CN207361708U - A kind of plank conveying arrangement - Google Patents

A kind of plank conveying arrangement Download PDF

Info

Publication number
CN207361708U
CN207361708U CN201721077206.XU CN201721077206U CN207361708U CN 207361708 U CN207361708 U CN 207361708U CN 201721077206 U CN201721077206 U CN 201721077206U CN 207361708 U CN207361708 U CN 207361708U
Authority
CN
China
Prior art keywords
mobile device
housing
plank
bearing
conveying arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721077206.XU
Other languages
Chinese (zh)
Inventor
徐贵强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Zhengyi Wood Industry Co., Ltd.
Original Assignee
Xinchang County Qinzhen Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang County Qinzhen Machinery Manufacturing Co Ltd filed Critical Xinchang County Qinzhen Machinery Manufacturing Co Ltd
Priority to CN201721077206.XU priority Critical patent/CN207361708U/en
Application granted granted Critical
Publication of CN207361708U publication Critical patent/CN207361708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a kind of plank conveying arrangement, including housing, the lower surface of inner walls is provided with the first mobile device and the second mobile device, second mobile device is identical with the structure of the first mobile device, second mobile device is located at the front side of the first mobile device, first mobile device includes two the first electric pushrods, the lower surface of inner walls is fixedly connected by two the first electric pushrods with the lower surface of fixed plate, the upper surface of fixed plate is provided with two the first rollers, first roller is located in the through hole that support plate upper surface opens up, the left and right sides of support plate are both provided with first rotating shaft, the surface of first rotating shaft is socketed with clutch shaft bearing, the clutch shaft bearing is connected to the side of inner walls.The plank conveying arrangement, by setting the first mobile device, the second mobile device, support plate and lifting gear, reduces the working strength of worker, improves conevying efficiency of the worker to plank.

Description

A kind of plank conveying arrangement
Technical field
Field of garden technology is the utility model is related to, is specially a kind of plank conveying arrangement.
Background technology
Plank is exactly using wood plank made of complete timber.These plates are sturdy and durable, lines is naturally, be in finishing Choosing in excellent.Such plate cost is high, and plank is generally according to plate essence name class, ununified standard specification.Plank It is the material being commonly used in house ornamentation, when choosing plank, has to see clearly that its lines, lines are clear, and it is generally advisable to not There is disconnected line.
When being transported to plank, different planks has different means of transportation, currently on the market to the fortune of plank Defeated device, is that direct pull plank unloads plank mostly, but such means of transportation not only increases the working strength of worker, and Very influence conevying efficiency of the worker to plank.
Utility model content
(1) technical problem solved
In view of the deficiencies of the prior art, the utility model provides a kind of plank conveying arrangement, solves currently on the market It is that direct pull plank unloads plank mostly, but such means of transportation not only increases worker's to the conveying arrangement of plank Working strength, and very influence the problem of worker is to plank conevying efficiency.
(2) technical solution
To achieve the above object, the utility model provides following technical solution:A kind of plank conveying arrangement, including housing, The lower surface of the inner walls is provided with the first mobile device and the second mobile device, and second mobile device is moved with first The structure of dynamic device is identical, and second mobile device is located at the front side of the first mobile device, and first mobile device includes Two the first electric pushrods, the lower surface of the inner walls are fixed by the lower surface of two the first electric pushrods and fixed plate Connection, the upper surface of the fixed plate are provided with two the first rollers, and first roller is located at what support plate upper surface opened up In through hole, the left and right sides of the support plate are both provided with first rotating shaft, and the surface of the first rotating shaft is socketed with first axle Hold, the clutch shaft bearing is connected to the side of inner walls, and the clutch shaft bearing is located at the rear side of the first mobile device, the branch The lower surface of fagging is fixedly connected by lifting gear with the lower surface of inner walls, and the bottom of the lifting gear is located at housing The centre position of interior lower surface, the lifting gear include two the first fixed blocks, the lower surface of first fixed block with The lower surface of inner walls is fixedly connected, and the opposite face of two the first fixed blocks is fixedly connected by the both ends of the second shaft, The surface of second shaft is socketed with second bearing, and the surface of the second bearing passes through the second electric pushrod and 3rd bearing Surface be fixedly connected, be socketed with the 3rd shaft in the 3rd bearing, the both ends of the 3rd shaft are fixed with second respectively The opposite face of block is fixedly connected, and the upper surface of second fixed block is fixedly connected with the lower surface of support plate, under the housing The four corners on surface are both provided with the second roller.
Preferably, the front of the housing is tiltedly installed with handle, and the surface of the handle is socketed with Anti-slip cover.
Preferably, the front of the housing is provided with control panel, and the output terminal of the control panel electronic is pushed away with first The input terminal of bar and the second electric pushrod is electrically connected.
Preferably, the lower surface of the housing is provided with storage battery, the output terminal of the storage battery and control panel it is defeated Enter end to be electrically connected.
Preferably, second mobile device is between the first mobile device and lifting gear, the 3rd bearing position In the front side of second bearing.
Preferably, the shape of the through hole is rectangle, and the length of the through hole is adapted with the diameter of the first roller.
(3) beneficial effect
The utility model provides a kind of plank conveying arrangement, possesses following beneficial effect:
(1), plank conveying arrangement, by setting the first mobile device, the second mobile device, support plate and lifting to fill Put, the first mobile device and the height of the second mobile device rise are controlled by control panel, when the height of the first mobile device During the height risen more than the second mobile device, the rear side of plank rises, and can prevent plank from being skidded off on rear side of housing, when the When the height that one mobile device rises is less than the height that the second mobile device rises, the front side of plank is risen, so as to so that wood Plate skids off housing, easy to the transport to plank, when the height that the first mobile device rises is equal to the height of the second mobile device rise When spending, four the first rollers jack up plank, and straight carrying is carried out to plank easy to worker, and by setting the first roller, can To reduce the frictional force of plank and support plate, by lifting gear, the lifting on front side of support plate can be controlled, so as to more preferable Plank is transported, reduce the working strength of worker, improve conevying efficiency of the worker to plank.
(2), the plank conveying arrangement, by setting handle, the second roller and storage battery, using handle and the second roller, Second roller can reduce the frictional force on housing and ground, coordinate with handle, easy to be transported to plank, by setting electric power storage Pond, works easy to the first electric pushrod and the second electric pushrod, and the utility model which has a compact structure and a reasonable design, practical Property is strong.
Brief description of the drawings
Fig. 1 is the cross-sectional view that the utility model is faced;
Fig. 2 is the cross-sectional view of the utility model left view;
Fig. 3 is the structure diagram that the utility model lifting gear is faced.
In figure:1 housing, 2 first mobile devices, 21 first electric pushrods, 22 fixed plates, 23 first rollers, 3 second movements Device, 4 support plates, 5 through holes, 6 first rotating shafts, 7 clutch shaft bearings, 8 lifting gears, 81 first fixed blocks, 82 second shafts, 83 Two bearings, 84 second electric pushrods, 85 3rd bearings, 86 the 3rd shafts, 87 second fixed blocks, 9 handles, 10 Anti-slip covers, 11 controls Panel processed, 12 second rollers, 13 storage batteries.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained, shall fall within the protection scope of the present invention.
As shown in Figs. 1-3, the utility model provides a kind of technical solution:A kind of plank conveying arrangement, including housing 1, lead to Setting housing 1 is crossed, easy to be transported to plank, the lower surface of 1 inner wall of housing is provided with the first mobile device 2 and the second movement Device 3, the second mobile device 3 is identical with the structure of the first mobile device 2, by setting the first mobile device 2 and the second movement Device 3, controls the first mobile device 2 and the second mobile device 3 to rise different height respectively, can carry out not Tongfang to plank The transport of formula, the second mobile device 3 is between the first mobile device 2 and lifting gear 8, can be with by setting lifting gear 8 The height of the front side of support plate 4 is controlled, 3rd bearing 85 is located at the front side of second bearing 83, and the second mobile device 3 is moved positioned at first The front side of dynamic device 2, the first mobile device 2 include two the first electric pushrods 21, by the first electric pushrod 21 of setting, when the During the first electric pushrod 21 elongation of one mobile device 2, the first roller 23 of the first mobile device 2 can be by the rear side top of plank Rise, plank can be tilted, so as to avoid the rear side of plank from housing 1 from skidding off, when the height that the second mobile device 3 rises During the height risen more than the first mobile device 2, the first roller 23 of the second mobile device 3 jacks up the front side of plank, so that Plank can be made to be skidded off to outside housing 1, when the first mobile device 2 is identical with height that the second mobile device 3 rises, four Second wheel 21 jacks up plank, so as to which so that worker carries out straight carrying to plank, the lower surface of 1 inner wall of housing passes through two First electric pushrod 21 is fixedly connected with the lower surface of fixed plate 22, and the upper surface of fixed plate 22 is provided with two the first rollers 23, by setting the first roller 23, when the first roller 23 jacks up plank, the frictional force of plank and support plate 4 can be reduced, First roller 23 is located in the through hole 5 that 4 upper surface of support plate opens up, and the shape of through hole 5 is rectangle, convenient by setting through hole 5 First roller 23 jacks up plank, and convenient that plank is transported, the length of through hole 5 is adapted with the diameter of the first roller 23, The left and right sides of support plate 4 are both provided with first rotating shaft 6, and the surface of first rotating shaft 6 is socketed with clutch shaft bearing 7, passes through setting First rotating shaft 6 and clutch shaft bearing 7, when lifting gear 8 works, can tilt preferably support plate 4, clutch shaft bearing 7 is clamped In the side of 1 inner wall of housing, clutch shaft bearing 7 is located at the rear side of the first mobile device 2, and the lower surface of support plate 4 is filled by lifting 8 to be put to be fixedly connected with the lower surface of 1 inner wall of housing, the bottom of lifting gear 8 is located at the centre position of 1 interior lower surface of housing, Lifting gear 8 includes two the first fixed blocks 81, and the lower surface of the first fixed block 81 is fixed with the lower surface of 1 inner wall of housing to be connected Connect, and the opposite face of two the first fixed blocks 81 is fixedly connected by the both ends of the second shaft 82, the surface set of the second shaft 82 Second bearing 83 is connected to, the surface of second bearing 83 is fixedly connected by the second electric pushrod 84 with the surface of 3rd bearing 85, The 3rd shaft 86 is socketed with 3rd bearing 85, the both ends of the 3rd shaft 86 are fixed with the opposite face of the second fixed block 87 respectively to be connected Connect, by setting the second shaft 82, second bearing 83,85 and the 3rd shaft 86 of 3rd bearing, the second electric pushrod 84 can be made The lifting of 4 front side of control support plate is more convenient during work, the upper surface of the second fixed block 87 is fixed with the lower surface of support plate 4 to be connected Connect, by setting the first fixed block 81 and the second fixed block 87, the second shaft 82 and the 3rd shaft 86 can be fixed, shell The four corners of 1 lower surface of body are both provided with the second roller 12, and the front of housing 1 is tiltedly installed with handle 9, by setting the second rolling Wheel 12 and handle 9, the second roller 12 can reduce the frictional force of housing 1 and ground, and the cooperation of handle 9 can be preferably to housing 1 is moved, and the lower surface of housing 1 is provided with storage battery 13, the output terminal of storage battery 13 and the input terminal electricity of control panel 11 Connection, the surface of handle 9 are socketed with Anti-slip cover 10, by setting Anti-slip cover 10, the frictional force of increase hand and handle 9, to housing 1 Moved, the front of housing 1 is provided with control panel 11, the output terminal of control panel 11 and the first electric pushrod 21 and second The input terminal of electric pushrod 84 is electrically connected, and by setting control panel 11, can preferably control the first electric pushrod 21 and the Two electric pushrods 84 work, and preferably plank can be transported.
In use, plank is placed in support plate 4, the second electric pushrod 84 is controlled to shorten by control panel 11, from And decline the front side of support plate 4, so that declining on front side of plank, it can be skidded off to avoid the rear side of plank from housing 1, pass through handle 9 and second roller 12 of hand moves housing 1, when needing plank carrying out straight carrying, controls the second electric pushrod 84 Elongation, makes the front side of support plate 4 set back, and the first mobile device 2 and the second mobile device 3 are controlled by control panel 11 First electric pushrod 21 extends, so that fixed plate 22 rises, so that the first roller 23 jacks up plank, so as to wood Plate carries out straight carrying, meanwhile, by controlling the height that the second mobile device 3 rises to be more than the height that the first mobile device 2 rises Degree, can be such that plank is slid automatically from the upper surface of support plate 4.
It can to sum up obtain, the plank conveying arrangement, by setting the first mobile device 2, the second mobile device 3,4 and of support plate Lifting gear 8, controls the first mobile device 2 and the height of the second mobile device 3 rise, when the first movement by control panel 11 When the height of device 2 is more than the height that the second mobile device 3 rises, the rear side of plank rises, and plank can be prevented from housing 1 Rear side skids off, when the height that the first mobile device 2 rises is less than the height that the second mobile device 3 rises, the front side liter of plank Rise, so as to so that plank skids off housing 1, easy to the transport to plank, when the height that the first mobile device 2 rises is equal to second During the height that mobile device 3 rises, four the first rollers 23 jack up plank, and straight carrying is carried out to plank easy to worker, and By setting the first roller 23, it is possible to reduce plank and the frictional force of support plate 4, by lifting gear 8, can control support plate The lifting of 4 front sides, so as to preferably be transported to plank, reduces the working strength of worker, improves worker to wood The conevying efficiency of plate.
Meanwhile the plank conveying arrangement, by setting handle 9, the second roller 12 and storage battery 13, use handle 9 and Second wheel 12, the second roller 12 can reduce the frictional force of housing 1 and ground, coordinate with handle 9, easy to be transported to plank It is defeated, by setting storage battery 13, work easy to the first electric pushrod 21 and the second electric pushrod 84, and the utility model knot Structure is compact, and design is reasonable, highly practical.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of plank conveying arrangement, including housing (1), it is characterised in that:The lower surface of housing (1) inner wall is provided with One mobile device (2) and the second mobile device (3), second mobile device (3) and the structure phase of the first mobile device (2) Together, second mobile device (3) is located at the front side of the first mobile device (2), and first mobile device (2) includes two the One electric pushrod (21), the lower surface of housing (1) inner wall pass through two the first electric pushrods (21) and fixed plate (22) Lower surface is fixedly connected, and the upper surface of the fixed plate (22) is provided with two the first rollers (23), first roller (23) In the through hole (5) opened up positioned at support plate (4) upper surface, the left and right sides of the support plate (4) are both provided with first rotating shaft (6), the surface of the first rotating shaft (6) is socketed with clutch shaft bearing (7), and the clutch shaft bearing (7) is connected to housing (1) inner wall Side, the clutch shaft bearing (7) are located at the rear side of the first mobile device (2), and the lower surface of the support plate (4) is filled by lifting The lower surface that (8) are put with housing (1) inner wall is fixedly connected, and the bottom of the lifting gear (8) is located at housing (1) interior lower surface Centre position, the lifting gear (8) includes two the first fixed blocks (81), the lower surface of first fixed block (81) with The lower surface of housing (1) inner wall is fixedly connected, and the opposite face of two the first fixed blocks (81) passes through the two of the second shaft (82) End is fixedly connected, and the surface of second shaft (82) is socketed with second bearing (83), and the surface of the second bearing (83) leads to The surface that the second electric pushrod (84) is crossed with 3rd bearing (85) is fixedly connected, and the 3rd turn is socketed with the 3rd bearing (85) Axis (86), the opposite face of the both ends of the 3rd shaft (86) respectively with the second fixed block (87) are fixedly connected, and described second is solid The upper surface for determining block (87) is fixedly connected with the lower surface of support plate (4), and the four corners of housing (1) lower surface are both provided with Second roller (12).
A kind of 2. plank conveying arrangement according to claim 1, it is characterised in that:The front of the housing (1), which tilts, to be set Handle (9) is equipped with, the surface of the handle (9) is socketed with Anti-slip cover (10).
A kind of 3. plank conveying arrangement according to claim 1, it is characterised in that:The front of the housing (1) is provided with Control panel (11), the output terminal of the control panel (11) and the first electric pushrod (21) and the second electric pushrod (84) it is defeated Enter end to be electrically connected.
A kind of 4. plank conveying arrangement according to claim 1, it is characterised in that:The lower surface of the housing (1) is set There is storage battery (13), the output terminal of the storage battery (13) is electrically connected with the input terminal of control panel (11).
A kind of 5. plank conveying arrangement according to claim 1, it is characterised in that:Second mobile device (3) is located at Between first mobile device (2) and lifting gear (8), the 3rd bearing (85) is located at the front side of second bearing (83).
A kind of 6. plank conveying arrangement according to claim 1, it is characterised in that:The shape of the through hole (5) is rectangle, The length of the through hole (5) is adapted with the diameter of the first roller (23).
CN201721077206.XU 2017-08-26 2017-08-26 A kind of plank conveying arrangement Expired - Fee Related CN207361708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721077206.XU CN207361708U (en) 2017-08-26 2017-08-26 A kind of plank conveying arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721077206.XU CN207361708U (en) 2017-08-26 2017-08-26 A kind of plank conveying arrangement

Publications (1)

Publication Number Publication Date
CN207361708U true CN207361708U (en) 2018-05-15

Family

ID=62351299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721077206.XU Expired - Fee Related CN207361708U (en) 2017-08-26 2017-08-26 A kind of plank conveying arrangement

Country Status (1)

Country Link
CN (1) CN207361708U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725303A (en) * 2018-07-18 2018-11-02 重庆力迅家居有限公司 Energy-saving type plank transport device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725303A (en) * 2018-07-18 2018-11-02 重庆力迅家居有限公司 Energy-saving type plank transport device

Similar Documents

Publication Publication Date Title
CN205574016U (en) Article transporting car
CN207361708U (en) A kind of plank conveying arrangement
CN206086812U (en) Three -dimensional adjustable power battery lifting platform car
CN108891902B (en) Wall brick transportation equipment for building indoor wall surface of building construction
CN207345106U (en) A kind of lifting structure on mould carrier
CN207276123U (en) A kind of Miniature lifting device and miniature Load System
CN107719436A (en) A kind of transport of materials device of steel-structure factory building construction
CN206751335U (en) A kind of taking care of books moving lifting car
CN205949580U (en) Bending device of pipe for dustbin
CN104477071B (en) Pushing and fixing device guaranteeing running of simple forklift along with container and method using device
CN109019412A (en) Efficient Moveable lifting stand
CN209127992U (en) A kind of fork truck is pitched with foot
CN205527569U (en) Liftable goods carries handler
CN207345855U (en) A kind of trolley for building
CN207659037U (en) A kind of vertical-type building hoist
CN206317861U (en) A kind of lifting electric animal flows transporter
CN213011619U (en) Turning device is used in processing of tower section of thick bamboo convenient to it is fixed
CN205890930U (en) Change work material bucket locomotive
CN206126733U (en) Light lift
CN205724577U (en) Cubicle switch cabinet transport installation tool
CN207955704U (en) A kind of transport of materials device of steel-structure factory building construction
CN206828022U (en) A kind of pallet escalator
CN202302570U (en) Conveying structure of diesel-electric set
CN206901673U (en) Step drives the front-wheel electrically propelled traction vehicle of formula four
CN107499553A (en) A kind of miniature Load System

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180810

Address after: 221341 Private Industrial Park, Cha He Town, Pizhou City, Xuzhou, Jiangsu

Patentee after: Xuzhou Zhengyi Wood Industry Co., Ltd.

Address before: 312500 No. 98, West pits, Qi Shi Village, Nanxiang, Xinchang County, Shaoxing, Zhejiang

Patentee before: Xinchang County diligent Machinery Manufacturing Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515

Termination date: 20180826

CF01 Termination of patent right due to non-payment of annual fee