1)

Publication Number Publication Date
CN207405843U true CN207405843U (en) 2018-05-25

Family

ID=62320867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721365056.2U Active CN207405843U (en) 2017-10-19 2017-10-19 A kind of precast splice type floor

Country Status (1)

Country Link
CN (1) CN207405843U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795055A (en) * 2017-10-19 2018-03-13 武汉理工大学 A kind of modular combination floor and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795055A (en) * 2017-10-19 2018-03-13 武汉理工大学 A kind of modular combination floor and construction method

Similar Documents

Publication Publication Date Title
US9874036B2 (en) Prefabricated, deconstructable, multistory building construction
CN202866321U (en) Slope roof lightweight steel construction mobile home
CN106801436B (en) A kind of construction method overlapping assembled underground pipe gallery
CN206859479U (en) A kind of steel bar girder laminated floor slab
CN105201071A (en) Totally-prefabricated concrete structure
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN106193402B (en) Girder truss integrated form flooring module and its installation method
CN107795055A (en) A kind of modular combination floor and construction method
CA2842249A1 (en) Prefabricated reinforced concrete wall panel and installation method
CN104912321A (en) Steel truss formwork support structure for suspended structure and installing method of steel truss formwork support structure
CN113529956A (en) Shear wall box type assembly type building structure and construction method thereof
CN103306483B (en) The industrial construction method of building
CN111962675A (en) Construction method of large-span special-shaped cast-in-place reinforced concrete open-web truss
CN112832368A (en) Quick construction process for cantilever beam at ultrahigh position
CN110396919B (en) Assembled steel structure-concrete combined bridge and construction method thereof
CN114108917A (en) Height-adjustable assembly type composite floor slab construction method
CN115324366A (en) Hoisting method for overlong and overweight truss of framed bent structure system
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CN207405843U (en) A kind of precast splice type floor
KR101272601B1 (en) A joint structure for sculpture of rooftop
CN102808375B (en) Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof
CN205677070U (en) A kind of building frame construction
KR101658929B1 (en) Precast box structure and construction method thereof
KR101036177B1 (en) Method for constructing building using PRC integrating method
CN108396781B (en) Assembled shaft fore shaft circle beam member structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211229

Address after: No. 122, Lo lion Road, Hongshan District, Wuhan, Hubei

Patentee after: Wuhan University of science and technology design and Research Institute Co.,Ltd.

Address before: 430070 Hubei Province, Wuhan city Hongshan District Luoshi Road No. 122

Patentee before: WUHAN University OF TECHNOLOGY