CN207332906U - Steelframe shores component - Google Patents
Steelframe shores component Download PDFInfo
- Publication number
- CN207332906U CN207332906U CN201720916857.7U CN201720916857U CN207332906U CN 207332906 U CN207332906 U CN 207332906U CN 201720916857 U CN201720916857 U CN 201720916857U CN 207332906 U CN207332906 U CN 207332906U
- Authority
- CN
- China
- Prior art keywords
- steelframe
- nut
- jacking screw
- component
- shores
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of steelframe and shores component, the steelframe, which shores component, includes lower support tube (2) and upper support frame (1), the upper support frame includes shoring the supporting part of steelframe and the jacking screw (13) extended downwardly, the jacking screw is downwardly into the top tube chamber of the lower support tube, nut (14) is arranged with the jacking screw, the nut is shored can simultaneously surround jacking screw rotation to jack the upper support frame upwards on the top of the lower support tube.Compared with traditional stand, the labour of 2 to 4 operating personnels can be saved by shoring component using the steelframe, and since the structure of supporting part is simple, operating personnel's energy fast accurate, align erection by steelframe securely, the setting support speed in work progress is improved, has ensured the security of construction.
Description
Technical field
The utility model belongs to technical field of tunnel construction, and in particular to a kind of steelframe shores component.
Background technology
In constructing tunnel, it is the important procedure for preventing tunnel cave to carry out quick supporting immediately to the tunnel after excavation, but
Tunnel excavation support is carried out there are speed is slow, steelframe precisely aligns the problems such as difficult, security is poor using existing traditional stand,
Leverage construction speed.
Therefore, it is necessary to continue to optimize tunnel excavation support technology, tunnel excavation support construction is set to accomplish safety, quick, section
About cost.
Utility model content
For the drawbacks described above or deficiency of the prior art, the utility model provides a kind of steelframe and shores component, can make tunnel
Road excavation supporting construction is accomplished safe, quick, cost-effective.
To achieve the above object, the utility model provides a kind of steelframe and shores component, and the steelframe, which shores component, to be included
Lower support tube and upper support frame, the upper support frame includes shoring the supporting part of steelframe and the jacking screw extended downwardly, described
Jacking screw is downwardly into the top tube chamber of the lower support tube, and nut, the nut top are arranged with the jacking screw
Support can simultaneously surround the jacking screw on the top of the lower support tube and rotate to jack the upper support frame upwards.
Preferably, the internal diameter of the top tube chamber of the lower support tube is more than the outside diameter of the jacking screw.
Preferably, the supporting part is U-shaped frame, and the steelframe is sticked in the U-lag of the U-shaped frame.
Preferably, the U-shaped frame includes two vertical reinforcements and horizontal steel plate, and two vertical reinforced-bar-weldings are in described
The both ends of horizontal steel plate, the top of the jacking screw are welded in the bottom centre of the horizontal steel plate.
Preferably, the thickness of the horizontal steel plate is not less than 10cm not less than 10mm and width, the vertical reinforcement it is straight
Footpath is not less than 20mm.
Preferably, the diameter d of the jacking screw meets:28mm≤d≤32mm.
Preferably, rectilinear path of the nut on the jacking screw is no less than 100mm.
Preferably, the steelframe, which shores component, includes the lower support tube of different lengths specification.
Preferably, the steelframe, which shores component, includes rotation handle, and the pars intermedia for rotating handle is fixedly connected described
Nut is to drive the nut to rotate.
Preferably, the nut is six-sided nut, and the rotation handle is welded on the six-sided nut for level
The double parallel bar on symmetrical side.
Compared with traditional stand, the labour of 2 to 4 operating personnels can be saved by shoring component using the steelframe, and
Since the structure of supporting part is simple, operating personnel's energy fast accurate, align erection by steelframe securely, improves in work progress
Setting support speed, ensured construction security.
Other features and advantages of the utility model will be described in detail in subsequent specific embodiment part.
Brief description of the drawings
Fig. 1 is the front view that steelframe shores component
Description of reference numerals
1:Upper support frame;11:Vertical reinforcement;12:Horizontal steel plate;13:Jacking screw;
14:Nut;15:Rotate handle;
2:Lower support tube;
3:Steelframe
Embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with attached drawing.It should be appreciated that herein
Described embodiment is only used for describing and explaining the present invention, and is not intended to limit the present invention.
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the utility model can
To be mutually combined.
In the utility model, in the case where not making conversely explanation, the noun of locality such as " upper and lower, top, bottom " used is usually
It is each component mutual alignment either on vertical, vertical or gravity direction for direction shown in the drawings
Relationship description word.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in Figure 1, the utility model, which provides a kind of steelframe, shores component, including lower support tube 2 and upper support frame 1, on
Supporting rack 1 includes shoring the supporting part of steelframe and the jacking screw 13 extended downwardly, and jacking screw 13 is downwardly into lower support tube 2
Top tube chamber in, be arranged with nut 14 on jacking screw 13, nut 14 is shored can simultaneously surround top on the top of lower support tube 2
Rotated into screw 13 to jack upper support frame 1 upwards.
During operation, the lower support tube 2 that steelframe can be shored to component is vertically placed on flat hard ground.It is rotated down and is arranged
In the nut 14 on jacking screw 13, jacking screw 13 moves upwards therewith, and then jacks the steelframe 3 being erected on supporting part,
Steelframe shores the elevating movement that component can be by convert rotational motion that is relatively labor-saving and being easily manipulated for 3 in the vertical direction of steelframe,
Steelframe 3 is jacked to object height, only needs a people to help steelframe to shore component, other operating personnels can carry out steelframe 3
Connection and reinforcing.Compared with traditional stand, the labour of 2 to 4 operating personnels can be saved by shoring component using steelframe, and by
Simple in the structure of supporting part, operating personnel's energy fast accurate, align erection by steelframe 3 securely, improves in work progress
Setting support speed, ensured construction security.
Specifically, the internal diameter of the top tube chamber of lower support tube 2 is more than the outside diameter of jacking screw 13.That is, jacking silk
One section of the bottom of bar 13 will be downwardly into the top tube chamber of lower support tube 2, it is necessary to meet that the inner diameter of lower support tube 2 is more than
The major diameter of thread of jacking screw 13, is inserted under jacking screw 13 in the tube chamber of lower support tube 2 and can do plug rectilinear movement, lower branch
Stay tube 2 ensures that steelframe is shored component and can be jacked steelframe 3 to the object height of operation.
Specifically, supporting part is U-shaped frame, and steelframe 3 is sticked in the U-lag of U-shaped frame.
Preferably, U-shaped frame includes two vertical reinforcements 11 and horizontal steel plate 12, and two vertical reinforcements 11 are welded in horizontal steel
The both ends of plate 12, the top of jacking screw 13 are welded in the bottom centre of horizontal steel plate 12.Supporting part is arranged to U-shaped, can be more preferable
Ground engages steelframe 3, avoids steelframe 3 from occurring situation about deflecting during jacking, operating personnel need to only help the two of steelframe 3
End, just can be not only laborsaving but also safely stablizes jacking by steelframe 3.
Preferably, the thickness of horizontal steel plate 12 is not less than 10cm not less than 10mm and width, and the diameter of vertical reinforcement 11 is not
Less than 20mm.U-shaped frame includes two vertical reinforcements 11 and horizontal steel plate 12, processes and obtains in waste and old steel that can be at the construction field (site)
Take, construction cost is greatly saved, such as the vertical reinforcement 11 of two a diameter of 25mm of selection and thickness are 15mm, width is
The horizontal steel plate 12 of 10cm is welded into U-shaped frame, it is ensured that the U-shaped frame has enough strength and stiffness to engage and consolidates steelframe 3,
Improve the security of work progress.
Preferably, the major diameter of thread d of jacking screw 13 meets:28mm≤d≤32mm.The diameter of jacking screw 13 be more than etc.
In 28mm, can guarantee that steelframe shores the rigidity and intensity requirement when component meets jacking steelframe 3, avoid the occurrence of jacking screw 13 because
Load-bearing capacity deficiency and abrupt bend or fracture, so as to threaten the situation of construction worker's life security.In addition, though jacking
The diameter of screw 13 also meets rigidity and intensity requirement when being more than 32mm, but steelframe is shored the quality of component and can therefore be become
Greatly, it is unfavorable for light assembly and disassembly and use.
Preferably, rectilinear path of the nut 14 on jacking screw 13 is no less than 100mm.Component is shored due to steelframe pushing up
During rising steelframe 3, nut 14 is rotated down relative to jacking screw 13, and the rectilinear path of its in the vertical direction is equal to top
The rectilinear path risen into screw, therefore rectilinear path of the nut 14 on jacking screw 13 influences the height that steelframe 3 is jacked,
Its rectilinear path is no less than 100mm, then coordinates the length of lower support tube 2, it is ensured that steelframe 3 can be jacked to object height and carried out
Connection is fixed.
Specifically, steelframe, which shores component, includes the lower support tube 2 of different lengths specification.Each tunnel construction site builds steel
Height during frame 3 is not quite similar, and in different construction sites, steelframe need to only be shored the upper support frame 1 of component under original
Extract, be inserted into meeting in another lower support tube 2 of corresponding construction height specification in support tube 2, can be switched fast for
Suitable steelframe shores component and carries out constructing tunnel, has saved construction cost and construction time.
Specifically, steelframe shore component include rotation handle 15, rotation handle 15 pars intermedia be fixedly connected nut 14 with
Driving nut 14 rotates.
Preferably, nut 14 is six-sided nut, and rotation handle 15 is welded on the symmetrical side of six-sided nut for level
Double parallel bar.For example, the spiral that can choose two a diameter of 20mm chooses six-sided nut conduct as rotation handle 15
Two rotation 15 levels of handle are welded on formation double parallel bar on the symmetrical side of nut 14, add rotating mechanism by nut 14
The arm of force, enable operating personnel preferably handle, and more effortless by 14 turn of nut, improve steelframe and shore component
Operability.
The preferred embodiment of the utility model, still, the utility model and unlimited are described in detail above in association with attached drawing
Detail in the above embodiment, can be to the skill of the utility model in the range of the technology design of the utility model
Art scheme carries out a variety of simple variants, these simple variants belong to the scope of protection of the utility model.
It is further to note that each particular technique feature described in above-mentioned embodiment, in not lance
In the case of shield, it can be combined by any suitable means, in order to avoid unnecessary repetition, the utility model is to each
The possible combination of kind no longer separately illustrates.
In addition, it can also be combined between a variety of embodiments of the utility model, as long as it is not disobeyed
The thought of the utility model is carried on the back, it should equally be considered as content disclosed in the utility model.
Claims (10)
1. a kind of steelframe shores component, it is characterised in that the steelframe, which shores component, includes lower support tube (2) and upper support frame
(1), the upper support frame includes shoring the supporting part of steelframe and the jacking screw (13) extended downwardly, and the jacking screw is downward
It is inserted into the top tube chamber of the lower support tube, nut (14) is arranged with the jacking screw, the nut is shored described
The top of lower support tube can simultaneously surround the jacking screw and rotate to jack the upper support frame upwards.
2. steelframe according to claim 1 shores component, it is characterised in that the internal diameter of the top tube chamber of the lower support tube
More than the outside diameter of the jacking screw.
3. steelframe according to claim 1 shores component, it is characterised in that the supporting part is U-shaped frame, the steelframe card
Together in the U-lag of the U-shaped frame.
4. steelframe according to claim 3 shores component, it is characterised in that the U-shaped frame includes two vertical reinforcements
(11) and horizontal steel plate (12), two vertical reinforced-bar-weldings are in the both ends of the horizontal steel plate, the top of the jacking screw
End is welded in the bottom centre of the horizontal steel plate.
5. steelframe according to claim 4 shores component, it is characterised in that the thickness of the transverse direction steel plate is not less than 10mm
And width is not less than 10cm, the diameter of the vertical reinforcement is not less than 20mm.
6. steelframe according to claim 1 shores component, it is characterised in that the diameter d of the jacking screw meets:28mm
≤d≤32mm。
7. steelframe according to claim 1 shores component, it is characterised in that the nut is straight on the jacking screw
Lineal travel is no less than 100mm.
8. steelframe according to claim 1 shores component, it is characterised in that the steelframe, which shores component, includes different lengths
The lower support tube of specification.
9. the steelframe according to any one in claim 1~8 shores component, it is characterised in that the steelframe shores group
Part includes rotation handle (15), and the pars intermedia of the rotation handle is fixedly connected with the nut to drive the nut to rotate.
10. steelframe according to claim 9 shores component, it is characterised in that the nut is six-sided nut, the rotation
Change hands the double parallel bar that handle is welded on the symmetrical side of the six-sided nut for level.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720916857.7U CN207332906U (en) | 2017-07-25 | 2017-07-25 | Steelframe shores component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720916857.7U CN207332906U (en) | 2017-07-25 | 2017-07-25 | Steelframe shores component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207332906U true CN207332906U (en) | 2018-05-08 |
Family
ID=62376815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720916857.7U Expired - Fee Related CN207332906U (en) | 2017-07-25 | 2017-07-25 | Steelframe shores component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207332906U (en) |
-
2017
- 2017-07-25 CN CN201720916857.7U patent/CN207332906U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204343173U (en) | A kind of Segmental assembling bridge-erecting machine | |
CN108999226B (en) | Inclination correcting method for building with rotary displacement frame structure | |
CN203546728U (en) | Improved installation fixing device of top-down steel pipe column | |
CN106284366B (en) | External pulling type Larsen steel sheet pile reinforcement means | |
CN106337559A (en) | Early dismantling support system of mold plate support frame and application method of early dismantling support system | |
CN107013046B (en) | A kind of antidote of big section steel pipe concrete combination column | |
CN205936667U (en) | Steel pipe concrete support mounting plate | |
CN207332906U (en) | Steelframe shores component | |
CN108240228B (en) | A kind of assembly equipment and construction technology of confined concrete arch | |
JP5921263B2 (en) | Reinforcing bar erection device and method | |
CN111319011A (en) | Operation device for concrete structure bar planting and bar planting drilling method | |
CN203821248U (en) | Steel pipe arch main arch assembling supporting system | |
CN204299147U (en) | The chimney top operating platform that a kind of construction cost is low | |
CN205296173U (en) | Utilize structure of foundation ditch support system bearing tower crane | |
CN204780892U (en) | Tubular pile crack reinforcement structure of high strength | |
CN104018657A (en) | Method for constructing high and large cornice through horizontal sliding platform | |
CN108625292A (en) | A kind of template assembly platform of prefabricated stand column | |
CN211164702U (en) | Beam slab bar planting drilling tool | |
CN210507444U (en) | A positioner for pile foundation construction | |
CN103981810A (en) | Steel tube arch main arch splicing and supporting system | |
CN204299146U (en) | A kind of chimney top operating platform | |
CN203729578U (en) | Formwork folding and lifting device for walls | |
CN210152295U (en) | Can have enough to meet need reverse construction method steel-pipe column guiding device that hangs down of bolt formula | |
CN203924655U (en) | A kind of novel elevator pit shaft operating platform frame | |
CN221322416U (en) | Movable multifunctional operation platform device in tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180508 |
|
CF01 | Termination of patent right due to non-payment of annual fee |