CN207405633U - Foundation pit of the Fei Shou roads support with dynamic stress regulatory function - Google Patents

Foundation pit of the Fei Shou roads support with dynamic stress regulatory function Download PDF

Info

Publication number
CN207405633U
CN207405633U CN201721367107.5U CN201721367107U CN207405633U CN 207405633 U CN207405633 U CN 207405633U CN 201721367107 U CN201721367107 U CN 201721367107U CN 207405633 U CN207405633 U CN 207405633U
Authority
CN
China
Prior art keywords
support
supporting plate
foundation pit
fei
regulatory function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721367107.5U
Other languages
Chinese (zh)
Inventor
张中杰
吕培林
邓长茂
刘书
俞震中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201721367107.5U priority Critical patent/CN207405633U/en
Application granted granted Critical
Publication of CN207405633U publication Critical patent/CN207405633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses foundation pit of the Fei Shou roads support with dynamic stress regulatory function, and including several internal supports, inside support, which disconnects being equipped with close to centre position, answers apparatus for adjusting force;Apparatus for adjusting force is answered to include, and top is outer to choose supporting plate, sliding bearing and jack;Outer supporting plate of choosing includes the connecting portion being fixedly connected with steel column upper end and plate-like supporting plate;The corresponding inside support disconnected of supporting plate the upper surface of is equipped with sliding bearing, for holding internal support;Jack is arranged at internal support gap.During construction, after steel column is set, internal support corresponding position is excavated to, set in its top side it is outer chooses supporting plate and sliding bearing, pour supported inside phase when, just disconnected, and pre-embedded steel slab is set on section, jack is set in its gap after the completion of inside supports.The utility model overcomes the defects of inner concrete is supported on to environmental protection control aspect, while can also compensate concrete support in super foundation and shrink the adverse effect generated.

Description

Foundation pit of the Fei Shou roads support with dynamic stress regulatory function
Technical field
The utility model is related to foundation pit building technology fields, and more particularly to Fei Shou roads support is with dynamic stress regulatory function Foundation pit.
Background technology
In recent years, with the fast development of city development construction, the scarcity of city space and land resource becomes increasingly conspicuous, Especially in economically developed, heavy traffic large and medium-sized city, including underground space synthesis, subway station, underground garage, All kinds of underground space construction including underground substation, underground pump station, civil air defense constructions and installations, street crossing tunnel etc. are just built in high gear In.It builds the corresponding base pit engineering of underground space institute and is faced with that plane scale is big, cutting depth is deep, construction site is narrow and small, periphery Nearly four main trend of object distance is protected, is advocating people-oriented, harmonious development today, strictly controls foundation pit deformation, realization pair Effective protection of surrounding enviroment is the task that engineering construction person must complete.
At present in base pit engineering industry, wide Large Foundation Pit or the irregular foundation pit of flat shape, along foundation pit vertically from upper and Other supports outside the support of Xia Chushou roads, are also provided good generally using reinforced concrete support for entire foundation pit system Good overall stiffness.However, Fei Shou roads concrete support due to bearing position is deep, bears soil pressure is very big, itself construction when Between it is long, current Fei Shou roads concrete support can not but be applied as bracing members by segmented head and jack adjustable in addition Dynamic stress, and can only first be deformed and be inwardly compressed by the building enclosure of foundation pit, then concrete support is passively held The soil pressure come by transmission.So not only sacrificing to a certain degree influences surrounding enviroment the effect of control, but also when foundation pit is sent out During raw alarm dangerous situation, can not dangerous situation control be carried out by the measure taken support and intervened.Current deep basal pit Fei Shou roads coagulation Soil is supported on has the defects of being badly in need of solving to environmental protection control aspect.
Therefore, how effectively to solve the above problems, further improve the function of deep basal pit Fei Shou roads concrete support, expand The application range of concrete support improves control foundation pit deformation ability, is current engineering circles thorny problem urgently to be resolved hurrily.
Utility model content
In view of the drawbacks described above of the prior art, the first purpose that the utility model is realized is to realize coagulation inside foundation pit Soil be supported on vertical applied force it is still safe and reliable on the premise of, horizontal direction stress dynamically apply in real time and support axial stretching can Control adjustment.
To achieve the above object, the utility model discloses Fei Shou roads to support the foundation pit with dynamic stress regulatory function, Several horizontally disposed supports are vertically equipped in the foundation pit, are connected in several supports positioned at the foundation pit with ground The support at place is the support of first road, and all supports positioned at the first road support lower section are internal support, Ji Feishou roads branch Support.
Wherein, each internal support disconnects forming left partly support and right half support close to centre position, and described left half It is equipped between support and right half support and answers apparatus for adjusting force.
Described to answer apparatus for adjusting force, nationality is vertically arranged in steel column in the foundation pit by one, is fixed in the foundation pit.
Apparatus for adjusting force is answered to include choosing supporting plate, sliding bearing and jack outside described in each.
Each outer supporting plate of choosing includes the connecting portion being fixedly connected with steel column side corresponding position, Yi Jiyu The corresponding steel column is vertical and supports the supporting plate that the underface of center off position extends to the accordingly inside.
Each supporting plate corresponds to corresponding left half support and corresponding described right half and supports close to the position of gap It puts and is respectively equipped with the sliding bearing, it is each described outer to choose supporting plate equal nationality phase is held by corresponding two sliding bearings respectively Left half support and corresponding described right half answered support.
A pre-embedded steel slab is equipped on the section of left half support and the right half support gap, every two pieces described pre- It buries and is equipped with the jack between steel plate.
Preferably, each outer choose is equipped with triangle reinforcement branch between the connecting portion of supporting plate and the supporting plate Support.
Preferably, the steel column is steel lattice column, H profile steel column or steel pipe rod structure.
Preferably, the sliding bearing is made of tetrafluoride material, is connect above with left half support and right half support The horizontal coefficient of friction of contact portion point is 0.02.
Preferably, the pre-embedded steel slab is made of Q235B materials, thickness 8mm.
The beneficial effects of the utility model:
The utility model overcomes Fei Shou roads concrete support to environmental protection control aspect the defects of, while can also mend It repays concrete support in super foundation and shrinks the adverse effect generated, have a good application prospect in base pit engineering, especially It is suitble to foundation pit periphery protection building, down town city that underground utilities are intensive, traffic above-ground is busy etc. that there is stringent ecology to protect The region of requirement is protected, the construction means of underground engineering has effectively been expanded, has promoted technical progress of industry, there is good economy, society It can benefit.
The technique effect of the design of the utility model, concrete structure and generation is made furtherly below with reference to attached drawing It is bright, to be fully understood from the purpose of this utility model, feature and effect.
Description of the drawings
Fig. 1 shows the structure diagram of one embodiment of the utility model.
Fig. 2 shows the partial enlargement structural representation at A in Fig. 1.
Fig. 3 shows to complete the view that steel column is set in one embodiment of the utility model.
Fig. 4 shows to complete the outer view for choosing supporting plate setting in one embodiment of the utility model.
Fig. 5 shows that Fig. 4 China and foreign countries choose the partial enlargement structural representation at supporting plate.
Fig. 6 shows to complete the view that sliding bearing is set in one embodiment of the utility model.
Fig. 7 shows that Fig. 6 China and foreign countries choose the partial enlargement structural representation at supporting plate.
Fig. 8 goes out in one embodiment of the utility model to complete the view that first of inside support pours.
Fig. 9 shows that Fig. 8 China and foreign countries choose the partial enlargement structural representation at supporting plate.
Specific embodiment
Embodiment
As depicted in figs. 1 and 2, foundation pit of the Fei Shou roads support with dynamic stress regulatory function, in foundation pit vertically Equipped with several horizontally disposed supports, support of several support middle positions in foundation pit Yu 9 junction of ground is first road support, positioned at first road All supports of support lower section are internal support 1.
Wherein, each internal support 1 disconnects forming left half support 12 and right half support 11 close to centre position, and left half supports It is equipped between 12 and right half support 11 and answers apparatus for adjusting force 3.
Answer apparatus for adjusting force 3, nationality is vertically arranged in steel column 2 in foundation pit by one, is fixed in foundation pit.
It is each that apparatus for adjusting force 3 is answered to include choosing supporting plate 31, sliding bearing 32 and jack 33 outside.
It is each it is outer choose supporting plate 31 include the connecting portion being fixedly connected with 2 side corresponding position of steel column and with it is corresponding Steel column is vertical and the supporting plate of the underface extension of 1 center off position is supported to respective inner.
Each supporting plate corresponds to corresponding left half support 12 and corresponding right half support 11 is set respectively close to the position of gap There is sliding bearing 32, each outer 31 equal nationality of supporting plate of choosing holds corresponding left half support 12 respectively by corresponding two sliding bearings 32 With corresponding right half support 11.
A pre-embedded steel slab 13, every two pieces of pre-embedded steel slabs are equipped on the section of 11 gaps of left half support 12 and right half support Jack 33 is equipped between 13.
The principle of the utility model is, creatively summarizes and forms a kind of deep basal pit Fei Shou roads concrete support application The construction method of dynamic stress, this method utilize the side for the interim steel column for being used to support concrete support dead weight in foundation pit The outer supporting plate that caunches for being fixed with sliding bearing is set, and holds out against the branch for being divided into two absolute construction sections at the supporting plate with jack Support, realize Fei Shou roads concrete support vertical applied force it is still safe and reliable on the premise of, horizontal direction stress dynamically applies in real time With the controllable adjustment of support axial stretching.
Preferably, it is equipped with triangle between each outer connecting portion and supporting plate for choosing supporting plate 31 and strengthens support.
Preferably, steel column 2 is steel lattice column, H profile steel column or steel pipe rod structure.
Preferably, sliding bearing 32 is made of tetrafluoride material, supports 12 and 11 contact portions of right half support with left half above Horizontal coefficient of friction be 0.02.
Preferably, pre-embedded steel slab 13 is made of Q235B materials, thickness 8mm.
The utility model also provides a kind of construction method of foundation pit of the Fei Shou roads support with dynamic stress regulatory function, step It is rapid as follows:
A, as shown in figure 3, setting building enclosure, stand column pile and the steel column 2 of foundation pit;
The first road support of foundation pit is set between foundation pit and ground 9 B,;
C, as shown in Figure 4 and Figure 5, topsoil is excavated to the position of next support, is excavated positioned at the position of steel column 2 One pit with choosing the matching of supporting plate 31 outside, setting is outer to choose supporting plate 31;
D, as shown in Figure 6 and Figure 7, the installation sliding bearing 32 on supporting plate 31 is chosen outside;
E, as shown in Figure 8 and Figure 9, casting concrete completes the making of internal support 1, disconnects forming left half in predeterminated position Support 12 and right half support 11, are loaded in corresponding sliding bearing 32, pre-embedded steel slab 13 are set in casting process;
Jack 33 is set between two pre-embedded steel slabs 13 F,;
G, step C to F is repeated, until all inside supports 1 are completed.
Preferably, in step C, the bottom boundary of pit puts 200mm outside for steel column outer profile.
Preferably, in step C, supporting plate 31 is chosen outside and is arranged at welding manner on steel column 2.
Using the construction method of the utility model, not only before foundation pit carries out next step excavation, inside support 1 can be as general Logical bracing members equally apply the required prestressing force of design in advance, can effectively control initial stage foundation pit deformation.
Moreover, even if dangerous situation occurs for foundation pit, inside support 1 can also be according to real-time monitoring data, by adjusting jack 33 jacking force size adjusts the actual axle power of the support, effective guarantee deep pit monitor in time.
Also, for concrete support shrinkage in super foundation building enclosure can be caused to be forced inwardly to receive and generated additional Foundation pit deformation, when using this method, the gap value that can be also disconnected by the support of increased this road of jack 33 be compensated by It offsets.
The preferred embodiment of the utility model described in detail above.It should be appreciated that the ordinary skill people of this field Member according to the present utility model can conceive without creative work makes many modifications and variations.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality on the basis of existing technology according to the design of the utility model in domain Available technical solution is tested, it all should be in the protection domain being defined in the patent claims.

Claims (5)

1. the support of Fei Shou roads carries the foundation pit of dynamic stress regulatory function, vertically set in the foundation pit equipped with several levels Support is put, the support that the foundation pit and ground (9) junction are located in several supports is that first road supports, positioned at the first road All supports of support lower section are internal support (1);It is characterized in that:
Each internal support (1) disconnects forming left half support (12) and right half support (11), the left side close to centre position It is equipped between half support (12) and right half support (11) and answers apparatus for adjusting force (3);
Described to answer apparatus for adjusting force (3), nationality is vertically arranged in steel column (2) in the foundation pit by one, is fixed on the foundation pit It is interior;
Apparatus for adjusting force (3) is answered to include choosing supporting plate (31), sliding bearing (32) and jack (33) outside described in each;
Each outer supporting plate (31) of choosing includes the connecting portion being fixedly connected with the steel column (2) side corresponding position, with And supporting plate that is vertical with the corresponding steel column and extending to the underface of corresponding described internal support (1) center off position;
Each supporting plate corresponds to corresponding left half support (12) and corresponding right half support (11) close to gap Position be respectively equipped with the sliding bearing (32), each outer supporting plate (31) nationality of choosing is by the corresponding two slide plate branch Seat (32) holds corresponding left half support (12) and corresponding right half support (11) respectively;
Half support (12) of a left side and the right side half support and a pre-embedded steel slab (13) are equipped on the section of (11) gap, and every two The jack (33) is equipped between pre-embedded steel slab described in block (13).
2. foundation pit of the Fei Shou roads support with dynamic stress regulatory function according to claim 1, it is characterised in that:It is each Outer choose is equipped with triangle reinforcement support between the connecting portion of supporting plate (31) and the supporting plate.
3. foundation pit of the Fei Shou roads support with dynamic stress regulatory function according to claim 1, it is characterised in that:It is described Steel column (2) is steel lattice column, H profile steel column or steel pipe rod structure.
4. foundation pit of the Fei Shou roads support with dynamic stress regulatory function according to claim 1, it is characterised in that:It is described Sliding bearing (32) is made of tetrafluoride material, supports (11) contact portion with half support (12) of a left side and described right half above Horizontal coefficient of friction is 0.02.
5. foundation pit of the Fei Shou roads support with dynamic stress regulatory function according to claim 1, it is characterised in that:It is described Pre-embedded steel slab (13) is made of Q235B materials, thickness 8mm.
CN201721367107.5U 2017-10-23 2017-10-23 Foundation pit of the Fei Shou roads support with dynamic stress regulatory function Active CN207405633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721367107.5U CN207405633U (en) 2017-10-23 2017-10-23 Foundation pit of the Fei Shou roads support with dynamic stress regulatory function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721367107.5U CN207405633U (en) 2017-10-23 2017-10-23 Foundation pit of the Fei Shou roads support with dynamic stress regulatory function

Publications (1)

Publication Number Publication Date
CN207405633U true CN207405633U (en) 2018-05-25

Family

ID=62320857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721367107.5U Active CN207405633U (en) 2017-10-23 2017-10-23 Foundation pit of the Fei Shou roads support with dynamic stress regulatory function

Country Status (1)

Country Link
CN (1) CN207405633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558478A (en) * 2017-10-23 2018-01-09 上海市城市建设设计研究总院(集团)有限公司 Foundation ditch and construction method of the support of Fei Shou roads with dynamic stress regulatory function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558478A (en) * 2017-10-23 2018-01-09 上海市城市建设设计研究总院(集团)有限公司 Foundation ditch and construction method of the support of Fei Shou roads with dynamic stress regulatory function

Similar Documents

Publication Publication Date Title
CN107558478A (en) Foundation ditch and construction method of the support of Fei Shou roads with dynamic stress regulatory function
CN206267152U (en) Prefabricated pipe gallery installs alignment system
CN103911983B (en) Tire-gravel drainage pile treatment process of composite foundation
CN105970811A (en) Construction technology for elevated bridge with large-span spatial 3D-surface fish-bellied box steel structure
CN106013053A (en) Steel sheet pile support construction method for building underground garage open caisson
CN107687172A (en) First foundation ditch and construction method of the road support with dynamic stress regulatory function
WO2004090233A1 (en) Repair and reinforcement system of existing structure using reaction force of pressurizing means and method thereof
CN102733307B (en) Method for constructing cast-in-place beam falsework
CN207405633U (en) Foundation pit of the Fei Shou roads support with dynamic stress regulatory function
CN103276729B (en) A kind of movable steel casing and adopt this steel pile casting to carry out cast-in-place pile construction method
Tarasenko et al. Determining deformations of the central part of a vertical steel tank in the presence of the subsoil base inhomogeneity zones
CN205530262U (en) Adjust timing frame of steel tube column stake position among half reverse construction
CN108951658B (en) Deep foundation pit section steel supporting system based on active control
CN207405627U (en) First foundation pit of the road support with dynamic stress regulatory function
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN113502828A (en) Processing method for early warning of deep foundation pit
CN209066443U (en) A kind of deep basal pit fashioned iron support system based on active control
CN107558483A (en) A kind of building foundation and its construction method for installing wallboard
CN101892679A (en) Test device for simulating washing and bearing coupled characteristic of underwater pile foundation
CN209941754U (en) High-voltage power pipe culvert in-situ protection structure
CN206220534U (en) The pump line support meanss of concrete pumping equipment
Tarasenko et al. Justification of a method for complete lifting of a tank to repair its base and foundation
CN210141128U (en) Test device for simulating pipe curtain underground excavation
CN107829428A (en) A kind of variable diameters bamboo joint type mortar pile
Zhu et al. The land subsidence and building deformation during the excavation process of the deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant