CN207405560U - A kind of site operation tower crane spray equipment - Google Patents

A kind of site operation tower crane spray equipment Download PDF

Info

Publication number
CN207405560U
CN207405560U CN201721246594.XU CN201721246594U CN207405560U CN 207405560 U CN207405560 U CN 207405560U CN 201721246594 U CN201721246594 U CN 201721246594U CN 207405560 U CN207405560 U CN 207405560U
Authority
CN
China
Prior art keywords
water storage
feed pipe
storage box
tower crane
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721246594.XU
Other languages
Chinese (zh)
Inventor
陆晓静
金昱成
杜建峰
李凯
王勇
朱冬生
蓝伟军
张沛琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd
Original Assignee
HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd filed Critical HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd
Priority to CN201721246594.XU priority Critical patent/CN207405560U/en
Application granted granted Critical
Publication of CN207405560U publication Critical patent/CN207405560U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

The utility model discloses a kind of site operation tower crane spray equipments, including arm and tower body, tower body is equipped with the first feed pipe, first feed pipe is equipped with the first booster pump, first booster pump is equipped with the first water storage box, first water storage box is connected with ground, the top of first water storage box is equipped with the first water storage mouth, first feed pipe is equipped with the second feed pipe, second feed pipe is equipped with the second booster pump, second booster pump is equipped with the second water storage box, the top of second water storage box is equipped with the second water storage mouth, second water tank is equipped with first switch valve, first switch valve is connected with the second feed pipe, second feed pipe is equipped with the first connecting tube, first connecting tube is arranged at intervals, first connecting tube is equipped with injection spray pipe, the bottom of injection spray pipe is equipped with the first atomizer, the both sides of injection spray pipe are equipped with the second atomizer.It is big that the utility model solves tower crane spray system water consumption, consumes energy the problem of high.

Description

A kind of site operation tower crane spray equipment
Technical field
The utility model belongs to tower crane technical field, and in particular to a kind of site operation tower crane spray equipment.
Background technology
At present, there is the haze phenomenon of large area, serious threat to people in Chinese most cities and surrounding city Life and health.According to the data that State Ministry of Environmental Protection provides, the origin cause of formation of haze mainly has vehicle exhaust, industrial waste gas, fire coal And airborne dust etc..The pollution sources that thoroughly solve tail gas, exhaust gas and fire coal are an extremely complex and time-consuming very long systems Engineering, only administering airborne dust is relatively simple and can get instant result.In recent years some are directed to Construction Fugitive Dust Pollution feature Scientific achievement show to build up building site in the air PM10 mean concentration ratios for building building site it is high by 82%, it is higher by 78% than before site construction. Since urban road is distributed than comparatively dense, most of larger construction sites are all close in urban road periphery.
There is achievement in research to show that construction site can cause it to close on dust on the roads discharge capacity and significantly increase, therefore construct Scene becomes the main source of city raised dust.To reducing the appearance of haze weather and increasing substantially air quality, administer Construction site airborne dust becomes the objectives and tasks stood in the breach in Dust Improvement in city.Tower crane is the construction of each building site indispensability Instrument, tower crane spray system can effectively alleviate the problem of building-site haze is serious, and existing tower crane spray system exists The problem of water consumption big high energy consumption.
Utility model content
The utility model aim is to solve the above-mentioned technical problems in the prior art, provides a kind of site operation and use Tower crane spray equipment, it is big to solve tower crane spray system water consumption, consumes energy the problem of high.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
A kind of site operation tower crane spray equipment, including arm and tower body, it is characterised in that:Tower body is equipped with first and supplies water Pipe, the first feed pipe are equipped with the first booster pump, and the first booster pump is equipped with the first water storage box, and the first water storage box is connected with ground, the The top of one water storage box is equipped with the first water storage mouth, and the first feed pipe is equipped with the second feed pipe, and the second feed pipe is equipped with the second supercharging Pump, the second booster pump are equipped with the second water storage box, and the top of the second water storage box is equipped with the second water storage mouth, and the second water storage box is equipped with first Switch valve, first switch valve are connected with the second feed pipe, and the second feed pipe is equipped with the first connecting tube, and the first connecting tube interval is set It puts, the first connecting tube is equipped with injection spray pipe, and the bottom of injection spray pipe is equipped with the first atomizer, and the both sides of injection spray pipe are equipped with Two atomizers.Tower crane lower part sets the first water storage box for collecting rainwater, it is possible to reduce water consumption, the second water storage box are arranged on tower It hangs on, the weight of balance weight can be shared, while the power of the first booster pump can also be reduced, reduce potential energy drop, reduce spray The consumption of system power is spilt, it is big to solve tower crane spray system water consumption, consumes energy the problem of high.
Further, the second feed pipe is equipped with service ports, and service ports are arranged at intervals, and service ports are equipped with service cover, service cover It is threadedly coupled with service ports rotation, water supply line can have line clogging, therefore set service ports that can facilitate dredging Pipeline, it is spaced to be provided with beneficial to pipe-dredging conveniently, while facility service cover, it is connected by rotating screw thread, facilitates peace Dress and unlatching.
Further, the first feed pipe and the second feed pipe are equipped with filter device, and filter device was used for miscellaneous in drainage Object prevents the blocking of pipeline and atomizer, and the water quality of sprinkling is made more to clean, and prevents the secondary cleaning to scene.
Further, the second feed pipe includes the first tube body and the second tube body, and the first tube body and the second tube body are structure as a whole, First tube body bore is more than the second tube body, and that has saved pipeline uses material, and the water consumption of pipeline front end is larger, it is necessary to bigbore pipe Road, the end pipe water requirement to arm is less, reduces caliber and is conducive to material saving, reduces cost.
Further, the second water storage box bottom is equipped with second switch valve, and switch valve controls the water discharge of the second water storage box clean, Sunlight can be made to be irradiated water storage box bottom when fine, prevent the growth of bacterium and microorganism, be conducive to spray The operation of system.
Further, the first water storage mouth and the second water storage mouth are equipped with strainer, prevent leaf, and sundries is blown into water storage box, Cause line clogging.
Further, the first water storage box is equipped with cleaning door, and by the immersion of long-term rain, bottom is susceptible to pollutant and sinks Product, causes deteriorating water quality, and cleaning door can clear up water tank by cleaning door, increase water cleaning degree, prevent The only growth of microorganism.
The utility model is by adopting the above-described technical solution, have the advantages that:
Tower crane lower part sets the first water storage box for collecting rainwater in the utility model, it is possible to reduce water consumption, the second water storage Case is arranged on tower crane, can share the weight of balance weight, while can also reduce the power of the first booster pump, is reduced potential energy and is fallen Difference reduces the consumption of sprinkling system electric energy, and it is big to solve tower crane spray system water consumption, consumes energy the problem of high.
The second feed pipe is equipped with service ports in the utility model, and service ports are arranged at intervals, and service ports are equipped with service cover, are tieed up It builds and is threadedly coupled with service ports rotation, water supply line can have line clogging, therefore set service ports that can facilitate Dredging pipeline, it is spaced to be provided with beneficial to pipe-dredging conveniently, while facility service cover, it is connected by rotating screw thread, side Just install and open.First feed pipe and the second feed pipe are equipped with filter device, and filter device was used for the sundries in drainage, It prevents the blocking of pipeline and atomizer, the water quality of sprinkling is made more to clean, prevent from causing the pollution to building-site.Second supplies Water pipe includes the first tube body and the second tube body, and the first tube body and the second tube body are structure as a whole, and the first tube body bore is more than second Tube body has saved the material of using of pipeline, and the water consumption of pipeline front end is larger, it is necessary to bigbore pipeline, to the end pipe of arm Water requirement is less, reduces caliber and is conducive to material saving, reduces cost.Second water storage box bottom is equipped with second switch valve, switch Valve controls the water discharge of the second water storage box clean, sunlight can be made to be irradiated water storage box bottom when fine, prevented Bacterium and the growth of microorganism, are conducive to the operation of sprinkling system.First water storage mouth and the second water storage mouth are equipped with strainer, prevent Leaf, sundries are blown into water storage box, cause line clogging.First water storage box is equipped with cleaning door, by the immersion of long-term rain, Bottom is susceptible to accumulation of pollutants, causes deteriorating water quality, and cleaning door can carry out clearly water tank by cleaning door Reason increases water cleaning degree, prevents the growth of microorganism.
Description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is a kind of structure diagram of site operation tower crane spray equipment of the utility model;
Fig. 2 is the structure enlargement diagram at A in Fig. 1;
Fig. 3 is the structure enlargement diagram at B in Fig. 1;
Fig. 4 is the first atomizer and the structure diagram of the second atomizer connection in the utility model.
In figure, 1- arms;2- tower bodies;The first feed pipes of 3-;The first booster pumps of 4-;The first water storage boxes of 5-;The first water storages of 6- Mouthful;The second feed pipes of 7-;The second booster pumps of 8-;The second water storage boxes of 9-;10- first switch casees;The second tube bodies of 11-;12- first Connecting tube;13- injection spray pipes;The first atomizers of 14-;The second atomizers of 15-;16- service ports;17- service covers;18- first Tube body;19- filter devices;20- second switch valves;21- the second water storage mouths;22- strainers;23- cleans door.
Specific embodiment
As shown in Figures 1 to 4, it is a kind of site operation tower crane spray equipment of the utility model, including arm 1 and tower body 2, tower body 2 is equipped with the first feed pipe 3, and by the rainwater of collection toward conveying on tower crane, the first feed pipe 3 is equipped with the first booster pump 4, the One booster pump 4 hoists water conveying, and the first booster pump 4 is equipped with the first water storage box 5, and the first water storage box 5 is connected with ground, and first The top of water storage box 5 is equipped with the first water storage mouth 6, by rain collecting and is stored in the first water storage box 5 by water storage mouth, reaches saving With the effect of water, the first feed pipe 3 is equipped with the second feed pipe 7, and the second feed pipe 7 is equipped with the second booster pump 8, and tower crane top is equipped with Second feed pipe 7 is delivered water on arm 1, sprays 15 by the first atomizer 14 and the second atomization to reach spray Effect.Second booster pump 8 is equipped with the second water storage box 9, and the top of the second water storage box 9 is equipped with the second water storage mouth 21, the second water storage mouth 21 by rain collecting, and is stored in the second water storage box 9.Second water storage box 9 be equipped with first switch valve 10, first switch valve 10 with Second feed pipe 7 connects, and first switch valve 10 is to control the water of the second water storage box 9 into the second feed pipe 7, when spray system not First switch valve 10 is closed during work, the second feed pipe 7 is equipped with the first connecting tube 12, and the first connecting tube 12 is arranged at intervals, and first Connecting tube 12 is equipped with injection spray pipe 13, and the bottom of injection spray pipe 13 is equipped with the first atomizer 14, and the both sides of injection spray pipe 13 are all provided with There is the second atomizer 15, it is the area for increasing spray that both sides, which set the second atomizer 15, improves spray efficiency.
The second feed pipe 7 is equipped with service ports 16 in the utility model, and service ports 16 are arranged at intervals, and service ports 16 are equipped with Service cover 17, service cover 17 are threadedly coupled with the rotation of service ports 16, and water supply line can have line clogging, therefore set Service ports 16 can facilitate dredging pipeline, spaced to be provided with beneficial to pipe-dredging conveniently, while facility service cover 17, pass through Screw thread is rotated to connect, and facilitates installation and unlatching.First feed pipe 3 and the second feed pipe 7 are equipped with filter device 19, filtering dress 19 sundries being used in drainage are put, prevent the blocking of pipeline and atomizer, the water quality of sprinkling is made more to clean, prevent from causing Pollution to building-site.Second feed pipe 7 includes the first tube body 18 and the second tube body 11, the first tube body 18 and the second tube body 11 Be structure as a whole, 18 bore of the first tube body is more than the second tube body 11, has saved the material of using of pipeline, the water consumption of pipeline front end compared with Greatly, it is necessary to which bigbore pipeline, the end pipe water requirement to arm 1 is less, reduce caliber and be conducive to material saving, reduce into This.Second water storage box, 9 bottom is equipped with second switch valve 20, and second switch valve 20 controls the water discharge of the second water storage box 9 clean, when When fine sunlight can be made to be irradiated water storage box bottom, prevent the growth of bacterium and microorganism, be conducive to sprinkling system The operation of system.First water storage mouth 6 and the second water storage mouth 21 are equipped with strainer 22, prevent leaf, sundries is blown into water storage box, makes Into line clogging.First water storage box 5 is equipped with cleaning door 23, and by the immersion of long-term rain, bottom is susceptible to accumulation of pollutants, Deteriorating water quality is caused, cleaning door 23 can be cleared up water tank by cleaning door 23, increase water cleaning degree, prevent The only growth of microorganism.
Tower crane lower part sets the first water storage box 5 for collecting rainwater in the utility model, it is possible to reduce water consumption, the second water storage Case 9 is arranged on tower crane, can share the weight of balance weight, while can also reduce the power of the first booster pump 4, reduces potential energy Drop reduces the consumption of sprinkling system electric energy, and it is big to solve tower crane spray system water consumption, consumes energy the problem of high.
The above are only specific embodiments of the present invention, but the technical characteristics of the utility model is not limited thereto.Appoint How based on the utility model, to solve the technical issues of essentially identical, essentially identical technique effect is realized, it is made Simple change, equivalent substitution or modification etc., are all covered by among the scope of protection of the utility model.

Claims (7)

1. a kind of site operation tower crane spray equipment, including arm and tower body, it is characterised in that:The tower body is equipped with first and supplies Water pipe, first feed pipe are equipped with the first booster pump, and first booster pump is equipped with the first water storage box, first water storage box It is connected with ground, the top of first water storage box is equipped with the first water storage mouth, and first feed pipe is equipped with the second feed pipe, institute The second feed pipe is stated equipped with the second booster pump, second booster pump is equipped with the second water storage box, the top of second water storage box Equipped with the second water storage mouth, second water storage box is equipped with first switch valve, and the first switch valve connects with second feed pipe It connects, second feed pipe is equipped with the first connecting tube, and first connecting tube is arranged at intervals, and first connecting tube is equipped with spray Mist pipe, the bottom of the injection spray pipe are equipped with the first atomizer, and the both sides of the injection spray pipe are equipped with the second atomizer.
2. a kind of site operation tower crane spray equipment according to claim 1, it is characterised in that:Second feed pipe Equipped with service ports, the service ports are arranged at intervals, and the service ports are equipped with service cover, and the service cover is revolved with the service ports Turn to be threadedly coupled.
3. a kind of site operation tower crane spray equipment according to claim 1, it is characterised in that:First feed pipe Filter device is equipped with the second feed pipe.
4. a kind of site operation tower crane spray equipment according to claim 1, it is characterised in that:Second feed pipe Including the first tube body and the second tube body, first tube body and second tube body are structure as a whole, the first tube body bore More than second tube body.
5. a kind of site operation tower crane spray equipment according to claim 1, it is characterised in that:Second water storage box Bottom is equipped with second switch valve.
6. according to a kind of site operation tower crane spray equipment described in claim 1, it is characterised in that:The first water storage mouth and Second water storage mouth is equipped with strainer.
7. according to a kind of site operation tower crane spray equipment described in claim 1, it is characterised in that:First water storage box is set There is cleaning door.
CN201721246594.XU 2017-09-26 2017-09-26 A kind of site operation tower crane spray equipment Expired - Fee Related CN207405560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721246594.XU CN207405560U (en) 2017-09-26 2017-09-26 A kind of site operation tower crane spray equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721246594.XU CN207405560U (en) 2017-09-26 2017-09-26 A kind of site operation tower crane spray equipment

Publications (1)

Publication Number Publication Date
CN207405560U true CN207405560U (en) 2018-05-25

Family

ID=62406448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721246594.XU Expired - Fee Related CN207405560U (en) 2017-09-26 2017-09-26 A kind of site operation tower crane spray equipment

Country Status (1)

Country Link
CN (1) CN207405560U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111530201A (en) * 2020-05-18 2020-08-14 郭学兵 Water supply decontamination system for tower crane spraying machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111530201A (en) * 2020-05-18 2020-08-14 郭学兵 Water supply decontamination system for tower crane spraying machine

Similar Documents

Publication Publication Date Title
CN202561619U (en) Air purifying street lamp
CN206398605U (en) A kind of solar energy wisdom street lamp that there is watering to drop haze function
CN203852968U (en) Haze treatment device and system
CN105757562A (en) Urban intelligent high pole street lamp spraying system
CN207146243U (en) A kind of street lamp for mitigating tropical island effect
CN207405560U (en) A kind of site operation tower crane spray equipment
CN206008309U (en) A kind of device for being arranged on street lamp, administering haze
CN204023475U (en) For the building operations cleaning dust remover of Sloping field in mountain area
CN205746526U (en) A kind of novel street lamp that can eliminate airborne dust, haze
CN205591337U (en) Prevent hole pumping system of sediment
CN205948555U (en) Road air cleaning device
CN204356726U (en) A kind of urban road is from drenching dirt device
CN205213649U (en) Solar energy pressure boost intelligence tower crane spraying system
CN205379760U (en) Remove haze system
CN105239658A (en) Construction method for suppressing dust by sprinkling collected rainwater to construction site road
CN204457841U (en) A kind of mining wet precipitator
CN208526164U (en) A kind of hedgerow isolation strip air cleaning unit
CN204486031U (en) A kind of electrostatic precipitator
CN211098156U (en) City is restrained dirt and is fallen atomizing system of haze
CN211885971U (en) Waste gas discharging equipment in factory building
CN207520800U (en) A kind of Coal Transport spraying device
CN207960665U (en) A kind of surface mine dust suppression device by water spray
CN203285477U (en) Combined underground coal mine dust falling device
CN207591489U (en) A kind of assembled piping lane internal air stream leads to filter device
CN108543381A (en) A kind of hedgerow isolation strip air cleaning unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180525

CF01 Termination of patent right due to non-payment of annual fee