CN207376645U - Prefabricated sandwich wall and intermediate overlapping board connecting structure - Google Patents

Prefabricated sandwich wall and intermediate overlapping board connecting structure Download PDF

Info

Publication number
CN207376645U
CN207376645U CN201721207954.5U CN201721207954U CN207376645U CN 207376645 U CN207376645 U CN 207376645U CN 201721207954 U CN201721207954 U CN 201721207954U CN 207376645 U CN207376645 U CN 207376645U
Authority
CN
China
Prior art keywords
prefabricated sandwich
sandwich wall
layer
lower floor
principal rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721207954.5U
Other languages
Chinese (zh)
Inventor
张剑
何磊
熊伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Yuanda Engineering Design Co Ltd
Original Assignee
Hunan Yuanda Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Yuanda Engineering Design Co Ltd filed Critical Hunan Yuanda Engineering Design Co Ltd
Priority to CN201721207954.5U priority Critical patent/CN207376645U/en
Application granted granted Critical
Publication of CN207376645U publication Critical patent/CN207376645U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of prefabricated sandwich walls and intermediate overlapping board connecting structure, it includes the prefabricated sandwich wall of the prefabricated sandwich wall in upper strata and lower floor connected by first node, and the prefabricated sandwich wall of the lower floor connects intermediate superimposed sheet by section point, the principal rod of the prefabricated sandwich wall in upper strata is extended down into inside first node;The principal rod of the prefabricated sandwich wall of lower floor is extended upwardly into inside first node, and extends to the first preformed layer bottom of the prefabricated sandwich wall in upper strata;Principal rod in the second in-situ layer and the second preformed layer of intermediate superimposed sheet is respectively protruding into section point;First in-situ layer of first node and the prefabricated sandwich wall in upper strata is cast-in-place into the first Cast-in-Situ Segment, and the first in-situ layer of the prefabricated sandwich wall of section point and lower floor, the second in-situ layer of intermediate superimposed sheet are cast-in-place into the second Cast-in-Situ Segment.

Description

Prefabricated sandwich wall and intermediate overlapping board connecting structure
Technical field
The utility model is related to complete prefabricated overlapping assembled underground pipe gallery, particularly a kind of complete prefabricated overlapping assembled The prefabricated sandwich wall of underground pipe gallery and intermediate overlapping board connecting structure.
Background technology
Chinese patent application CN205742265U discloses a kind of complete prefabricated overlapping assembled underground pipe gallery, bottom plate For prefabricated overlapping bottom plate, side wall or side wall and middle wall body are prefabricated sandwich wall, and top plate is prefabricated overlapping top plate, bottom plate, Side wall or side wall connect into whole underground pipe gallery with middle wall body, top plate three by cast-in-place.Prefabricated sandwich wall therein Preformed layer including both sides and intermediate sandwich in-situ layer are embedded with reinforced mesh in the preformed layer of prefabricated sandwich wall, both sides Reinforced mesh is fixed by binding to connect on intermediate truss in preformed layer.It can by Chinese patent application CN205742265U Know, it, can be by burying rectangle steel reinforcement cage in junction, and by junction and two prefabricated sandwich walls during two prefabricated sandwich walls connections Cast-in-place sandwich in-situ layer is overall structure.But this connection mode is only suitable for the situation that two prefabricated sandwich walls are directly connected to, If pipe gallery is multilayered structure, which can not just ensure it with enough bonding strengths and good stress Energy.
Utility model content
Technical problem to be solved in the utility model is, in view of the shortcomings of the prior art, providing a kind of energy realizes upper and lower layer Prefabricated sandwich wall is attached with intermediate superimposed sheet, and the prefabricated sandwich wall with enough stress performances is connected with intermediate superimposed sheet Structure.
In order to solve the above technical problems, the utility model provides a kind of prefabricated sandwich wall and intermediate overlapping board connecting structure, The prefabricated sandwich wall of the prefabricated sandwich wall in upper strata and lower floor including interconnection, the prefabricated intermediate superimposed sheet of sandwich wall connection of the lower floor, The prefabricated sandwich wall of upper and lower layer is included respectively positioned at the first preformed layer of both sides and positioned at the first intermediate in-situ layer, centre overlapping Plate includes the second preformed layer positioned at bottom and the second in-situ layer on the second preformed layer, the prefabricated sandwich wall of upper and lower layer and Distributing reinforcement is buried in intermediate superimposed sheet respectively and principal rod, the upper and lower prefabricated sandwich wall of layer are connected by first node, and upper strata is prefabricated The principal rod of sandwich wall is extended down into inside first node, and is extended to the prefabricated sandwich coping of lower floor and bent relatively The principal rod of the prefabricated sandwich wall of lower floor is extended upwardly into inside first node, and extends to the first preformed layer of the prefabricated sandwich wall in upper strata Bottom;The prefabricated sandwich wall of lower floor connects intermediate superimposed sheet by section point, and the second in-situ layer of intermediate superimposed sheet and second is in advance Principal rod in preparative layer is respectively protruding into;First in-situ layer concrete cast-in-situ of first node and the prefabricated sandwich wall in upper strata is into first Cast-in-Situ Segment, the first in-situ layer of the prefabricated sandwich wall of section point and lower floor, the second in-situ layer of intermediate superimposed sheet are cast-in-place into second Cast-in-Situ Segment.
Preferably, first and second node is adjacent, and adjacent place sets steel plate for sealing water, to improve water resistance.
Preferably, the principal rod in the second in-situ layer of the intermediate superimposed sheet is bent downward simultaneously after stretching into section point It is extended into along the first preformed layer of outside of the prefabricated sandwich wall of lower floor in the second in-situ layer of the prefabricated sandwich wall of lower floor.
Preferably, it is adjacent it is described it is prefabricated it is sandwich overlapping wall vertical piece and expansion joint at principal rod use open-type Reinforcing bar.The end of the opening steel bar is linear pattern, alternatively, the end of the opening steel bar is opposite bending.
Preferably, multigroup principal rod at the prefabricated sandwich wall both ends of the lower floor is symmetrical arranged as U-shaped structure, and U-shaped knot The principal rod of structure extends to the bottom of the prefabricated sandwich wall in upper strata.
Preferably, the prefabricated sandwich coping of the lower floor is higher than the second in-situ layer of the intermediate superimposed sheet, makes the First, the adjacent place of two nodes is higher by the second in-situ layer of the intermediate superimposed sheet.
Preferably, the first connection is set in the reinforcing steel bar frame that the principal rod of the prefabricated sandwich wall of upper and lower layer extends to form Reinforcing bar;The principal rod of principal rod and the prefabricated sandwich wall of lower floor in the second preformed layer and the second in-situ layer of the intermediate superimposed sheet Second connection reinforcing bar is set in the reinforcing steel bar frame of formation.
Compared with prior art, the utility model has the following advantages:
The utility model each extends over the principal rod of the prefabricated sandwich wall of upper and lower layer into first node, and intermediate overlapping Principal rod in the second in-situ layer of plate is bent downward after extending into section point into inside the prefabricated sandwich wall of lower floor, and centre is folded Principal rod in the second preformed layer of plywood is folded upward at extending with the principal rod in the second in-situ layer after extending into section point Part is superimposed, and by the first in-situ layer concrete cast-in-situ of first node and the prefabricated sandwich wall in upper strata into the first Cast-in-Situ Segment, First in-situ layer of the prefabricated sandwich wall of section point and lower floor, the second in-situ layer of intermediate superimposed sheet are cast-in-place into the second Cast-in-Situ Segment, In this way, the present invention not only realizes the connection of the prefabricated sandwich wall of upper and lower layer and intermediate superimposed sheet, and effectively improve first and second Holistic resistant behavior at node.
Description of the drawings
Fig. 1 is the structure diagram of one embodiment of the utility model.
Fig. 2 is the reality that the vertical piece of prefabricated sandwich overlapping wall and expansion joint both sides principal rod end use opening steel bar Apply example one
Fig. 3 is the reality that the vertical piece of prefabricated sandwich overlapping wall and expansion joint both sides principal rod end use opening steel bar Apply example two.
In figure:The prefabricated sandwich wall in 1 upper strata;The prefabricated sandwich wall of 2 lower floors;3 intermediate superimposed sheets;31 second preformed layers;32 second In-situ layer;4 distributing reinforcements;5 principal rods;6 first nodes;7 section points;8 steel plate for sealing water;9 girder ribs;10 first connection reinforcing bars; 11 first preformed layers;12 first in-situ layers;13 second connection reinforcing bars.
Specific embodiment
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
It refer to Fig. 1, the prefabricated sandwich wall of the utility model and one embodiment of intermediate overlapping board connecting structure are included by the The prefabricated sandwich wall 2 of the prefabricated sandwich wall 1 in upper strata and lower floor of one node 6 connection, the prefabricated sandwich wall 2 of the lower floor pass through section point 7 Superimposed sheet 3 among connection.The prefabricated sandwich wall 1,2 of upper and lower layer is included respectively positioned at the first preformed layer 11 of both sides and positioned at centre The first in-situ layer 12, equidistant pre-buried principal rod 5 in the first preformed layer of both sides 11, the principal rod 5 in the first preformed layer of both sides 11 Between be uniformly arranged the distributing reinforcement 4 vertical with principal rod 5 and be used to support the girder rib 9 of principal rod 5.Intermediate superimposed sheet 3 includes The second in-situ layer 32 positioned at the second preformed layer 31 of bottom and on the second preformed layer, the second preformed layer 31 and second are cast-in-place The distributing reinforcement 4 vertical with principal rod 5 is uniformly arranged between principal rod 5 in layer 32 and is used to support the girder rib 9 of principal rod 5. The principal rod 5 of the prefabricated sandwich wall 1 in upper strata extends down into 6 inside of first node and reaches the top of the prefabricated sandwich wall 2 of lower floor Opposite bending afterwards, the principal rod 5 of the prefabricated sandwich wall 2 of lower floor is extended upwardly into inside first node 6, and it is prefabricated sandwich to extend to upper strata 11 bottom of the first preformed layer of wall 1.Principal rod in second in-situ layer 32 of intermediate superimposed sheet 3 is stretched into after section point 7 under It bends and stretches into the prefabricated sandwich wall 2 of lower floor, the principal rod 5 in the second preformed layer 31 of intermediate superimposed sheet 3 stretches into section point 7 It is folded upward at and is overlapped with the principal rod in the second in-situ layer 32 afterwards.The first of the sandwich wall 1 prefabricated with upper strata of first node 6 is cast-in-place Layer 12 with concrete cast-in-situ into the first Cast-in-Situ Segment, it is the first in-situ layer 12 of section point 7 and the prefabricated sandwich wall 2 of lower floor, intermediate folded Second in-situ layer 32 of plywood 3 is cast-in-place into the second Cast-in-Situ Segment, to improve holistic resistant behavior.
To improve the water resistance of first and second node 6,7, first and second node 6,7 is disposed adjacent, and adjacent place Steel plate for sealing water 8 is set.To improve integrally-built shear resistance, first and second node 6,7 adjacent places are higher by intermediate superimposed sheet 3 The second in-situ layer 32.To further enhance the bonding strength and stress performance at connecting node, the second of intermediate superimposed sheet 3 is existing It pours and is bent downward after the principal rod 5 in layer 32 stretches into section point 7 and along the first preformed layer of outside of the prefabricated sandwich wall 2 of lower floor 11 extend into the prefabricated sandwich wall 2 of lower floor.Principal rod in the first preformed layer of both ends 11 of the prefabricated sandwich wall 2 of lower floor is symmetrically set U-shaped structure is set to, and the principal rod of U-shaped structure extends to the bottom of the prefabricated sandwich wall 1 in upper strata, to support the prefabricated sandwich wall in upper strata 1.First connection reinforcing bar 10 is set in the reinforcing steel bar frame that the principal rod of the prefabricated sandwich wall 1,2 of upper and lower layer extends to form;Intermediate superimposed sheet The reinforcing steel bar frame that the principal rod of principal rod and the prefabricated sandwich wall 2 of lower floor in 3 the second preformed layer 31 and the second in-situ layer 32 is formed It is interior that second connection reinforcing bar 13 is set.
As shown in Figure 2 and Figure 3, the prefabricated sandwich principal rod overlapped at the vertical piece of wall 1 and each 300mm in expansion joint both sides Using opening steel bar, the end of the opening steel bar is linear pattern or opposite bending.
The prefabricated sandwich wall of the utility model and the construction method of intermediate overlapping board connecting structure comprise the following steps:
1) lift the prefabricated sandwich wall of lower floor and place it to installation site;
2) support system is built to be placed on the prefabricated sandwich wall of lower floor of installation site;
3) the second preformed layer of superimposed sheet among lifting, and the horizontal positioned section point at the top of the prefabricated sandwich wall of lower floor Place, while the principal rod in the second in-situ layer and the second preformed layer of intermediate superimposed sheet is made to stretch into section point;
4) together with the prefabricated sandwich wall of lower floor is bound with the reinforcing bar that intermediate superimposed sheet is located at section point, and in lower floor Prefabricated sandwich coping sets steel plate for sealing water;
5) reinforcing bar among binding in the second in-situ layer of superimposed sheet;
6) rib mould is installed on the outside of intermediate superimposed sheet and section point;
7) with the first in-situ layer of the prefabricated sandwich wall of concreting lower floor, the second in-situ layer and second of intermediate superimposed sheet Node;
8) rib mould on the outside of intermediate superimposed sheet and section point is removed;
9) lift the prefabricated sandwich wall in upper strata and place it to installation site, while make the prefabricated sandwich wall both sides first in upper strata pre- Principal rod in preparative layer extends into first node and reaches at the top of the prefabricated sandwich wall of lower floor, the prefabricated sandwich wall both sides first of lower floor Principal rod in preformed layer extends to the prefabricated sandwich wall bottom in upper strata;
10) support system is built to be placed on the prefabricated sandwich wall in upper strata of installation site;
11) together with the reinforcing bar binding that the prefabricated sandwich wall in upper strata and lower floor prefabricated sandwich wall are located at first node;
12) rib mould is installed on the outside of first node;
13) the first in-situ layer and first node of the prefabricated sandwich wall in concreting upper strata are used;
14) rib mould on the outside of first node is removed, construction is completed.
Illustrative description has been carried out to the utility model above in conjunction with attached drawing, it is clear that the realization of the utility model and from The limitation of aforesaid way, as long as employing the various improvement or not improved by this practicality of technical solutions of the utility model progress New design and technical solution directly applies to other occasions, within the protection scope of the present utility model.

Claims (10)

1. a kind of prefabricated sandwich wall is with intermediate overlapping board connecting structure, the prefabricated sandwich wall in upper strata including interconnection(1)With under The prefabricated sandwich wall of layer(2), the prefabricated intermediate superimposed sheet of sandwich wall connection of the lower floor(3), the upper and lower prefabricated sandwich wall of layer is respectively including position The first preformed layer in both sides(11)With the first in-situ layer positioned at centre(12), intermediate superimposed sheet is including positioned at the second of bottom Preformed layer(31)With the second in-situ layer on the second preformed layer(32), in the prefabricated sandwich wall of upper and lower layer and intermediate superimposed sheet Distributing reinforcement is buried respectively(4)And principal rod(5), which is characterized in that the upper and lower prefabricated sandwich wall of layer passes through first node(6)Connection, The principal rod of the prefabricated sandwich wall in upper strata is extended down into inside first node, and extend to the prefabricated sandwich coping of lower floor and The principal rod of the prefabricated sandwich wall of opposite bending lower floor is extended upwardly into inside first node, and extends to the of the prefabricated sandwich wall in upper strata One preformed layer bottom;The prefabricated sandwich wall of lower floor passes through section point(7)Superimposed sheet among connection, the second of intermediate superimposed sheet are cast-in-place Principal rod in layer and the second preformed layer is respectively protruding into;First in-situ layer concrete of first node and the prefabricated sandwich wall in upper strata It is cast-in-place into the first Cast-in-Situ Segment, the first in-situ layer of the prefabricated sandwich wall of section point and lower floor, the second in-situ layer of intermediate superimposed sheet It is cast-in-place into the second Cast-in-Situ Segment.
2. prefabricated sandwich wall according to claim 1 and intermediate overlapping board connecting structure, which is characterized in that described first, Two nodes are adjacent, and adjacent place sets steel plate for sealing water.
3. prefabricated sandwich wall according to claim 1 and intermediate overlapping board connecting structure, which is characterized in that fold the centre Principal rod in second in-situ layer of plywood bends downward after stretching into section point and along the outside first of the prefabricated sandwich wall of lower floor Preformed layer is extended into the second in-situ layer of the prefabricated sandwich wall of lower floor.
4. prefabricated sandwich wall and intermediate overlapping board connecting structure according to claim 1 or 2 or 3, which is characterized in that adjacent Principal rod at the vertical piece of the prefabricated sandwich overlapping wall and expansion joint uses opening steel bar.
5. prefabricated sandwich wall according to claim 4 and intermediate overlapping board connecting structure, which is characterized in that the open-type The end of reinforcing bar is linear pattern.
6. prefabricated sandwich wall according to claim 4 and intermediate overlapping board connecting structure, which is characterized in that the open-type The end of reinforcing bar is opposite bending.
7. prefabricated sandwich wall and intermediate overlapping board connecting structure according to claim 1 or 2 or 3, which is characterized in that described Multigroup principal rod at the prefabricated sandwich wall both ends of lower floor is symmetrical arranged as U-shaped structure, and to extend to upper strata pre- for the principal rod of U-shaped structure The bottom of sandwich wall processed.
8. prefabricated sandwich wall and intermediate overlapping board connecting structure according to claim 1 or 2 or 3, which is characterized in that described The prefabricated sandwich coping of lower floor is higher than the second in-situ layer of the intermediate superimposed sheet, is higher by the adjacent place of first and second node Second in-situ layer of the intermediate superimposed sheet.
9. prefabricated sandwich wall and intermediate overlapping board connecting structure according to claim 1 or 2 or 3, which is characterized in that described First connection reinforcing bar is set in the reinforcing steel bar frame that the principal rod of the prefabricated sandwich wall of upper and lower layer extends to form(10);Overlapping among described It is set in the reinforcing steel bar frame that the principal rod of principal rod in the second preformed layer and the second in-situ layer of plate and lower floor prefabricated sandwich wall is formed Put the second connection reinforcing bar(13).
10. prefabricated sandwich wall and intermediate overlapping board connecting structure according to claim 1 or 2 or 3, which is characterized in that institute It states and the prefabricated sandwich wall of lower floor is bent downward and stretched into after the principal rod in the second in-situ layer of intermediate superimposed sheet stretches into section point In, the principal rod in the second preformed layer of intermediate superimposed sheet is folded upward at after stretching into section point and with the second of intermediate superimposed sheet Principal rod overlapping in in-situ layer.
CN201721207954.5U 2017-09-20 2017-09-20 Prefabricated sandwich wall and intermediate overlapping board connecting structure Withdrawn - After Issue CN207376645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721207954.5U CN207376645U (en) 2017-09-20 2017-09-20 Prefabricated sandwich wall and intermediate overlapping board connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721207954.5U CN207376645U (en) 2017-09-20 2017-09-20 Prefabricated sandwich wall and intermediate overlapping board connecting structure

Publications (1)

Publication Number Publication Date
CN207376645U true CN207376645U (en) 2018-05-18

Family

ID=62341164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721207954.5U Withdrawn - After Issue CN207376645U (en) 2017-09-20 2017-09-20 Prefabricated sandwich wall and intermediate overlapping board connecting structure

Country Status (1)

Country Link
CN (1) CN207376645U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642104A (en) * 2017-09-20 2018-01-30 湖南远大工程设计有限公司 Prefabricated sandwich wall and middle overlapping board connecting structure and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642104A (en) * 2017-09-20 2018-01-30 湖南远大工程设计有限公司 Prefabricated sandwich wall and middle overlapping board connecting structure and its construction method
CN107642104B (en) * 2017-09-20 2022-12-30 湖南远大工程设计有限公司 Connecting structure of prefabricated sandwich wall and middle laminated slab and construction method thereof

Similar Documents

Publication Publication Date Title
CN107503553A (en) Full prefabricated PC concrete frame energy dissipation component system and construction method
CN102168455B (en) Horizontal seam U-shaped closed rib junction structure of assembled shear wall structure
CN105735469B (en) A kind of part adhesive precast prestressed concrete frame structure
CN107700653A (en) A kind of Hybrid connections post-tensioned prestressing assembling concrete frame system and its construction method
CN107476482B (en) A kind of prefabricated panel with light gauge cold-formed steel shape rib, superimposed sheet and preparation method thereof
CN107642104A (en) Prefabricated sandwich wall and middle overlapping board connecting structure and its construction method
CN106836280A (en) A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
CN104594523A (en) Prestress splicing method for fabricated shear wall
CN110318426A (en) A kind of assembled Steel-concrete Composite subway station and assembly method
CN103541305B (en) A kind of construction method of the hollow slab bridge structure with integration pave-load layer
CN106638671A (en) High and low bin assembling integrated utility tunnel or draining canal
CN207538322U (en) A kind of prefabricated PC concrete frame frame system
CN108005304A (en) A kind of prefabricated PC concrete frame frame system and its construction method
CN107859059A (en) Prefabricated sandwich side wall and prefabricated overlapping bottom plate connecting joint structure and its construction method
CN108265822A (en) A kind of prefabricated board connecting structure
CN106223183A (en) Assembled concrete-filled rectangular steel tube combination truss bridge and construction method
CN108179808A (en) A kind of prefabricated beam column crimping joint strengthening stirrup construction and its construction method
CN207376645U (en) Prefabricated sandwich wall and intermediate overlapping board connecting structure
CN106368353B (en) A kind of composite plate shear wall structure
CN108775084A (en) Steel-concrete combines precast beam and prefabricated post connection structure and construction method
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN209261310U (en) The concrete prefabricated assembly combined storehouse of Contiuum type
CN207277372U (en) Prefabricated sandwich middle walls and prefabricated overlapping bottom plate connecting joint structure
CN208830532U (en) A kind of vertical reinforcement concentration constraint slurry anchor connection precast shear wall
CN208088500U (en) A kind of prefabricated beam column crimping joint strengthening stirrup construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180518

Effective date of abandoning: 20221230

AV01 Patent right actively abandoned

Granted publication date: 20180518

Effective date of abandoning: 20221230

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned