CN207347122U - A kind of automatic Lift-on/Lift-off System of bridge construction - Google Patents
A kind of automatic Lift-on/Lift-off System of bridge construction Download PDFInfo
- Publication number
- CN207347122U CN207347122U CN201721366073.8U CN201721366073U CN207347122U CN 207347122 U CN207347122 U CN 207347122U CN 201721366073 U CN201721366073 U CN 201721366073U CN 207347122 U CN207347122 U CN 207347122U
- Authority
- CN
- China
- Prior art keywords
- bridge
- lift
- hoist engine
- distribution box
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 239000000725 suspension Substances 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 8
- 239000010959 steel Substances 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 description 7
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
It the utility model is related to bridge building operations field, and in particular to a kind of automatic Lift-on/Lift-off System of bridge construction.Technical solution is as follows:Including construction operation platform and two mobile lifting operation cars, mobile lifting operation car includes electric platforms, hoist engine, stent, ballast box and distribution box, the hoist engine and stent are arranged on the front portion of the electric platforms, and the ballast box and distribution box are arranged on the rear portion of the electric platforms;The stent is equipped with pulley, and the steel wire rope of the hoist engine is hung on the pulley, and the front end of the steel wire rope is equipped with suspension hook;The distribution box is connected by electric wire with the motor of the electric platforms and hoist engine, and the distribution box is equipped with controller and its corresponding remote controler;Two mobile lifting operation cars are individually positioned on the both sides bridge floor of bridge, and the construction operation platform is connected by the suspension hook.The utility model accelerates construction progress while ensureing safe, realizes the economic benefit of bigger.
Description
Technical field
It the utility model is related to bridge building operations field, and in particular to a kind of automatic Lift-on/Lift-off System of bridge construction.
Background technology
In bridge building operations, lifting system has obtained more and more utilizations.Before not being open to traffic also after the completion of bridge main body,
The work such as the template peace for needing to carry out on bridge tears open, repairs, application, are required for setting up bridge main body bottom surface construction working platform.
At present, construction working platform in bridge main body bottom surface substantially adds hanging basket method using automobile arm top and sets up
Two methods of full framing.Automobile arm top, which adds hanging basket method, is stretched lever arm by crane under bridge, the construction in hanging basket
Personnel are sent to designated position, and hanging basket is directly becoming workbench, and this method danger is higher, work area is small, of high cost;
Raft support method is a kind of method in bridge lower plane position erection construction platform, and safe and stable property is good, but there are it is of high cost,
Time-consuming, the shortcomings of can not moving.
Utility model content
The utility model provides a kind of automatic Lift-on/Lift-off System of bridge construction, and two mobile lifting operation cars are placed on bridge,
Construction operation platform under bridge is sling jointly, by remote-controlled movement lifting operation car, is moved the construction operation platform under bridge,
So as to solving the problems such as the of high cost of conventional method, security and very flexible, while ensureing safe, quickening construct into
Degree, realizes the economic benefit of bigger.
The technical solution of the utility model is as follows:
A kind of automatic Lift-on/Lift-off System of bridge construction, including construction operation platform and two mobile lifting operation cars, movement are hung
Dress Operation Van includes electric platforms, hoist engine, stent, ballast box and distribution box, and the hoist engine and stent are arranged on the electricity
The front portion of moving platform, the ballast box and distribution box are arranged on the rear portion of the electric platforms;The stent is equipped with pulley, institute
The steel wire rope for stating hoist engine is hung on the pulley, and the front end of the steel wire rope is equipped with suspension hook;The distribution box by electric wire with
The motor connection of the electric platforms and hoist engine, the distribution box are equipped with controller and its corresponding remote controler;Two shiftings
Dynamic lifting operation car is individually positioned on the both sides bridge floor of bridge, and the construction operation platform is connected by the suspension hook.
The automatic Lift-on/Lift-off System of the bridge construction, its preferred solution are that the front end of the electric platforms is equipped with anticollision side
Wheel.
The beneficial effects of the utility model are:
1st, the utility model is in the construction process, practical light, it is not necessary to which that heavy mechanical equipment auxiliary construction, reduces labor
Business and equipment cost.
2nd, the utility model can be advanced or retreated by electronic remote control system robot, conveniently moving, improve work
Efficiency.
3rd, the utility model is simple in structure, small, and transport easy to remove, component is sturdy and durable, and failure rate is low, security
Height, is adapted to construction site to use.
Brief description of the drawings
Fig. 1 is mobile lifting operation car stereogram;
Fig. 2 is mobile lifting operation car owner's view;
Fig. 3 is the automatic Lift-on/Lift-off System usage state diagram of bridge construction.
Embodiment
As shown in Figs. 1-3, the automatic Lift-on/Lift-off System of a kind of bridge construction, including construction operation platform 12 and two mobile liftings
Operation Van 11, mobile lifting operation car 11 include electric platforms 2, hoist engine 4, stent 8, ballast box 9 and distribution box 1, the volume
Raise machine 4 and stent 8 is arranged on the front portion of the electric platforms 2, the ballast box 9 and distribution box 1 are arranged on the electric platforms 2
Rear portion;The stent 8 is equipped with pulley 5, and the steel wire rope 7 of the hoist engine 4 is hung on the pulley 5, the steel wire rope 7
Front end is equipped with suspension hook 6;The distribution box 1 is connected by electric wire with the motor of the electric platforms 2 and hoist engine 4, the distribution
Case 1 is equipped with controller and its corresponding remote controler;Two mobile lifting operation cars 11 are individually positioned in the both sides bridge floor of bridge
On 13, the construction operation platform 12 is connected by the suspension hook 6;The front end of the electric platforms 2 is equipped with anticollision side wheel 3.
The course of work is as follows:After system normally starts, by remote controller operation controller distribution control box 1 to electric platforms
2 motor power supply so that the mobile lifting operation car 11 on bridge is travelled to operating position, passes through remote control control hoist engine 4
Suspension hook 6 is put down, after construction operation platform 12 is connected with suspension hook 6, passes through 4 lifting construction job platform 12 of remote control control hoist engine
Designated position is reached, is constructed;In construction plane, it can realize to move back and forth on bridge floor 13 and apply by remote control device
Work job platform 12.The utility model produces certain dead weight by adding weight in ballast box 9, avoids mobile lifting operation
Car 11 is turned on one's side, and increase dead weight can be achieved by addition standard quality cement concrete block prefabricated in advance.
Claims (2)
1. a kind of automatic Lift-on/Lift-off System of bridge construction, it is characterised in that including construction operation platform and two mobile lifting operations
Car, mobile lifting operation car include electric platforms, hoist engine, stent, ballast box and distribution box, and the hoist engine and stent are set
In the front portion of the electric platforms, the ballast box and distribution box are arranged on the rear portion of the electric platforms;Set on the stent
There is pulley, the steel wire rope of the hoist engine is hung on the pulley, and the front end of the steel wire rope is equipped with suspension hook;The distribution box leads to
The motor that electric wire is crossed with the electric platforms and hoist engine is connected, and the distribution box is equipped with controller and its corresponding remote control
Device;Two mobile lifting operation cars are individually positioned on the both sides bridge floor of bridge, and the construction operation is connected by the suspension hook
Platform.
2. the automatic Lift-on/Lift-off System of bridge construction according to claim 1, it is characterised in that the front end of the electric platforms is set
There is anticollision side wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721366073.8U CN207347122U (en) | 2017-10-23 | 2017-10-23 | A kind of automatic Lift-on/Lift-off System of bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721366073.8U CN207347122U (en) | 2017-10-23 | 2017-10-23 | A kind of automatic Lift-on/Lift-off System of bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207347122U true CN207347122U (en) | 2018-05-11 |
Family
ID=62355400
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721366073.8U Expired - Fee Related CN207347122U (en) | 2017-10-23 | 2017-10-23 | A kind of automatic Lift-on/Lift-off System of bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207347122U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109081246A (en) * | 2018-09-30 | 2018-12-25 | 张学文 | A kind of road and bridge lifting construction device |
CN109183629A (en) * | 2018-10-31 | 2019-01-11 | 上海城建市政工程(集团)有限公司 | A kind of great cantilever bent cap precast assembly method |
CN109797649A (en) * | 2019-01-31 | 2019-05-24 | 中铁大桥(南京)桥隧诊治有限公司 | A kind of tool car Hoisting Program not influencing bridge deck traffic |
CN110143532A (en) * | 2019-05-17 | 2019-08-20 | 陕西国防工业职业技术学院 | A kind of bridge construction hanging device |
-
2017
- 2017-10-23 CN CN201721366073.8U patent/CN207347122U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109081246A (en) * | 2018-09-30 | 2018-12-25 | 张学文 | A kind of road and bridge lifting construction device |
CN109183629A (en) * | 2018-10-31 | 2019-01-11 | 上海城建市政工程(集团)有限公司 | A kind of great cantilever bent cap precast assembly method |
CN109183629B (en) * | 2018-10-31 | 2020-04-28 | 上海城建市政工程(集团)有限公司 | Large cantilever bent cap prefabrication and assembly method |
CN109797649A (en) * | 2019-01-31 | 2019-05-24 | 中铁大桥(南京)桥隧诊治有限公司 | A kind of tool car Hoisting Program not influencing bridge deck traffic |
CN109797649B (en) * | 2019-01-31 | 2021-09-24 | 中铁桥隧技术有限公司 | Maintenance vehicle hoisting scheme without influence on bridge floor traffic |
CN110143532A (en) * | 2019-05-17 | 2019-08-20 | 陕西国防工业职业技术学院 | A kind of bridge construction hanging device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207347122U (en) | A kind of automatic Lift-on/Lift-off System of bridge construction | |
CN203922518U (en) | A kind of portable high-building hoisting machine | |
CN210528272U (en) | Hoisting equipment for prefabricated parts | |
CN202148909U (en) | Operation vehicle for mounting tunnel arch trusses | |
CN104192735A (en) | Small-size crane | |
CN105569692A (en) | Trolley for welding tunnel waterproof board hanging cloth | |
CN203740992U (en) | Working table with lifting and overturning device | |
CN205802916U (en) | A kind of intelligence automatic-lifting overhauling platform for transmission equipment | |
CN108946542A (en) | A kind of small gun carriage and its construction method | |
CN203199883U (en) | Scissor type lifting tool for steel rail lifting | |
CN203095440U (en) | Special lifting device for asphalt pavement maintenance truck in high-altitude low-temperature region | |
CN206144559U (en) | Portable mining lifting support that fixes | |
CN206956559U (en) | Quick peace for guardrail template in Bridge guardrail concrete pouring construction tears equipment open | |
CN102886679B (en) | Work piece butting equipment and work piece butting device thereof | |
CN106185626B (en) | Turning device and method are aided in suitable for the packaged type of large volume and wt pts | |
CN206328062U (en) | A kind of novel cantilever is hung | |
CN205776225U (en) | Inclined hole embedded rock pile steel reinforcement cage transfers leading truck device | |
CN204938726U (en) | Plate founds ground support | |
CN205328346U (en) | Unwrapping wire ware support | |
CN204529154U (en) | Cement brick hoisting machine | |
CN208856779U (en) | A kind of tile hanging apparatus | |
CN206256382U (en) | It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed | |
CN206203763U (en) | Self-driving floor hanging apparatus | |
CN105672910B (en) | Oil pipe traction lifting Aided Machine | |
CN205668903U (en) | Small precast basis sling cart |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |