CN206267152U - Prefabricated pipe gallery installs alignment system - Google Patents

Prefabricated pipe gallery installs alignment system Download PDF

Info

Publication number
CN206267152U
CN206267152U CN201621323473.6U CN201621323473U CN206267152U CN 206267152 U CN206267152 U CN 206267152U CN 201621323473 U CN201621323473 U CN 201621323473U CN 206267152 U CN206267152 U CN 206267152U
Authority
CN
China
Prior art keywords
jack
piping lane
pipe gallery
alignment system
walking dolly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621323473.6U
Other languages
Chinese (zh)
Inventor
崔猛
王会丽
蒋海里
陆俊华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Road and Bridge Group Co Ltd
Original Assignee
Shanghai Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Road and Bridge Group Co Ltd filed Critical Shanghai Road and Bridge Group Co Ltd
Priority to CN201621323473.6U priority Critical patent/CN206267152U/en
Application granted granted Critical
Publication of CN206267152U publication Critical patent/CN206267152U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of prefabricated pipe gallery and installs alignment system, it includes track foundation, walking dolly, track foundation is provided with walking track, walking dolly is slided on walking track, track foundation is provided with the buttress placed side that can place temporary rest pier, the upper surface of walking dolly is provided with the piping lane placed side for placing piping lane sections, and walking dolly is additionally provided with the jack of the top for projecting to piping lane placed side.The prefabricated pipe gallery installs alignment system, the position of piping lane can be accurately adjusted according to construction requirement, ensure that the installation accuracy of prefabricated piping lane, and strong adaptability, simple structure easy processing, low cost, install convenient is easy to control, safe and reliable risk is small, can greatly improve the installation rate of prefabricated piping lane.

Description

Prefabricated pipe gallery installs alignment system
Technical field
The utility model is related to a kind of prefabricated pipe gallery to install alignment system.
Background technology
China is in urbanization fast development period, and underground foundation Facilities Construction is developed rapidly, and various pipelines are intensive to be built If.Propulsion Urban Underground pipe gallery is built, and is conducive to radical cure " sick road ", the generation on " Duo Ming roads ", eliminates on " slide fastener road " Phenomenon.To ensure urban safety, city function is improved, beautifying city landscape promotes the intensive efficient and Transformation Development in city, tradition Cast-in-place piping lane has that job site difficulty is big, efficiency is low, the cycle, to reduce shadow of the piping lane construction to urban transportation Ring, should be from efficiency of construction be improved, reducing the deep trench engineering time set about, and be that this prefabricated assembled pipe gallery is development from now on Direction.
Prefabricated assembled pipe gallery, be by the main structure body piecemeal of pipe gallery or it is segmented be prefabricated in the factory, then Transport to scene carry out assembly it is a kind of quick green construction technology, can not only significantly improve construction quality, improve construction environment, Accelerating construction progress, and integrated cost of constructing do not increase substantially.
Currently for the technical research of prefabricated pipe gallery, the structure type and joint for focusing primarily upon prefabricated piping lane are prevented Water, but it is less to the accurate mounting technique research of prefabricated piping lane sections, and piping lane stage installation accuracy is relatively low, causes piping lane joint Impervious, water resistance is poor.For the problem, the utility model provides a economic and practical prefabricated pipe gallery and installs fixed Position system.
Utility model content
For the piping lane installation accuracy for solving existing prefabricated pipe gallery installation alignment system is relatively low, piping lane joint resists Ooze, the poor technical problem of water resistance, there is provided a kind of prefabricated pipe gallery installs alignment system.
The utility model provides a kind of prefabricated pipe gallery and installs alignment system, and it includes track foundation, walking dolly, Track foundation is provided with walking track, and walking dolly is slided on walking track, and track foundation is provided with can place temporary rest pier Buttress placed side, the upper surface of walking dolly is provided with the piping lane placed side for placing piping lane sections, and walking dolly is additionally provided with protrusion To the jack of the top of piping lane placed side.
The prefabricated pipe gallery installs alignment system, and strong adaptability goes for the accurate installation of prefabricated pipe gallery In construction, simple structure, easy processing, low cost, install convenient, safe and reliable risk is small, can greatly improve prefabricated piping lane Installation rate.
Preferably, walking dolly is provided with wheel, and wheel is rolled on walking track.By rolling of the wheel on walking track It is dynamic, enable walking dolly along walking track travel.
Preferably, walking dolly is provided with jack adjusting apparatus, and jack adjusting apparatus adjustment jack is in the horizontal direction Position.The position of jack is adjusted by jack adjusting apparatus, so as to realize the accurate adjustment of the position of piping lane sections.
Further preferably, jack adjusting apparatus include horizontal concrete chute and two cylinders, and jack is located at horizontal concrete chute Interior, two piston rods of cylinder can withstand jack, axis and the horizontal concrete chute of the piston rod of cylinder from the both sides of jack Axis is parallel.Further preferably, jack includes jack base, and jack base is located in horizontal concrete chute, cylinder Piston rod withstand jack base.The piston rod of two cylinders acts on jack base, makes jack overall in horizontal cunning Moved in groove.
Preferably, jack includes jack base, jack cylinder body, jack piston rod and jacking backing plate, jack Cylinder body is fixed on jack base, and jack piston rod is arranged on jack cylinder body, and the end of jack piston rod is fixed Jacking backing plate, jacking backing plate can be by piping lane sections jack-up.By the stretching motion of jack piston rod, make to be located at jack piston The jacking backing plate of the end of bar by piping lane sections jack-up or can put down.
Preferably, walking dolly includes and two longitudinal sides being engaged of walking track and two longitudinal sides are mutual The lateral connection side of connection, the upper surface of longitudinal side is provided with piping lane placed side, and jack is arranged in longitudinal side.Further Preferably, walking dolly also includes two inclined support bars on ground, and two of walking dolly diagonally be connected by inclined support bar.Further Preferably, the infall of two inclined support bars is further fixed on reinforcing plate on ground.Inclined support bar, reinforcing plate can strengthen the entirety of walking dolly Intensity, prevents walking dolly from deforming and influence is used.
On the basis of common sense in the field is met, above-mentioned each optimum condition can be combined, obtain final product the utility model it is each compared with Good example.
Positive effect of the present utility model is:
The prefabricated pipe gallery installs alignment system, and the position of piping lane can be accurately adjusted according to construction requirement, ensure that The installation accuracy of prefabricated piping lane, and strong adaptability, simple structure easy processing, low cost, install convenient are easy to control, safe and reliable Risk is small, can greatly improve the installation rate of prefabricated piping lane.
Brief description of the drawings
Fig. 1 is the structural representation that the prefabricated pipe gallery of the utility model installs alignment system.
Fig. 2 is the partial enlarged drawing of the prefabricated pipe gallery installation alignment system shown in Fig. 1.
Fig. 3 is the structural representation of the walking dolly of the prefabricated pipe gallery installation alignment system shown in Fig. 1.
Fig. 4 is the partial enlarged drawing of the walking dolly of the prefabricated pipe gallery installation alignment system shown in Fig. 3.
Fig. 5 is the A-A of the walking dolly of the prefabricated pipe gallery installation alignment system shown in Fig. 4 to sectional view.
Description of reference numerals
1 track foundation
11 walking tracks
12 buttress placed sides
2 walking dollies
21 piping lane placed sides
22 jack
221 jack bases
222 jack cylinder bodies
223 jack piston rods
224 jacking backing plates
23 wheels
24 jack adjusting apparatus
241 horizontal concrete chutes
242 cylinders
243 piston rods
25 longitudinal sides
26 lateral connection sides
27 inclined support bars
28 reinforcing plates
3 temporary rest piers
4 piping lane sections
Specific embodiment
The utility model is further illustrated below by the mode of embodiment, but is not therefore limited in the utility model Among described scope of embodiments.
As shown in Figures 1 to 5, the utility model provides a kind of prefabricated pipe gallery and installs alignment system, and it includes track Basis 1, walking dolly 2, track foundation 1 is provided with walking track 11, and walking dolly 2 is slided on walking track 11, track base Plinth 1 is provided with the buttress placed side 12 that can place temporary rest pier 3, and the upper surface of walking dolly 2 is provided with the pipe for placing piping lane sections 4 Corridor placed side 21, walking dolly 2 is additionally provided with the jack 22 of the top for projecting to piping lane placed side 21.
The prefabricated walking track 11 on track foundation 1, during pipe gallery installation, first by walking dolly 2 are hung on walking track 11 by crane, then piping lane sections 4 is placed on walking dolly 2 by crane, and walking dolly 2 exists Moved on walking track 11 under the dragging of hoist engine, prefabricated piping lane sections 4 is transported to installation site, by jack 22 By the jack-up of piping lane sections 4, disengage piping lane sections 4 and piping lane placed side 21.On the buttress placed side 12 of track foundation 1 Temporary rest pier 3 is placed, temporary rest pier 3 is located at the lower section of piping lane sections 4, and jack 22 is retracted, piping lane sections 4 is fallen interim branch On pier 3, finally the filled and process light soil in the gap of piping lane sections 4 and track foundation 1, completes the installation of the piping lane sections 4, The installment work of next piping lane sections 4 can be entered.
The prefabricated pipe gallery installs alignment system, and strong adaptability goes for the accurate installation of prefabricated pipe gallery In construction, simple structure, easy processing, low cost, install convenient, safe and reliable risk is small, can greatly improve prefabricated piping lane Installation rate.
As shown in Figures 2 to 4, walking dolly 2 is provided with wheel 23, and wheel 23 is rolled on walking track 11.By wheel 23 rolling on walking track 11, enables walking dolly 2 to be walked along walking track 11.
As shown in Figures 2 to 5, walking dolly 2 is provided with jack adjusting apparatus 24, and jack adjusting apparatus 24 adjust very heavy 22 position in the horizontal direction of top.The jack-up of piping lane sections 4 departs from piping lane sections 4 and piping lane placed side 21 and connects by jack 22 After touch, using the coefficient of friction between jack 22 and piping lane sections 4 more than the friction system between jack 22 and walking dolly 2 Several characteristics, by jack adjusting apparatus 24 adjust jack 22 position, so as to realize piping lane sections 4 position it is accurate Adjustment, after the completion of piping lane sections 4 is positioned, then jack 22 is retracted, and piping lane sections 4 is fallen the temporary rest pier 3 of prior arrangement On.
The concrete structure of jack adjusting apparatus 24 is as shown in Fig. 4 to Fig. 5.Jack adjusting apparatus 24 include horizontal concrete chute 241 and two cylinders 242, jack 22 is located in horizontal concrete chute 241, and two piston rods of cylinder 242 243 can be from jack 22 Both sides withstand jack 22, the axis of the piston rod 243 of cylinder 242 is parallel with the axis of horizontal concrete chute 241.By two The stretching motion of the piston rod 243 of cylinder 242, makes the entirety of jack 22 be moved in horizontal concrete chute 241, so that being located at very heavy Piping lane sections 4 on top 22 is moved, and realizes the accurate adjustment of the position of piping lane sections 4.
The concrete structure of jack 22 is as shown in Fig. 4 to Fig. 5.Jack 22 includes jack base 221, jack cylinder body 222nd, jack piston rod 223 and jacking backing plate 224, jack cylinder body 222 are fixed on jack base 221, and jack is lived Stopper rod 223 is arranged on jack cylinder body 222, and jacking backing plate 224, jacking backing plate 224 are fixed in the end of jack piston rod 223 Can be by the jack-up of piping lane sections 4.By the stretching motion of jack piston rod 223, make to be located at the end of jack piston rod 223 Jacking backing plate 224 by the jack-up of piping lane sections 4 or can put down.
Jack base 221 is located in horizontal concrete chute 241, and the piston rod 243 of cylinder 242 withstands jack base 221.Two The piston rod 243 of individual cylinder 242 acts on jack base 221, the entirety of jack 22 is moved in horizontal concrete chute 241.
As shown in figure 3, walking dolly 2 is included with two longitudinal sides 25 being engaged of walking track 11 and by two longitudinal directions The lateral connection side 26 that side 25 is connected with each other, the upper surface of longitudinal side 25 is provided with piping lane placed side 21, and jack 22 is installed In longitudinal side 25.
Walking dolly 2 also includes two inclined support bars 27, and two of walking dolly 2 diagonally be connected by inclined support bar 27; The infall of two inclined support bars 27 is further fixed on reinforcing plate 28.Inclined support bar 27, reinforcing plate 28 can strengthen the whole of walking dolly 2 Body intensity, prevents walking dolly 2 from deforming and influenceing to use.
In sum, the prefabricated pipe gallery of the utility model installs alignment system, and pipe can be accurately adjusted according to construction requirement The position of corridor, ensure that the installation accuracy of prefabricated piping lane, and strong adaptability, and simple structure easy processing, low cost is installed just Prompt easy to control, safe and reliable risk is small, can greatly improve the installation rate of prefabricated piping lane.
The utility model is not limited to above-mentioned implementation method, no matter making any change in its shape or structure, all falls within Within protection domain of the present utility model.Protection domain of the present utility model is defined by the appended claims, this area Technical staff on the premise of without departing substantially from principle of the present utility model and essence, various changes can be made to these implementation methods More or modification, but these change and modification each fall within protection domain of the present utility model.

Claims (9)

1. a kind of prefabricated pipe gallery installs alignment system, it is characterised in that:It includes track foundation (1), walking dolly (2), The track foundation (1) is provided with walking track (11), and the walking dolly (2) is slided on walking track (11), institute State track foundation (1) and be provided with the buttress placed side (12) that can place temporary rest pier (3), the upper surface of the walking dolly (2) The piping lane placed side (21) for placing piping lane sections (4) is provided with, the walking dolly (2) is additionally provided with and projects to the piping lane placed side (21) jack (22) of top.
2. prefabricated pipe gallery according to claim 1 installs alignment system, it is characterised in that:The walking dolly (2) Wheel (23) is provided with, the wheel (23) rolls on walking track (11).
3. prefabricated pipe gallery according to claim 1 installs alignment system, it is characterised in that:The walking dolly (2) Jack adjusting apparatus (24) are provided with, the jack adjusting apparatus (24) adjust the jack (22) position in the horizontal direction Put.
4. prefabricated pipe gallery according to claim 3 installs alignment system, it is characterised in that:The jack adjustment dress Putting (24) includes horizontal concrete chute (241) and two cylinders (242), and the jack (22) is interior positioned at the horizontal concrete chute (241), Two piston rods (243) of the cylinder (242) can withstand the jack (22) from the both sides of the jack (22), described The axis of the piston rod (243) of cylinder (242) is parallel with the axis of the horizontal concrete chute (241).
5. prefabricated pipe gallery according to claim 4 installs alignment system, it is characterised in that:Jack (22) bag Jack base (221) is included, the jack base (221) is interior positioned at the horizontal concrete chute (241), the cylinder (242) Piston rod (243) withstands the jack base (221).
6. prefabricated pipe gallery according to claim 1 installs alignment system, it is characterised in that:Jack (22) bag Include jack base (221), jack cylinder body (222), jack piston rod (223) and jacking backing plate (224), the jack Cylinder body (222) is fixed on the jack base (221), and the jack piston rod (223) is installed in the jack cylinder On body (222), the jacking backing plate (224), the jacking backing plate (224) are fixed in the end of the jack piston rod (223) Can be by piping lane sections (4) jack-up.
7. prefabricated pipe gallery according to claim 1 installs alignment system, it is characterised in that:The walking dolly (2) Mutually interconnected including two longitudinal sides (25) being engaged with walking track (11) and by two longitudinal sides (25) The lateral connection side (26) for connecing, the upper surface of the longitudinal side (25) is provided with the piping lane placed side (21), the jack (22) in the longitudinal side (25).
8. prefabricated pipe gallery according to claim 7 installs alignment system, it is characterised in that:The walking dolly (2) Also include two inclined support bars (27), two of the walking dolly (2) diagonally be connected by the inclined support bar (27).
9. prefabricated pipe gallery according to claim 8 installs alignment system, it is characterised in that:Two inclined support bars (27) infall is further fixed on reinforcing plate (28).
CN201621323473.6U 2016-12-05 2016-12-05 Prefabricated pipe gallery installs alignment system Active CN206267152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621323473.6U CN206267152U (en) 2016-12-05 2016-12-05 Prefabricated pipe gallery installs alignment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621323473.6U CN206267152U (en) 2016-12-05 2016-12-05 Prefabricated pipe gallery installs alignment system

Publications (1)

Publication Number Publication Date
CN206267152U true CN206267152U (en) 2017-06-20

Family

ID=59041727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621323473.6U Active CN206267152U (en) 2016-12-05 2016-12-05 Prefabricated pipe gallery installs alignment system

Country Status (1)

Country Link
CN (1) CN206267152U (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343087A (en) * 2018-04-26 2018-07-31 北京建工土木工程有限公司 A kind of the transport assembly equipment system and its construction method of prefabricated components
CN109024677A (en) * 2018-08-10 2018-12-18 上海公路桥梁(集团)有限公司 Assembling method
CN109356193A (en) * 2018-11-16 2019-02-19 青岛理工大学 A kind of prefabricated piping lane push constructing device
CN109505309A (en) * 2019-01-07 2019-03-22 浙江大学城市学院 A kind of shift system of piping lane segment and the piping lane installation method of application shift system
CN109811795A (en) * 2019-03-25 2019-05-28 中铁隧道集团一处有限公司 Piping lane prefabricated subsection installs transverse fine-adjusting device and lateral method for trimming
CN109914479A (en) * 2019-04-09 2019-06-21 中建二局第三建筑工程有限公司 A kind of big tube coupling prefabricated pipe corridor sets accurate adjustment location equipment and its construction method
CN110359492A (en) * 2019-07-03 2019-10-22 鞍山三冶建筑工程有限公司 A kind of construction method of large scale prefabricated piping lane
CN110359490A (en) * 2019-07-03 2019-10-22 鞍山三冶建筑工程有限公司 A kind of translational installation method of large scale prefabricated piping lane
CN111424708A (en) * 2020-04-09 2020-07-17 中国十九冶集团有限公司 Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method
CN112196615A (en) * 2020-09-08 2021-01-08 中建钢构天津有限公司 Construction method of retaining wall system in narrow space in tunnel
CN113062355A (en) * 2021-03-26 2021-07-02 中交路桥建设有限公司 Simple and rapid prefabricated pipe gallery head segment installation positioning method
CN113152521A (en) * 2021-03-09 2021-07-23 山东鲁桥建设有限公司 Prefabricated comprehensive pipe gallery jacking construction method
CN113431086A (en) * 2021-06-25 2021-09-24 中交路桥建设有限公司 Method for improving installation elevation precision of prefabricated pipe gallery
CN113482045A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Traction type pipe gallery installation method
CN114808994A (en) * 2022-05-10 2022-07-29 中国二十二冶集团有限公司 Single-bin prefabricated pipe gallery assembling vehicle and pipe gallery installation method
CN109356193B (en) * 2018-11-16 2024-06-28 青岛理工大学 Prefabricated piping lane propelling movement construction equipment

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343087A (en) * 2018-04-26 2018-07-31 北京建工土木工程有限公司 A kind of the transport assembly equipment system and its construction method of prefabricated components
CN108343087B (en) * 2018-04-26 2024-04-12 北京建工土木工程有限公司 Prefabricated part transportation and assembly equipment system and construction method thereof
CN109024677A (en) * 2018-08-10 2018-12-18 上海公路桥梁(集团)有限公司 Assembling method
CN109356193A (en) * 2018-11-16 2019-02-19 青岛理工大学 A kind of prefabricated piping lane push constructing device
CN109356193B (en) * 2018-11-16 2024-06-28 青岛理工大学 Prefabricated piping lane propelling movement construction equipment
CN109505309A (en) * 2019-01-07 2019-03-22 浙江大学城市学院 A kind of shift system of piping lane segment and the piping lane installation method of application shift system
CN109505309B (en) * 2019-01-07 2023-09-26 浙江大学城市学院 Pipe gallery segment displacement system and pipe gallery installation method using same
CN109811795A (en) * 2019-03-25 2019-05-28 中铁隧道集团一处有限公司 Piping lane prefabricated subsection installs transverse fine-adjusting device and lateral method for trimming
CN109914479A (en) * 2019-04-09 2019-06-21 中建二局第三建筑工程有限公司 A kind of big tube coupling prefabricated pipe corridor sets accurate adjustment location equipment and its construction method
CN109914479B (en) * 2019-04-09 2024-01-05 中建二局第三建筑工程有限公司 Fine adjustment positioning device for erecting large pipe joint prefabricated pipe gallery and construction method thereof
CN110359492B (en) * 2019-07-03 2021-07-13 鞍山三冶建筑工程有限公司 Construction method of large prefabricated pipe gallery
CN110359490B (en) * 2019-07-03 2021-07-13 鞍山三冶建筑工程有限公司 Translation installation method of large prefabricated pipe gallery
CN110359492A (en) * 2019-07-03 2019-10-22 鞍山三冶建筑工程有限公司 A kind of construction method of large scale prefabricated piping lane
CN110359490A (en) * 2019-07-03 2019-10-22 鞍山三冶建筑工程有限公司 A kind of translational installation method of large scale prefabricated piping lane
CN111424708A (en) * 2020-04-09 2020-07-17 中国十九冶集团有限公司 Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method
CN111424708B (en) * 2020-04-09 2021-09-14 中国十九冶集团有限公司 Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method
CN112196615A (en) * 2020-09-08 2021-01-08 中建钢构天津有限公司 Construction method of retaining wall system in narrow space in tunnel
CN113152521A (en) * 2021-03-09 2021-07-23 山东鲁桥建设有限公司 Prefabricated comprehensive pipe gallery jacking construction method
CN113062355A (en) * 2021-03-26 2021-07-02 中交路桥建设有限公司 Simple and rapid prefabricated pipe gallery head segment installation positioning method
CN113431086A (en) * 2021-06-25 2021-09-24 中交路桥建设有限公司 Method for improving installation elevation precision of prefabricated pipe gallery
CN113431086B (en) * 2021-06-25 2022-08-19 中交路桥建设有限公司 Method for improving installation elevation precision of prefabricated pipe gallery
CN113482045A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Traction type pipe gallery installation method
CN114808994A (en) * 2022-05-10 2022-07-29 中国二十二冶集团有限公司 Single-bin prefabricated pipe gallery assembling vehicle and pipe gallery installation method
CN114808994B (en) * 2022-05-10 2024-03-26 中国二十二冶集团有限公司 Single-bin prefabricated pipe gallery assembling vehicle and pipe gallery installation method

Similar Documents

Publication Publication Date Title
CN206267152U (en) Prefabricated pipe gallery installs alignment system
CN107882064A (en) A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN106760619A (en) A kind of building translation apparatus and its construction method
CN106193117B (en) A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN108561156B (en) Separated tunnel arch-changing supporting structure and construction method thereof
CN102080548A (en) Construction method of tunnel to cross airport runway by shield method
CN107780663A (en) A kind of network camber line displacement accumulation slippage construction method
CN104533460A (en) Construction method for concrete pouring of support-changing type formwork trolley and underground channel
CN207567810U (en) A kind of formwork jumbo for pipe gallery cast-in-place concrete slding form operation
CN207091890U (en) A kind of steady elevation control device of new type water
CN102733307B (en) Method for constructing cast-in-place beam falsework
CN102146492A (en) Method for installing converter body equipment and tooling platform
CN106480826B (en) The cast-in-place traversing construction engineering method of single line box beam pier top
CN106241234B (en) A kind of self-propelled transport assembly car for prefabricated pipe gallery
CN108999427A (en) The support construction and its construction method of traveling load when a kind of building moving is in place
CN210886806U (en) Hidden bridge type airport runway
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN208578065U (en) A kind of transport assembly equipment system of prefabricated components
CN208684247U (en) A kind of prefabricated subsection hanging apparatus
CN108222035B (en) Stable highway subgrade ecological slope protection and construction method thereof
CN206888997U (en) Tunnel plain concrete lining construction auxiliary equipment
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN211397587U (en) Steel-concrete combined segment structure with counterweight function and used for rectangular shield jacking box culvert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant