CN207376380U - A kind of cableway converter in extra-high voltage project - Google Patents
A kind of cableway converter in extra-high voltage project Download PDFInfo
- Publication number
- CN207376380U CN207376380U CN201720949666.0U CN201720949666U CN207376380U CN 207376380 U CN207376380 U CN 207376380U CN 201720949666 U CN201720949666 U CN 201720949666U CN 207376380 U CN207376380 U CN 207376380U
- Authority
- CN
- China
- Prior art keywords
- cableway
- rope
- connection track
- extra
- high voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002994 raw material Substances 0.000 claims abstract description 6
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 6
- 239000000463 material Substances 0.000 abstract description 10
- 238000000034 method Methods 0.000 abstract description 9
- 238000010276 construction Methods 0.000 abstract description 4
- 238000012545 processing Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000013459 approach Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a kind of cableway converter in extra-high voltage project, including cableway frame, carrying rope, rope circuit, anchor, connection track and buckle.The beneficial effects of the utility model are:By installing connection track additional two cableways is made to form an entirety between carrying rope, the artificial usage amount of transport process can not only be reduced, transhipment time can also be reduced simultaneously, improve work efficiency, it is and of low cost, securely and reliably, it is with obvious effects, connection track is attached to after need not material be unloaded by a upper cableway on next cableway, reduce construction cost, accelerate project progress, the making raw material that connection track uses is 28 reinforcing bar of Φ, simple processing and practicability is preferable, buckle is changed to spring latch mode by existing bolt fastening, by inertia and spring Self-closing lock, automatically next stage cableway is gone to from upper level cableway, manual operation is not required in whole process, it is transported without track cooperation is stopped, artificial usage amount is made to reduce by zero, further improve cableway running efficiency.
Description
Technical field
The utility model is related to a kind of cableway converters, are specially a kind of cableway converter in extra-high voltage project,
Belong to technical field of cableway transport.
Background technology
Jiuquan-Hunan ± 800kV extra high voltage direct current transmission lines engineering (2 bid section of Hubei Province) is located at Enshi State of Hubei Province, Yichang
City is domestic, by Enshi Badong County Ye Sanguan towns, clear peaceful town, water cloth Ya Zhen, Populations in Changyang County fishing mouth of a gorge town, Wu Feng counties
Fu Jiayan townshiies, the township that picks flowers, 7, Wu Feng towns small towns administrative unit, line length 66.830km, circuit is by way of Badong County length
28.489km, the positive county magistrate's degree of approach length are 12.426km, and five peak county magistrate's degree of approach is 25.915km.Landform is with mountainous region, height along the line
Based on mountain, high mountain, tower bit distribution between 200m-1700m, design 143 base of shaft tower, be along the line mountainous region, high mountain, high mountain, wherein
Mountainous region 31.5%, high mountain 50.01%, high mountain 17.5%, transport of materials share 111, cableway, accounting based on cableway transport
77.62%, since high mountain, high mountain are numerous, complex geologic conditions, cableway sets up addressing difficulty, therefore there are a large amount of cableways intersections
Transport the situation of material.
And the material that needs a person with the qualifications of a general during transport material is intersected is unloaded by a upper cableway, is attached to next cableway again
On, this is time-consuming in the process, improves construction cost, project progress of having delayed.At present used in scheme be select compared with
Small barrel makes it allow one man operation, reduces artificial usage amount, improves efficiency, worker is reduced to a people by two people, although manually
Usage amount is reduced, but since handling barrel lacks personnel's cooperation, single transfer operation averagely takes and rises to 110s, and transhipment time
Number is more double, and efficiency is caused to reduce.
If selecting the barrel of bigger, single freight volume is improved, transhipment number is reduced, improves efficiency, since barrel is overweight, four
Name worker's cooperation is difficult, and work efficiency significantly reduces after loading and unloading three times, and single transfer operation averagely takes 105s, and manually consuming
Excessively, it is inapplicable.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of rope in extra-high voltage project
Road converter.
The utility model is achieved through the following technical solutions above-mentioned purpose:A kind of cableway in extra-high voltage project turns
Parallel operation, the cableway frame including being fixed on earth's surface vertically;The cableway frame is connected with carrying rope and is arranged in parallel with the carrying rope
Rope circuit;The turning point of the carrying rope and rope circuit is fixedly installed on the cableway frame, and the carrying rope
Turning point is located on the upside of the turning point of the rope circuit;
Connection track parallel to ground, one end connection of the connection track are installed between two adjacent cableway framves
On a carrying rope, the other end of the connection track is connected on another described carrying rope.
Preferably, the cableway frame both sides are mounted on anchor;Described anchor one end is fixedly installed in the cableway frame top
End, the anchor other end are fixedly installed in ground.
Preferably, buckle is further included, the connection track both ends are linked together by buckle and the carrying rope.
Preferably, for the ease of processing and practicability it is preferable, it is described connection track use raw material as 28 reinforcing bars of Φ.
Preferably, in order to which artificial usage amount is made to reduce by zero, cableway running efficiency is further improved, the buckle closes for spring
Locking-type structure.
The beneficial effects of the utility model are:The cableway converter design being used in extra-high voltage project is reasonable, carries rope
Between by installing connection track additional two cableways is made to form an entirety, can not only reduce the artificial usage amount of transport process, together
When can also reduce transhipment time, improve work efficiency, and of low cost, securely and reliably, with obvious effects, connection track is by material
It is attached to after being unloaded by a upper cableway on next cableway, reduces construction cost, accelerate project progress, connection track uses
Making raw material be 28 reinforcing bars of Φ, material is simple, cheap, at the same simple processing and practicability it is preferable, be buckled by existing bolt
Fastening means is changed to spring latch mode, makes it without manually loading and unloading rope circuit fastener, by inertia and spring Self-closing lock, automatically
Next stage cableway is gone to from upper level cableway, manual operation is not required in whole process, without track cooperation transhipment is stopped, making one
Work usage amount reduces by zero, and process time loss is reduced to zero, further improves cableway running efficiency.
Description of the drawings
Fig. 1 is the utility model structure diagram;
In figure:1st, cableway frame, 2, carrying rope, 3, rope circuit, 4, anchor, 5, connection track and 6, buckle.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of cableway converter in extra-high voltage project, including cableway frame 1, carrying rope 2, rope circuit
3rd, anchor 4, connection track 5 and buckle 6.The cableway frame 1 is fixed on the ground vertically by buried, is connected on the cableway frame 1
Be connected to carrying rope 2 and rope circuit 3, the turning point of the carrying rope 2 is fixedly mounted on the upper end of cableway frame 1, the carrying rope 2 with
Rope circuit 3 is in horizontal setting, and the turning point of the rope circuit 3 is fixedly mounted on cableway frame 1, and the rope circuit 3 is located at carrying
The lower section of rope 2, the anchor 4 are separately positioned on the left and right sides of cableway frame 1, and one end of the anchor 4 is fixed on cableway frame 1
Top, the other end of the anchor 4 are connected to ground, and the connection track 5 is arranged between the adjacent cableway frame 1 of left and right sides, institute
Connection track 5 is stated with ground in horizontal setting, the both ends of the connection track 5 are linked together by buckle 6 and carrying rope 2,
The buckle 6 is mounted on carrying rope 2, and the buckle 6 is located at the middle part of carrying rope 2, passes through the company of installation additional between the carrying rope 2
Integrating with 5 makes two cableways form an entirety, can not only reduce the artificial usage amount of transport process, while can also reduce and turn
The time is transported, improves work efficiency, and it is of low cost, securely and reliably, with obvious effects, the connection track 5 is by material by upper one
Cableway is attached to after unloading on next cableway, reduces construction cost, accelerates project progress, the system that the connection track 5 uses
Make raw material as 28 reinforcing bars of Φ, material is simple, cheap, while simple processing and practicability it is preferable, the buckle 6 is by existing spiral shell
Bolt fastening means is changed to spring latch mode, makes it without manually loading and unloading 3 fastener of rope circuit, by inertia and spring Self-closing lock,
Automatically next stage cableway being gone to from upper level cableway, manual operation is not required in whole process, is transported without track cooperation is stopped,
Artificial usage amount is made to reduce by zero, process time loss is reduced to zero, further improves cableway running efficiency.
By installing connection track additional two cableways is made to form an entirety between carrying rope, connection track is by material by upper one
Bar cableway is attached to after unloading on next cableway, and the making raw material that connection track uses is buckled for 28 reinforcing bars of Φ by existing bolt
Fastening means is changed to spring latch mode.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned exemplary embodiment, and
And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new
The scope of type is indicated by the appended claims rather than the foregoing description, it is intended that will fall containing in the equivalent requirements of the claims
All changes in justice and scope are embraced therein.Any reference numeral in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
Using specification as an entirety, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (5)
1. a kind of cableway converter in extra-high voltage project, it is characterised in that:Cableway frame including being fixed on earth's surface vertically
(1);The cableway frame (1) is connected with carrying rope (2) and the rope circuit (3) being arranged in parallel with the carrying rope (2);The carrying
The turning point of rope (2) and rope circuit (3) is fixedly installed on the cableway frame (1), and the turning point of the carrying rope (2)
On the upside of the turning point of the rope circuit (3);
Connection track (5) parallel to ground is installed between two adjacent cableway framves (1), it is described to connect the one of track (5)
End is connected on a carrying rope (2), and the other end of the connection track (5) is connected to another carrying rope (2)
On.
2. a kind of cableway converter in extra-high voltage project according to claim 1, it is characterised in that:The cableway
Frame (1) both sides are mounted on anchor (4);Described anchor (4) one end is fixedly installed in cableway frame (1) top, the anchor
(4) other end is fixedly installed in ground.
3. a kind of cableway converter in extra-high voltage project according to claim 1, it is characterised in that:Further include card
It detains (6), described connection track (5) both ends are linked together by buckle (6) and the carrying rope (2).
4. a kind of cableway converter in extra-high voltage project according to claim 1, it is characterised in that:The connection
Track (5) uses raw material as 28 reinforcing bars of Φ.
5. a kind of cableway converter in extra-high voltage project according to claim 3, it is characterised in that:The buckle
(6) it is spring latch formula structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720949666.0U CN207376380U (en) | 2017-08-01 | 2017-08-01 | A kind of cableway converter in extra-high voltage project |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720949666.0U CN207376380U (en) | 2017-08-01 | 2017-08-01 | A kind of cableway converter in extra-high voltage project |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207376380U true CN207376380U (en) | 2018-05-18 |
Family
ID=62341693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720949666.0U Active CN207376380U (en) | 2017-08-01 | 2017-08-01 | A kind of cableway converter in extra-high voltage project |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207376380U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108995660A (en) * | 2018-08-15 | 2018-12-14 | 广州智网联运物流有限公司 | A kind of cableway track exchanging device |
CN110435674A (en) * | 2019-08-30 | 2019-11-12 | 北京起重运输机械设计研究院有限公司 | Supporting beam switching device |
-
2017
- 2017-08-01 CN CN201720949666.0U patent/CN207376380U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108995660A (en) * | 2018-08-15 | 2018-12-14 | 广州智网联运物流有限公司 | A kind of cableway track exchanging device |
CN108995660B (en) * | 2018-08-15 | 2024-03-15 | 广东自来物智能科技有限公司 | Cableway rail changing device |
CN110435674A (en) * | 2019-08-30 | 2019-11-12 | 北京起重运输机械设计研究院有限公司 | Supporting beam switching device |
CN110435674B (en) * | 2019-08-30 | 2024-05-28 | 北京起重运输机械设计研究院有限公司 | Support beam switching device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207376380U (en) | A kind of cableway converter in extra-high voltage project | |
CN102155261B (en) | Paste combined filling method utilizing solid wastes of mine | |
CN102259649B (en) | Curve cableway transporting system of double-cable circulating type | |
Konieczna et al. | Nd and Sr isotopic evidence for provenance of clastic material of the Upper Triassic rocks of Silesia, Poland | |
CN206827946U (en) | Possess discharging to reckon by the piece the gantry of statistical function | |
CN104230236B (en) | Basalt fibre ceramsite concrete light-weight concrete segment | |
CN203961414U (en) | Unprotect layer concrete electric pole | |
CN205588137U (en) | Chain pole loading attachment | |
CN206838532U (en) | A kind of four bin components of halved belt sorter | |
CN206937609U (en) | Constructure ground gravity flowing levelling mortar backfill pump station device based on helical blade | |
CN206172791U (en) | Special cage of building block | |
CN206917276U (en) | A kind of civil engineering plotting board | |
CN203701526U (en) | Inclined rubbish slideway | |
CN204872590U (en) | Machine is transported to building grit | |
CN206287332U (en) | A kind of mortar stirring device | |
CN107816111A (en) | A kind of rainwater slow release device | |
CN207798508U (en) | A kind of homogeneous saturation sand sample preparation facilities based on helical axis radius change | |
CN209258659U (en) | A kind of concrete wire ladder binding apparatus | |
CN221165073U (en) | Material conveying device for river | |
CN215408755U (en) | Sand making and filling equipment for tailless mine construction | |
CN207955634U (en) | A kind of electric power conveyer | |
CN210179328U (en) | Self-flowing ore pulp pipeline conveying device | |
CN207144971U (en) | A kind of high inclination-angle colliery lane integer support device | |
CN214460500U (en) | Water and soil conservation filling fastening device | |
Milutinović | Local sustainable development planning in Serbia: Achievements so far and future challenges |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |