CN207377561U - The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device - Google Patents

The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device Download PDF

Info

Publication number
CN207377561U
CN207377561U CN201720906265.7U CN201720906265U CN207377561U CN 207377561 U CN207377561 U CN 207377561U CN 201720906265 U CN201720906265 U CN 201720906265U CN 207377561 U CN207377561 U CN 207377561U
Authority
CN
China
Prior art keywords
slip casting
bearing layer
targeting
water
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720906265.7U
Other languages
Chinese (zh)
Inventor
董亚宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Maanshan Iron and Steel Mining Resources Group Co Ltd
Original Assignee
Magang Group Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Magang Group Holding Co Ltd filed Critical Magang Group Holding Co Ltd
Priority to CN201720906265.7U priority Critical patent/CN207377561U/en
Application granted granted Critical
Publication of CN207377561U publication Critical patent/CN207377561U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section is related to the Mine Shaft Lining and constructing device of poor strata.Feature is that position targeting inlet well, orifice tube, slip casting section, outer wall and inner wall are set around pit shaft;Positioning targeting inlet well using wellbore centre as the center of circle, along outside pit shaft famine radial line circumference 2m is evenly arranged and perpendicular to the ground, at least sets 8 positioning targeting inlet wells in pairs;Orifice tube is put in positioning targeting inlet well, and cement grout is injected by targeting inlet well, is extended in the bad water-bearing layer of drilling surrounding 5~10m rock sections, is frozen into slip casting section, and the layering of slip casting section is located in the bad water-bearing layer residing for rock section;The outer wall is the armored concrete not less than 300mm thickness, and inner wall is the armored concrete not less than 600mm thickness.Advantage is novel, and simple in structure, reliable and stable, high capacity, water plugging effect is good, and construction is quick, convenient, can realize pit shaft speed excavation and masonry, save money.

Description

The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device
Technical field:
The utility model belongs to the Mine Shaft Lining in mine vertical construction technique field more particularly to poor strata and applies Frock is put.
Background technology
Vertical is important promotion, ventilation, transport, draining and the personnel safety passage of underground mining contact underground and earth's surface, Pit shaft is connected directly with earth's surface, is directly born pit shaft and is promoted the whole load of facility, for that purpose it is necessary to ensure that shaft of vertical well structure has There are enough bearing capacities and non-deformability.
With the rapid development of mining industry, the ratio shared by underground mining is increasing, and vertical is increasingly deeper, the ground that passes through Layer becomes increasingly complex, and especially shaft of vertical well rock section is in bad water-bearing layer as severely-weathered layer, middle weathered layer and water-enriched layer, In, severely-weathered layer and middle weathered layer belong to aquitard, and cranny development degree has differences, and lower part is strong aquifer.It is bad to contain Water layer protolith ingredient based on tufaceous, by it is severely-weathered effect it is changeable turn to the clay minerals such as kaolin, in loose earthy or be in Relic shape is shown in air or meets water and then disintegrate in fluffy that crack is permeable, and water yield is big, and pit shaft can not descend pick, supporting.
Now, the conventional method that shaft of vertical well rock section is in bad water-bearing layer is freezing or shaft face slip casting Method.Freezing is to bore a circle or two circle freezing holes to rock stratum or wellbore bottom 10m~20m is stablized from earth's surface, in freezing hole entirely Hole, which is set, freezes steel pipe, refrigeration station is arranged in earth's surface, by freezing steel pipe by refrigerating fluid circulation conveying to freezing hole bottom, so as to reach To freezing shaft whole body country rock, achieve the purpose that water-impervious reinforces country rock.Existing defects are this method refrigeration system equipment durations Long, cost height, power consumption are big.Shaft face slip casting method, be shaft face soon close to bad water-bearing layer when, stop driving, 10m or so is stayed to stop, and magmatic rock emits or casting concrete grout cover, the arrangement drilling in shaft face carry out grouting.It deposits It is that the slip casting pump power that this method uses is small, and slip casting ability is low in defect, injecting paste material consumption is few, it is difficult to block crack passage In water, after Shaft Excavation, water yield is still very big, and crack water burst drives wall damage, causes disaster.Practice have shown that this two The kind equal existing defects of method, can not meet the requirement of self well digging and bearing capacity.Therefore, a kind of more rational rock section is sought Bad water-bearing layer positioning targeting slip casting Mine Shaft Lining and construction method are extremely urgent.
The content of the invention
The defects of to overcome the prior art, the purpose of this utility model are to provide a kind of bad water-bearing layer positioning target of rock section To slip casting Mine Shaft Lining and construction method, this is simple in structure, stable, reliable, construction is quick, can guarantee the steady of shaft of vertical well It is qualitative.
The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, is included in the well set in bad water-bearing layer Cylinder, its main feature is that, positioning targeting inlet well, orifice tube, slip casting section, outer wall and inner wall are set around the pit shaft;It is described Positioning targeting inlet well, be evenly arranged in pairs and vertically outside along pit shaft famine radial line circumference 2m by the center of circle of wellbore centre Face, full well at least set 8 positioning targeting inlet wells;The orifice tube is arranged in positioning targeting inlet well, cement Slurries are injected by targeting inlet well, are extended to around drilling in the bad water-bearing layer of 5~10m rock section cranny developments, solidification Into slip casting section, slip casting section is stratified and set in the bad water-bearing layer residing for rock section, blocks crack, reinforces country rock;Described is outer Wall is the armored concrete not less than 300mm thickness, and inner wall is the armored concrete not less than 600mm thickness.
It is further improved, positioning targeting inlet well, is vertically to be drilled to down from ground using drilling machine, depth should Through bad water-bearing layer lower end 10m thickness, aperture pipeline section bore diameter is not less than not less than 250mm, lower boreholes diameter 133mm。
It is further improved, the orifice tube uses reducing structure type, and wherein 0~10m of vertical depth sections, tubing specification is φ 219×6mm;10~30m sections of vertical depth, tubing specification are 159 × 5mm of φ.
It is further improved, the injecting paste material of the slip casting section is according to rock crusher degree, the fractured situation on stratum And water consumption selection clay cement grout/superfine cement slurry;Grouting pressure is 2.5~4 times of place height and position hydrostatic pressure; High 30m~the 50m of section, depending on strata condition is disclosed.
It is further improved, the weight ratio value range of the clay cement grout water ash is 1.2~1.5, superfine cement Pulp-water ash weight ratio value range is 0.8~1.0;Described superfine cement slurry prepared by cement plus water, salt, triethanolamine and Into triethanolamine addition is the 0.5 ‰ of cement weight, and salt addition is the 5 ‰ of cement weight;The cement is common Silicate PO42.5;Waterglass is 28~40Be;The sand content of clay is less than 5%.
Be further improved, the injecting paste material by 8 positioning target inlet wells the bad water-bearing layer of rock section to 5~10m of waste footpath external diffusion blocks crevice water, reinforces country rock.
It is further improved, the outer wall concrete is label not less than C30, the interior arrangement double steel bar of concrete, stress Muscle diameter is not less than 20mm, is arranged along pit shaft periphery, spacing 300mm;Branch's muscle diameter is not less than 20mm, along wellbore centre line side To arrangement, spacing 300mm.
It is further improved, the internal-wall concrete is label not less than C30, the interior arrangement individual layer reinforcing bar of concrete, stress Muscle diameter is not less than 20mm, is arranged along pit shaft periphery, spacing 300mm;Branch's muscle diameter is not less than 20mm, along wellbore centre line side To arrangement, spacing 300mm.
Rock section bad water-bearing layer positioning targeting slip casting Mine Shaft Lining constructing device, its main feature is that including magma pond, Reserve pit, clear water reserviors, waterglass pond and the cementing tank being arranged in pairs, slush pump, level-one agitator tank, two level agitator tank, high pressure injection Stock pump is located near wellbore nearby;Magma pond and reserve pit pipeline are direct;Level-one agitator tank feed inlet is connected by pipeline and cementing tank It connects, reserve pit is connected by pipeline, slush pump, is connected by pipeline with clear water reserviors, is incorporated suitable cement, mud and clear water;Two level Agitator tank feed inlet is connected with level-one agitator tank discharge opening pipeline, is connected by pipeline with waterglass pond, the cement of level-one agitator tank Slurry adds waterglass, continues to stir in two level agitator tank, two level agitator tank discharge port and high-pressure injection pump, positioning targeting note Drill pipe is connected, and high-pressure injection pump will be in cement mortar high pressure injection hole.
The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining construction method of rock section, carries out as follows:
1st, calibrating and positioning targeting slip casting Mine Shaft Lining construction line calibrates wellbore centre according to design coordinate in earth's surface Point calibrates the net radial line of pit shaft and waste radial line according to the pit shaft net diameter and lining thickness of wellbore centre point and design;Along pit shaft The outer 2m circumference of waste radial line at least symmetrically and evenly arranges 8 positioning targeting note drilling perpendicular to the ground, and bore diameter is not less than 250mm, depth should pass through bad aqueous layer thickness lower end 10m, serial number 1#, 2#, 3#, 4#, 5#, 6#, 7#, 8#, by 8 Hole is divided into two groups, and first group is 1#, 3#, 5#, 7#, and second group is 2#, 4#, 6#, 8#;It first constructs first group of drilling, according to place Size, while 2/4 drilling of constructing;
2nd, set slip casting station that slip casting station is set nearby in the appropriate nearby location in ground, two sets of filling systems are set altogether, including two A cementing tank, a magma pond, a reserve pit, a clear water reserviors, a waterglass pond, two slush pumps, two level-ones are stirred Mix tank, two two level grade agitator tanks, two grouting pumps;
3rd, rigging up is put down by design requirement progress field, I-shaped steel bottom plate is installed above the position of the hole of calibration, on chassis Rigging up and boring tower;
4th, drill and set orifice tube and 40.5m is drilled down into using φ 250mm drill bits, in drilling decentralization long 10m, straight is set The reducing structure orifice tube of footpath 219 × 6mm of φ and long 30m, 159 × 5mm of diameter phi, into orifice tube, injection water ash weight ratio is 0.6:1 cement mortar, until slurry is returned in aperture;Through 24 it is small when conserve, sweep mouth to original depth and carry out packer permeability test, check solid Quality is tied, drainage is such as found, grouting reinforcement should be carried out again;
5th, stop grouting plug is set to be drilled down into using φ 133mm compact bit centreless to the first slip casting section, in aperture pipeline section KWS type stop grouting plugs are set;
6th, packer permeability test water filling into drilling by drilling rod carries out packer permeability test, after meeting design standard, can carry out height Pressure grouting;
7th, high-pressure slip-casting prepares cement clay slurries by design proportion, by drilling rod into drilling high-pressure slip-casting, reach note Slurry setting pressure, stabilization time 20min, reaches or close to after design grouting amount, this section of slip casting terminates;
8th, mouth is swept, 4,5,6,7 steps is repeated and constructs into next slip casting section, KWS type stop grouting plugs are arranged on slip casting section top Stablize in rock stratum;
9th, gradually excavation section by section pit shaft, each excavation are deep from top to bottom in the range of the waste radial line that excavation pit shaft is designed in pit shaft Degree is no more than 4m;
10th, pour pit shaft outer wall armored concrete and pour pit shaft outer wall reinforcing bar outer wall from top to bottom, until slip casting section bottom; Concrete is not less than C30 for label, double steel bar is arranged in concrete, principal rod diameter is not less than 20mm, along pit shaft periphery cloth It puts, spacing 300mm;Branch's muscle diameter is not less than 20mm, is arranged along wellbore centre line direction, spacing 300mm.
11st, shaft in wall armored concrete is poured from slip casting section bottom continuous placing shaft in wall reinforced concrete from bottom to top Soil, until well head earth's surface;Concrete is not less than C30 for label, arranges double steel bar in concrete, principal rod diameter is not less than 20mm is arranged, spacing 300mm along pit shaft periphery;Branch's muscle diameter is not less than 20mm, is arranged along wellbore centre line direction, spacing 300mm;
12nd, Demolition Construction device, construction terminate.
Compared with prior art, advantage is novel that simple in structure, reliable and stable, slip casting section escorts rock section pit shaft, High capacity, water plugging effect is good, and construction is quick, convenient, can realize pit shaft speed excavation and masonry, save money.
Description of the drawings
Below against attached drawing, the utility model is described in further detail.
The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining floor map of Fig. 1 rock sections.
Fig. 2 is the B-B section shaft wall structure schematic diagrames of Fig. 1
Fig. 3 is orifice tube diagrammatic cross-section.
Fig. 4 is the constructing device structure diagram of Fig. 1.
In figure:1st, wellbore centre 2, net radial line 3, waste radial line 4,5 inner wall 6 of outer wall, orifice tube 7, cement mortar 8, note Starch 9 drilling machine 11 of section, stop grouting plug 12, drilling rod 13, magma pond 14, reserve pit 15, slush pump 16, clear water reserviors 17, cement Tank 18, level-one agitator tank 19, waterglass pond 20, two level agitator tank 21, high-pressure injection pump 22, aquifer water-bearing stratum drilling
Specific embodiment
The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, is included in it can be seen from Fig. 1, Fig. 2, Fig. 3 The pit shaft set in bad water-bearing layer, 1 surrounding of pit shaft set positioning targeting inlet well 4, orifice tube 7, slip casting section 9,6 and of outer wall Inner wall 5;Positioning targeting inlet well, with wellbore centre 1.1 (being not marked in figure) for the center of circle along outside 3 circumference 2m of pit shaft famine radial line into To being evenly arranged and perpendicular to the ground, full well at least sets 8 positioning targeting inlet wells;The orifice tube is arranged on positioning target Into inlet well, cement grout is injected by targeting inlet well, extends to the bad of drilling surrounding 8m rock section cranny developments In water-bearing layer, slip casting section is frozen into, slip casting section is stratified and set in the bad water-bearing layer 22 residing for rock section, blocks crack, add Gu country rock;The outer wall is the armored concrete of 350mm thickness, and inner wall is the armored concrete of 700mm thickness.
The described positioning targeting inlet well it can be seen from Fig. 1, Fig. 2, Fig. 3 is from ground toward sagging using drilling machine 10 It is directly drilled to, depth should pass through bad water-bearing layer lower end 10m thickness, aperture pipeline section bore diameter 350mm, lower boreholes diameter 145mm。
It can be seen from Fig. 1, Fig. 2, Fig. 3 the orifice tube use reducing structure type, wherein 0~10m of vertical depth sections, Tubing specification is 219 × 6mm of φ;10~30m sections of vertical depth, tubing specification are 159 × 5mm of φ.
It can be seen from Fig. 1, Fig. 2, Fig. 3 the injecting paste material of the slip casting section according to the rock crusher degree on stratum, split Gap developmental state and water consumption selection clay cement grout/superfine cement slurry;Grouting pressure is place height and position hydrostatic pressure 3 times;The high 45m of section, depending on strata condition is disclosed.
The clay cement grout water ash weight ratio value range is 1.3 it can be seen from Fig. 1, Fig. 2, Fig. 3, ultra-fine Cement pulp-water ash weight ratio value range is 0.9;Described superfine cement slurry prepared by cement plus water, salt, triethanolamine and Into triethanolamine addition is the 0.5 ‰ of cement weight, and salt addition is the 5 ‰ of cement weight;The cement is common Silicate PO42.5;Waterglass is 28~40Be;The sand content of clay is less than 5%.
It can be seen from Fig. 1, Fig. 2, Fig. 3 the injecting paste material by 8 positioning target inlet wells in rock section not Good water-bearing layer blocks crevice water, reinforces country rock to waste footpath external diffusion 8m.
The outer wall concrete is label C30 it can be seen from Fig. 1, Fig. 2, Fig. 3, and double steel bar is arranged in concrete, Principal rod diameter 25mm is arranged, spacing 300mm along pit shaft periphery;Branch muscle diameter 22mm, along wellbore centre line direction arrange, Spacing 300mm.
The internal-wall concrete is label C30 it can be seen from Fig. 1, Fig. 2, Fig. 3, and individual layer reinforcing bar is arranged in concrete, Principal rod diameter 25mm is arranged, spacing 300mm along pit shaft periphery;Branch muscle diameter 22mm, along wellbore centre line direction arrange, Spacing 300mm.
The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining construction dress of rock section it can be seen from Fig. 1, Fig. 2, Fig. 3 It puts, its main feature is that including magma pond 13, reserve pit 14, clear water reserviors 16, waterglass pond 19 and cementing tank 17, the mud being arranged in pairs Pump 15, level-one agitator tank 18, two level agitator tank 20, high-pressure injection pump 21, are located near wellbore nearby;Magma pond and reserve pit pipe Road is direct;Level-one agitator tank feed inlet is connected by pipeline with cementing tank, and reserve pit is connected by slush pump, is connected by pipeline and clear water reserviors It connects, is incorporated suitable cement, mud and clear water;Two level agitator tank feed inlet is connected with level-one agitator tank discharge opening pipeline, by pipe Road is connected with waterglass pond, and the cement mortar of level-one agitator tank adds waterglass, continues to stir in two level agitator tank, two level is stirred It mixes tank discharge port with high-pressure injection pump, positioning targeting note drill pipe to be connected, high-pressure injection pump, which injects cement mortar high pressure, to be bored In hole.
The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining construction method of rock section, carries out as follows:
1st, calibrating and positioning targeting slip casting Mine Shaft Lining construction line calibrates wellbore centre according to design coordinate in earth's surface Point calibrates the net radial line of pit shaft and waste radial line according to the pit shaft net diameter and lining thickness of wellbore centre line and design;Along pit shaft The outer 2m circumference of waste radial line at least symmetrically and evenly arranges 8 positioning targeting note drilling perpendicular to the ground, and bore diameter is not less than 250mm, depth should pass through bad aqueous layer thickness lower end 10m, serial number 1#, 2#, 3#, 4#, 5#, 6#, 7#, 8#, by 8 Hole is divided into two groups, and first group is 1#, 3#, 5#, 7#, and second group is 2#, 4#, 6#, 8#;It first constructs first group of drilling, according to place Size, while 2/4 drilling of constructing;
2nd, set slip casting station that slip casting station is set nearby in the appropriate nearby location in ground, two sets of filling systems are set altogether, including two A cementing tank, a magma pond, a reserve pit, a clear water reserviors, a waterglass pond, two slush pumps, two level-ones are stirred Mix tank, two two level grade agitator tanks, two grouting pumps;
3rd, rigging up is put down by design requirement progress field, I-shaped steel bottom plate is installed above the position of the hole of calibration, on chassis Rigging up and boring tower;
4th, drill and set orifice tube and 40.5m is drilled down into using φ 250mm drill bits, it is lower in drilling that long 10m, diameter are set The reducing structure orifice tube of 159 × 5mm of 219 × 6mm of φ and long 30m diameter phis, into orifice tube, injection water ash weight ratio is 0.6:1 cement mortar, until slurry is returned in aperture;Through 24 it is small when conserve, sweep mouth to original depth and carry out packer permeability test, check solid Quality is tied, drainage is such as found, grouting reinforcement should be carried out again;
5th, stop grouting plug is set to be drilled down into using φ 133mm compact bit centreless to the first slip casting section, in aperture pipeline section KWS type stop grouting plugs are set;
6th, packer permeability test water filling into drilling by drilling rod carries out packer permeability test, after meeting design standard, can carry out height Pressure grouting;
7th, high-pressure slip-casting prepares cement clay slurries by design proportion, by drilling rod into drilling high-pressure slip-casting, reach note Slurry setting pressure, stabilization time 20min, reaches or close to after design grouting amount, this section of slip casting terminates;
8th, mouth is swept, 4,5,6,7 steps is repeated and constructs into next slip casting section, KWS type stop grouting plugs are arranged on slip casting section top Stablize in rock stratum;
9th, gradually excavation section by section pit shaft, each excavation are deep from top to bottom in the range of the waste radial line that excavation pit shaft is designed in pit shaft Spend 3.5m;
10th, pour pit shaft outer wall armored concrete and pour pit shaft outer wall reinforcing bar outer wall from top to bottom, until slip casting section bottom; Concrete is label C30, and double steel bar is arranged in concrete, and principal rod diameter 25mm is arranged, spacing 300mm along pit shaft periphery; Branch muscle diameter 22mm is arranged, spacing 300mm along wellbore centre line direction.
11st, shaft in wall armored concrete is poured from slip casting section bottom continuous placing shaft in wall reinforced concrete from bottom to top Soil, until well head earth's surface;Concrete is label C30, and double steel bar, principal rod diameter 25mm, along pit shaft week are arranged in concrete Side arrangement, spacing 300mm;Branch muscle diameter 22mm is arranged, spacing 300mm along wellbore centre line direction.
12nd, Demolition Construction device, construction terminate.

Claims (8)

1. the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, is included in the pit shaft set in bad water-bearing layer, Its main feature is that positioning targeting inlet well (4), orifice tube (7), slip casting section (9), outer wall (6) are set around the pit shaft (1) With inner wall (5);Described positioning targeting inlet well is the center of circle along outside pit shaft famine radial line (3) circumference 2m with wellbore centre (1.1) It is evenly arranged in pairs and perpendicular to the ground, full well at least sets 8 positioning targeting inlet wells;The orifice tube is arranged on positioning It targets in inlet well, cement mortar hydraulic pressure is injected by targeting inlet well, extends to 5~10 rock section cranny developments around drilling Bad water-bearing layer in, be frozen into slip casting section, slip casting section is stratified and set in the bad water-bearing layer (22) residing for rock section Nei, blocks Crack reinforces country rock;The outer wall is the armored concrete not less than 300mm thickness, and inner wall is the reinforcing bar not less than 600mm thickness Concrete.
2. the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section according to claim 1, it is characterised in that The positioning targeting inlet well, is vertically to be drilled to down from ground using drilling machine (10), depth should pass through bad water-bearing layer Lower end 10m thickness, aperture pipeline section bore diameter are not less than 133mm not less than 250mm, lower boreholes diameter.
3. the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section according to claim 1, it is characterised in that The orifice tube (7) uses reducing structure type, and wherein 0~10m of vertical depth sections, tubing specification is 219 × 6mm of φ;Vertical depth 10 ~30m sections, tubing specification is 159 × 5mm of φ.
4. the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section according to claim 1, it is characterised in that The injecting paste material of the slip casting section selects clay cement according to the rock crusher degree, fractured situation and water consumption on stratum Slurries/superfine cement slurry;Grouting pressure is 2.5~4 times of place height and position hydrostatic pressure;High 30m~the 50m of section, according to taking off Depending on dew strata condition.
5. the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section according to claim 1, it is characterised in that The injecting paste material targets inlet well in the bad water-bearing layer of rock section to 5~10m of waste footpath external diffusion by 8 positioning, blocks up Firmly crevice water reinforces country rock.
6. the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section according to claim 1, it is characterised in that The outer wall concrete is not less than C30 for label, and double steel bar is arranged in concrete, and principal rod diameter is not less than 20mm, edge Pit shaft periphery arrangement, spacing 300mm;Branch's muscle diameter is not less than 20mm, is arranged along wellbore centre line direction, spacing 300mm.
7. the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section according to claim 1, it is characterised in that The internal-wall concrete is not less than C30 for label, and individual layer reinforcing bar is arranged in concrete, and principal rod diameter is not less than 20mm, edge Pit shaft periphery arrangement, spacing 300mm;Branch's muscle diameter is not less than 20mm, is arranged along wellbore centre line direction, spacing 300mm.
8. the constructing device of the bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section according to claim 1, It is characterized in that the constructing device includes magma pond (13), reserve pit (14), clear water reserviors (16), waterglass pond (19) and sets in pairs Cementing tank (17), slush pump (15), level-one agitator tank (18), two level agitator tank (20), the high-pressure injection pump (21) put, set nearby In near wellbore;Magma pond and reserve pit pipeline are direct;Level-one agitator tank feed inlet is connected by pipeline with cementing tank, by slush pump Reserve pit is connected, is connected by pipeline with clear water reserviors, is incorporated suitable cement, mud and clear water;Two level agitator tank feed inlet and one The discharge opening pipeline connection of grade agitator tank, is connected by pipeline with waterglass pond, and the cement mortar of level-one agitator tank adds waterglass, Continue to stir in two level agitator tank, two level agitator tank discharge port is connected with high-pressure injection pump, positioning targeting note drill pipe, high Pressure injection stock pump will be in cement mortar high pressure injection hole.
CN201720906265.7U 2017-07-25 2017-07-25 The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device Active CN207377561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720906265.7U CN207377561U (en) 2017-07-25 2017-07-25 The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720906265.7U CN207377561U (en) 2017-07-25 2017-07-25 The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device

Publications (1)

Publication Number Publication Date
CN207377561U true CN207377561U (en) 2018-05-18

Family

ID=62298070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720906265.7U Active CN207377561U (en) 2017-07-25 2017-07-25 The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device

Country Status (1)

Country Link
CN (1) CN207377561U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107191188A (en) * 2017-07-25 2017-09-22 马钢(集团)控股有限公司 The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, constructing device and method
CN109403982A (en) * 2018-11-05 2019-03-01 淮南矿业(集团)有限责任公司 A kind of shaft of vertical well grouting process
CN109577989A (en) * 2018-12-13 2019-04-05 山东大学 A kind of novel deeps mines shaft wall structure and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107191188A (en) * 2017-07-25 2017-09-22 马钢(集团)控股有限公司 The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, constructing device and method
CN107191188B (en) * 2017-07-25 2023-06-06 马钢(集团)控股有限公司 Bedrock section bad aquifer positioning and targeting grouting vertical shaft wall structure, construction device and construction method
CN109403982A (en) * 2018-11-05 2019-03-01 淮南矿业(集团)有限责任公司 A kind of shaft of vertical well grouting process
CN109577989A (en) * 2018-12-13 2019-04-05 山东大学 A kind of novel deeps mines shaft wall structure and construction method
CN109577989B (en) * 2018-12-13 2020-08-25 山东大学 Novel deep mine shaft wall structure and construction method

Similar Documents

Publication Publication Date Title
CN107246267A (en) Mine Shaft Lining, constructing device and method in a kind of poor strata
CN102418344B (en) Injector, drill bit combination structure and combination drilling tool
CN107191188A (en) The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, constructing device and method
CN104963334B (en) Reinforced with slip casting freezing pipe and freeze the construction method that service channel suppresses frozen swell and melt settlement
CN103277120B (en) A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls
CN103015402B (en) Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN108119143B (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain
CN109594564A (en) A kind of anti-collapse construction method of Metro Deep Excavation open cut
CN104453913A (en) Vertical shaft working face ahead pre-grouting method
CN102561950B (en) Process for realizing grouting consolidation for aggregates filled in cavities of strata and jetting drill bit
CN207377562U (en) Mine Shaft Lining and constructing device in a kind of poor strata
CN207377561U (en) The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section and constructing device
CN206625831U (en) A kind of Karst grouting automatic monitored control system
CN101906991A (en) Construction method for managing underground mined-out area or cavity
CN109881696A (en) A kind of HPPG back cover construction method
CN110939404A (en) Hydraulic joint cutting pressure relief device and method for coal mine tunnel broken surrounding rock roof
CN102011591A (en) Grouting process for working surface of deep well
CN109519150A (en) One kind being directed to the biggish plugging dewatering well device and method of water yield
CN113323584A (en) Drilling method of large vibrating long spiral drilling machine
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN112593943A (en) Vertical shaft neck section well wall structure in thick water-containing backfill soil layer and construction method
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN101832137A (en) Pre-embedding method for coal seam roof strut
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN107313788B (en) The method and device of grouting for water blocking under strong hydraulic connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180809

Address after: 243071 No. 1899 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui

Patentee after: Magang Group mining industry Co., Ltd

Address before: 243000 8 Jiuhua Road, Yushan, Ma'anshan, Anhui

Patentee before: Magang (Group) Holding Company Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 243071 No. 1899 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui

Patentee after: Anhui Maanshan Iron and Steel Mining Resources Group Co., Ltd.