CN207398748U - Cable testing bridge - Google Patents

Cable testing bridge Download PDF

Info

Publication number
CN207398748U
CN207398748U CN201721339355.9U CN201721339355U CN207398748U CN 207398748 U CN207398748 U CN 207398748U CN 201721339355 U CN201721339355 U CN 201721339355U CN 207398748 U CN207398748 U CN 207398748U
Authority
CN
China
Prior art keywords
cable testing
testing bridge
side panel
crane span
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721339355.9U
Other languages
Chinese (zh)
Inventor
梅仁平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ruiren Auto Parts Co Ltd
Original Assignee
Jiangsu Ruiren Auto Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Ruiren Auto Parts Co Ltd filed Critical Jiangsu Ruiren Auto Parts Co Ltd
Priority to CN201721339355.9U priority Critical patent/CN207398748U/en
Application granted granted Critical
Publication of CN207398748U publication Critical patent/CN207398748U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of cable testing bridges, which is characterized in that it is formed by crane span structure holder combination, wherein, the crane span structure stent includes pedestal(2)The side panel being arranged in parallel with two groups(1)Composition, side panel described in every group(1)Include the side plate at multiple intervals(3), each adjacent side plate(3)Between spacing be equal to side panel described in two groups(1)The distance between;Side panel described in two groups(1)The side plate(3)It corresponds and sets respectively.The cable testing bridge of bending part is formed with by the assembling for the crane span structure stent for being provided with spacer, replace traditional way that bending is completed using connector, it is not only easy for installation, but also the installation that T-shaped, L-type, cross etc. have the cable testing bridge of bending section can be realized without special connecting piece.

Description

Cable testing bridge
Technical field
The utility model is related to cable mounting technique more particularly to a kind of cable testing bridges.
Background technology
Cable testing bridge is made of stent, trailing arm and installation attachment etc., and cable is independently supported or is fixed on building(Structure Build object)And its rigid structure general name on attachment.Cable testing bridge is a kind of new cable laying device, and cable testing bridge is real It is used with when being cabling at the beginning of new, it is all to be referred to as cable testing bridges, it is not only only used now in cabling, Optical cable and pipeline also use cable testing bridge when laying installations.
But present cable testing bridge be mostly fixed setting, need bending place using connector be attached so as to fulfill The turning of crane span structure, and the installation of connector is more complicated, and need to be attached the selection of part according to actual demand, it is time-consuming to take Power influences installation progress.
In view of above-mentioned existing cable testing bridge there are the defects of, the utility model people be based on be engaged in such product design system Abundant for many years practical experience and professional knowledge are made, and coordinates the utilization of scientific principle, is actively subject to research and innovation, to found one kind Assembled cable testing bridge makes it have more practicability.By constantly studying, designing, and after studying sample repeatedly and improving, Finally the utility model having practical value is created.
Utility model content
The main purpose of the utility model is that overcome existing cable testing bridge there are the defects of, and provide a kind of assembling The cable testing bridge of formula increases the versatility of crane span structure while easy for installation, thus more suitable for practicality, and with the profit in industry With value.
The purpose of this utility model and its technical problem is solved using following technical scheme to realize.
Cable testing bridge is formed by crane span structure holder combination, wherein, the crane span structure stent is arranged in parallel including pedestal and two groups Side panel forms,
Side panel includes the side plate at multiple intervals described in every group, and the spacing between each adjacent side plate is equal to two groups The distance between described side panel;
The side plate of side panel described in two groups corresponds setting respectively.
As a kind of perferred technical scheme, the cable testing bridge is any one of yi word pattern, cross, T-shaped, L-type Or a variety of combination.
As a kind of perferred technical scheme, it is to be detachably connected between the crane span structure stent.
As a kind of perferred technical scheme, multiple preformed holes, and the preformed hole are uniformly provided on the pedestal The interval being arranged between the adjacent side plate.
As a kind of perferred technical scheme, the preformed hole is the interior threaded hole for setting screw thread.
As a kind of perferred technical scheme, one end of side panel described in every group is the side plate, and the other end is interval.
As a kind of perferred technical scheme, the pedestal and the side panel are metal material, and the metal material Surface be coated with anti-corrosion material.
As a kind of perferred technical scheme, the anti-corrosion material is any one of paint, vaseline, machine oil.
The spacer of crane span structure stent described in one group is placed on crane span structure stent described in another group by the installation method of cable testing bridge Spacer at, be fixed by bolts two groups of crane span structure stents and form it into entirety.
Using above-mentioned technical proposal, following technique effect can be realized:
1), crane span structure stent by being provided with spacer assembling be formed with the cable testing bridge of bending part, replace traditional The way of bending is completed using connector, it is not only easy for installation, but also T-shaped, L-type, cross can be realized without special connecting piece Type etc. has the installation of the cable testing bridge of bending section;
2), using the metal material coated with anti-corrosion material, not only intensity is high, and long lifespan.
3), between every group of crane span structure stent to be detachably connected, it is easy for installation, and repair easy to disassemble.
Description of the drawings
Fig. 1 is the structure diagram of the utility model central bridge stent;
Wherein, 1- side panels, 2- pedestals, 3- side plates, 4- spacers, 5- preformed holes.
Specific embodiment
Further to illustrate that the utility model is to reach the technological means and effect that predetermined purpose of utility model taken, To according to the utility model proposes cable testing bridge its specific embodiment, feature and its effect, be described in detail as after.
As shown in Figure 1, the utility model discloses a kind of cable testing bridges, formed by crane span structure holder combination, wherein, crane span structure branch Frame includes pedestal 2 and two groups of side panels 1 being arranged in parallel form,
Every group of side panel 1 includes the side plate 3 at multiple intervals, and the spacing between each adjacent side plate 3 is equal to two groups of sides The distance between plate 1 so that two groups of crane span structure stents joint blocking without side panel 1 in combination;
The side plate 3 of two groups of side panels 1 corresponds setting respectively, i.e., side plate 3 and the spacer 4 of two groups side panels 1 are distinguished It corresponds.
As a kind of perferred technical scheme, cable testing bridge is any one of yi word pattern, cross, T-shaped, L-type or more Kind combination, specifically, two groups of crane span structure stents are attached from intermediate spacer 4, form cross cable testing bridge, any group The end of crane span structure spacer support frame section 4 is placed on the middle ware compartment 4 of another group of crane span structure stent, forms T-shaped cable testing bridge, two groups The end connection of cable testing bridge spacer 4, forms L-type.
As a kind of perferred technical scheme, it is to be detachably connected between crane span structure stent.
As a kind of perferred technical scheme, multiple preformed holes 5 are uniformly provided on pedestal 2, and preformed hole 5 is arranged on With the interval between adjacent side plate 3.
As a kind of perferred technical scheme, preformed hole 5 is the interior threaded hole for setting screw thread, by bolt by the pedestal of connection 2 fix.
As a kind of perferred technical scheme, one end of every group of side panel 1 is side plate 3, and the other end is interval.
As a kind of perferred technical scheme, pedestal 2 and side panel 1 are metal material, and the surface of metal material coats There is anti-corrosion material.
As a kind of perferred technical scheme, anti-corrosion material is any one of paint, vaseline, machine oil.
The spacer 4 of one group of crane span structure stent is placed on the interval of another group of crane span structure stent by the installation method of cable testing bridge At section 4, it is fixed by bolts two groups of crane span structure stents and forms it into entirety.
The above descriptions are merely preferred embodiments of the present invention, and not the utility model is made in any form Limitation, although the utility model has been disclosed with preferred embodiment as above, be not limited to the utility model, it is any ripe Professional and technical personnel is known, is not being departed from the range of technical solutions of the utility model, when in the technology using the disclosure above Hold the equivalent embodiment made a little change or be modified to equivalent variations, as long as being without departing from technical solutions of the utility model Hold, any simple modification, equivalent change and modification that foundation the technical essence of the utility model makees above example, still Belong in the range of technical solutions of the utility model.

Claims (8)

1. cable testing bridge, which is characterized in that it is formed by crane span structure holder combination, wherein, the crane span structure stent includes pedestal(2)With two The side panel that group is arranged in parallel(1)Composition,
Side panel described in every group(1)Include the side plate at multiple intervals(3), each adjacent side plate(3)Between spacing etc. In side panel described in two groups(1)The distance between;
Side panel described in two groups(1)The side plate(3)It corresponds and sets respectively.
2. cable testing bridge according to claim 1, which is characterized in that the cable testing bridge for yi word pattern, it is cross, T-shaped, Any one of L-type or a variety of combinations.
3. cable testing bridge according to claim 1, which is characterized in that be to be detachably connected between the crane span structure stent.
4. cable testing bridge according to claim 3, which is characterized in that the pedestal(2)On be uniformly provided with it is multiple pre- It boxes out(5), and the preformed hole(5)It is arranged on and the adjacent side plate(3)Between interval.
5. cable testing bridge according to claim 4, which is characterized in that the preformed hole(5)For the interior threaded hole for setting screw thread.
6. cable testing bridge according to claim 1, which is characterized in that side panel described in every group(1)One end be the side Plate(3), the other end is interval.
7. cable testing bridge according to claim 1, which is characterized in that the pedestal(2)With the side panel(1)For metal Material, and the surface of the metal material is coated with anti-corrosion material.
8. cable testing bridge according to claim 7, which is characterized in that the anti-corrosion material is paint, in vaseline, machine oil It is any.
CN201721339355.9U 2017-10-17 2017-10-17 Cable testing bridge Expired - Fee Related CN207398748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721339355.9U CN207398748U (en) 2017-10-17 2017-10-17 Cable testing bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721339355.9U CN207398748U (en) 2017-10-17 2017-10-17 Cable testing bridge

Publications (1)

Publication Number Publication Date
CN207398748U true CN207398748U (en) 2018-05-22

Family

ID=62328531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721339355.9U Expired - Fee Related CN207398748U (en) 2017-10-17 2017-10-17 Cable testing bridge

Country Status (1)

Country Link
CN (1) CN207398748U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107579488A (en) * 2017-10-17 2018-01-12 江苏瑞仁汽车部件有限公司 Cable testing bridge and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107579488A (en) * 2017-10-17 2018-01-12 江苏瑞仁汽车部件有限公司 Cable testing bridge and its installation method

Similar Documents

Publication Publication Date Title
CN104060746B (en) The anti-engineering method that supports of a kind of furred ceiling angle bar frame
CN110512790B (en) High and large space multi-curvature suspended ceiling structure and construction method thereof
CN207398748U (en) Cable testing bridge
CN211183238U (en) Cable bridge convenient to cable laying dismantles
CN203961091U (en) The anti-bracing or strutting arrangement of a kind of furred ceiling angle bar frame and ceiling structure thereof
CN204592560U (en) A kind of adjustable cable crane span structure support supported for curved wall
CN104153501A (en) Energy-saving metal curtain wall
CN103806924A (en) Steel form carrier variable camber gear for concrete lining for cave depot
CN205157327U (en) Furred ceiling clad can fossil fragments mechanical testing device
CN203871761U (en) Cable support
CN107579488A (en) Cable testing bridge and its installation method
CN105350716A (en) Cold-formed thin-walled type steel combined truss purline
CN206712382U (en) Using the portal structure for being exclusively used in power cable and crossing the river of composite
CN113193519B (en) Inner support type bridge frame for bridge, box girder and tunnel construction
CN209958614U (en) Reinforced house H-shaped steel beam
CN203716296U (en) All-purpose support for modularized building
CN204023863U (en) A kind of Novel cable suspension arrangement
CN210947634U (en) Fixing device convenient for installation of bailey frames
CN112443070A (en) Finished product ceiling stepped mounting structure and mounting method
CN110306768B (en) Auxiliary bracket for installing ceiling panel and construction method thereof
CN210263588U (en) Use assembled furred ceiling structure of steel construction as basic unit
CN105178496A (en) Mounting structure for curved-surface hanger plate on wall top surface
CN105350788A (en) Method for conducting suspension and equipment pipeline arrangement by means of auxiliary steel frame
CN203393960U (en) Welding-free steel frame assembly structure
CN202405642U (en) Electric cabinet frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522

Termination date: 20181017