CN108725303A - Energy-saving type plank transport device - Google Patents
Energy-saving type plank transport device Download PDFInfo
- Publication number
- CN108725303A CN108725303A CN201810791279.8A CN201810791279A CN108725303A CN 108725303 A CN108725303 A CN 108725303A CN 201810791279 A CN201810791279 A CN 201810791279A CN 108725303 A CN108725303 A CN 108725303A
- Authority
- CN
- China
- Prior art keywords
- side wall
- plank
- steel ball
- fin
- gap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 64
- 239000010959 steel Substances 0.000 claims abstract description 64
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 12
- 229910052742 iron Inorganic materials 0.000 claims abstract description 4
- 238000010943 off-gassing Methods 0.000 claims description 7
- 238000005192 partition Methods 0.000 claims description 5
- 230000007246 mechanism Effects 0.000 claims description 4
- 230000002035 prolonged effect Effects 0.000 claims 1
- 230000009471 action Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 9
- 239000002023 wood Substances 0.000 description 7
- 230000000694 effects Effects 0.000 description 4
- 238000010521 absorption reaction Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 239000002775 capsule Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 231100001261 hazardous Toxicity 0.000 description 1
- 230000005389 magnetism Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60P—VEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
- B60P3/00—Vehicles adapted to transport, to carry or to comprise special loads or objects
- B60P3/40—Vehicles adapted to transport, to carry or to comprise special loads or objects for carrying long loads, e.g. with separate wheeled load supporting elements
- B60P3/41—Vehicles adapted to transport, to carry or to comprise special loads or objects for carrying long loads, e.g. with separate wheeled load supporting elements for log transport
Abstract
This application involves conveying sheet technical fields, specifically disclose energy-saving type plank transport device comprising plank transport case, the shaft for being fixed on plank transport case bottom and the transport wheel for being rotatably connected on shaft both ends;Plank transport case includes bottom plate, front side wall, back side panel, left side wall and right side wall;The opposite face of left side wall and right side wall is equipped with several magnetic force units set gradually from top to bottom, and magnetic force unit includes several electromagnet, steel ball and the fin for being horizontally disposed with and being fabricated from iron, and iron core and the fin of electromagnet are fixed;Gap is equipped between adjacent fin, the thickness in gap is less than the thickness of plank, and the diameter of steel ball is less than the thickness in gap, and elastic layer is equipped in gap.When unloading plank, due to having steel ball between plank and plank, so as to reduce the frictional force between plank and plank, it is easier to pull out plank out of plank transport case, then unloading is easier, and plays energy-conserving action.
Description
Technical field
The present invention relates to conveying sheet technical fields, and in particular to a kind of energy-saving type plank transport device.
Background technology
The wood furniture that the various furniture of present people's family more and more select timber to be made, wood furniture
It needs that timber is first processed into molding plank when making, but when being stored to the molding plank produced, needs
The plank produced is put into storage box, storage box in the prior art is exactly common chest, is positioned to for convenience
Type plank generally carries out storage forming wood board using the chest more larger than forming wood board.Usual plank stacking is stored in storage box
It is interior, due to having larger contact area between plank and plank, when plank is drawn off storage box, plank and plank it
Between have larger frictional force, it is more laborious when to pull plank;Plank would generally be drawn off by machinery.On the one hand so that behaviour
Make complex, another aspect, it is poor in terms of energy saving.
Invention content
The purpose of the present invention is to provide convenient for drawing off the energy-saving type plank transport device of plank.
In order to achieve the above objectives, base case of the invention is as follows:
Energy-saving type plank transport device includes plank transport case, and the shaft and rotation for being fixed on plank transport case bottom connect
It is connected on the transport wheel at shaft both ends;Plank transport case includes bottom plate, front side wall, back side panel, left side wall and right side wall, bottom plate, preceding
Side wall, left side wall and right side wall are mutually permanently connected, and back side panel is detachably connected with bottom plate;The phase of the left side wall and right side wall
Opposite is equipped with several magnetic force units set gradually from top to bottom, and magnetic force unit includes several electromagnet, steel ball and level
The fin for being arranged and being fabricated from iron, iron core and the fin of electromagnet are fixed;Gap, the thickness in gap are equipped between adjacent fin
Less than the thickness of plank, the diameter of steel ball is less than the thickness in gap, and elastic layer is equipped in gap;It is convex on left side wall
The vertical range of the surface of rib and the inner wall of left side wall is more than the inner wall on the surface and left side wall for the elastic layer being set on left side wall
Vertical range;The vertical range of the surface of fin on right side wall and the inner wall of right left side wall, which is more than, is set to right side wall
On elastic layer surface and right side wall inner wall vertical range;Bottom plate is equipped with supporting plate moving up and down, under supporting plate
Side is equipped with jack.
The principle of this programme energy-saving type plank transport device is:
Plank transport case there is loading effect, plank to be layered in plank transport case plank;The width of plank is equal to a left side
The length of opposite the distance between fin on side wall and right side wall, plank is equal to the distance between front side wall and back side panel;From
And front side wall, back side panel, left side wall and right side wall have limit to plank, to which in transportational process, plank can be limited
Vibrations.
Before being put into plank into plank transport case, back side panel is opened, and electromagnet is powered on, then fin will have
It is magnetic;Be magnetic pole and since fin is fixed on the end of electromagnet core, at fin, i.e., fin surface it is magnetic most
Greatly.Steel ball is spread into side wall to the left and right side wall, then steel ball will be adsorbed on fin.When due to placing plank, plank is usually from upper
To lower movement, when plank passes through fin, plank will play the role of pushing to the steel ball being adsorbed on fin, while in fin pair
Under the suction-operated of steel ball, steel ball is by the gap between entering adjacent lugs, and elasticity of compression layer.
After plank crosses fin, since elastic layer is squeezed, steel ball will be transported outward under the action of elastic layer to gap
It is dynamic;And since the magnetism on fin surface is maximum, steel ball will revert again to fin surface.In addition, when plank reaches placed position
When setting, the steel ball at this will be blocked in gap, and at this time to jack pressure release, then plank will move down a distance, so as to make
Steel ball is back to fin surface out of gap, then so that supporting plate is restored to original position by jack again.To with plank by
It is gradually put into, will have steel ball between adjacent plank.In transportational process, by electromagnet deenergization, then fin is no longer to steel
Ball has suction-operated;And in transportational process, mobile vibrations are will produce, during vibrations, steel ball can random motion;Cause
This, in Discharging Process, due to the rolling of steel ball so that the frictional force between adjacent plank reduces so that the unloading of plank is lighter
Pine.
This programme generate advantageous effect be:
(1) when unloading plank, due to having steel ball between plank and plank, so as to reduce plank and plank it
Between frictional force, it is easier to plank is pulled out out of plank transport case, then unloading be easier, play energy-conserving action.
(2) when loading plank, electromagnet and fin have fixed function to steel ball, so as to avoid loading wood
When plate, plank sliding makes troubles to the loading of plank.In addition, an adsorbable steel ball of fin is limited, so as to plank
Steel ball number between plank is controlled, and avoids steel ball excessive, causes the waste of steel ball;It also can avoid steel ball number simultaneously
The very few forced area for leading to plank and steel ball is too small.
Preferred embodiment one:It is advanced optimized as to base case, the elastic layer is air bag;When the elasticity drop of air bag
When low, gas can be passed through into air bag to enhance elasticity;And other materials, as usage time extends, elasticity will reduce,
Elastic layer can only then be replaced.Therefore elastic layer is more convenient for safeguarding using air bag.
Preferred embodiment two:As advanced optimizing to preferred embodiment one, the front side wall is equipped with cylinder body, is set in cylinder body
There are the piston that can be slided along the axial cylinder, the top of piston to be equipped with breather check valve and outgassing nonreturn valve, the transport is taken turns and lives
Plug is connected by connecting rod, and cylinder body, sliding block, connecting rod and transport wheel constitute slider-crank mechanism;It is equipped with air cavity in the front side wall, goes out
The outlet side of gas check valve is connected to the top of air cavity, several partition boards is equipped in air cavity, air cavity is divided into air cavity unit, and every
Plate is equipped with check valve, the air cavity unit of the inlet end connection top of check valve, the air cavity of the outlet side connection lower section of check valve
Unit, each air cavity unit is interior to be equipped with the push rod being slidably connected with front side wall, and plank transport case, and front side are stretched into one end of push rod
Wall is equipped with the fastening structure that can fix push rod.
When being transported to plank, transport wheel will rotation;Since cylinder body, sliding block, connecting rod and transport wheel constitute slide crank
Block mechanism, therefore during transport wheel rotation, sliding block will move back and forth in cylinder body;So that cylinder body, piston, air inlet list
To valve inflator structure similar with outgassing nonreturn valve composition so that the pressure in air cavity increases.During unloading plank, by
In the plank for first unloading top, therefore by unclamping fastening effect of the fastening structure to push rod, the pressure in air cavity unit will push
Movement in push rod case plank transport case, to which plank is released plank transport case.In addition, due to the gas in the air cavity unit of lower section
Body cannot as top air cavity unit in flow, therefore push rod can be made to stretch into one by one in plank transport case from top to bottom, to by
It is a to unload plank.
Preferred embodiment three:As advanced optimizing to preferred embodiment two, the lower end of the back side panel is hinged on bottom plate,
The upper end of back side panel is equipped with can be with the fixed latch hook of left side wall and right side wall upper end.After unclamping latch hook, back side panel can rotate down,
Then the upper end overlap joint of back side panel can form a gradient on the ground, to which operating personnel can walk in the gradient, convenient for unloading
Lower plank.
Preferred embodiment four:As advanced optimizing to preferred embodiment three, the upper end of the back side panel is equipped with collecting tank, receives
Collect the opening of slot towards the lower end of back side panel.During pulling plank, since electromagnet no longer there is absorption to make steel ball
With therefore, steel ball will be rolled in board surface, finally be rolled to collecting tank along the surface of back side panel, be collected to steel ball.
Preferred embodiment five:As advanced optimizing to preferred embodiment four, the inner wall of the back side panel, which is equipped with, extends to receipts
Collect the groove in slot, the depth and width of groove are more than the diameter of steel ball.Since when unloading plank, operating personnel will be in rear side
It is operated on plate, and steel ball is in back side panel surface scrolls at this time, if step on will be than relatively hazardous by operating personnel;By the way that ditch is arranged
Slot, steel ball will enter groove, the steel ball so that avoidable operating personnel step on.
Description of the drawings
Fig. 1 is the structural schematic diagram of energy-saving type plank transport device embodiment of the present invention;
Fig. 2 is the sectional view of right side wall.
Specific implementation mode
Below by specific implementation mode, the present invention is described in further detail:
Reference numeral in Figure of description includes:Bottom plate 10, transport wheel 11, left side wall 20, cross bar 21, front side wall 30,
Air cavity unit 31, push rod 32, check valve 33, cylinder body 34, piston 35, breather check valve 36, outgassing nonreturn valve 37, back side panel 40,
Collecting tank 41, groove 42, right side wall 50, fin 61, electromagnet 62, air bag 63, steel ball 64.
Embodiment is substantially as shown in Figure 1 and Figure 2:
The energy-saving type plank transport device of the present embodiment includes plank transport case, is fixed on the shaft of plank transport case bottom
And it is rotatably connected on the transport wheel 11 at shaft both ends;The front end of plank transport case is equipped with interconnecting piece, to by plank transport case
It is connected on trailer, so as to drag the movement of plank transport case.
Plank transport case includes bottom plate 10, front side wall 30, back side panel 40, left side wall 20 and right side wall 50, bottom plate 10,
Together with front side wall 30, left side wall 20 are welded to each other with right side wall 50;Left side wall 20 and right side wall are respectively provided at the top of 50 end
A piece cross bar 21, two cross bars 21 are oppositely arranged, and have gap between two cross bars 21.It is cut with scissors with bottom plate 10 lower end of back side panel 40
It connects, so that back side panel 40 can be overturn;The upper end of back side panel 40 is equipped with hook, and hook can be formed with cross bar 21 to be coordinated, from
And back side panel 40 can be made to be formed with left side wall 20, right side wall 50 and fixed;And then surround the space for loading plank.When loading plank,
Back side panel 40 is overturn, and the upper end of back side panel 40 is made to overlap on the ground, then back side panel 40 will form a gradient, to just
Enter in plank transport case in operating personnel and operates;When loading plank, plank is moved to wood by way of lifting
In plate transport case, and the gap between two cross bars 21 then passes through for the rope of lifting.
The opposite face of left side wall 20 and right side wall 50 is equipped with several magnetic force units set gradually from top to bottom, magnetic force list
Member includes several electromagnet 62, steel ball 64 and the fin 61 for being horizontally disposed with and being fabricated from iron;Fin 61 is fixed on left side wall 20
Or on right side wall 50, and the iron core of electromagnet 62 is fixed with fin 61.When electromagnet 62 powers on, fin 61 is located at electromagnet
At 62 magnetic pole, so as to form maximum magnetic field on the surface of fin 61.Gap is equipped between adjacent fin 61, gap
Thickness is less than the thickness of plank;So as to avoid plank from being caught in gap.And the diameter of steel ball 64 is less than the thickness in gap, then
When loading plank, plank moves from top to bottom, and plank will be pressed down against steel ball 64;And the absorption of steel ball 64 is made in fin 61
Under, steel ball 64 will enter in gap.In addition, being equipped with air bag 63 in gap, in the entrance of steel ball 64 gap, and plank passes through
When by the gap, plank will squeeze steel ball 64 so that steel ball 64 enters in gap, then extruding gasbag 63 is made gas by steel ball 64
Capsule 63 deforms;And after plank crosses gap, air bag 63 will outwardly against steel ball 64, so that steel ball 64 leaves gap, then
The secondary surface for being adsorbed to fin 61.Bottom plate is equipped with supporting plate moving up and down, and the lower section of supporting plate is equipped with several jack, from
And supporting plate is supported by jack;When plank reaches placed position, the steel ball 64 at this will be blocked in gap, this
When to jack pressure release, then plank will move down a distance, so as to make steel ball 64 be back to 61 surface of fin out of gap, so
Supporting plate is set to restore to original position by jack again afterwards.
The vertical range of the surface of fin 61 on left side wall 20 and the inner wall of left side wall 20, which is more than, is set to left side
The vertical range on the surface of the elastic layer on wall 20 and the inner wall of left side wall 20;The surface of fin 61 on right side wall 50
It is more than the inner wall on the surface and right side wall 50 of the elastic layer being set on right side wall 50 with the vertical range of the inner wall of right left side wall 20
Vertical range.
It is welded with cylinder body 34 on front side wall 30, piston 35 is slidably connected in cylinder body 34, the top of piston 35 is equipped with air inlet
Check valve 36 and outgassing nonreturn valve 37.Transport wheel 11 is connected with piston 35 by connecting rod, i.e. the bottom of one end of connecting rod and piston 35
Portion is hinged, and the other end of connecting rod is then hinged with transport wheel 11, and the hinged place of connecting rod and transport wheel 11 is set to the inclined of transport wheel 11
At the heart.Then cylinder body 34, sliding block, connecting rod and transport wheel 11 constitute slider-crank mechanism;And cylinder body 34 then constitutes an inflator knot
Structure.Air cavity is equipped in front side wall 30, air cavity is interior to be divided into air cavity unit 31 equipped with several partition boards by air cavity;Partition board is equipped with unidirectional
Valve 33, the air cavity unit 31 of the inlet end connection top of check valve 33, the air cavity unit of the outlet side connection lower section of check valve 33
31.The outlet side of outgassing nonreturn valve 37 is connected to the air cavity unit 31 of top, then when piston 35 moves back and forth, the top
The pressure of air cavity unit 31 constantly increases, and air can be entered in the air cavity unit 31 of lower section by check valve 33, therefore, finally
Pressure in air cavity unit 31 used will all increase.It is equipped with the push rod being slidably connected with front side wall 30 in each air cavity unit 31
32, plank transport case is stretched into one end of push rod 32, is in addition equipped with tension spring in air cavity unit 31, and tension spring is connect with push rod 32 with to drawing
Spring applies pulling force.When the pressure in air cavity unit 31 increases, then push rod 32 can be released to apply thrust to plank;In addition side
Wall is equipped with fastening bolt, and the end of fastening bolt can hold out against push rod 32, and after unclamping fastening bolt, push rod 32 can just be stretched
Go out.
The upper end of back side panel 40 is equipped with collecting tank 41, and the opening of collecting tank 41 is towards the lower end of back side panel 40;Unloading wood
When plate, collecting tank 41 can be collected steel ball 64.And the inner wall of back side panel 40 is equipped with the groove 42 extended in collecting tank 41,
The depth and width of groove 42 are more than the diameter of steel ball 64;Groove 42 will be entered when being rolled on back side panel 40 to steel ball 64, from
And it can avoid operating personnel and step on steel ball 64.
The specific work process of the present embodiment energy-saving type plank transport device is:
The width of plank is equal to the distance between fin 61 opposite on left side wall 20 and right side wall 50, the length etc. of plank
In the distance between front side wall 30 and back side panel 40;To which front side wall 30, back side panel 40, left side wall 20 and right side wall 50 are to plank
With limit, in transportational process, the vibrations of plank can be limited.
Back side panel 40 is opened, and electromagnet 62 is powered on;Then steel ball 64 is spread into side wall 20 to the left and right side wall 50,
Then steel ball 64 will be adsorbed on fin 61.When lifting plank, plank moves from top to bottom, when plank passes through fin 61, plank
There to be pushing to the steel ball 64 being adsorbed on fin 61, and in fin 61 under the suction-operated of steel ball 64, steel ball 64
It will enter in the gap between adjacent lugs 61, and elasticity of compression layer.After plank crosses fin 61, since elastic layer is squeezed,
Steel ball 64 will move under the action of elastic layer to outside gap, and turn again to 61 surface of fin.And coordinate jack pair supporting plate
Position operated, then plank can be made gradually to be layered in plank transport case, and make that there is between adjacent plank steel ball 64.
In transportational process, by 62 deenergization of electromagnet, then fin 61 is no longer to steel ball 64 with suction-operated;Then transport
During defeated, 64 random motion of steel ball is simultaneously distributed between plank.Simultaneously in transportational process, the pressure in air cavity unit 31 will
Increase;Therefore, in Discharging Process, by unclamping fastening bolt, plank transport case can be released in the end of plank, consequently facilitating
Pull plank.Due to the rolling of steel ball 64 so that the frictional force between adjacent plank reduces so that the unloading of plank is lighter.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and characteristic are not made herein in scheme
Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art
Several modifications and improvements are made, these should also be considered as protection scope of the present invention, these all do not interfere with what the present invention was implemented
Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification
The records such as specific implementation mode can be used for explaining the content of claim.
Claims (6)
1. energy-saving type plank transport device, it is characterised in that:Including plank transport case, it is fixed on the shaft of plank transport case bottom
And it is rotatably connected on the transport wheel at shaft both ends;Plank transport case includes bottom plate, front side wall, back side panel, left side wall and right side
Wall, bottom plate, front side wall, left side wall and right side wall are mutually permanently connected, and back side panel is detachably connected with bottom plate;The left side wall and
The opposite face of right side wall is equipped with several magnetic force units set gradually from top to bottom, and magnetic force unit includes several electromagnet, steel
Ball and the fin for being horizontally disposed with and being fabricated from iron, iron core and the fin of electromagnet are fixed;Gap is equipped between adjacent fin,
The thickness in gap is less than the thickness of plank, and the diameter of steel ball is less than the thickness in gap, and elastic layer is equipped in gap;Mounted on a left side
The vertical range of the surface of fin on side wall and the inner wall of left side wall is more than the surface and a left side for the elastic layer being set on left side wall
The vertical range of the inner wall of side wall;The surface of fin on right side wall and the vertical range of the inner wall of right left side wall are more than
The vertical range on the surface of the elastic layer on right side wall and the inner wall of right side wall;Bottom plate is equipped with support moving up and down
The lower section of plate, supporting plate is equipped with jack.
2. energy-saving type plank transport device according to claim 1, it is characterised in that:The elastic layer is air bag.
3. energy-saving type plank transport device according to claim 2, it is characterised in that:The front side wall is equipped with cylinder body,
The piston that can be slided along the axial cylinder is equipped in cylinder body, the top of piston is equipped with breather check valve and outgassing nonreturn valve, the fortune
Defeated wheel is connected with piston by connecting rod, and cylinder body, sliding block, connecting rod and transport wheel constitute slider-crank mechanism;It is set in the front side wall
There are air cavity, the outlet side of outgassing nonreturn valve to be connected to the top of air cavity, air cavity is divided into air cavity equipped with several partition boards in air cavity
Unit, and partition board is equipped with check valve, the air cavity unit of the inlet end connection top of check valve, under the outlet side connection of check valve
The air cavity unit of side, each air cavity unit is interior to be equipped with the push rod being slidably connected with front side wall, and plank transport is stretched into one end of push rod
Case, and front side wall is equipped with the fastening structure that can fix push rod.
4. energy-saving type plank transport device according to claim 3, it is characterised in that:The lower end of the back side panel is hinged on
On bottom plate, the upper end of back side panel is equipped with can be with the fixed latch hook of left side wall and right side wall upper end.
5. energy-saving type plank transport device according to claim 4, it is characterised in that:The upper end of the back side panel, which is equipped with, receives
Collect slot, the opening of collecting tank is towards the lower end of back side panel.
6. energy-saving type plank transport device according to claim 5, it is characterised in that:Being internally provided with for the back side panel is prolonged
The groove in collecting tank is reached, the depth and width of groove are more than the diameter of steel ball.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810791279.8A CN108725303A (en) | 2018-07-18 | 2018-07-18 | Energy-saving type plank transport device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810791279.8A CN108725303A (en) | 2018-07-18 | 2018-07-18 | Energy-saving type plank transport device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108725303A true CN108725303A (en) | 2018-11-02 |
Family
ID=63926578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810791279.8A Pending CN108725303A (en) | 2018-07-18 | 2018-07-18 | Energy-saving type plank transport device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108725303A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113335174A (en) * | 2021-05-29 | 2021-09-03 | 安徽科林新材料科技有限公司 | Wood conveying device and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202499339U (en) * | 2012-02-27 | 2012-10-24 | 上海拖拉机内燃机有限公司 | Clamping-hook type full dismounting wooden case structure |
DE202015105038U1 (en) * | 2015-09-23 | 2015-10-30 | Roland Köhler | Cart for the transport of meters of wood |
WO2018036046A1 (en) * | 2016-08-26 | 2018-03-01 | 李晓敏 | Construction vehicle for transporting cables |
CN108032792A (en) * | 2017-11-09 | 2018-05-15 | 季利杰 | A kind of nursery stock transfer car(buggy) |
CN207361708U (en) * | 2017-08-26 | 2018-05-15 | 新昌县勤振机械制造有限公司 | A kind of plank conveying arrangement |
CN108099996A (en) * | 2017-12-13 | 2018-06-01 | 宁波隆锐机械制造有限公司 | A kind of circuit board transporter |
CN208530405U (en) * | 2018-07-18 | 2019-02-22 | 重庆力迅家居有限公司 | Energy-saving type plank transport device |
-
2018
- 2018-07-18 CN CN201810791279.8A patent/CN108725303A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202499339U (en) * | 2012-02-27 | 2012-10-24 | 上海拖拉机内燃机有限公司 | Clamping-hook type full dismounting wooden case structure |
DE202015105038U1 (en) * | 2015-09-23 | 2015-10-30 | Roland Köhler | Cart for the transport of meters of wood |
WO2018036046A1 (en) * | 2016-08-26 | 2018-03-01 | 李晓敏 | Construction vehicle for transporting cables |
CN207361708U (en) * | 2017-08-26 | 2018-05-15 | 新昌县勤振机械制造有限公司 | A kind of plank conveying arrangement |
CN108032792A (en) * | 2017-11-09 | 2018-05-15 | 季利杰 | A kind of nursery stock transfer car(buggy) |
CN108099996A (en) * | 2017-12-13 | 2018-06-01 | 宁波隆锐机械制造有限公司 | A kind of circuit board transporter |
CN208530405U (en) * | 2018-07-18 | 2019-02-22 | 重庆力迅家居有限公司 | Energy-saving type plank transport device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113335174A (en) * | 2021-05-29 | 2021-09-03 | 安徽科林新材料科技有限公司 | Wood conveying device and method |
CN113335174B (en) * | 2021-05-29 | 2023-08-22 | 安徽科林新材料科技有限公司 | Wood transportation device and transportation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208530405U (en) | Energy-saving type plank transport device | |
CN209239111U (en) | A kind of valve rod bar portion drilling processing equipment with cutting agency | |
CN108725303A (en) | Energy-saving type plank transport device | |
CN209239569U (en) | A kind of valve rod bar portion drilling processing equipment being provided with feed mechanism | |
CN208439527U (en) | A kind of waste paper packing apparatus | |
CN211246745U (en) | Soil remediation is with firming device convenient to ejection of compact | |
CN107539597A (en) | A kind of timber bogey | |
CN111846700A (en) | Building rubbish storage box | |
US20090199727A1 (en) | Portable compactor for materials, especially waste and recyclable materials | |
CN104138021B (en) | For the packing apparatus of paste hair smoke leaf | |
CN206939614U (en) | A kind of logistics shelf for being easy to unload goods | |
CN208435105U (en) | A kind of shelf for facilitating cargo to pick and place | |
CN206783050U (en) | Double-sucker type safety alarm device | |
CN207172813U (en) | A kind of efficient refuse compaction equipment | |
CN207312741U (en) | One kind storage cloth holder | |
CN112498209A (en) | Novel building dump truck hopper capable of reducing dust | |
CN206749109U (en) | A kind of vertical baler | |
CN207503309U (en) | Cash box and financial self-service equipment | |
CN110377122A (en) | Lever labor-saving grip and its application method | |
CN113774758B (en) | Road roller for road construction and use method thereof | |
CN204368834U (en) | Gate-type compression box in upset | |
CN208530617U (en) | A kind of handling device of efficient billet | |
US3289572A (en) | Refuse loading and compacting apparatus | |
CN206459457U (en) | Rare earth permanent-magnetic material fast-drying device | |
CN210739008U (en) | Movable silent hydraulic station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |