CN207392164U - A kind of plugging structure of hanging vertical shaft - Google Patents

A kind of plugging structure of hanging vertical shaft Download PDF

Info

Publication number
CN207392164U
CN207392164U CN201721197477.9U CN201721197477U CN207392164U CN 207392164 U CN207392164 U CN 207392164U CN 201721197477 U CN201721197477 U CN 201721197477U CN 207392164 U CN207392164 U CN 207392164U
Authority
CN
China
Prior art keywords
vertical shaft
hanging vertical
hanging
tunnel
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721197477.9U
Other languages
Chinese (zh)
Inventor
王鹏
石安池
李孙权
宋刚
洪望兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Original Assignee
ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd filed Critical ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Priority to CN201721197477.9U priority Critical patent/CN207392164U/en
Application granted granted Critical
Publication of CN207392164U publication Critical patent/CN207392164U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model is related to a kind of plugging structures of hanging vertical shaft.The purpose of this utility model is to provide a kind of plugging structure simple in structure, easy for construction, safe and reliable, the smaller hanging vertical shaft of interference.The technical solution of the utility model is:A kind of plugging structure of hanging vertical shaft, for blocking the hanging vertical shaft excavated in advance at the top of tunnel, it is characterised in that:At the top of tunnel, around hanging Shaft bank anchor pole is penetrated equipped with several, this penetrates anchor pole and arranges and expose in hanging vertical shaft obliquely at the top of tunnel, the template being equipped in the hanging vertical shaft in silo bottom has poured blocking concrete, and exposing section of the anchor pole in hanging vertical shaft is penetrated described in blocking concrete package.The utility model is suitable for the underground engineering fields such as water power water conservancy.

Description

A kind of plugging structure of hanging vertical shaft
Technical field
The utility model is related to a kind of plugging structures of hanging vertical shaft.Suitable for underground engineering fields such as water power water conservancies.
Background technology
In modern water power hydraulic engineering, the subterranean tunnels such as generating system by piloting water are huge, many for ventilation requirement Engineering can excavate Temporary Ventilation vertical shaft in advance at the top of tunnel, and the high tens of rice of the short person of these vertical shafts are had up to a hundred or so rice, adopted more It is bored and constructed with anti-well, do not take supporting measure substantially.After the completion of tunnel, air shaft bottom terrain clearance up to more than 20 rice, How even more high becomes a no small problem to vertical shaft closure.
Such vertical shaft tradition closure scheme is that scaffold is set up in tunnel until at the top of tunnel, then sets concrete bottom Mould is blocked, and steel bar stress can not be set in concrete.There is the construction time is long, security risk is high, shadow for traditional scheme It rings in tunnel and passes through, influences the construction of other positions, tie up the unfavorable factors such as duration.
The content of the invention
The technical problems to be solved in the utility model is:In view of the above problems, a kind of simple in structure, construction is provided Convenient, safe and reliable, the smaller hanging vertical shaft of interference plugging structure.
Technical solution is used by the utility model:A kind of plugging structure of hanging vertical shaft, for blocking at the top of tunnel The hanging vertical shaft excavated in advance, it is characterised in that:Anchor pole is penetrated equipped with several at the top of tunnel, around hanging Shaft bank, it should It penetrates anchor pole to arrange and expose in hanging vertical shaft obliquely at the top of tunnel, be equipped in the hanging vertical shaft in vertical shaft bottom The template in portion has poured blocking concrete, and exposing section of the anchor pole in hanging vertical shaft is penetrated described in blocking concrete package.
The shuttering supporting is on formwork support structure, and formwork support structure is fixed on through fixing anchor bar at the top of tunnel, institute State that fixing anchor bar is fixed at the top of tunnel and its lower end is exposed, fixing anchor bar exposed junction is welded and fixed with formwork support structure.
The anchor pole that penetrates is evenly arranged at the top of tunnel using hanging Shaft bank center on several circles in the center of circle, to wear Vertical shaft axis is directed toward in oblique top to saturating anchor pole at an angle.
The anchor pole that penetrates is directed toward vertical shaft axis in the oblique top of 45° angle.
The anchor pole that penetrates is evenly arranged at the top of tunnel using hanging Shaft bank center as on two circles in the center of circle, two The distance of circle and hanging Shaft bank is respectively 1.5m and 2.5m.
The fixing anchor bar be arranged in around hanging Shaft bank, it is parallel with hanging vertical shaft axis.
The formwork support structure is made of several main support dowels being criss-cross arranged and auxiliary support dowel, Main and auxiliary support dowel both ends are weldingly connected with the corresponding fixing anchor bar.
The beneficial effects of the utility model are:Anchor pole is penetrated in the utility model reversely to apply to hanging vertical shaft out of tunnel Work can not dispose main reinforcement in the joint bar that solves the problems, such as can not to construct in hanging vertical shaft, concrete, make blocking concrete with enclosing Rock is combined together, and improves the safety coefficient of blocking concrete.
Fixing anchor bar lower part is exposed in the utility model, simple in structure, easy for construction as the fulcrum of fixed form, solution The fixation problem for silo bottom template of having determined.
The utility model arrangement and method for construction is simple and practicable, can be pre-buried in early period, also can in equipment constructions such as later-stage utilization cranes, And short construction period, other positions are disturbed small.
Description of the drawings
Fig. 1 is the diagrammatic cross-section of embodiment.
Fig. 2 is the arrangement schematic diagram that anchor pole is penetrated in embodiment.
Fig. 3 is the scheme of installation of formwork support structure in embodiment.
Specific embodiment
As shown in Figure 1, the present embodiment is a kind of plugging structure of hanging vertical shaft, excavated in advance for blocking 2 top of tunnel Hanging vertical shaft 1, hanging 1 diameter 3.5m of vertical shaft is advance by certain layout rules around the top of tunnel 2,1 well head of hanging vertical shaft Anchor pole 5 and fixing anchor bar 3 are penetrated equipped with several, you can it is pre-buried early period in 1 stage excavation of tunnel, it can also be stepped on using crane etc. in the later stage High equipment is implemented.
Anchor pole 5 is penetrated in the present embodiment in tunnel to implement, it is circumferentially disposed along hanging 1 periphery of vertical shaft, it is evenly arranged in tunnel 2 top of hole is enclosed using hanging 1 well head of vertical shaft as the two of the center of circle on circle.The distance of two circles and hanging 1 well head of vertical shaft is respectively 1.5m And 2.5m, the axis (see Fig. 2) that anchor pole 5 is directed toward hanging vertical shaft 1 in the oblique top of 45° angle is penetrated, anchor pole 5 is penetrated on same circle circle Spacing 1m or so, penetrates 5 length 4.5m of anchor pole, and its upper part penetrates hanging 1 borehole wall of vertical shaft and exposed.
This example sets to block the template 6 of hanging Shaft bank below hanging vertical shaft 1, and template 6 is supported in template branch On support structure 4, formwork support structure 4 is fixed on 2 top of tunnel through fixing anchor bar 3.As shown in figure 3, formwork support structure 4 is by indulging 3 of horizontal interlaced arrangement main support dowels 41 and 1 auxiliary support dowel 42 form, main and auxiliary support dowel both ends with Corresponding fixing anchor bar 3 is weldingly connected.Fixing anchor bar 3 is implemented in tunnel in this example, is arranged on hanging 1 periphery of vertical shaft, length 3m is constructed upwards by 2 crown of tunnel, and parallel with hanging 1 axis of vertical shaft, appear 20cm for lower part, and section is exposed in the lower part of fixing anchor bar 3 It is weldingly connected with formwork support structure 4.
Blocking concrete is poured using the template 6 below hanging vertical shaft 1 in hanging vertical shaft 1, blocking concrete package is worn Saturating exposing section of the anchor pole 5 in hanging vertical shaft.It penetrates anchor pole 5 and can be used as blocking concrete steel bar stress, but also as country rock Joint bar links together blocking concrete and hanging 1 country rock of vertical shaft.
The construction method of the present embodiment is as follows:
The first step in 2 stage excavation early period of tunnel, in the case of hanging 1 terrain clearance of vertical shaft is smaller, is pressed in tunnel 2 Certain rule penetrates anchor pole 5 and fixing anchor bar 3 to the construction of hanging 1 periphery of vertical shaft, also can according to circumstances be utilized after the completion of tunnel 1 Crane etc. ascend a height equipment implementation.
Second step, hanging vertical shaft 1 are appeared using the equipment of ascending a height such as loop wheel machine in 3 lower part of fixing anchor bar using after the completion of function The main and auxiliary support dowel 41,42 of section welding, the formwork support structure 4 of the corresponding hanging vertical shaft 1 of composition.
Template 6 is inserted between 2 crown of formwork support structure 4 and tunnel in interspacing in advance, and is securely connected by the 3rd step, seals Closed cycle side gap.
4th step pours downwards blocking concrete from hanging 1 top of vertical shaft.
5th step, form removal after blocking concrete solidification, completes closure.
Certainly, above description is not limitation of the utility model, and the utility model is also not limited to the example above, this skill The those of ordinary skill in art field, in the scope of the utility model, variation, addition or the replacement made should all belong to this reality With new protection domain.

Claims (7)

1. a kind of plugging structure of hanging vertical shaft, for blocking the hanging vertical shaft (1) excavated in advance at the top of tunnel (2), feature It is:Anchor pole (5) is penetrated equipped with several at the top of tunnel (2), around hanging vertical shaft (1) well head, this penetrates anchor pole from tunnel (2) Top is implemented and is exposed in hanging vertical shaft (1) obliquely, and the template in silo bottom is equipped in the hanging vertical shaft (1) (6) blocking concrete has been poured, exposing section of the anchor pole (5) in hanging vertical shaft (1) is penetrated described in blocking concrete package.
2. the plugging structure of hanging vertical shaft according to claim 1, it is characterised in that:The template (6) is supported in template In support construction (4), formwork support structure (4) is fixed on through fixing anchor bar (3) at the top of tunnel (2), and the fixing anchor bar (3) is solid At the top of tunnel (2) and its lower end is exposed, and fixing anchor bar (3) exposed junction is welded and fixed with formwork support structure (4).
3. the plugging structure of hanging vertical shaft according to claim 1 or 2, it is characterised in that:It is described to penetrate anchor pole (5) uniformly It is in certain angle to be arranged at the top of tunnel (2) using hanging vertical shaft (1) well head center as anchor pole (5) on several circles in the center of circle, is penetrated It spends oblique top and is directed toward vertical shaft axis.
4. the plugging structure of hanging vertical shaft according to claim 3, it is characterised in that:The anchor pole (5) that penetrates is in 45° angle It is directed toward vertical shaft axis in oblique top.
5. the plugging structure of hanging vertical shaft according to claim 4, it is characterised in that:It is described to penetrate anchor pole (5) uniform cloth It is two circles and hanging vertical shaft (1) well head on two circles in the center of circle to be placed at the top of tunnel (2) using hanging vertical shaft (1) well head center Distance be respectively 1.5m and 2.5m.
6. the plugging structure of hanging vertical shaft according to claim 2, it is characterised in that:The fixing anchor bar (3) is arranged in It is parallel with hanging vertical shaft (1) axis around hanging vertical shaft (1) well head.
7. the plugging structure of hanging vertical shaft according to claim 2, it is characterised in that:The formwork support structure (4) by Several main support dowels (41) being criss-cross arranged and auxiliary support dowel composition (42), main and auxiliary support dowel both ends It is weldingly connected with the corresponding fixing anchor bar (3).
CN201721197477.9U 2017-09-18 2017-09-18 A kind of plugging structure of hanging vertical shaft Active CN207392164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721197477.9U CN207392164U (en) 2017-09-18 2017-09-18 A kind of plugging structure of hanging vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721197477.9U CN207392164U (en) 2017-09-18 2017-09-18 A kind of plugging structure of hanging vertical shaft

Publications (1)

Publication Number Publication Date
CN207392164U true CN207392164U (en) 2018-05-22

Family

ID=62404405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721197477.9U Active CN207392164U (en) 2017-09-18 2017-09-18 A kind of plugging structure of hanging vertical shaft

Country Status (1)

Country Link
CN (1) CN207392164U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611138A (en) * 2019-01-17 2019-04-12 平顶山平煤设计院有限公司 A kind of distinguished and admirable partition method of mine shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611138A (en) * 2019-01-17 2019-04-12 平顶山平煤设计院有限公司 A kind of distinguished and admirable partition method of mine shaft

Similar Documents

Publication Publication Date Title
CN107060840B (en) A kind of construction method of large cross-section tunnel V grades of country rock excavation supportings
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN105201532B (en) The Ring Cutting construction method of underground Long span spherical crown shape dome under weak surrounding rock
CN104806252B (en) Underground dome excavation construction arrangement and excavation method
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN105350973A (en) Construction method for large-span section loess tunnel under-crossing highway
CN102606162A (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN104612713B (en) Buried section of method for tunnel construction of an ultra shallow
CN109707399B (en) Tunnel exit supporting structure and construction method thereof
CN102226398A (en) Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN108166989A (en) The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape
CN105114098A (en) Method for treating unfavorable geology segment of diversion tunnel and major-diameter diversion tunnel structure
CN109930609A (en) A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN106968139A (en) The construction method of railway bed supporting in undercrossing tunnel jacking framed bridge jack-in process
CN104405411A (en) Oversized variable cross section tunnel supporting structure
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN207392164U (en) A kind of plugging structure of hanging vertical shaft
CN204716253U (en) Circular major diameter diversion tunnel structure
CN109518722A (en) The short underpass structure and its construction method of newly-built basement and existing subway station
CN206530341U (en) A kind of underground cavern crown structure and its underground chamber

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant