CN207331726U - A kind of composite foundation of churning driven drilling construction - Google Patents

A kind of composite foundation of churning driven drilling construction Download PDF

Info

Publication number
CN207331726U
CN207331726U CN201720768624.7U CN201720768624U CN207331726U CN 207331726 U CN207331726 U CN 207331726U CN 201720768624 U CN201720768624 U CN 201720768624U CN 207331726 U CN207331726 U CN 207331726U
Authority
CN
China
Prior art keywords
steel
construction
pipe pile
composite foundation
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720768624.7U
Other languages
Chinese (zh)
Inventor
朱小金
吴建军
王德港
赵廷建
丛磊
武尚伟
李博
杨超
查道涵
李紫阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN201720768624.7U priority Critical patent/CN207331726U/en
Application granted granted Critical
Publication of CN207331726U publication Critical patent/CN207331726U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a kind of composite foundation of churning driven drilling construction, including steel-pipe pile, base board, soft base, the steel-pipe pile is inserted into soft base, steel-pipe pile upper end is concordant with soft base upper surface, the base board is layed on steel-pipe pile, form the composite foundation, the utility model is a kind of novel foundation, large-scale equipment need not be used, influenced by external environment small, peace is torn open, have enough to meet the need simple and convenient, it is easy to operate, construction safety, to reducing construction cost, remarkable result will be had by accelerating construction progress, helpful reference can be provided for the construction on similar basis, solves existing foundation construction cycle length, manually input is big, it is of high cost, the problems such as economic benefit is undesirable.

Description

A kind of composite foundation of churning driven drilling construction
Technical field
It the utility model is related to ground field, and in particular to a kind of composite foundation of churning driven drilling construction.
Background technology
With China's rapid development of economy, churning driven is a kind of construction work of pore-forming operation in suitable building foundation engineering Skill, is widely used in the ground foundation construction work such as urban construction, highway bridge, skyscraper, coordinates different drilling tools, be adapted to various Pore-forming operation, churning driven as a kind of pore-forming efficiency is high, the guaranteed pore-forming equipment of construction quality and it is very popular.Churning driven is applied The ground in man-hour is then an essential facility.
At present, ground is mainly changed using ground and fills out or set up fixed drilling platform, and input is big, construction period Long, turnover inconvenience, its economic benefit is undesirable, also and then constrains the popularization and application of churning driven.
Therefore, the utility model proposes a kind of new composite foundation, for rotary drilling rig drilling construction, solve existing The foundation construction cycle is long, manually puts into the problems such as big, of high cost, economic benefit is undesirable.
Utility model content
The purpose of the utility model is to overcome length of existing foundation construction cycle, manually put into big, of high cost, economic benefit not The problems such as preferable, there is provided a kind of composite foundation of churning driven drilling construction, it is simple in structure, it is easy to operate, this to quickening construct into Degree, reduction construction cost have significant effect.
The technical solution of the utility model there is provided a kind of composite foundation of churning driven drilling construction, including steel-pipe pile, Base board, soft base, the steel-pipe pile are inserted into soft base, and steel-pipe pile upper end is concordant with soft base upper surface, and the base board is layed in On steel-pipe pile, the composite foundation is formed.
The steel-pipe pile is equipped with four, and four steel-pipe piles form a rectangle.
The base board is equipped with two, and two base boards are arranged in parallel, and each base board is layed on two steel-pipe piles.
The length of the steel-pipe pile is 9 ~ 12m.
The beneficial effects of the utility model:
The composite foundation of this churning driven drilling construction provided by the utility model is a kind of novel foundation, it is not necessary to is used Large-scale equipment, influenced by external environment it is small, peace tear open, have enough to meet the need simple and convenient, easy to operate, construction safety, to reduce construct Cost, accelerate construction progress with remarkable result, can provide helpful reference for the construction on similar basis, solve existing ground Long construction period, manually put into the problems such as big, of high cost, economic benefit is undesirable.
The utility model is described in further details below with reference to attached drawing.
Brief description of the drawings
Fig. 1 is the structure diagram of the composite foundation of the utility model churning driven drilling construction;
Fig. 2 is the side structure schematic diagram of Fig. 1;
Fig. 3 is the overlooking the structure diagram of Fig. 1.
Description of reference numerals:1st, steel-pipe pile;2nd, base board;3rd, soft base.
Embodiment
Embodiment 1:
In order to overcome existing foundation construction cycle length, manually put into the problems such as big, of high cost, economic benefit is undesirable, this Embodiment provides a kind of composite foundation of churning driven drilling construction as shown in Figure 1 to Figure 3, including steel-pipe pile 1, base board 2, Soft base 3, the steel-pipe pile 1 are inserted into soft base 3, and 1 upper end of steel-pipe pile is concordant with soft 3 upper surface of base, and the base board 2 is layed in steel On pile pile 1, the composite foundation is formed.
In soft base 3, base board 2 is supported on steel-pipe pile 11 inserting piling of steel-pipe pile, forms a kind of composite foundation, churning driven station Stand on and pore-forming operation is carried out on the base board 2 of the composite foundation, after the completion of the pile foundation construction for treating the pier position, by the steel pipe 1 Other pier positions are gone within 2 weeks with the base board, composite foundation is continuously formed and constructs.
The composite foundation of this churning driven drilling construction provided by the utility model, is a kind of novel foundation, it is not necessary to adopt With large-scale equipment, influenced by external environment small, peace tears open, has enough to meet the need simple and convenient, easy to operate, construction safety, and reduction is applied Work cost, accelerate construction progress with remarkable result, can provide helpful reference for the construction on similar basis.
Embodiment 2:
On the basis of embodiment 1, the composite foundation of this churning driven drilling construction provided in this embodiment, including steel pipe Stake 1, base board 2, soft base 3, the steel-pipe pile 1 are inserted into soft base 3, and 1 upper end of steel-pipe pile is concordant with soft 3 upper surface of base, the road Substrate 2 is layed on steel-pipe pile 1, forms the composite foundation.
Further, the steel-pipe pile 1 is equipped with four, and four steel-pipe piles 1 form a rectangle.The base board 2 is set There are two, two base boards 2 are arranged in parallel, and each base board 2 is layed on two steel-pipe piles 1, between two base boards 2 Spacing between distance and two crawler belts of churning driven is identical, and this structure is a kind of relatively simple form, installation and removal Equal simple and fast.
The length of the steel-pipe pile 1 is generally 9 ~ 12m, with the processing capacity at the scene of reducing, improves construction effect.
In practical application, the quantity of the steel-pipe pile 1 is determined by support force, steel-pipe pile 1 be supported on base board 2 just under Side.The base board 2 needs certain rigidity, to have the function that to spread load.
Exemplified as above is only for example, not forming to the scope of protection of the utility model to the utility model Limitation, it is every to be belonged to the same or similar design of the utility model within the scope of protection of the utility model.

Claims (2)

  1. A kind of 1. composite foundation of churning driven drilling construction, it is characterised in that:Including steel-pipe pile(1), base board(2), soft base (3), the steel-pipe pile(1)It is inserted into soft base(3)It is interior, steel-pipe pile(1)Upper end and soft base(3)Upper surface is concordant, the base board(2) It is layed in steel-pipe pile(1)On, form the composite foundation;
    The steel-pipe pile(1)Equipped with four, and four steel-pipe piles(1)Form a rectangle, the base board(2)Equipped with two, Two base boards(2)It is arranged in parallel, and each base board(2)It is layed in two steel-pipe piles(1)On.
  2. 2. the composite foundation of churning driven drilling construction as claimed in claim 1, it is characterised in that:The steel-pipe pile(1)Length Spend for 9 ~ 12m.
CN201720768624.7U 2017-06-29 2017-06-29 A kind of composite foundation of churning driven drilling construction Active CN207331726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720768624.7U CN207331726U (en) 2017-06-29 2017-06-29 A kind of composite foundation of churning driven drilling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720768624.7U CN207331726U (en) 2017-06-29 2017-06-29 A kind of composite foundation of churning driven drilling construction

Publications (1)

Publication Number Publication Date
CN207331726U true CN207331726U (en) 2018-05-08

Family

ID=62426912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720768624.7U Active CN207331726U (en) 2017-06-29 2017-06-29 A kind of composite foundation of churning driven drilling construction

Country Status (1)

Country Link
CN (1) CN207331726U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453720A (en) * 2019-08-21 2019-11-15 中交二公局第五工程有限公司 A kind of steel pipe post of big load falsework structure and basic connecting structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453720A (en) * 2019-08-21 2019-11-15 中交二公局第五工程有限公司 A kind of steel pipe post of big load falsework structure and basic connecting structure and its construction method

Similar Documents

Publication Publication Date Title
CN104775447B (en) Composite base framework used for power transmission tower in steep mountainous area and construction technology thereof
CN208152051U (en) Foundation pit supporting structure with loose end
CN212688967U (en) Municipal administration small-size excavation supporting device
CN201901879U (en) Nonstandard foundation used for fixing tower crane
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN202124862U (en) Spiral-anchor plate type composite foundation
CN207331726U (en) A kind of composite foundation of churning driven drilling construction
CN202865845U (en) 'Water knife' structure assisting in inserting and piling steel sheet pile
CN106978817A (en) A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
CN102733398A (en) Combined recyclable supporting upright post in foundation pit support
CN103422508B (en) Deep foundation ditch inner support platform structure machinery is vexed tears method and structure open
CN204530685U (en) A kind of cement-soil stiff composite pile
CN200992711Y (en) Composite building foundation
CN203922510U (en) A kind of simple and easy cable machine that is arranged in slope
CN202559360U (en) Longitudinal variable-stiffness foundation pit supporting structure
CN207567749U (en) A kind of Plastic Drain Slab Construction device
CN207079596U (en) A kind of board-like double-row pile foundation pit support structure of counterfort
CN202745081U (en) Large-size rubble concrete settlement joint template system
CN201526058U (en) Counter force rack for pile pushing
CN206205457U (en) A kind of steel reinforcement cage aids in colligation frame
CN201826326U (en) Foundation of deep-excavation tower crane
CN206924959U (en) A kind of steel pipe inner wall fills paint device
CN206815279U (en) A kind of assembled high-rise pile cap revetment structure
CN206844049U (en) A kind of Novel retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant